Through the combination design of single ceiling bricks with heavy materials and hanging bricks with light body materials in the furnace ceiling structure, combined with the design of refractory mud layer and adjustment hanging hooks, the kiln ceiling structure has a large weight and high energy consumption. Problem, extends the service life of the kiln and reduces energy consumption.

CN221944900UActive Publication Date: 2024-11-01ZIBO LIANXING KILN IND TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420279503.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-11-01
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

The existing kiln ceiling structure consists of multiple heavy materials, which affects the service life of the kiln and has high energy consumption.

Method used

The ceiling brick consists of two heavy material single bricks, and the hanging bricks of light body material are connected to the upper part. The design of circular hanging grooves and cylinders is combined with the refractory mud layer to form an annular structure. To prevent the rotation from falling off, and use screws and adjust flange at the hanging hook to adjust the height.

Benefits of technology

It reduces the weight of the kiln, extends the service life, and reduces energy consumption through the heat dissipation performance of lightweight materials, avoiding crack defects in the ceiling structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221944900U_ABST
    Figure CN221944900U_ABST
Patent Text Reader

Abstract

The utility model relates to a kiln suspended ceiling structure which comprises a plurality of first suspended ceiling bricks made of heavy materials and arranged on the top of a side wall of a kiln, each suspended ceiling brick is composed of two suspended ceiling single bricks, the upper portion of each suspended ceiling brick is connected with a suspended brick made of light materials, and the upper portions of the opposite faces of the two suspended ceiling single bricks are both provided with circular hanging and pulling grooves. The lower portion of the hanging brick is provided with a hanging cylinder matched with the hanging groove, the top of the hanging groove is provided with a penetrating opening, the top of the hanging cylinder is provided with a hanging rod extending out of the penetrating opening, the hanging rod is provided with a hanging hole, a hanging hook is connected to the hanging hole in a hooked mode, and a hanging frame is fixed to the top of the hanging hook. According to the kiln suspended ceiling structure, the suspended ceiling bricks made of heavy materials are arranged on the lower portion of the kiln suspended ceiling structure, the strength of a kiln is guaranteed, the suspended bricks made of light materials are arranged at the connecting positions of the upper portion and the hanging hooks, the weight of the kiln suspended ceiling can be reduced, the service life of the kiln is guaranteed, the heat dissipation speed of the suspended bricks made of the light materials is low, and energy consumption of the kiln can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a kiln ceiling structure and belongs to the technical field of kiln structures. Background Art

[0002] Kiln is a special thermal equipment for producing refractory materials for metallurgy such as steel. It is designed and used according to the needs of different products. The corresponding operating temperature is generally between 1200-1800℃. Its lining material and kiln structure determine the thermal technical indicators of the kiln. In recent years, lightweight high-temperature resistant materials have been widely used, shortening the firing cycle and significantly reducing energy consumption. However, the current kiln ceiling structure is still composed of multiple ceiling bricks made of heavy materials, which affects the service life of the kiln and has high energy consumption. Utility Model Content

[0003] The utility model provides a kiln ceiling structure, which solves the problem that the current kiln ceiling structure is still composed of a plurality of ceiling bricks made of heavy materials, which affects the service life of the kiln and has high energy consumption.

[0004] The utility model relates to a kiln ceiling structure, comprising a plurality of ceiling bricks made of heavy materials arranged on the top of the kiln side wall, each ceiling brick is composed of two single ceiling bricks, the upper part of the ceiling brick is connected with a hanging brick made of light materials, the upper parts of the opposite surfaces of the two single ceiling bricks are provided with circular hanging grooves, the lower part of the hanging bricks is provided with a hanging cylinder matched with the hanging grooves, the top of the hanging grooves is provided with a through opening, the top of the hanging cylinder is provided with a hanging rod passing through the through opening, the hanging rod is provided with a hanging hole, the hanging hole is hooked with a hanging hook, the top of the hanging hook is fixed with a hanger, and refractory clay layers are provided between adjacent ceiling bricks, between the single ceiling bricks in the same group, and between the ceiling bricks and the hanging bricks.

[0005] As a preferred embodiment, the hanging hook includes a vertical hanging rod and a hook at the lower end, a transition arc is provided at the lower end of the hanging rod, and a straight section is provided between the transition arc and the hook. The kiln ceiling can expand and contract freely at high temperature to prevent the hanging bricks from being damaged.

[0006] As a preferred embodiment, the top of the lifting hole is provided with an excessive rounded corner.

[0007] As a preferred embodiment, an I-beam is fixed to the outer side of the top of the hanger, and a support frame is fixed to the top of the I-beam.

[0008] As a preferred embodiment, a screw is fixed on the top of the hook, an adjustment flange is fixed on the hanger, a through hole for the screw to pass through is provided on the adjustment flange, and adjustment nuts are provided on the screws above and below the adjustment flange, so that the height of the hook can be adjusted.

[0009] The utility model has the following beneficial effects:

[0010] The lower part of the kiln ceiling structure uses ceiling bricks made of heavy materials to ensure the strength of the kiln, and the upper part connected to the hanging hooks uses hanging bricks made of light materials to reduce the weight of the kiln ceiling and ensure the service life of the kiln. The light hanging bricks have slow heat dissipation and can reduce the energy consumption of the kiln. The connection between the hanging bricks and the ceiling bricks is a ring structure, and there are no cracks in the hanging grooves, which solves the problem of the ceiling turning and falling off. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the utility model;

[0012] Figure 2 It is a structural schematic diagram of the upper part of the hanging hook;

[0013] Figure 3 It is a structural schematic diagram of the connection between the ceiling brick and the hanging brick;

[0014] Figure 4 This is a schematic diagram of the structure of a single brick of a suspended ceiling;

[0015] Figure 5 It is a schematic diagram of the side structure of a single brick of a suspended ceiling;

[0016] Figure 6 It is a schematic diagram of the structure of hanging bricks;

[0017] Figure 7 It is a structural diagram of the side of the hanging brick;

[0018] In the figure: 1. support frame; 2. I-beam; 3. hanger; 4. hanging hook; 5. side wall of kiln; 6. single ceiling brick; 7. hanging brick; 8. hanging groove; 9. hanging cylinder; 10. hanging rod; 11. hanging hole; 12. straight section; 13. through-hole; 14. screw; 15. adjusting nut; 16. adjusting flange. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with embodiments.

[0020] Embodiment 1, as Figures 1 to 7 As shown, the utility model is a kiln ceiling structure, including a plurality of ceiling bricks made of heavy materials arranged on the top of the kiln side wall 5, each ceiling brick is composed of two single ceiling bricks 6, and a hanging brick 7 made of light materials is connected to the upper part of the ceiling brick, and circular hanging grooves 8 are provided on the upper parts of the opposite surfaces of the two single ceiling bricks 6, and a hanging cylinder 9 matched with the hanging groove 8 is provided on the lower part of the hanging brick 7, and a through-hole 13 is provided on the top of the hanging groove 8, and a hanging rod 10 passing through the through-hole 13 is provided on the top of the hanging cylinder 9, and a hanging hole 11 is provided on the hanging rod 10, and a hanging hook 4 is hooked on the hanging hole 11, and a hanger 3 is fixed on the top of the hanging hook 4, and a refractory clay layer is provided between adjacent ceiling bricks, between the single ceiling bricks 6 of the same group, and between the ceiling bricks and the hanging bricks 7.

[0021] During installation, separate the two single ceiling bricks 6, then extend the hanging cylinder 9 at the bottom of the hanging brick 7 into the hanging groove 8, then close the two single ceiling bricks 6, pass the hanging rod 10 through the through-hole, and then hook the hanging hole 11 on the hanging hook 4, the single ceiling brick 6 and the hanging brick 7 are matched with a gap, and then after the other ceiling bricks are installed, put a mud guard at the bottom of the ceiling brick, and then pour refractory putty in the gap to form a refractory putty layer.

[0022] Embodiment 2, on the basis of embodiment 1, the hanging hook 4 comprises a vertical hanging rod and a hanging hook at the lower end, a transition arc is provided at the lower end of the hanging rod, and a straight section 12 is provided between the transition arc and the hanging hook.

[0023] The top of the lifting hole 11 is provided with an over-rounded corner.

[0024] An I-beam 2 is fixed to the outer side of the top of the hanger 3 , and a support frame 1 is fixed to the top of the I-beam 2 .

[0025] A screw rod 14 is fixed to the top of the hanging hook 4, and an adjustment flange 16 is fixed to the hanger 3. The adjustment flange 16 is provided with a through hole for the screw rod 14 to pass through, and an adjustment nut 15 is provided on the screw rod 14 above and below the adjustment flange 16. Before installation, the position of the upper and lower adjustment nuts 15 can be rotated as needed to adjust the height of the hanging hook 4.

[0026] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

[0027] In the description of the present invention, the terms "inside", "outside", "longitudinal", "lateral", "upper", "lower", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention.

Claims

1. A kiln ceiling structure, comprising a plurality of ceiling bricks made of heavy materials arranged on the top of a kiln side wall (5), characterized in that: Each ceiling brick is composed of two single ceiling bricks (6), and a hanging brick (7) made of a light material is connected to the upper part of the ceiling brick. The upper parts of the opposite surfaces of the two single ceiling bricks (6) are provided with circular hanging grooves (8). The lower part of the hanging brick (7) is provided with a hanging cylinder (9) matched with the hanging groove (8). The top of the hanging groove (8) is provided with a through-hole (13). The top of the hanging cylinder (9) is provided with a hanging rod (10) extending from the through-hole (13). The hanging rod (10) is provided with a hanging hole (11). The hanging hole (11) is hooked with a hanging hook (4). The top of the hanging hook (4) is fixed with a hanger (3). A refractory clay layer is provided between adjacent ceiling bricks, between the single ceiling bricks (6) of the same group, and between the ceiling bricks and the hanging bricks (7).

2. The kiln ceiling structure according to claim 1, characterized in that: The hanging hook (4) comprises a vertical hanging rod and a hanging hook at the lower end, a transition arc is provided at the lower end of the hanging rod, and a straight section (12) is provided between the transition arc and the hanging hook.

3. The kiln ceiling structure according to claim 2, characterized in that: The top of the lifting hole (11) is provided with a transition rounded corner.

4. The kiln ceiling structure according to claim 1, characterized in that: An I-beam (2) is fixed on the outside of the top of the hanger (3), and a support frame (1) is fixed on the top of the I-beam (2).

5. The kiln ceiling structure according to claim 4, characterized in that: A screw rod (14) is fixed on the top of the hanging hook (4), an adjusting flange (16) is fixed on the hanger (3), a through hole for the screw rod (14) to pass through is provided on the adjusting flange (16), and adjusting nuts (15) are provided on the screw rods (14) above and below the adjusting flange (16).