Oil shale underground in-situ conversion construction device

By using fluid heating components and high-pressure co-frequency components in oil shale layers, and by using electrode rods and electromagnetic heat-generating coils to heat the oil shale, the problem of long oil extraction time in existing technologies has been solved, and a highly efficient oil extraction process from oil shale has been achieved.

CN221942414UActive Publication Date: 2024-11-01SHAANXI YANCHANG PETROLEUM GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420080535.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-11-01
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

Existing technologies require a long time to crack shale oil and bring it into production wells, resulting in complicated construction procedures and high costs.

Method used

By employing fluid heating components and high-voltage common frequency components, an electric field is formed in the oil shale layer through positive and negative electrode rods. Heat is generated by the resistance of the oil shale itself, and combined with electromagnetic heating coils to heat the liquid medium, achieving rapid heating and efficient oil extraction.

Benefits of technology

It shortens the construction steps, saves construction costs, and significantly improves oil extraction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942414U_ABST
    Figure CN221942414U_ABST
Patent Text Reader

Abstract

The utility model discloses an oil shale underground in-situ conversion construction device, which relates to the technical field of oil exploitation and comprises a fluid heating component, an oil extraction component and a high-pressure common-frequency component. The high-voltage common-frequency assembly comprises a negative electrode bar and a positive electrode bar, the negative electrode bar is installed on the heating pipe body, the positive electrode bar is also arranged in the oil shale layer, and the oil extraction assembly is located between the positive electrode bar and the negative electrode bar. According to the oil shale underground in-situ conversion construction device, the construction steps are shortened, the construction cost is saved, meanwhile, the heat production efficiency is greatly improved, and finally the oil production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of petroleum exploitation, in particular to an underground in-situ conversion construction device for oil shale. Background Art

[0002] In-situ extraction refers to a method of converting solid kerogen in oil shale into liquid hydrocarbons by heating the oil shale reservoir at high temperature, and then extracting the liquid hydrocarbons from underground through traditional oil and gas drilling and production processes. The current shale oil development technologies include: 1. Electric heating technology, that is, electrically heating the oil shale formation through a heating well to crack the shale oil and enter the production well, and then extract the shale oil; 2. Fluid heating technology, that is, transporting high-temperature fluid to the oil shale through a heating well to crack the shale oil and enter the production well, and then extract the shale oil; 3. Radiation heating technology, that is, adopting a "microwave oven"-like heating method for the oil shale formation through a heating well to crack the shale oil and enter the production well, and then extract the shale oil. In the existing technology, it takes a long time for shale oil to crack and enter the production well. For this reason, we propose an underground in-situ conversion construction device for oil shale. Utility Model Content

[0003] In view of this, the purpose of the utility model is to provide an underground in-situ conversion construction device for oil shale to solve the problem in the prior art that it takes a long time for shale oil to crack and enter the production well.

[0004] Based on the above-mentioned purpose, the utility model provides an underground in-situ conversion construction device for oil shale, including a fluid heating component and an oil production component, and also including a high-voltage common frequency component, the fluid heating component includes a heating pipe body located in the oil shale layer, the high-voltage common frequency component includes a negative electrode rod and a positive electrode rod, the negative electrode rod is installed on the heating pipe body, the positive electrode rod is also arranged in the oil shale layer, and the oil production component is located between the positive electrode rod and the negative electrode rod.

[0005] Furthermore, it also includes an industrial computer, and the fluid heating component, the negative electrode rod and the positive electrode rod are all electrically connected to the industrial computer.

[0006] Furthermore, the industrial computer controls the positive electrode rod to be a normal voltage positive terminal through a DC power supply device, and the industrial computer controls the negative electrode rod to be a high frequency negative electrode terminal through a DC power supply device.

[0007] Furthermore, a heat generating tube is embedded in the interior of the heating tube body, an electromagnetic heat generating coil is disposed in the interior of the heat generating tube, and the industrial computer is electrically connected to the electromagnetic heat generating coil.

[0008] Furthermore, a liquid medium tank is formed between the interior of the heating tube body and the outer wall of the heat-generating tube, and a liquid pipe is connected to the upper end of the heating tube body. The liquid pipe is communicated with the liquid medium tank, and an electromagnetic valve, a pressure sensor, a temperature sensor and a booster pump are installed on the liquid pipe, and the end of the liquid pipe is connected to a liquid storage box.

[0009] Furthermore, the oil production assembly includes an oil production pipe located in the oil shale layer, the upper end of the oil production pipe is connected to an oil production device, and the oil production device is connected to an oil storage tank through a pipeline.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] In the utility model, an oil production well is first drilled at a fixed position, and then installation wells are drilled on both sides of the oil production well. A positive electrode rod is placed in one installation well, and a heating pipe body is placed in the other installation well. Since the negative electrode rod is installed on the heating pipe body, the negative electrode rod is synchronously placed in the other installation well, and then the line connection with the industrial control computer is completed. The industrial control computer controls the positive electrode rod to be a normal pressure positive terminal through a DC power supply device, and the industrial control computer controls the negative electrode rod to be a high-frequency negative electrode terminal through a DC power supply device. The positive electrode rod and the negative electrode rod penetrate the oil shale layer, and heat is generated by the oil shale layer's own resistance, so as to improve the heating effect of the oil shale layer. At the same time, the industrial control computer controls the electromagnetic heat generation coil to generate heat, so as to heat the liquid medium, and heat the oil shale under the heat conduction of the heating pipe body, so as to improve the heating effect and the oil production efficiency. Then the oil production device produces oil through the oil production pipe, and transmits the crude oil to the oil storage tank. The utility model shortens the construction steps, saves construction costs, and greatly improves the heat generation efficiency, so as to finally improve the oil production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the main structure of an underground in-situ conversion construction device for oil shale according to the utility model.

[0013] Figure 2 The utility model is a schematic diagram of the cross-sectional structure of an underground in-situ conversion construction device for oil shale.

[0014] Figure 3 It is a schematic diagram of the cross-sectional structure of a heating pipe body in an underground in-situ conversion construction device for oil shale according to the utility model.

[0015] In the figure: 1. fluid heating component; 2. oil production component; 3. high voltage common frequency component; 4. industrial computer; 101. heating pipe body; 102. heat generating pipe; 103. electromagnetic heat generating coil; 104. liquid pipe; 105. solenoid valve; 106. pressure sensor; 107. temperature sensor; 108. booster pump; 109. liquid storage tank; 201. oil production pipe; 202. oil production device; 203. oil storage tank; 301. negative electrode rod; 302. positive electrode rod. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.

[0017] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0018] Please also read Figure 1-Figure 3 ,in, Figure 1 This is a schematic diagram of the main structure of an underground in-situ conversion construction device for oil shale according to the utility model; Figure 2 This is a schematic cross-sectional view of an oil shale underground in-situ conversion construction device according to the utility model; Figure 3 It is a schematic diagram of the cross-sectional structure of a heating pipe body in an underground in-situ conversion construction device for oil shale according to the utility model.

[0019] An underground in-situ conversion construction device for oil shale includes a fluid heating component 1 and an oil production component 2, and also includes a high-voltage common frequency component 3. The fluid heating component 1 includes a heating pipe body 101 located in the oil shale layer, and the high-voltage common frequency component 3 includes a negative electrode rod 301 and a positive electrode rod 302. The negative electrode rod 301 is installed on the heating pipe body 101, and the positive electrode rod 302 is also set in the oil shale layer. The oil production component 2 is located between the positive electrode rod 302 and the negative electrode rod 301.

[0020] In actual use, the oil production assembly 2 is arranged in an oil production well, such as Figure 1 As shown, the ground is divided into three layers, the topmost layer is the overlying rock layer, the middle layer is the oil shale layer, and the bottommost layer is the lower covering rock layer. An oil production well is provided, and the oil production component 2 is arranged in the oil production well. During the construction process of underground in-situ conversion of oil shale, after opening an oil production well, the utility model only needs to set the heating pipe body 101 and the positive electrode rod 302 at the corresponding position to improve the heating effect under fluid heating and high-voltage common frequency, and finally realize the rapid oil production of the oil production component 2.

[0021] Furthermore, it also includes an industrial computer 4, and the fluid heating component 1, the negative electrode rod 301 and the positive electrode rod 302 are all electrically connected to the industrial computer 4. The industrial computer 4 controls the positive electrode rod 302 to be a normal pressure positive terminal through a DC power supply device, and the industrial computer 4 controls the negative electrode rod 301 to be a high-frequency negative electrode terminal through a DC power supply device.

[0022] In actual use, the positive electrode rod 302 and the negative electrode rod 301 penetrate the oil shale layer and generate heat by using the resistance of the oil shale layer itself, thereby improving the heating effect of the oil shale layer and ultimately improving the oil production efficiency.

[0023] Furthermore, a heat generating tube 102 is embedded in the heating tube body 101 , an electromagnetic heat generating coil 103 is disposed in the heat generating tube 102 , and the industrial computer 4 is electrically connected to the electromagnetic heat generating coil 103 .

[0024] In actual use, the industrial computer 4 controls the electromagnetic heat generating coil 103 to generate heat, thereby heating the liquid medium, and heating the oil shale under the heat conduction of the heating tube body 101, thereby improving the heating effect and the oil extraction efficiency.

[0025] Furthermore, a liquid medium tank is formed between the interior of the heating tube body 101 and the outer wall of the heat generating tube 102. The upper end of the heating tube body 101 is connected to a liquid tube 104, and the liquid tube 104 is connected to the liquid medium tank. A solenoid valve 105, a pressure sensor 106, a temperature sensor 107 and a boost pump 108 are installed on the liquid tube 104. The end of the liquid tube 104 is connected to a liquid storage tank 109.

[0026] Furthermore, the oil production component 2 includes an oil production pipe 201 located in the oil shale layer, the upper end of the oil production pipe 201 is connected to an oil production device 202, and the oil production device 202 is connected to an oil storage tank 203 through a pipeline; wherein, the specific structure of the oil production device 202 is common knowledge known to personnel in this field and will not be elaborated here, the oil production device 202 produces oil through the oil production pipe 201 and transmits the crude oil to the oil storage tank 203.

[0027] In summary, in actual use, first, an oil well is drilled at a fixed position, and then installation wells are drilled on both sides of the oil well. The positive electrode rod 302 is placed in one installation well, and the heating pipe body 101 is placed in the other installation well. Since the negative electrode rod (301) is installed on the heating pipe body (101), the negative electrode rod (301) is synchronously placed in the other installation well, and then the line connection with the industrial control computer 4 is completed. The industrial control computer 4 controls the positive electrode rod 302 to be the normal pressure positive terminal through the DC power supply device. The industrial control computer 4 controls the positive electrode rod 302 to be the normal pressure positive terminal through the DC power supply device. The negative electrode rod 301 is controlled to be a high-frequency negative electrode end, and the positive electrode rod 302 and the negative electrode rod 301 penetrate the oil shale layer, and at the same time, generate heat with the help of the oil shale layer's own resistance, so as to improve the heating effect of the oil shale layer. At the same time, the industrial computer 4 controls the electromagnetic heating coil 103 to generate heat, so as to heat the liquid medium, and heat the oil shale under the heat conduction action of the heating pipe body 101, so as to improve the heating effect and the oil production efficiency. Then the oil production device 202 produces oil through the oil production pipe 201, and transmits the crude oil to the oil storage tank 203.

[0028] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention (including the claims) is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.

[0029] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. An underground in-situ conversion construction device for oil shale, comprising a fluid heating component (1) and an oil production component (2), characterized in that: It also includes a high-voltage common frequency component (3), wherein the fluid heating component (1) includes a heating pipe body (101) located in the oil shale layer, the high-voltage common frequency component (3) includes a negative electrode rod (301) and a positive electrode rod (302), the negative electrode rod (301) is installed on the heating pipe body (101), the positive electrode rod (302) is also set in the oil shale layer, and the oil production component (2) is located between the positive electrode rod (302) and the negative electrode rod (301).

2. The oil shale underground in-situ conversion construction device according to claim 1, characterized in that: It also includes an industrial computer (4), and the fluid heating component (1), the negative electrode rod (301) and the positive electrode rod (302) are all electrically connected to the industrial computer (4).

3. The oil shale underground in-situ conversion construction device according to claim 2, characterized in that: The industrial control computer (4) controls the positive electrode rod (302) to be a normal voltage positive terminal through a DC power supply device, and the industrial control computer (4) controls the negative electrode rod (301) to be a high frequency negative electrode terminal through a DC power supply device.

4. The oil shale underground in-situ conversion construction device according to claim 3, characterized in that: A heat generating tube (102) is embedded in the heating tube body (101), an electromagnetic heat generating coil (103) is disposed in the heat generating tube (102), and the industrial control computer (4) is electrically connected to the electromagnetic heat generating coil (103).

5. The oil shale underground in-situ conversion construction device according to claim 4, characterized in that: A liquid medium tank is formed between the interior of the heating tube body (101) and the outer wall of the heat generating tube (102); the upper end of the heating tube body (101) is connected to a liquid tube (104); the liquid tube (104) is connected to the liquid medium tank; a solenoid valve (105), a pressure sensor (106), a temperature sensor (107) and a booster pump (108) are installed on the liquid tube (104); and the end of the liquid tube (104) is connected to a liquid storage box (109).

6. The oil shale underground in-situ conversion construction device according to claim 5, characterized in that: The oil production assembly (2) comprises an oil production pipe (201) located in the oil shale layer, the upper end of the oil production pipe (201) is connected to an oil production device (202), and the oil production device (202) is connected to an oil storage tank (203) via a pipeline.