Repairing device for burner nozzle of regenerative heating furnace

By designing a repair device for a thermal storage heating furnace, the inclined ventilation pipe and injection pipe form a cylindrical void pipe, the problem of cumbersome repair after the burner nozzle nozzle is damaged is solved, and the rapid repair of the heating furnace and gas are achieved Reduced consumption, improving work efficiency and safety.

CN221944906UActive Publication Date: 2024-11-01GANSU JIU STEEL GRP HONGXING IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323259313.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-30
Publication Date
2024-11-01
Estimated Expiration
2033-11-30

AI Technical Summary

Technical Problem

After the nozzle nozzle of the traditional heat storage furnace is damaged, the repair process is cumbersome, affecting efficiency and time, resulting in a reduction in the efficiency of the heating furnace, an increase in gas consumption and equipment safety hazards, and a long-term suspension of production for maintenance.

Method used

Design a repair device including a mold, a vent pipe, a connecting plate and an injection pipe. The vent pipe is inclined at 19°. It forms a cylindrical void-shaped pipe through the injection material to ensure uniform airflow mixing. It is equipped with a valve and a flowmeter to Control the pouring process.

Benefits of technology

The rapid repair of the heating furnace burner nozzle nozzle is achieved, which reduces the downtime and maintenance costs, improves work efficiency and safety, and ensures uniform mixed combustion of gas and air flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221944906U_ABST
    Figure CN221944906U_ABST
Patent Text Reader

Abstract

The utility model discloses a repairing device for a nozzle of a regenerative heating furnace burner, which belongs to the technical field of thermal engineering, solves the problems that the repairing process of the nozzle of the traditional burner is tedious, and the efficiency and the time are influenced, and comprises a mold, the mold is of a rectangular structure with an opening at the upper part, and a plurality of breather pipes are arranged in an inner cavity of the mold; the two ends of the breather pipe abut against the inner wall of the mold, the inclination angle alpha between the arrangement direction of the breather pipe and the center line of the mold is 19 degrees, the two sides of the mold are connected with a first connecting plate and a second connecting plate respectively, a connecting hole is formed in the second connecting plate in a penetrating mode and penetrates through the side wall of the mold, and an injection pipe is connected to the connecting hole. The utility model solves the problem that the burner of the conventional heat accumulating type heating furnace cannot be quickly recovered on line after being damaged, realizes the capability of quickly repairing the damaged nozzle of the burner during the shutdown overhaul period of the heating furnace, so as to timely recover the heat supply capability of the original burner of the heating furnace, greatly improve the working efficiency and reduce the production cost. And the construction period and the maintenance cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of thermal technology, and in particular relates to a repairing device for a burner nozzle of a regenerative heating furnace. Background Art

[0002] In the metallurgical industry, the burner nozzle of the regenerative heating furnace is the key equipment for heating capacity. The burner nozzle affects the heating efficiency of the steel billet. When the burner nozzle is damaged, the gas and air entering the furnace of the heating furnace do not pass through the nozzle, and there is no fixed mixing direction and pressure. The damage of the burner nozzle seriously affects the heating efficiency of the steel billet and the gas consumption index, resulting in damage to the furnace wall of the heating furnace, fire and gas leakage due to furnace wall damage, and safety and equipment accidents such as furnace wall collapse. Usually, when the burner nozzle is damaged, it is necessary to dismantle the furnace wall of a certain section of the heating furnace, dismantle the burner, reinstall the new burner, and re-pour the furnace wall. This repair method causes the heating furnace to bake, seriously restricting the rolling line capacity, increasing downtime and maintenance costs. Utility Model Content

[0003] The utility model aims to provide a repair device for a burner nozzle of a regenerative heating furnace, so as to solve the problem that the repair process of a damaged burner nozzle of a conventional furnace is complicated, affecting efficiency and time.

[0004] The technical solution of the utility model is: a repair device for a burner nozzle of a regenerative heating furnace, comprising a mold, the mold is a rectangular structure with an upper opening, a plurality of ventilation pipes are arranged in the inner cavity of the mold, both ends of the ventilation pipes are against the inner wall of the mold, the ventilation pipes are arranged in a direction with an inclination angle α of 19° to the center line of the mold, a first connecting plate and a second connecting plate are respectively connected on both sides of the mold, a connecting hole is penetrated on the second connecting plate, the connecting hole penetrates the side wall of the mold, and an injection pipe is connected to the connecting hole.

[0005] Furthermore, a valve and a flow meter are respectively provided on the injection pipe.

[0006] Furthermore, the mold, the ventilation pipe, the first connecting plate and the second connecting plate are all made of steel plates.

[0007] The beneficial effects of the utility model are as follows: the utility model is placed at the position of the damaged burner nozzle of the heating furnace, the first connecting plate is fixed around the inner cavity of the burner, the second connecting plate is fixed around the original nozzle of the furnace wall, and pouring is performed through the injection pipe. The castable enters the mold from the connecting hole. After filling, the mold, the vent pipe, the first connecting plate and the second connecting plate are removed, and the position left by the vent pipe forms a cylindrical gap-shaped pipe. After field tests, the cross-circular nozzle airflow mixing angle, airflow outlet velocity, airflow mixing cross-region flame combustion uniformity, thermal radiation intensity and high-temperature flue gas diffusion rate are calculated. Combined with the reversing cycle of the heat storage burner, the air and gas inlet pressure and flow rate, the combustion reaction rate of the cross-mixed airflow in the furnace is calculated. Finally, the inclination angle α of the vent pipe is determined to be 19°. This angle can realize the airflow entering the furnace along the cylindrical gap-shaped pipe. The gas and air airflows with this angle are cross-mixed and burned at a fixed position in the furnace, which improves the mixing uniformity of the gas and air airflows and reduces the gas consumption index.

[0008] The valve installed on the injection pipe can make the control more convenient during pouring, and the flow meter installed can timely judge the flow rate and velocity of the castable, avoiding safety accidents caused by excessive flow rate, and increasing the safety guarantee of the pouring operation.

[0009] The utility model has a simple structure and high efficiency, and solves the problem in the prior art that the burner of a heat storage heating furnace cannot be quickly restored online after being damaged, and realizes the ability of the heating furnace equipment to quickly repair the damaged burner nozzle during shutdown and maintenance, so as to promptly restore the original burner heating capacity of the heating furnace, and effectively reduces the time and cost of removing the furnace wall and installing a new burner during the previous long equipment maintenance period. The online rapid formwork and pouring construction of the burner nozzle can be completed during a shorter shutdown time, which greatly improves work efficiency and reduces construction time and maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a left side cross-sectional view of the utility model in use state;

[0011] Figure 2 It is a front view cross-sectional view of the structure of the utility model;

[0012] Figure 3 It is a left side cross-sectional view of the structure of the utility model;

[0013] Figure 4 It is a top view of the structure of the utility model.

[0014] In the figure: 1-mold; 2-ventilation pipe; 3-first connecting plate; 4-second connecting plate; 5-connecting hole; 6-injection pipe; 7-valve; 8-flow meter; 9-burner; 10-furnace wall. DETAILED DESCRIPTION

[0015] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0016] like Figure 1-Figure 4 As shown, a repair device for a burner nozzle of a regenerative heating furnace comprises a mold 1. The mold 1 is a rectangular structure with an upper opening. A plurality of vent pipes 2 are arranged in the inner cavity of the mold 1. Both ends of the vent pipes 2 are against the inner wall of the mold 1. The vent pipes 2 are arranged in a direction with an inclination angle α of 19° to the center line of the mold 1. A first connecting plate 3 and a second connecting plate 4 are connected to both sides of the mold 1 respectively. A connecting hole 5 is penetrated on the second connecting plate 4. The connecting hole 5 penetrates the side wall of the mold 1. An injection pipe 6 is connected to the connecting hole 5.

[0017] The injection pipe 6 is provided with a valve 7 and a flow meter 8 respectively.

[0018] The mold 1, the ventilation pipe 2, the first connecting plate 3 and the second connecting plate 4 are all made of steel plates.

[0019] When in use, the mold 1 is made according to the design drawings based on the damage of the burner nozzle on site. The mold 1, the first connecting plate 3 and the second connecting plate 4 are made of Q235 steel plates with a thickness of 2mm. The ventilation pipe 2 is a seamless steel pipe with a diameter of φ80mm and a wall thickness of 4mm. The first connecting plate 3 and the second connecting plate 4 are spaced 300mm apart. Taking the forward direction of the burner nozzle as an example, the first connecting plate 3 and the second connecting plate 4 are first welded and fixed to the front and rear sides of the mold 1, and then the ventilation pipe 2 is connected to the mold 1. The installation angle of the ventilation pipe 2 and the inclination angle α of the center line of the mold 1 are 19°. After the connection is completed, the connecting hole 5 is connected to the injection pipe 6, and the injection pipe 6 is connected to the external casting material pipeline.

[0020] At the damaged part of the original burner nozzle, the damaged refractory material is cleaned up, and according to the size of the inner cavity of the burner 9, the center point of the cross of the inner cavity of the burner 9 coincides with the center point of the mold 1, the four corners of the first connecting plate 3 are in the same position as the four corners of the inner cavity of the burner 9, and the four corners of the second connecting plate 4 are in the same position as the four corners of the original nozzle of the furnace wall 10. There is a certain gap between the original damaged burner nozzle and the furnace wall 10. Therefore, after fixing the second connecting plate 4 to the furnace wall 10, it is necessary to use steel strips to seal it to prevent the castable from overflowing from the gap during pouring construction. The position of the second connecting plate 4 and the furnace wall 10 are on the same horizontal plane and shall not be recessed into the inner cavity of the burner 9 or protrude into the furnace. After the position is calibrated, the mold 1, the first connecting plate 3 and the second connecting plate 4 are fixed. The fixing method can be flexibly applied according to the actual situation on site. The first connecting plate 3 is welded to the steel plate of the inner cavity of the burner 9, and the second connecting plate 4 is supported on the water beam furnace rib tube in the furnace. The mold 1 must be firmly fixed to prevent the mold from expanding and the mold 1 from deformation and displacement during the pouring process.

[0021] After the mold 1 is firmly fixed, the external casting material is introduced and the valve 7 is opened. The casting material enters the mold 1 from the injection pipe 6 through the connecting hole 5. During pouring, a vibrating rod is used to vibrate back and forth in the mold 1. The casting material in the mold 1 is filled densely after vibration to prevent gaps in the casting material inside the mold 1. During the pouring process, the flow meter 8 and the injection situation are observed by the naked eye to control the injection amount by controlling the valve 7. After 12 hours of pouring construction, the mold 1 is dismantled. An oxygen-acetylene cutting gun is used to cut and dismantle the mold 1, the vent pipe 2, the first connecting plate 3 and the second connecting plate 4 piece by piece to complete the dismantling of the mold 1. The position left by the dismantled vent pipe 2 forms a cylindrical gap-shaped pipe.

[0022] Taking a gas burner as an example, after the gas burner nozzle is repaired by the utility model, the gas supplied by the gas pipeline passes through the inner cavity of the gas burner, and passes through the cylindrical gap-shaped pipe cast by the mold 1, and is sprayed obliquely into the heating furnace. According to the actual test conditions on site, it is ensured that the oblique gas flow and the oblique air flow are mixed and burned at the designed position in the furnace, and turbulence is formed in the high-temperature area of ​​the combustion flame. The high-temperature flue gas of the combustion can be fully diffused into the furnace to form high-temperature radiant heat. The high-temperature flue gas is sucked into the heat storage burner on the opposite furnace wall and discharged to the chimney of the heating furnace through the flue gas pipe.

Claims

1. A repair device for a burner nozzle of a regenerative heating furnace, characterized in that: The invention comprises a mould (1), wherein the mould (1) is a rectangular structure with an opening at the top, a plurality of ventilation pipes (2) are arranged in the inner cavity of the mould (1), the two ends of the ventilation pipes (2) are against the inner wall of the mould (1), the arrangement direction of the ventilation pipes (2) and the inclination angle α of the centre line of the mould (1) are 19 degrees, a first connecting plate (3) and a second connecting plate (4) are respectively connected to the two sides of the mould (1), a connecting hole (5) is penetrated through the second connecting plate (4), the connecting hole (5) penetrates the side wall of the mould (1), and an injection pipe (6) is connected to the connecting hole (5).

2. A repair device for a burner nozzle of a regenerative heating furnace according to claim 1, characterized in that: The injection pipe (6) is provided with a valve (7) and a flow meter (8) respectively.

3. The repair device for the burner nozzle of a regenerative heating furnace according to claim 1, characterized in that: The mould (1), the ventilation pipe (2), the first connecting plate (3) and the second connecting plate (4) are all made of steel plates.