Flow guide equipment for water conservancy construction

By using branch alternating flow diversion and automatic sludge discharge components in water conservancy construction diversion equipment, the problem of silt and sand blockage is solved, and the automatic cleaning of sludge is achieved, and construction efficiency and convenience are improved.

CN221943553UInactive Publication Date: 2024-11-01SHANDONG YELLOW RIVER RIVER AFFAIRS BUREAU LIAOCHENG YELLOW RIVER RIVER AFFAIRS BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420607022.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During use, due to the high sediment content of existing water conservancy construction diversion equipment, the filter structure is frequently blocked, and staff need to clean it frequently, which affects the construction efficiency.

Method used

A flow diversion equipment including water inlet pipe, drain pipe, branch flow diversion pipe, mud leaking bucket, mud discharge assembly and filter intercepting mesh was designed. The branch alternate flow diversion method was adopted to realize automatic timing cleaning through solenoid valve and reducer motor. Sludge, reduce manual intervention.

Benefits of technology

It realizes non-stop water conservancy construction drainage, automatically and regularly cleans up sludge, improves construction efficiency, and reduces maintenance costs and work intensity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221943553U_ABST
    Figure CN221943553U_ABST
Patent Text Reader

Abstract

The diversion equipment comprises a water inlet pipe and a drainage pipe arranged right opposite to the water inlet pipe, two branch diversion pipes used for water diversion and drainage are fixedly communicated between the water inlet pipe and the drainage pipe, and a first electromagnetic valve is fixedly installed at the end, close to the water inlet pipe, of each branch diversion pipe. According to the diversion equipment for water conservancy construction, a branch alternate diversion mode is adopted, one pipe is used for diversion and drainage, the other pipe is used for back flushing and decontamination, drainage is smooth and stable, non-stop type work can be achieved, and the diversion equipment for water conservancy construction has the advantages of being simple in structure, convenient to use and high in practicability. The sludge discharging assembly is additionally arranged between the two branch flow guide pipes, automatic sewage discharging can be achieved in a timed mode, manual disassembly and cleaning are not needed, sewage discharging is smooth and efficient, more time and labor are saved, and the beneficial effects of being convenient to maintain and manage, low in production cost and convenient and fast to install and use are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy construction, in particular to a diversion device used for water conservancy construction. Background Art

[0002] In water conservancy construction, in order to enable the construction of hydraulic structures on dry land, cofferdams are used to maintain the foundation pit, and the water flow in the foundation pit is drained through diversion equipment. The most commonly used diversion device for water conservancy construction is a diversion pipe. A valve body and a filter assembly are installed in the middle of the diversion pipe, and the diversion of water in the water conservancy construction area is achieved by means of a drainage pipe. For example, a water conservancy construction diversion equipment with application number CN202320125305.X includes a diversion box, on both sides of which are respectively fixed an inlet pipe and an outlet pipe, a box cover is hinged on one side of the top of the diversion box, and limiting grooves are provided on both sides of the inner wall of the diversion box, and the inner wall of the limiting groove is slidably connected to the limiting block; the above common types of diversion equipment for water conservancy construction still have the following shortcomings in actual applications:

[0003] Since the water that needs to be drained during water conservancy construction contains a lot of sediment, although a filtering structure is added to the diversion equipment to prevent the drainage pipe from being blocked, during the drainage process, the staff needs to frequently clean the filtering structure to maintain the normal operation of the drainage device, which is time-consuming and labor-intensive and affects the efficiency of drainage. Utility Model Content

[0004] The utility model aims to provide a diversion device for water conservancy construction, so as to solve the problem that the existing diversion device for water conservancy construction proposed in the above background technology requires workers to frequently clean the filter screen, thus affecting the construction efficiency.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a diversion device for water conservancy construction, comprising a water inlet pipe and a drainage pipe arranged opposite to the water inlet pipe, two branch diversion pipes for water diversion and drainage are fixedly connected between the water inlet pipe and the drainage pipe, a first solenoid valve is fixedly installed on one end of the branch diversion pipe close to the water inlet pipe, a second solenoid valve is fixedly installed on one end of the branch diversion pipe close to the drainage pipe, a sludge hopper is fixedly connected to the middle of the branch diversion pipe, a lower discharge pipe is fixedly connected to the bottom end of the sludge hopper, a third solenoid valve is fixedly installed in the middle of the lower discharge pipe, a sludge discharge assembly for regularly cleaning sludge in the pipe is fixedly connected between the two lower discharge pipes, and a filter screen is fixedly installed on one side of the branch diversion pipe close to the sludge hopper.

[0006] Preferably, the mud discharge assembly includes a sewage collecting pipe and a mounting bracket fixedly arranged at one end of the sewage collecting pipe, a reduction motor is fixedly installed on the mounting bracket, a sewage discharge auger is fixedly installed at the output end of the reduction motor, the sewage discharge auger is arranged inside the sewage collecting pipe, the bottom end of the sewage collecting pipe is fixedly connected to a sewage discharge pipe, and an electromagnetic sewage discharge valve is fixedly installed in the middle of the sewage discharge pipe; sewage discharge is smooth and stable.

[0007] Preferably, a timing switch is fixedly installed on one side of the mounting frame, and the reduction motor, the electromagnetic drain valve, the first electromagnetic valve, the second electromagnetic valve and the third electromagnetic valve are all electrically connected to an external power supply through the timing switch.

[0008] Preferably, a water inlet flange is fixedly installed at one end of the water inlet pipe, and a drainage flange is fixedly installed at one end of the drainage pipe; the installation and use are convenient.

[0009] Preferably, one end of the water inlet pipe away from the water inlet flange and one end of the drain pipe away from the drain flange are both threadedly connected with a rotary sealing cap, so that the staff can clean and unclog the water inlet pipe and the drain pipe easily.

[0010] Preferably, a transparent observation strip is fixedly installed on the surface of the branch guide pipe close to the filter screen, so that the staff can observe the status of the filter screen and clean and maintain it in time.

[0011] Preferably, the water inlet pipe, the drain pipe and the branch guide pipe are all made of PVC material; the whole is relatively light, has low production cost and is corrosion-resistant.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The water conservancy construction diversion equipment adopts a branch alternating diversion method. One pipe diverts and drains water, and the other pipe recoils and cleans the sewage. The drainage is smooth and stable, and non-stop operation can be achieved, which is beneficial to improving the drainage efficiency during water conservancy construction. A mud discharge component is added between the two sections of branch diversion pipes, which can automatically discharge sewage at a fixed time without manual disassembly and cleaning. The sewage cleaning is smooth and efficient, saving time and effort, and is easy to maintain and manage, has low production costs, and is easy to install and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the flow diversion device of the utility model;

[0015] Figure 2 It is a top cross-sectional view of the flow diversion device of the utility model;

[0016] Figure 3 This is a front cross-sectional view of the sewage collecting pipe of the utility model;

[0017] Figure 4 It is a structural schematic diagram of the branch guide pipe of the utility model.

[0018] In the figure: 1. water inlet pipe; 2. drain pipe; 3. branch guide pipe; 4. first solenoid valve; 5. filter screen; 6. second solenoid valve; 7. lower drain pipe; 8. sewage collecting pipe; 9. third solenoid valve; 10. mounting frame; 11. reduction motor; 12. time switch; 13. sewage pipe; 14. solenoid sewage valve; 15. water inlet flange; 16. drain flange; 17. rotary sealing cap; 18. mud funnel; 19. sewage auger; 20. transparent observation strip. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0020] See also Figure 1-4 The utility model provides a diversion device for water conservancy construction, comprising a water inlet pipe 1 and a drainage pipe 2 arranged opposite to the water inlet pipe 1, two branch diversion pipes 3 for water diversion and drainage are fixedly connected between the water inlet pipe 1 and the drainage pipe 2, a first solenoid valve 4 is fixedly installed at one end of the branch diversion pipe 3 close to the water inlet pipe 1, a second solenoid valve 6 is fixedly installed at one end of the branch diversion pipe 3 close to the drainage pipe 2, a mud funnel 18 is fixedly connected in the middle of the branch diversion pipe 3, a lower discharge pipe 7 is fixedly connected at the bottom end of the mud funnel 18, a third solenoid valve 9 is fixedly installed in the middle of the lower discharge pipe 7, a mud discharge assembly for regularly cleaning mud in the pipe is fixedly connected between the two lower discharge pipes 7, a filter screen 5 is fixedly installed on one side of the branch diversion pipe 3 close to the mud funnel 18, and the water inlet pipe 1, the drainage pipe 2 and the branch diversion pipe 3 are all made of PVC material;

[0021] See also Figure 1 , Figure 2 and Figure 3 , further, the mud discharge assembly includes a sewage collecting pipe 8 and a mounting frame 10 fixedly arranged at one end of the sewage collecting pipe 8, a reduction motor 11 is fixedly installed on the mounting frame 10, a sewage discharge auger 19 is fixedly installed at the output end of the reduction motor 11, and the sewage discharge auger 19 is arranged inside the sewage collecting pipe 8, the bottom end of the sewage collecting pipe 8 is fixedly connected with a sewage discharge pipe 13, and an electromagnetic sewage discharge valve 14 is fixedly installed in the middle of the sewage discharge pipe 13, and a timing switch 12 is fixedly installed on one side of the mounting frame 10, and the reduction motor 11, the electromagnetic sewage discharge valve 14, the first electromagnetic valve 4, the second electromagnetic valve 6 and the third electromagnetic valve 9 are all electrically connected to the external power supply through the timing switch 12;

[0022] When in use, the electromagnetic drain valve 14 is opened regularly, the reduction motor 11 works regularly, the reduction motor 11 drives the drain auger 19 to work, and the sludge leaking into the sewage collecting pipe 8 is pushed along the sewage collecting pipe 8, and the sewage is discharged through the sewage pipe 13. The sludge is discharged regularly, which saves time and effort.

[0023] See also Figure 1 and Figure 2 Further, a water inlet flange 15 is fixedly installed at one end of the water inlet pipe 1, a drainage flange 16 is fixedly installed at one end of the drainage pipe 2, and a rotary sealing cap 17 is threadedly connected to one end of the water inlet pipe 1 away from the water inlet flange 15 and one end of the drainage pipe 2 away from the drainage flange 16, and a transparent observation strip 20 is fixedly installed on the surface of the branch guide pipe 3 close to the filter screen 5;

[0024] When in use, the water inlet pipe 1 is connected to the drain outlet of the pumping equipment through the water inlet flange 15. The drainage equipment is placed in the retaining pit of the water conservancy construction area. The drainage flange 16 is connected to the external diversion pipe. The water in the construction area is filled into the water inlet pipe 1 through the drainage equipment, and then enters the drain pipe 2 along the branch diversion pipe 3 to achieve the diversion and drainage function.

[0025] When the embodiment of the present application is in use: the two branch diversion pipes 3 are arranged side by side, and when one of the branch diversion pipes 3 is turned on, the other branch diversion pipe 3 is turned off. Its working principle is that when the left branch diversion pipe 3 is turned on, the first solenoid valve 4 and the second solenoid valve 6 on the left branch diversion pipe 3 will be opened at the same time, and the first solenoid valve 4 and the second solenoid valve 6 on the right branch diversion pipe 3 are in a closed state, and the two third solenoid valves 9 are in a closed state. At this time, the muddy water in the construction area will enter from the water inlet pipe 1 and then flow into the left branch diversion pipe 3. During the circulation process, the silt in the water body is intercepted by the filter net 5 to prevent the diversion pipe from being blocked. The filtered water flows out through the drain pipe 2, and the timing switch 12 works regularly. After a period of time, the first solenoid valve 4, the second solenoid valve 6 on the right branch diversion pipe 3 and the third solenoid valve 9 on the left branch diversion pipe 3 are controlled to be opened at the same time, and the first solenoid valve 4 on the left branch diversion pipe 3 and the second solenoid valve 6 on the left branch diversion pipe 3 are in a closed state. The magnetic valve 4 is closed immediately, and the second solenoid valve 6 on the left branch guide pipe 3 is closed with a delay. At the same time, the reduction motor 11 and the electromagnetic drain valve 14 will also work. The sludge filtered in the left branch guide pipe 3 will enter the sewage collecting pipe 8 through the sludge funnel 18 and the lower discharge pipe 7. Driven by the sewage auger 19, the sludge is discharged through the sewage pipe 13. During the drainage process of the right branch guide pipe 3, due to the delayed closure of the second solenoid valve 6, a part of the water filtered and diverted from the right side will enter the left branch guide pipe 3 through the drainage pipe 2 under the action of water pressure, thereby backwashing from the back of the filter screen 5, thereby accelerating the drainage of the sludge and playing a role in auxiliary cleaning. After a period of time, the second solenoid valve 6, the reduction motor 11 and the electromagnetic drain valve 14 are closed. In this way, the left and right branch guide pipes 3 alternately drain and drain the sludge, which can realize automatic cleaning without manual shutdown for cleaning, which saves time and effort and can improve the drainage efficiency of water conservancy construction.

[0026] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A diversion device for water conservancy construction, comprising a water inlet pipe (1) and a drainage pipe (2) arranged opposite to the water inlet pipe (1), characterized in that: Two branch flow guide pipes (3) for water diversion and drainage are fixedly connected between the water inlet pipe (1) and the drainage pipe (2); a first solenoid valve (4) is fixedly installed on one end of the branch flow guide pipe (3) close to the water inlet pipe (1); a second solenoid valve (6) is fixedly installed on one end of the branch flow guide pipe (3) close to the drainage pipe (2); a sludge hopper (18) is fixedly connected in the middle of the branch flow guide pipe (3); a lower discharge pipe (7) is fixedly connected at the bottom end of the sludge hopper (18); a third solenoid valve (9) is fixedly installed in the middle of the lower discharge pipe (7); a sludge discharge assembly for regularly cleaning sludge in the pipe is fixedly connected between the two lower discharge pipes (7); and a filter screen (5) is fixedly installed on one side of the branch flow guide pipe (3) close to the sludge hopper (18).

2. A diversion device for water conservancy construction according to claim 1, characterized in that: The mud discharge assembly comprises a sewage collecting pipe (8) and a mounting frame (10) fixedly arranged at one end of the sewage collecting pipe (8); a reduction motor (11) is fixedly installed on the mounting frame (10); a sewage discharge auger (19) is fixedly installed at the output end of the reduction motor (11); the sewage discharge auger (19) is arranged inside the sewage collecting pipe (8); the bottom end of the sewage collecting pipe (8) is fixedly connected to a sewage discharge pipe (13); and an electromagnetic sewage discharge valve (14) is fixedly installed in the middle of the sewage discharge pipe (13).

3. A diversion device for water conservancy construction according to claim 2, characterized in that: A timing switch (12) is fixedly mounted on one side of the mounting frame (10), and the reduction motor (11), the electromagnetic drain valve (14), the first electromagnetic valve (4), the second electromagnetic valve (6) and the third electromagnetic valve (9) are all electrically connected to an external power supply via the timing switch (12).

4. The diversion device for water conservancy construction according to claim 1, characterized in that: A water inlet flange (15) is fixedly mounted on one end of the water inlet pipe (1), and a drainage flange (16) is fixedly mounted on one end of the drainage pipe (2).

5. A diversion device for water conservancy construction according to claim 4, characterized in that: One end of the water inlet pipe (1) away from the water inlet flange (15) and one end of the drain pipe (2) away from the drain flange (16) are both threadedly connected with a rotary sealing cap (17).

6. The diversion device for water conservancy construction according to claim 1, characterized in that: A transparent observation strip (20) is fixedly mounted on the surface of the branch flow guide pipe (3) close to the filter screen (5).

7. The diversion device for water conservancy construction according to claim 1, characterized in that: The water inlet pipe (1), the drainage pipe (2) and the branch guide pipe (3) are all made of PVC material.