Steel cofferdam inner support installation operation safety mother rope device
By designing a safety mother rope device in the inner support system of the steel cofferdam, using wire round steel and locking components to lock the purlins and provide a safety belt, the problem of high-altitude fall risk during the installation of the inner support system of the steel cofferdam is solved. The safety guarantee for the operators is achieved.
Patent Information
- Application Number
- CN202420260842.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-02-02
AI Technical Summary
During the installation of the internal support system of the second and lower layers of the steel cofferdam, the operators lack effective safety guarantee measures, resulting in an increase in the risk of falling from high altitudes.
Design a working safety mother rope device for internal support and installation of steel cofferdams, including wire round steel and locking assembly, the locking steel pipe is penetrated into the wire round steel, and locking nuts are installed at both ends, and connected by wire threading plates and wire ropes. The locking assembly locks the legs of the purlin H-shaped steel or I-shaped steel, and provides a safety belt lanyard to ensure the safety of the workers.
It effectively avoids high-altitude fall accidents, is simple in design, reusable, low in cost, is easy to install and dismantle, and improves operational safety.
Smart Images

Figure CN221942021U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a safety mother rope device for installation work of inner support of a steel cofferdam. Background Art
[0002] Steel cofferdam is a temporary steel structure, mainly used in construction sites or rivers where temporary enclosure is required. It is usually composed of two parts: vertical support columns and horizontal frames. Some materials need to be filled inside to increase the stability and density of the enclosure. Steel cofferdams are widely used, including but not limited to enclosing water flow, slope support, deep foundation pit construction, river transformation and other projects.
[0003] With the rapid development of infrastructure in my country, the construction of deep foundation pits in soft strata and deep foundation pits in water areas have basically become the necessary construction content of each project. The support form of deep foundation pits in soft strata and deep foundation pits in water areas usually adopts a steel cofferdam support system. However, when installing the internal support system of the second and lower layers of the steel cofferdam, the internal support installation position is often more than 2 meters away from the open surface. There are no effective safety measures for workers in the high-altitude operations such as welding purlin support corbels, installing purlins, and installing bracing steel pipes. There are only simple working platforms. The operation process increases the risk of workers falling from heights due to walking on the simple platform or on the purlins, or even using the purlins as working platforms. Utility Model Content
[0004] The utility model aims to provide a safety mother rope device for supporting installation operations inside a steel cofferdam, so as to solve the problem that there are no effective safety measures during the installation and construction process of a deep foundation pit in water areas, which easily causes the risk of falling from a height.
[0005] To achieve the above purpose, the utility model provides the following technical solutions: a safety mother rope device for supporting and installing work inside a steel cofferdam, comprising:
[0006] Two threaded round bars, and
[0007] A locking component is provided at each end of the threaded round steel, and the locking component comprises a locking steel pipe, a locking slot is fixedly connected to the locking steel pipe, and the locking steel pipe is inserted into the threaded round steel.
[0008] Preferably, one side of the lock slot is welded to the side of the lock steel pipe.
[0009] Preferably, the two locking steel tubes are respectively inserted into the two ends of the threaded round steel.
[0010] Preferably, two ends of the locking steel pipe are respectively tightly attached to a locking nut, and the inner wall of the locking nut is threadedly connected to the threaded round steel.
[0011] Preferably, a threading plate is fixedly connected to one side of one of the locking steel tubes.
[0012] Preferably, the U-shaped openings of the two locking slots on the threaded round steel are located on the same axis.
[0013] Preferably, a steel wire rope is connected between the two threading plates.
[0014] Preferably, the two threaded round steels are parallel to each other.
[0015] It can be seen from the above technical solution that the utility model has the following beneficial effects:
[0016] The inner support and installation operation safety mother rope device of the steel cofferdam is provided with a locking assembly at each end of the threaded round steel. The locking assembly includes a locking slot fixedly connected to the locking round tube, the locking steel tube is inserted into the threaded round steel, and a locking nut is provided at both ends of the locking steel tube. A threading plate is provided on one of the locking steel tubes, and a steel wire rope is connected between the two threading plates. The locking assembly of the device locks the H-shaped steel or I-shaped steel leg of the surrounding purlin, and the design is safe and stable. When working, the safety belt is hung on the steel wire rope, which can effectively avoid the next The structure is simple in design, reusable, low in cost, easy to purchase, convenient to install and dismantle, and highly flexible. It solves the problem that in the existing construction process, there are no effective safety measures for workers in the high-altitude operations such as welding purlin support corbels, installing purlins, and installing bracing steel pipes. There are only simple working platforms, which increases the risk of workers falling from heights due to walking on the simple platform or on the purlins or even using the purlins as working platforms. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a side view of the overall structure of the utility model implemented on a double H-shaped purlin;
[0018] Figure 2 For this utility model Figure 1 Enlarged view of point A in the middle;
[0019] Figure 3 This is an elevation view of the overall structure of the utility model implemented on a double H-shaped purlin;
[0020] Figure 4 It is a top view of the overall structure of the utility model implemented on a double H-shaped purlin;
[0021] Figure 5 It is a schematic diagram of the separation of the overall structural components of the utility model.
[0022] In the figure: 1. threaded round steel; 2. locking assembly; 21. locking steel pipe; 22. locking slot; 23. locking nut; 3. threading plate; 4. wire rope. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] like Figure 1-Figure 5 As shown, a safety mother rope device for the installation of internal support of a steel cofferdam comprises two threaded round steels 1 and a locking assembly 2. A locking assembly 2 is provided at each end of the threaded round steel 1. The locking assembly 2 comprises a locking steel pipe 21 and a locking slot 22. The locking slot 22 is fixedly connected to the locking steel pipe 21. The locking steel pipe 21 is inserted into the threaded round steel 1. A locking nut 23 is provided at both ends of the locking steel pipe 21. A threading plate 3 is provided on one of the locking steel pipes 21. A steel wire rope 4 is connected between the two threading plates 3. The locking assembly 2 of the device locks the H-shaped steel or I-shaped steel leg of the surrounding purlin. The design is safe and stable. When working, the safety belt is hung on the steel wire rope 4, which can effectively prevent the construction workers of the support system of the next layer of the cofferdam from falling from a high altitude. The structure is simple in design, reusable, low in cost, easy to purchase, easy to install and dismantle, and highly flexible.
[0025] like Figure 1-Figure 5 As shown, one side of the locking slot 22 is welded to the side of the locking steel pipe 21, and the two locking steel pipes 21 are respectively inserted into the two ends of the threaded round steel 1, and the two ends of the locking steel pipe 21 are respectively closely attached to a locking nut 23, and the inner wall of the locking nut 23 is threadedly connected to the threaded round steel 1, and one side of the locking steel pipe 21 is fixedly connected with a threading plate 3, and the U-shaped openings of the two locking slots 22 on the threaded round steel 1 are located on the same axis, and a steel wire 4 is connected between the two threading plates 3, and the two threaded round steels 1 are parallel to each other, and the U-shaped grooves on the two locking slots 22 on the threaded round steel 1 face each other. Before the operation, the locking assembly 2 is locked to the H-shaped steel or I-shaped steel leg of the surrounding purlin, and the safety belt is hung on the steel wire 4 during the operation. The device has the characteristics of being reusable and easy to disassemble, and can effectively prevent the construction workers of the support system in the next layer of the cofferdam from falling from a high altitude.
[0026] In the specific implementation process, according to the leg width and thickness of the H-shaped steel or I-shaped steel of the purlin size and after force calculation, a U-shaped lock slot 22 is processed by steel plate, and the inner width of the lock slot 22 is 5-10mm larger than the width of the component to be fastened. A round steel of appropriate length is cut, and the length of the round steel is larger than the vertical height of the purlin + 1.5 times the height of the lock slot 22. The threads at both ends of the round steel are cut. The length of the lower thread is larger than 1.3 times the height of the lock slot 22, and the length of the upper thread is larger than 2 times the height of the lock slot 22 as the threaded round steel 1 at both ends. According to the diameter of the threaded round steel 1 at both ends and the upper thread, the threaded round steel 1 is cut into the steel plate 1. The outer diameter of the locking nut 23 at the top is selected, and the inner diameter of the steel pipe is larger than the threaded round steel 1 at both ends and smaller than the outer diameter of the upper locking nut 23. The length of the steel pipe is larger than the height of the locking slot 22, and the thickness meets the welding requirements. The upper locking slot 22 is double-sided welded to the steel pipe along the axial direction of the steel pipe to form an integral body, and a single locking nut 23 is screwed into the upper end of the threaded round steel 1, and then the upper locking steel pipe 21 and the locking slot 22 welded into one are inserted into the thread head at the upper end of the round steel through the pipe mouth of the upper locking steel pipe 21, and finally the single locking nut 23 is screwed in.
[0027] The manufacturing process of the lower locking component 2 is the same as the above steps. Then, a steel plate of appropriate size is selected and a hole is opened in the plate with a size larger than the outer diameter of the wire rope 4 by 3 mm as a threading plate 3. After the locking slot 22 and the locking steel pipe 21 are welded into one, the double-sided symmetrical locking slot 22 of the threading plate 3 is welded to the locking steel pipe 21. The threading plate 3 and the locking slot 22 must be in the same plane.
[0028] The installation of the wire rope 4 needs to be based on the width of the cofferdam and the number of people working at the same time. After calculation, the wire rope 4 of suitable specifications and length should be selected, and the two ends of the wire rope 4 should be respectively inserted into the threading plate 3, and a shackle should be installed at the end of the wire rope 4 as a limit end.
[0029] Before installation, the position of the locking assembly 2 is adjusted to be no less than 3 cm away from the thread heads of the threaded round steels 1 at both ends through the locking nut 23. During installation, the mouth of the locking slot 22 is first inserted into the lower leg of the surrounding purlin, and then the locking nut 23 is tightened by rotation to fasten the locking assembly 2 to the top leg of the surrounding purlin, and the steel wire rope 4 must be kept in a straight state.
[0030] When the device is removed, the locking nut 23 is loosened by rotating it back, and the locking position of the locking assembly 2 is adjusted to the top of the thread head of the threaded round steel 1. The device can be taken out after ensuring that the length between the locking assemblies 2 is greater than the vertical height of the surrounding purlin.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A safety mother rope device for the installation of internal support of a steel cofferdam, characterized in that: include: Two threaded round bars (1), and A locking component (2), wherein each end of the threaded round steel (1) is provided with a locking component (2), wherein the locking component (2) comprises a locking steel pipe (21), a locking slot (22) being fixedly connected to the locking steel pipe (21), and the locking steel pipe (21) is inserted into the threaded round steel (1).
2. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: One side of the lock buckle slot (22) is welded to the side of the lock buckle steel pipe (21).
3. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: The two locking steel pipes (21) are respectively inserted into the two ends of the threaded round steel (1).
4. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: A locking nut (23) is respectively tightly attached to both ends of the locking steel pipe (21), and the inner wall of the locking nut (23) is threadedly connected to the threaded round steel (1).
5. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: A threading plate (3) is fixedly connected to one side of one of the locking steel tubes (21).
6. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: The U-shaped openings of the two locking slots (22) on the threaded round steel (1) are located on the same axis.
7. A safety mother rope device for steel cofferdam inner support installation work according to claim 5, characterized in that: A steel wire rope (4) is connected between the two threading plates (3).
8. A safety mother rope device for steel cofferdam inner support installation work according to claim 1, characterized in that: The two threaded round steel bars (1) are parallel to each other.