Sheet-pile wall for rapid flood control

Through the structure of prefabricated steel columns and PVC flood control sheet piles, the embedded connection and water stop bar design are used to solve the problems of low construction efficiency and poor stability of traditional PVC flood control sheet piles, and achieve rapid construction and efficient flood control effects. It is suitable for Complex terrain and limited equipment environment.

CN221941224UActive Publication Date: 2024-11-01HOHAI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420460758.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-11-01
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

Traditional PVC flood control sheet piles have low construction efficiency and poor structural stability when dealing with sudden floods, making it difficult to meet the requirements of rapid disassembly and anti-capsulation, especially when the terrain is complex and the equipment cannot enter the site.

Method used

The structure is adopted that combines prefabricated steel columns and PVC flood control sheet piles, which are fixedly connected by connecting parts. The prefabricated steel columns are arranged along the river direction. The PVC flood control sheet piles are designed with embedded connections and water stop strips, and are fixed with stainless steel connectors and screws. A hinged structure is formed to improve stability and stiffness.

Benefits of technology

It realizes rapid construction and secondary disassembly and assembly, improves flood control construction efficiency, enhances the anti-overturning ability of sheet pile walls, is suitable for scenes where terrain is complex and equipment cannot enter the site, and overcomes the problem of limited fixed length of sheet piles .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941224U_ABST
    Figure CN221941224U_ABST
Patent Text Reader

Abstract

The sheet-pile wall comprises PVC (polyvinyl chloride) flood control sheet piles, prefabricated steel columns and connecting pieces, the PVC flood control sheet piles are fixedly connected with the prefabricated steel columns through the connecting pieces, and the prefabricated steel columns are sequentially arranged in the direction of a flood control river channel; the PVC flood prevention sheet pile comprises a first horizontal bottom plate, a first inclined plate, a horizontal top plate and a second inclined plate which are sequentially connected, anti-scouring protrusions are arranged on the second horizontal bottom plate, the first inclined plate and the second inclined plate, a trapezoidal groove is formed in the middle of the horizontal top plate, a connecting protruding block is arranged at one end of the first horizontal bottom plate, and a clamping groove is formed in one end of the second horizontal bottom plate. The connecting protruding blocks can be embedded into the clamping grooves so that the PVC flood control sheet piles can be connected. The structural form that the prefabricated steel columns and the PVC flood control sheet piles are combined is adopted, only the PVC flood control sheet piles need to be combined and fixedly connected with the prefabricated steel columns during construction, the procedure that the PVC flood control sheet piles are driven into sludge one by one is avoided, secondary disassembly and assembly are facilitated, and flood control construction efficiency can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a sheet pile wall, in particular to a sheet pile wall used for rapid flood prevention. Background Art

[0002] Flood disasters are usually caused by heavy rains, which are extremely sudden and instantaneous. They often cause serious damage to the city's power transmission lines and public facilities, and soak a large number of urban materials, which will destroy the power supply, transportation, and communication systems. In severe cases, they will also destroy urban roads, houses, etc., posing a serious threat to the lives and safety of residents.

[0003] PVC flood-proof sheet piles are high in strength and light in weight, and have high anti-seepage ability, which can effectively resist floods. The construction of PVC flood-proof sheet piles is simple and does not require large equipment to be brought in. It is conducive to rapid construction in flood-prone areas with complex terrain and narrow areas. However, traditional PVC flood-proof sheet piles adopt a piece-by-piece splicing construction method, and the sheet piles need to be driven into the river embankments on both sides of the river in turn. When responding to sudden floods, it still cannot meet the requirements of rapid construction and is not conducive to secondary disassembly and assembly. In addition, the direct-driven structure of PVC flood-proof sheet piles has poor stability, and overall instability is prone to occur when the coastline is long. Utility Model Content

[0004] Purpose of the invention: In order to overcome the deficiencies in the prior art, the purpose of the utility model is to provide a sheet pile wall for rapid flood control that is conducive to secondary disassembly and assembly, can effectively improve flood control, and has high construction efficiency.

[0005] Technical solution: The utility model describes a sheet pile wall for rapid flood prevention, comprising PVC flood-prevention sheet piles, prefabricated steel columns and connectors. The PVC flood-prevention sheet piles are fixedly connected to the prefabricated steel columns by connectors, and the prefabricated steel columns are arranged sequentially along the direction of the flood-prevention river channel; the PVC flood-prevention sheet piles comprise a horizontal bottom plate 1, an inclined plate 1, a horizontal top plate, an inclined plate 2, and a horizontal bottom plate 2 connected in sequence, the inclined plate 1 and the inclined plate 2 are both provided with anti-scouring protrusions, a trapezoidal groove is provided in the middle of the horizontal top plate, a connecting protrusion is provided at one end of the horizontal bottom plate 1, and a card slot is provided at one end of the horizontal bottom plate 2, and the connecting protrusion can be embedded in the card slot to achieve connection between the PVC flood-prevention sheet piles.

[0006] Furthermore, the outer diameter of the connecting protrusion is the same as the inner diameter of the slot.

[0007] Furthermore, an integrated extruded water stop strip is provided on a side of the connecting protrusion away from the flat bottom plate.

[0008] Furthermore, the angle between the inclined plate 1 and the horizontal bottom plate 1 is 60° to 70°. The angle between the inclined plate 2 and the horizontal bottom plate 2 is 60° to 70°.

[0009] Furthermore, the prefabricated steel column includes a column body, a splicing groove, and a square plate. The square plate is arranged at one end of the column body close to the silt, and a plurality of splicing grooves for connecting the PVC flood-proof sheet piles and the prefabricated steel column are arranged on the column body. The splicing grooves along which the PVC flood-proof sheet piles are connected and fitted in sequence form a sheet pile wall.

[0010] Furthermore, the connecting piece is a stainless steel connecting piece.

[0011] Furthermore, the connecting piece is fixedly connected to the prefabricated steel column by means of screws or bolts, and screw holes matching the screws or bolts are arranged on the connecting piece.

[0012] Furthermore, the connecting piece has a symmetrical structure.

[0013] Working principle: Each unit sheet pile wall connected by bolts is hinged, and the sheet pile wall directly transfers shear force by friction, which makes the overall stability of the sheet pile wall better. At the same time, the connection of prefabricated steel columns can also improve the overall rigidity of the structure.

[0014] Construction method: First, on the flood control river bank side, according to the construction burial depth, select mechanical or manual prefabricated steel columns to ensure that the square plates are driven into the silt to maintain the stability of the prefabricated steel columns. PVC flood control sheet piles can be spliced ​​on site or in the factory according to on-site construction conditions and transportation conditions. The splicing of PVC flood control sheet piles only requires inserting the connecting protrusions into the slots, ensuring that the water stop strips are filled in the gaps between the connecting protrusions and the slots, and fitting the connected PVC flood control sheet piles with the splicing grooves of the prefabricated steel columns. After fitting, fix them with connectors. Install bolts and screws vertically to the reserved holes of the connectors. The screws should penetrate the PVC flood control sheet piles and the prefabricated steel columns. Then, fit the PVC flood control sheet pile walls of each unit with the prefabricated steel columns horizontally in turn, and install screws and bolts to the reserved holes of the connectors to fix the PVC flood control sheet pile walls of each unit.

[0015] Beneficial effects: Compared with the prior art, the utility model has the following characteristics:

[0016] 1. The structure of prefabricated steel columns and PVC flood-proof sheet piles is adopted. During construction, it is only necessary to combine the PVC flood-proof sheet piles and connect and fix them with the prefabricated steel columns, avoiding the process of driving the PVC flood-proof sheet piles into the silt one by one, which is conducive to secondary disassembly and assembly, and can effectively improve the efficiency of flood control construction;

[0017] 2. Using prefabricated steel columns to connect the unit PVC sheet pile walls can effectively improve the rigidity of the sheet pile wall system, and can provide better anti-overturning ability for rivers with longer flood control construction requirements;

[0018] 3. It is only necessary to bury the prefabricated steel column square plate underground, and adopt the manual excavation and landfill method to avoid the use of large mechanical equipment. It can be applied to the situation where large equipment cannot enter the site under extreme flood control conditions;

[0019] 4. The PVC flood prevention sheet piles can be cut to the required length for flood prevention, overcoming the disadvantage that the vertical driven sheet piles are limited by the fixed specifications of the product and cannot arbitrarily change the construction length. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the utility model;

[0021] Figure 2 It is a cross-sectional view of the utility model PVC flood prevention sheet pile 1;

[0022] Figure 3 It is a cross-sectional view of the prefabricated steel column 2 of the utility model;

[0023] Figure 4 It is a front view of the connector 3 of the utility model;

[0024] Figure 5 It is a top view of the connecting piece 3 of the utility model. DETAILED DESCRIPTION

[0025] like Figures 1 to 5 The sheet pile wall used for rapid flood control includes PVC flood-proof sheet piles 1, a number of prefabricated steel columns 2 and connectors 3. The prefabricated steel columns 2 are arranged in sequence along the direction of the flood control river channel. When arranged, the prefabricated steel columns 2 should be perpendicular to the ground, and the square plates 203 should be driven into the silt. The prefabricated steel columns 2 can realize the connection of the unit PVC flood-proof sheet pile 1 wall and the steering function of the sheet pile wall system. The PVC flood-proof sheet pile 1 adopts a fixing method of splicing connection between the plate bodies and connection with connectors 3. The PVC flood-proof sheet pile 1 includes a horizontal bottom plate 101, an inclined plate 102, a horizontal top plate 103, an inclined plate 2 104, and a horizontal bottom plate 2 105 connected in sequence. The PVC flood-proof sheet pile 1 is provided with a card slot 6 and a connecting protrusion 5 on both sides of the plate body. The outer diameter of the connecting protrusion 5 is the same as the inner diameter of the card slot 6, and can be embedded in the card slot 6 to connect each PVC flood-proof sheet pile 1. When embedded, the integrated extruded water stop strip 7 can be inserted into the gap between the card slot 6 and the connecting protrusion 5 to achieve the water stop function. Each PVC flood-proof sheet pile 1 is sequentially connected and fitted with the splicing groove 202 on the prefabricated steel column 2 in the vertical direction to form a unit PVC sheet pile wall. The angle between the inclined plate 1 102 and the horizontal bottom plate 1 101 is 60° to 70°, and the angle between the inclined plate 2 104 and the horizontal bottom plate 2 105 is 60° to 70°, preferably 60°. The inclined plate 1 102 and the inclined plate 2 104 are both provided with anti-scouring protrusions 4, the middle part of the horizontal top plate 103 is provided with a trapezoidal groove 8, one end of the horizontal bottom plate 1 101 is provided with a connecting protrusion 5, and one end of the horizontal bottom plate 2 105 is provided with a card slot 6.

[0026] The prefabricated steel column 2 includes a column 201, a splicing groove 202, and a square plate 203. The square plate 203 is arranged at one end of the column 201 close to the silt, and the column 201 is provided with a splicing groove 202. After the PVC flood-proof sheet pile 1 is fitted with the splicing groove 202 of the prefabricated steel column 2, it is fixed by the connecting piece 3, and several unit PVC sheet pile walls are also fixed by the connecting piece 3. After the connecting piece 3 is fitted, the end of the sheet pile wall is fixed to the prefabricated steel column 2 by screws or bolts. The screws or bolts should be installed through the screw holes 301 reserved on the connecting piece 3. The horizontal screw holes 301 of the connecting piece 3 are used to fix adjacent unit PVC flood-proof sheet piles 1. The vertically reserved screw holes 301 are used for the connection and fixation of adjacent PVC flood-proof sheet piles 1, and the screws must penetrate the PVC flood-proof sheet pile 1 and the splicing groove 202 and the column 201.

Claims

1. A sheet pile wall for rapid flood control, Features: The invention comprises a PVC flood-proof sheet pile (1), a prefabricated steel column (2) and a connecting piece (3), wherein the PVC flood-proof sheet pile (1) is fixedly connected to the prefabricated steel column (2) via the connecting piece (3), and the prefabricated steel column (2) is arranged in sequence along the flood control river channel; the PVC flood-proof sheet pile (1) comprises a horizontal bottom plate 1 (101), an inclined plate 1 (102), a horizontal top plate (103), an inclined plate 2 (104), and a horizontal bottom plate 2 (105) which are connected in sequence, wherein the inclined plate 1 (102) and the inclined plate 2 (104) are both provided with an anti-scouring protrusion (4), a trapezoidal groove (8) is provided in the middle of the horizontal top plate (103), a connecting protrusion (5) is provided at one end of the horizontal bottom plate 1 (101), and a clamping groove (6) is provided at one end of the horizontal bottom plate 2 (105), and the connecting protrusion (5) can be embedded in the clamping groove (6) to realize the connection between the PVC flood-proof sheet piles (1).

2. A sheet pile wall for rapid flood protection according to claim 1, Features: The outer diameter of the connecting protrusion (5) is the same as the inner diameter of the clamping groove (6).

3. A sheet pile wall for rapid flood protection according to claim 1, Features: An integrated extruded water stop strip (7) is provided on a side of the connecting protrusion (5) away from the horizontal bottom plate (101).

4. A sheet pile wall for rapid flood protection according to claim 1, Features: The angle between the inclined plate 1 (102) and the horizontal bottom plate 1 (101) is 60° to 70°.

5. A sheet pile wall for rapid flood protection according to claim 1, Features: The included angle between the second inclined plate (104) and the second horizontal bottom plate (105) is 60° to 70°.

6. A sheet pile wall for rapid flood protection according to claim 1, Features: The prefabricated steel column (2) comprises a column body (201), a splicing groove (202), and a square plate (203); the square plate (203) is arranged at one end of the column body (201) close to the silt; and a plurality of splicing grooves (202) for connecting the PVC flood-proof sheet piles (1) and the prefabricated steel column (2) are arranged on the column body (201).

7. A sheet pile wall for rapid flood protection according to claim 6, Features: The PVC flood prevention sheet piles (1) are sequentially connected and bonded along the splicing grooves (202) to form a sheet pile wall.

8. A sheet pile wall for rapid flood protection according to claim 1, Features: The connecting piece (3) is a stainless steel connecting piece.

9. A sheet pile wall for rapid flood protection according to claim 1, Features: The connecting member (3) is fixedly connected to the prefabricated steel column (2) via screws or bolts, and screw holes (301) matching the screws or bolts are provided on the connecting member (3).

10. A sheet pile wall for rapid flood protection according to claim 1, Features: The connecting piece (3) has a symmetrical structure.