Aerated concrete block wall anchoring device

By using a combination of mounting parts, bladders and extrusions in the aerated concrete block wall anchoring device, the problem of uniform filling of expansion bolt pressure and adhesive is solved, and the stability of anchoring and connection strength are improved.

CN221941743UActive Publication Date: 2024-11-01SHANDONG CHUANGDA CONSTR ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420506750.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-11-01
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

In the wall anchoring device of aerated concrete blocks, the expansion bolt pressure causes the block to break, and the chemical adhesive cannot fill the gap evenly, affecting the curing stability.

Method used

Using mounting parts, bladder body, overflow unit and extrusion part, the punctured part is driven to puncture the bladder body through the extrusion part, so that chemical solid agent flows out to the wall and block gaps through the overflow part, combining cleaning rings and friction The strip ensures that the solidifier is filled evenly.

Benefits of technology

It improves the stability of anchoring, ensures that the chemical solidifier is evenly filled, avoids residues affecting curing, and enhances the connection strength between the wall and the block.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941743U_ABST
    Figure CN221941743U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of wall anchoring, in particular to an aerated concrete block wall anchoring device which comprises an installation part, a bag body containing a chemical solid agent, an overflow unit and an extrusion part. The installation part is of a hollow structure with one end open and is used for being inserted into a wall and a building block, the installation part comprises a first installation part and a second installation part, the bag body is installed on the inner wall of the end of the first installation part and the inner wall of the end of the second installation part, and the overflow unit is composed of a plurality of overflow holes formed in the installation part. According to the utility model, after the puncturing piece is driven by the extrusion piece to puncture the bag body, the chemical solid agent in the bag body flows out from the overflow unit to the gaps between the mounting piece and the wall body and between the mounting piece and the building block, so that the chemical solid agent can be more uniformly filled in the mounting holes of the wall body and the building block in the mounting process, and the anchoring stability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an anchoring device, in particular to an aerated concrete block wall anchoring device, belonging to the technical field of wall anchoring. Background Art

[0002] Aerated concrete blocks are a new type of building material that is lightweight, porous, thermally insulating, fire-resistant, can be nailed, sawed, planed, and has a certain degree of earthquake resistance. At present, the connection between aerated concrete blocks and walls is achieved through anchoring devices. This connection method can effectively improve the earthquake resistance and bearing capacity of the wall and ensure the safety performance of the building.

[0003] Since aerated concrete blocks are a kind of lightweight and porous building material with low density and strength, and contain a large number of tiny pores inside, the compressive strength and tensile strength of aerated concrete blocks are relatively low. If expansion bolts are used as anchoring devices, when the expansion bolts generate pressure on the aerated concrete blocks, the structure of the blocks is easily damaged, and if the expansion bolts are improperly installed, the expanded part of the bolts may over-extrude the blocks, causing the blocks to rupture. Therefore, with the development of science and technology, chemical anchoring methods have gradually emerged. Through special chemical adhesives, the screws are glued and fixed in the drilled holes of the concrete substrate to achieve anchoring of the fixings. However, during the installation process, due to the influence of masonry debris, mortar joint residues, etc., there may be gaps that chemical solidifiers cannot reach, affecting its curing stability.

[0004] Therefore, we propose an aerated concrete block wall anchoring device to solve the above-mentioned problems. Utility Model Content

[0005] The purpose of the utility model is to provide an aerated concrete block wall anchoring device, which drives the piercing member to pierce the capsule through the extrusion member, so that the chemical solid in the capsule flows out from the overflow unit to the gap between the mounting member and the wall and between the mounting member and the block, which helps to more evenly fill the chemical solid in the mounting holes of the wall and the block during the installation process, thereby improving the stability of the anchoring.

[0006] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include: a mounting piece, a capsule containing a chemical solid, an overflow unit and an extrusion piece; the mounting piece is a hollow structure with one end open, which is used to be inserted into a wall and a building block, the mounting piece includes a first mounting part and a second mounting part, the capsule is installed on the inner wall of the end of the first mounting part and the second mounting part, the overflow unit is composed of a plurality of overflow holes opened on the mounting piece, the extrusion piece is installed inside the mounting piece, and a piercing piece is provided on the extrusion piece, and when the piercing piece pierces the capsule, the chemical solid in the capsule flows out from the overflow hole.

[0007] Preferably, the inner diameter of the first mounting portion is smaller than the inner diameter of the second mounting portion, and the extrusion member comprises a first extrusion portion and a second extrusion portion, and the first extrusion portion and the second extrusion portion respectively cooperate with the first mounting portion and the second mounting portion.

[0008] Preferably, the extrusion piece is threadedly connected to the mounting piece.

[0009] Preferably, the piercing member is located on an end surface of the first extrusion portion and the second extrusion portion close to the capsule, and the conical tip of the piercing member is opposite to the capsule.

[0010] Preferably, a first cleaning ring is provided on the outer wall of the first mounting portion, and a second cleaning ring is provided on the outer wall of the second mounting portion, and the outer diameters of the first cleaning ring and the second cleaning ring are respectively larger than the outer diameters of the first mounting portion and the second mounting portion.

[0011] Preferably, a plurality of friction strips are provided on the outer wall of the first mounting portion, and the plurality of friction strips are equidistantly arranged around the axis of the first mounting portion.

[0012] Preferably, a mounting slot is provided on an end surface of the extrusion piece away from the mounting piece.

[0013] Preferably, an auxiliary leakage hole is provided at the unopened end of the mounting member.

[0014] The utility model has at least the following beneficial effects:

[0015] 1. After the capsule is punctured by the extrusion member driving the puncture member, the chemical solid in the capsule flows out from the overflow unit to the gap between the mounting member and the wall and between the mounting member and the block, which helps the chemical solid to better fill the mounting holes of the wall and the block during the installation process and improve the stability of the anchoring.

[0016] 2. Through the functions of the first cleaning ring and the second cleaning ring, when the mounting piece is installed in the mounting hole of the wall and the block, the first cleaning ring and the second cleaning ring can push the residue in the mounting hole to the bottom of the mounting hole at the same time, so as to avoid the residue remaining on the hole wall and affecting the flow effect of the chemical solid agent. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0018] Figure 1 The isometric structure diagram provided for the utility model Figure 1 ;

[0019] Figure 2The isometric structure diagram provided for the utility model Figure 2 ;

[0020] Figure 3 A schematic diagram of the cross-sectional structure provided by the utility model;

[0021] Figure 4 This is a schematic diagram of the three-dimensional structure of the extrusion piece provided by the utility model.

[0022] In the figure, 1, mounting part; 11, first mounting part; 12, second mounting part; 13, first cleaning ring; 14, second cleaning ring; 15, friction strip; 2, capsule; 3, overflow hole; 4, extrusion part; 41, piercing part; 42, first extrusion part; 43, second extrusion part; 5, mounting slot; 6, auxiliary leakage hole. DETAILED DESCRIPTION

[0023] The following will describe the implementation methods of the present application in detail with the help of accompanying drawings and examples, so that the implementation process of how the present application uses technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly.

[0024] like Figure 1-Figure 4 As shown, the aerated concrete block wall anchoring device provided in this embodiment includes a mounting member 1, a bladder 2 containing a chemical solidifying agent, an overflow unit and an extrusion member 4; the bladder 2 can be made of some flexible materials such as fiber-reinforced composite materials and double-layer structure bladders 2, and these composite bladders 2 have good strength and corrosion resistance. The mounting member 1 is a hollow structure with an open end, which is used to be inserted into the wall and the block. The mounting member 1 includes a first mounting portion 11 and a second mounting portion 12. The bladder 2 is installed on the inner wall of the end of the first mounting portion 11 and the second mounting portion 12. The overflow unit consists of a plurality of overflow holes 3 opened on the mounting member 1. The overflow holes 3 are equidistantly arranged around the axis of the mounting member 1, the extrusion member 4 is installed inside the mounting member 1, and a puncture member 41 is provided on the extrusion member 4. When the puncture member 41 punctures the capsule 2, the chemical solid agent flowing through the overflow hole 3 can be evenly distributed to reach the mounting hole position of the wall and the block, and the chemical solid agent in the capsule 2 flows out from the overflow hole 3 and flows into the gap between the mounting member 1 and the wall and between the mounting member 1 and the block, which helps the chemical solid agent to better fill the mounting holes of the wall and the block during the installation process, and after the chemical solid agent is cured, the mounting member 1 is bonded to the wall and the block, thereby improving the stability of the anchoring.

[0025] Further, such as Figure 4As shown, the extrusion member 4 is threadedly connected to the mounting member 1. When the extrusion member 4 is rotated to move in the mounting member 1, the extrusion member 4 can drive the puncture member 41 to exert a greater force on the capsule 2, thereby making it easier to puncture the capsule 2. At the same time, it can also prevent the extrusion member 4 from rebounding and resetting, so that the extrusion member 4 can always keep squeezing the capsule 2, so that the chemical solid in the capsule 2 is completely squeezed out.

[0026] Further, such as Figure 3 As shown, the inner diameter of the first mounting portion 11 is smaller than the inner diameter of the second mounting portion 12. When in use, the first mounting portion 11 is installed in the mounting hole on the wall through the block, and the second mounting portion 12 is located in the mounting hole of the block. The extrusion member 4 includes a first extrusion portion 42 and a second extrusion portion 43. The first extrusion portion 42 and the second extrusion portion 43 are respectively matched with the first mounting portion 11 and the second mounting portion 12. The piercing member 41 is located on the end surface of the first extrusion portion 42 and the second extrusion portion 43 close to the capsule 2, and the conical tip of the piercing member 41 is opposite to the capsule 2. When the extrusion member 4 is rotated, the extrusion member 4 drives the piercing member 41 to move, so that the first extrusion portion 42 is squeezed onto the inner wall of the first mounting portion 11, and the second extrusion portion 43 is squeezed onto the inner wall of the second mounting portion 12, so that the capsule 2 is pierced and squeezed into an empty state.

[0027] Further, such as Figure 1 As shown, a plurality of friction strips 15 are provided on the outer wall of the first mounting portion 11, and the plurality of friction strips 15 are equidistantly arranged around the axis of the first mounting portion 11. The friction strips 15 can increase the friction between the first mounting portion 11 and the mounting hole opened in the wall. When the mounting member 1 is inserted into the mounting hole, the mounting member 1 is initially fixed to prevent the mounting member 1 from shaking at will, and ensure that the mounting member 1 is correctly positioned and fixed before the chemical solidifying agent is cured. When the mounting member 1 is installed in the mounting hole on the wall, a force can be applied to the end of the mounting member 1 through an external tool to make the mounting member 1 snap into the mounting hole opened in the wall.

[0028] Further, such as Figure 1As shown, a first cleaning ring 13 is provided on the outer wall of the first mounting portion 11, and a second cleaning ring 14 is provided on the outer wall of the second mounting portion 12. The outer diameters of the first cleaning ring 13 and the second cleaning ring 14 are respectively larger than the outer diameters of the first mounting portion 11 and the second mounting portion 12. The first cleaning ring 13 and the second cleaning ring 14 can be made of materials such as rubber with a certain elasticity. When entering the mounting opening of the wall or the building block, they conflict with the inner wall of the mounting hole to deform it, so that when the mounting member 1 enters the mounting hole, the first cleaning ring 13 and the second cleaning ring 14 can clean the residue inside the mounting hole to prevent the residue from affecting the flow effect of the chemical solid agent. The first cleaning ring 13 pushes the residue in the wall mounting hole to the bottom end of the mounting opening, and because the mounting hole on the building block penetrates the building block, the second cleaning ring 14 will push the residue in the mounting hole on the building block to between the building block and the wall.

[0029] Further, such as Figure 3 As shown, an auxiliary leakage hole 6 is opened at the unopened end of the mounting member 1. After the capsule 2 in the first mounting portion 11 is punctured, part of the chemical solid will flow out to the outside of the mounting member 1 through the auxiliary leakage hole 6, and bond and solidify the residues cleaned by the first cleaning ring 13 on the outside of the mounting member 1, thereby improving the anchoring effect between the mounting member 1 and the wall mounting hole.

[0030] Further, such as Figure 2 As shown, a mounting slot 5 is provided on the end face of the extrusion member 4 away from the mounting member 1. During installation, a tool such as a cross screwdriver is inserted into the mounting slot 5, so that the extrusion member 4 can be rotated to move in the mounting member 1. After the installation is completed, the end of the extrusion member 4 can be covered by setting subsequent decorative materials such as plaster, tiles, etc. on the outside of the block to improve the aesthetic effect.

[0031] like Figure 1-Figure 4 As shown, the principle of the aerated concrete block wall anchoring device provided in this embodiment is as follows: when in use, first insert the mounting member 1 into the mounting hole pre-opened on the wall and the block, and under the action of the first cleaning ring 13 and the second cleaning ring 14, the residues in the mounting hole of the wall and the block can be uniformly pushed to the bottom of the mounting hole. After the mounting member 1 is installed, the rotating extrusion member 4 drives the piercing member 41 to move in the direction of the capsule 2 to pierce the capsule 2, and as the first extrusion part 42 and the second extrusion part 43 squeeze the capsule 2, the chemical solid in the capsule 2 overflows and flows out through the overflow hole 3 to the outside of the mounting member 1, so as to better fill the gap between the mounting member 1 and the wall and the block, and wait for the chemical solid to solidify to improve the stability of the anchoring.

Claims

1. Aerated concrete block wall anchoring device, characterized by: include; A mounting member (1), the mounting member (1) being a hollow structure with one end open, and being used for being inserted into a wall and a building block, the mounting member (1) comprising a first mounting portion (11) and a second mounting portion (12); A capsule (2) containing a chemical solid, the capsule (2) being mounted on the inner wall of the end of the first mounting portion (11) and the second mounting portion (12); An overflow unit, the overflow unit comprising a plurality of overflow holes (3) opened on the mounting member (1); An extrusion member (4) is mounted inside the mounting member (1), and a puncturing member (41) is provided on the extrusion member (4). When the puncturing member (41) punctures the capsule (2), the chemical solid in the capsule (2) flows out from the overflow hole (3).

2. The aerated concrete block wall anchoring device according to claim 1, characterized in that: The inner diameter of the first mounting portion (11) is smaller than the inner diameter of the second mounting portion (12); the extrusion member (4) comprises a first extrusion portion (42) and a second extrusion portion (43); the first extrusion portion (42) and the second extrusion portion (43) respectively cooperate with the first mounting portion (11) and the second mounting portion (12).

3. The aerated concrete block wall anchoring device according to claim 1, characterized in that: The extrusion piece (4) is threadedly connected to the mounting piece (1).

4. The aerated concrete block wall anchoring device according to claim 2, characterized in that: The piercing member (41) is located on an end surface of the first extrusion portion (42) and the second extrusion portion (43) close to the capsule (2), and the conical tip of the piercing member (41) is opposite to the capsule (2).

5. The aerated concrete block wall anchoring device according to claim 1, characterized in that: A first cleaning ring (13) is provided on the outer wall of the first mounting portion (11), and a second cleaning ring (14) is provided on the outer wall of the second mounting portion (12); the outer diameters of the first cleaning ring (13) and the second cleaning ring (14) are respectively larger than the outer diameters of the first mounting portion (11) and the second mounting portion (12).

6. The aerated concrete block wall anchoring device according to claim 1, characterized in that: A plurality of friction strips (15) are provided on the outer wall of the first mounting portion (11), and the plurality of friction strips (15) are arranged at equal distances around the axis of the first mounting portion (11).

7. The aerated concrete block wall anchoring device according to claim 1, characterized in that: A mounting slot hole (5) is provided on an end surface of the extrusion piece (4) away from the mounting piece (1).

8. The aerated concrete block wall anchoring device according to claim 1, characterized in that: An auxiliary leakage hole (6) is provided at the unopened end of the mounting member (1).

Citation Information

Cited By

  • Quickly-installed aluminum veneer curtain wall structure for outer wall decoration and using method

    CN120625778A