Water heater mounting back wall

Through the design of prefabricated reinforced concrete walls and partition walls, combined with the top and side connection steel bars and the fixing method of docking pipe grooves and screws, the problems of cavity deformation and complex processes in the traditional water heater installation method are solved, and structural stability is achieved Increased sex and cost.

CN221941691UActive Publication Date: 2024-11-01CHIFENG HONGJI CONSTR (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422361902.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-11-01
Estimated Expiration
2034-09-27

AI Technical Summary

Technical Problem

The traditional water heater installation method has the potential for deformation, fall off or skew in the cavity, as well as the problems of cumbersome processes and damage structural stability.

Method used

Prefabricated reinforced concrete walls and partition walls are used to be poured in one piece through the top and side, and docking pipe grooves and screws are installed to fix water heaters to avoid secondary pouring and on-site drilling, reducing installation complexity.

Benefits of technology

The construction process is simplified, structural stability and aesthetics are improved, and construction costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941691U_ABST
    Figure CN221941691U_ABST
Patent Text Reader

Abstract

The utility model discloses a water heater mounting back wall which comprises a reinforced concrete wall body and a partition wall body which are arranged up and down, a top connecting steel bar is pre-buried at the top end of the reinforced concrete wall body, and the bottom end of the top connecting steel bar is fixed with a steel bar of the reinforced concrete wall body. And the top ends of the top connecting steel bars are fixed in a structural plate at the top of the reinforced concrete wall body. The water heater has the advantages that the reinforced concrete wall body can be prefabricated, the top connecting steel bars at the top of the structural plate are integrally poured when the structural plate is poured, secondary pouring is not needed, the working procedure can be simplified, the weight of the reinforced concrete wall body and the weight of the water heater are all borne by the structural plate, and the structural stability can be effectively improved; the lower partition wall body does not need to bear load, only has a partition function and can be arranged to be of a masonry structure, and the building cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water heater installation, in particular to a water heater installation back wall. Background Art

[0002] Water heaters are now a must-have daily necessity in every household. There are two traditional methods for installing water heaters. One is to use bricks to build the water heater wall and hang concrete on the outside. When installing the water heater, expansion screws are directly used to fix the water heater on the built cavity. However, the weight of the water heater plus the weight of the water acting on the cavity for a long time will cause the cavity to deform. In severe cases, the water heater may fall off or tilt, posing a major hidden danger. The second is to carry out secondary formwork and pouring of the concrete back wall at the water heater installation location after the residential frame is built. The secondary pouring requires secondary planting of reinforcement, binding, formwork, and pouring, and the process is cumbersome. In addition, when installing the water heater, it is necessary to drill holes in the concrete back wall for installation and groove laying of pipes. The process is complicated, which destroys the overall structure of the concrete back wall and affects the stability of the structure, causing great trouble to the householder. Utility Model Content

[0003] The utility model aims to provide a back wall for installing a water heater.

[0004] The utility model is implemented by the following technical scheme: a back wall for installing a water heater, which includes a reinforced concrete wall and a partition wall arranged up and down, and two butt joint pipe grooves corresponding to the water inlet and the water outlet of the water heater are reserved at the lower part of the inner wall of the reinforced concrete wall body; a plurality of screw rods are evenly arranged on the reinforced concrete wall body above the butt joint pipe grooves, and the bottom ends of the screw rods are fixed to the steel bars of the reinforced concrete wall body; a top connecting steel bar is embedded in the top of the reinforced concrete wall, and the bottom ends of the top connecting steel bars are fixed to the steel bars of the reinforced concrete wall, and the top ends of the top connecting steel bars are fixed to the inside of the structural plate at the top of the reinforced concrete wall.

[0005] Furthermore, the top end of the top connecting steel bar is fixed to the steel bar of the structural plate.

[0006] Furthermore, side connecting steel bars are pre-embedded on both sides of the reinforced concrete wall, one end of the side connecting steel bars is fixed to the steel bars of the reinforced concrete wall, and the other end of the side connecting steel bars is fixed inside the side wall of the side of the reinforced concrete wall.

[0007] Furthermore, the partition wall is a masonry wall.

[0008] Furthermore, pipe laying grooves corresponding to the respective butting pipe grooves are opened on the inner wall of the partition wall.

[0009] Advantages of the utility model: the reinforced concrete wall in the present application can be prefabricated, and the top connecting steel bars on the top thereof can be cast integrally when the structural slab is cast, without the need for secondary casting, thereby simplifying the process, and the weight of the reinforced concrete wall and the water heater is all borne by the structural slab, which can effectively improve the stability of the structure; the lower partition wall does not need to bear weight and only serves as a partition, and can be set as a masonry structure to reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the overall structure of this embodiment.

[0011] Figure 2 for Figure 1 AA section view.

[0012] Figure 3 This is a usage status diagram of this embodiment.

[0013] Reinforced concrete wall 1, partition wall 2, top connecting steel bars 3, structural plate 4, side connecting steel bars 5, side wall 6, butt pipe groove 7, pipe laying groove 8, screw rod 9. DETAILED DESCRIPTION

[0014] In the description of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, if the terms "first", "second", "third" appear, they are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0015] like Figures 1 to 3 The water heater installation back wall shown includes a reinforced concrete wall 1 and a partition wall 2 arranged above and below. The partition wall 2 is a masonry wall that is built on site. The lower partition wall 2 mainly plays a partition role and is built with bricks, which can reduce costs while providing partition.

[0016] A top connecting steel bar 3 is embedded at the top of the reinforced concrete wall 1, the bottom end of the top connecting steel bar 3 is fixed to the steel bar of the reinforced concrete wall 1, the top end of the top connecting steel bar 3 is fixed to the inside of the structural plate 4 at the top of the reinforced concrete wall 1, and the top end of the top connecting steel bar 3 is fixed to the steel bar of the structural plate 4. Side connecting steel bars 5 are embedded at both sides of the reinforced concrete wall 1, one end of the side connecting steel bar 5 is fixed to the steel bar of the reinforced concrete wall 1, and the other end of the side connecting steel bar 5 is fixed to the inside of the side wall 6 at the side of the reinforced concrete wall 1. By embedding the top connecting steel bar 3 and the side connecting steel bar 5 at the top and both sides of the reinforced concrete wall 1, when the top structural plate 4 and the side wall 6 are cast, they can be cast as one piece, which is convenient for construction and does not require secondary casting of the back plate of the water heater; and the weight of the reinforced concrete wall 1 and the water heater installed later can be applied to the structural plate 4 at the top, which can enhance the stability of the structure. Two butt joint grooves 7 corresponding to the water inlet and outlet of the water heater are reserved at the lower part of the inner wall of the reinforced concrete wall 1, and pipe laying grooves 8 corresponding to each butt joint groove 7 are opened on the inner wall of the partition wall 2; a plurality of screws 9 are evenly arranged on the reinforced concrete wall 1 above the butt joint grooves 7, and the bottom ends of the screws 9 are fixed to the steel bars of the reinforced concrete wall 1. The installation angle of the water heater is installed and fixed by the cooperation of the nut and the screw 9, and there is no need to destroy the original structure of the wall for on-site drilling, and the pipelines that are connected to the cold and hot water pipes of the water heater can be arranged along the pipe laying grooves 8 and the butt joint grooves 7, which is convenient for installation and does not require on-site grooving; and then the decorative panel is pasted on the outside of the back wall to hide the pipelines and improve the overall aesthetics. The reinforced concrete wall 1 in this embodiment can be prefabricated, and it is cast as a whole when the structural plate 4 and the side wall 6 are cast, without the need for secondary casting, which can simplify the process, and the weight of the reinforced concrete wall 1 and the water heater is all borne by the structural plate 4, which can effectively enhance the stability of the structure.

[0017] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.

Claims

1. A water heater installation back wall, characterized in that: It includes a reinforced concrete wall and a partition wall arranged up and down, and two connecting pipe grooves corresponding to the water inlet and outlet of the water heater are reserved at the lower part of the inner wall of the reinforced concrete wall body; a plurality of screws are evenly arranged on the reinforced concrete wall body above the connecting pipe grooves, and the bottom ends of the screws are fixed to the steel bars of the reinforced concrete wall body; a top connecting steel bar is embedded in the top of the reinforced concrete wall, and the bottom ends of the top connecting steel bars are fixed to the steel bars of the reinforced concrete wall, and the top ends of the top connecting steel bars are fixed to the inside of the structural plate at the top of the reinforced concrete wall.

2. A water heater installation back wall according to claim 1, characterized in that: The top end of the top connecting steel bar is fixed to the steel bar of the structural plate.

3. A water heater installation back wall according to claim 1 or 2, characterized in that: Side connecting steel bars are pre-buried on both sides of the reinforced concrete wall, one end of the side connecting steel bar is fixed to the steel bars of the reinforced concrete wall, and the other end of the side connecting steel bar is fixed inside the side wall of the side of the reinforced concrete wall.

4. A water heater installation back wall according to claim 1 or 2, characterized in that: The partition wall is a masonry wall.

5. The water heater installation back wall according to claim 1, characterized in that: Pipe laying grooves corresponding to the respective butting pipe grooves are provided on the inner wall of the partition wall.