Drainage pipe capable of automatically opening water seepage holes
By using water-soluble tape to seal the seepage holes in tunnel construction and combining the hard seepage main pipe and the outgoing hose structure, the problem of concrete slurry blocking the drain pipe is solved, automatic opening and efficient drainage are achieved, and the construction process is simplified.
Patent Information
- Application Number
- CN202420604885.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In tunnel construction, concrete slurry is prone to enter the seepage hole and block the drainage pipe, resulting in difficulty in drainage. In the prior art, such as the use of airbags to seal, there are problems such as construction difficulty and inconvenient operation.
Water-soluble tape is used to seal the seepage holes. After the concrete solidifies, it will automatically open under water soaking. Combined with the hard seepage main pipe and the outgoing hose structure, the seepage holes will be opened in time to achieve drainage, and when necessary, it will be improved through valves and heat shrink pipes. Sealing and grouting effect.
The seepage hole sealing during pouring is achieved, and the concrete is automatically opened after solidification, which simplifies the drainage process, reduces the construction difficulty, and improves the drainage capacity and sealing.
Smart Images

Figure CN221957638U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel leakage prevention, in particular to a drainage pipe with a water seepage hole that can be automatically opened. Background Art
[0002] Water accumulation and leakage are common and difficult to solve problems in tunnel construction, and their hazards are huge. Water accumulation will soften the surrounding rock and cause the roadbed to sink; leakage will erode the concrete lining and cause it to peel off.
[0003] See attached Figure 1 , Attachment Figure 2 and attached Figure 3 . The concrete lining 1 of the tunnel is poured multiple times, and leakage mostly occurs at the construction joints 13. At present, a more effective measure is to pre-embed the drainage pipe 2 at the construction joints 13 to actively drain the accumulated water. The specific technical solution is to pre-embed the waterstop 12 on the casting surface 11, and place the drainage pipe 2 on the water-facing surface of the waterstop 12. There are multiple seepage holes arranged in an array on the drainage pipe, the purpose of which is to expand the drainage area and drain the accumulated water on the water-facing side of the waterstop into the tunnel as much as possible.
[0004] The current problem is that after pouring again, the concrete slurry will enter the seepage holes and block the drain pipe, causing the drain pipe to be unable to drain or difficult to drain.
[0005] The patent with the authorization announcement number CN218522693U discloses a drainage and water-stopping process pipe for civil construction. The patent places an air bag in the plastic drainage pipe (the actual application is an elastic hose). During pouring, the hollow hole is blocked by inflating the hose to prevent concrete slurry from entering the drainage pipe. After the concrete slurry solidifies, the hose can be removed to achieve drainage. However, in actual application, it was found that the plastic drainage pipe is long and curved, and the hose is not easy to penetrate into the plastic drainage pipe or take out, which slows down the construction progress. Utility Model Content
[0006] In order to overcome the deficiencies in the background technology, the utility model discloses a drainage pipe which can automatically open a seepage hole, the purpose of which is to change the sealing structure of the seepage hole, improve the drainage capacity, and reduce the difficulty of anti-leakage construction of concrete construction joints.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] Technical Solution 1: A drainage pipe with automatically opened seepage holes is used for drainage of concrete construction joints. The drainage pipe includes a seepage main pipe with multiple seepage holes. A water-soluble tape is pasted on the outside of the seepage holes. The water-soluble tape is composed of a non-permeable substrate and a water-soluble adhesive layer. When pouring concrete, the water-soluble tape blocks the seepage holes. After the concrete solidifies, the adhesive layer of the water-soluble tape dissolves under immersion in water, and is separated from the blockage of the seepage holes.
[0009] After implementing Technical Solution 1, the beneficial effects are as follows: the drainage pipe utilizes the water-soluble characteristics of the water-soluble tape to block the seepage holes when pouring concrete, preventing concrete slurry from entering the seepage holes and blocking the drainage pipe; after the concrete solidifies, the seepage holes can be automatically opened under the immersion of water to drain the accumulated water in the construction joint. Compared with the existing drainage pipes and anti-leakage methods, the drainage pipe simplifies the structure, improves the drainage capacity, and greatly reduces the difficulty of anti-leakage construction of concrete construction joints.
[0010] Technical Solution 2: Based on Technical Solution 1, the water seepage main pipe is a hard pipe, and at least one end of the drainage pipe is connected to an extended hose.
[0011] If the seepage main pipe is made of a whole hard pipe, its outlet end cannot be bent freely according to the construction requirements. If the seepage main pipe is made of a whole soft pipe, firstly, the placement direction of the seepage hole cannot be controlled, which is not conducive to the entry of accumulated water; secondly, the soft pipe is easily flattened by concrete, which is not conducive to drainage.
[0012] After implementing Technical Solution 2, the beneficial effects are as follows: the seepage main pipe adopts a hard pipe and the external extension hose adopts a soft pipe, which not only meets the needs of drainage, but also meets the needs of construction.
[0013] Technical Solution 3: Based on Technical Solution 2, one end of the water seepage main pipe is connected to an extended hose and the other end is plugged with a plug.
[0014] After implementing the technical solution 3, the beneficial effect is that the water seepage pipe has a water outlet end, and a plug is plugged at the other end of the water seepage pipe. When pouring concrete, the plug can prevent concrete slurry from entering the water seepage pipe and blocking part of the water seepage holes.
[0015] Technical Solution 4: Based on Technical Solution 2, both ends of the water seepage main pipe are connected to extended hoses, and a valve is connected to one of the extended hoses.
[0016] Some tunnels need to be grouted in the later stages of construction to seal the drainage pipes. The space inside the construction joint is relatively closed, and air is not easy to be discharged. If a seepage main pipe is only connected to one extended hose, it is difficult to inject grout.
[0017] After implementing Technical Solution 4, the beneficial effects are as follows: grouting is performed in one extended hose, and the valve on the other extended hose is opened at the same time, so that the air in the drainage pipe and the construction joint can be discharged in the early stage of grouting, which is conducive to the injection of grouting. Closing the valve in the later stage of grouting is conducive to the filling and pressure maintenance of the grouting.
[0018] Technical solution 5: Based on technical solution 2, 3 or 4, a heat shrink tube is sleeved between the extended hose and the water seepage main pipe.
[0019] After implementing Technical Solution 5, the beneficial effect produced is that the heat shrink tube will shrink after being heated, which helps to strengthen the sealing between the extended hose and the water seepage main pipe.
[0020] Technical Solution 6: On the basis of Technical Solution 1, a groove is provided on the water seepage main pipe along the axial direction, and the water seepage hole is provided in the groove; when pouring concrete, the groove of the water seepage main pipe is placed downward.
[0021] After implementing Technical Solution 6, the beneficial effects are as follows: the seepage holes are arranged in the grooves, and the grooves are placed downwards, which can prevent concrete from entering the grooves; secondly, leave space for the water-soluble tape to fall off; and thirdly, facilitate the accumulation of water to enter the seepage main pipe.
[0022] Technical Solution 7: Based on Technical Solution 6, a protruding annular rib is provided on the outside of the seepage main pipe.
[0023] After implementing Technical Solution 7, the beneficial effects are: the fluidity of concrete is less than that of water, and the protruding annular reinforcement can create a tiny gap between the seepage main pipe and the casting surface, which can prevent concrete from entering the groove but will not prevent accumulated water from entering the groove.
[0024] Technical Solution 8: Based on Technical Solution 1, the non-permeable substrate is a plastic film, which can be one of a polyester film, a PVC film, a polyethylene film, an acrylic film, and a polyimide film. The above films are all non-permeable and can block the adhesive layer from contacting the water in the concrete slurry when pouring concrete.
[0025] Technical Solution 9: Based on Technical Solution 1, the material of the adhesive layer can be one of polyvinyl alcohol water-based adhesives, vinyl acetate water-based adhesives, acrylic water-based adhesives, polyurethane water-based adhesives, epoxy water-based adhesives, phenolic water-based adhesives, silicone water-based adhesives, and rubber water-based adhesives. The above adhesives are all water-soluble adhesives, which will become water-soluble when exposed to water and lose their adhesiveness.
[0026] Technical Solution 10: Based on Technical Solution 1, after the concrete solidifies, water at 35-50°C is introduced into the seepage main pipe.
[0027] After implementing technical solution 10, the beneficial effects are: higher water temperature is conducive to improving the water solubility of the adhesive layer. Passing 35-50°C water into the seepage main pipe can shorten the time for the seepage hole to be opened. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Attached Figure 1 Shown is a schematic diagram of the anti-leakage construction of concrete construction joints.
[0029] Attached Figure 2 The attached Figure 1 A partial enlarged schematic diagram of .
[0030] Attached Figure 3 Shown is a schematic diagram of the structure of an existing drainage pipe and a concrete construction joint.
[0031] Attached Figure 4 What is shown is a schematic diagram of the structure of the drainage pipe in Example 1.
[0032] Attached Figure 5 Shown is a schematic diagram of the cross-sectional structure of the water-soluble tape.
[0033] Attached Figure 6 What is shown is a schematic diagram of the cross-sectional structure of the water seepage main pipe and the concrete construction joint in Example 1.
[0034] Attached Figure 7 What is shown is a structural schematic diagram of the drainage pipe in Example 2.
[0035] Attached Figure 8 Another structural schematic diagram of the drainage pipe in Example 2 is shown.
[0036] Attached Fig. 9 What is shown is a structural schematic diagram of the water seepage main pipe in Example 3.
[0037] Attached Fig.10 Another structural schematic diagram of the water seepage main pipe in Example 3 is shown.
[0038] Attached Fig.11 What is shown is the structural schematic diagram of the water seepage main pipe in Example 4.
[0039] Attached Fig.12 The schematic diagram of the structure of the water seepage main pipe and the water-soluble adhesive tape in Example 4 is shown.
[0040] Attached photos
[0041] 1. Concrete lining;
[0042] 11. Casting surface; 12. Waterstop; 13. Construction joint;
[0043] 2. Drain pipe;
[0044] 21. Seepage main pipe; 211. Seepage hole; 212. Groove; 213. Ring rib; 214. Grooved segment; 215. I-shaped segment; 216. Spiral rib; 217. Seepage joint; 22. Water-soluble tape; 221. Adhesive layer; 222. Non-permeable substrate; 23. Extended hose; 24. Plug; 25. Valve. DETAILED DESCRIPTION
[0045] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the scope of protection of the present invention. It should be noted that in the description of the present invention, the terms "front", "rear", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of description, rather than indicating or implying that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. It should also be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or the internal connection of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. Embodiment 1:
[0046] The utility model relates to a drainage pipe with a seepage hole which can automatically open, and is used for drainage of the longitudinal concrete construction joint of the secondary lining of a tunnel.
[0047] See attached Figure 4 The drainage pipe 2 includes a water seepage main pipe 21. In this embodiment, the water seepage main pipe 21 is a whole plastic round pipe. A plurality of water seepage holes 211 are provided on the water seepage main pipe 21, and a water-soluble adhesive tape 22 is attached to the outside of the water seepage main pipe 21.
[0048] See attached Figure 5 The water-soluble tape 22 is composed of a water-impermeable substrate 222 and a water-soluble adhesive layer 221. The material of the adhesive layer 221 can be one of polyvinyl alcohol-based water-based adhesives, vinyl acetate-based water-based adhesives, acrylic acid-based water-based adhesives, polyurethane-based water-based adhesives, epoxy-based adhesives, phenolic-based water-based adhesives, silicone-based water-based adhesives, and rubber-based water-based adhesives. These adhesives have adhesion and water solubility, and will become water-soluble when in contact with water, losing adhesion.
[0049] As a support body of the adhesive layer 221, the non-permeable substrate 222 has waterproof and water-proof functions. When pouring concrete, the non-permeable substrate 222 can block the contact between the adhesive layer 221 and the concrete slurry. Common non-permeable substrates 222 are plastic films, which can be one of polyester films, PVC films, polyethylene films, acrylic films, and polyimide films. The non-permeable substrate 222 is not limited to plastic films, and can also be non-permeable paper-based substrates and cloth-based substrates such as coated kraft paper and coated non-woven fabrics.
[0050] See attached Figure 6 When pouring concrete, the water seepage main pipe 21 is placed on the water-facing surface of the waterstop 12, and the water seepage hole 211 is biased toward the pouring surface 11. Since the water in the concrete slurry is blocked by the non-permeable substrate 222, and the initial setting time of concrete is usually only 1-3 hours, the water-soluble phenomenon only occurs at the edge of the adhesive layer 221. The water-soluble tape 22 still has some bonding force, which can prevent the concrete slurry from entering the water seepage hole 211 to block the water seepage main pipe 21, resulting in the water seepage main pipe 21 being unable to drain.
[0051] After the newly poured concrete solidifies, a construction joint 13 will be formed on the casting surface 11. The water in the surrounding rock or initial support will enter the construction joint 13, causing water accumulation in the construction joint 13. In addition, the newly poured concrete will shrink after solidification, forming a ring seam on the periphery of the seepage main pipe 21, and the accumulated water in the construction joint 13 will enter the ring seam. This is also the reason why a drain pipe is placed on the casting surface for drainage. By placing a drain pipe 2, the accumulated water in the construction joint 13 can be introduced into the drain pipe 2 through the seepage hole 211, and then discharged into the tunnel, gradually draining the accumulated water in the surrounding rock or initial support.
[0052] For the present drainage pipe, there are two ways to open the water seepage hole 211: one is to let a small amount of water pass into the water seepage main pipe 21, and the water directly contacts the adhesive layer 221 through the water seepage hole 211, so that the adhesive layer 221 is gradually dissolved by water from the inside to the edge, at this time, the water-soluble tape 22 is separated from the blockage of the water seepage hole 211, the water seepage hole 211 is opened, and the drainage pipe 2 starts to drain water outward; the other way is to soak the water-soluble tape 22 in the accumulated water in the construction joint 13 for a long time, so that the adhesive layer 221 is gradually dissolved by water from the edge to the inside, at this time, the water-soluble tape 22 is separated from the blockage of the water seepage hole 211, the water seepage hole 211 is opened, and the drainage pipe 2 starts to drain water outward. Compared with the former, the latter takes a longer time to open the water seepage hole 211.
[0053] In order to shorten the opening time of the water seepage hole 211, water at 35-50°C may be introduced into the water seepage main pipe 21. A higher water temperature is beneficial to improving the water solubility of the adhesive layer 221, which can significantly shorten the opening time of the water seepage hole 211. Embodiment 2:
[0054] If the seepage main pipe 21 in Example 1 is made of a whole hard plastic pipe, its outlet end cannot be bent freely according to construction requirements. If the seepage main pipe 21 is made of a whole soft plastic pipe, firstly, the placement direction of the seepage hole 211 is uncontrollable, which is not conducive to the entry of accumulated water; secondly, the soft plastic pipe is easily flattened by concrete, which is not conducive to drainage.
[0055] In order to solve the above problem, the water seepage main pipe 21 in this embodiment is made of a hard pipe, and at least one end of the two ends of the water seepage main pipe 21 is connected to an extended hose 23.
[0056] See attached Figure 7 In one embodiment, the water seepage main pipe 21 is a hard plastic pipe with a hexagonal cross section, one end of the water seepage main pipe 21 is plugged with an extended hose 23, and the other end is plugged with a plug 24. When pouring concrete, the plug 24 can prevent concrete slurry from entering the water seepage main pipe 21 and blocking part of the water seepage holes 211.
[0057] The hexagonal hard plastic pipe is placed on the casting surface 11. First, it will not roll and can control the direction of the water seepage hole 211. Second, the hard plastic pipe has greater rigidity and will not be flattened by concrete. The extended hose 23 is a soft plastic pipe, which can be bent freely according to construction requirements, which is conducive to draining the accumulated water in the water seepage main pipe 21 into the tunnel. In this way, both the drainage needs and the construction needs are met.
[0058] Some tunnels need to be grouted in the drainage pipe 2 in the later stage of construction to block the drainage pipe 2. The space in the drainage pipe 2 and the construction joint 13 is relatively closed, and air is not easy to be discharged. If a seepage main pipe 21 is only connected to an extended hose 23, it is difficult to inject and enrich the slurry.
[0059] See attached Figure 8 In another embodiment, an extension hose 23 is connected to both ends of the water seepage main pipe 21, and a valve 25 is connected to one of the extension hoses 23. When plugging the drain pipe, grout is injected into one extension hose 23, and the valve 25 on the other extension hose 23 is opened at the same time. In the early stage of grouting, the air in the water seepage main pipe 21 and the construction joint 13 can be discharged, which is conducive to the injection of slurry. Closing the valve 25 in the later stage of grouting is conducive to the filling and pressure maintenance of the slurry.
[0060] In addition, a heat shrink tube (not shown in the figure) is sleeved between the extended hose 23 and the water seepage main pipe 21 . The heat shrink tube shrinks when heated, which helps to strengthen the sealing between the extended hose 23 and the water seepage main pipe 21 .
[0061] It is also worth noting that the water seepage main pipe 21 may also be a hard plastic pipe with other cross-sectional shapes, such as a semicircular pipe, a rectangular pipe, a special-shaped pipe, etc. Embodiment three:
[0062] See attached Fig. 9 The difference from the first embodiment is that a groove 212 is provided in the axial direction on the water seepage main pipe 21 , and a plurality of water seepage holes 211 are provided in the groove 212 .
[0063] In this embodiment, the water seepage main pipe 21 is shaped like a tunnel, with an arched upper portion and a flat lower portion. The groove 212 is arranged on the flat surface with the notch facing downward.
[0064] When pouring concrete, the groove 212 of the water seepage main pipe 21 is placed downward. The water seepage hole 211 is arranged in the groove 212, and the groove 212 is placed downward, firstly, it can prevent concrete from entering the groove 212; secondly, it leaves space for the water-soluble tape 22 to fall off; thirdly, it is conducive to the accumulation of water entering the water seepage main pipe 21.
[0065] See attached Fig.10 In another improved solution, a protruding annular rib 231 is provided on the outside of the water seepage main pipe 21. The fluidity of concrete is lower than that of water, and the protruding annular rib 231 can create a small gap between the water seepage main pipe 21 and the casting surface, which can prevent concrete slurry from entering the groove 212, but will not prevent the accumulated water from entering the groove 212. Embodiment 4:
[0066] The rubber-plastic extrusion winding process can be used to process drainage pipes of any shape. This process does not require complex and expensive injection molds, which can greatly reduce the production cost of drainage pipes.
[0067] Attached Fig.11 The drain pipe is made by the rubber-plastic extrusion winding process, and the water seepage main pipe 21 of the drain pipe is composed of a grooved pipe segment 214, an I-shaped pipe segment 215 and a spiral rib 216. The grooved pipe segment 214 and the I-shaped pipe segment 215 are extruded by an extrusion die, and the spiral rib 216 is extruded by a rotating die. The spiral rib 216 is wound around the outside of the grooved pipe segment 214 and the I-shaped pipe segment 215. The gap between the grooved pipe segment 214 and the I-shaped pipe segment 215 is a water seepage seam 217, and there are two water seepage seams 217. The function of the spiral rib 216 is to heat-melt the grooved pipe segment 214 and the I-shaped pipe segment 215 together to form a water seepage main pipe 21 with a water seepage seam 217.
[0068] See attached Fig.12 In this embodiment, a water-soluble tape 22 is attached to the outside of the water seepage joint 217. When pouring concrete, the water-soluble tape 22 blocks the water seepage joint 217; after the concrete solidifies, the adhesive layer 221 of the water-soluble tape 22 dissolves under the immersion of water, and the water seepage joint 217 is separated from the blockage.
[0069] Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the protection scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A drainage pipe with a seepage hole that can be opened automatically, used for drainage of concrete construction joints, the drainage pipe comprises a seepage main pipe, on which a plurality of seepage holes are provided, and is characterized by: A water-soluble tape is attached to the outside of the water seepage hole. The water-soluble tape is composed of a water-impermeable base material and a water-soluble adhesive layer.
2. A drain pipe with an automatically opened water seepage hole as claimed in claim 1, characterized in that: The water seepage main pipe is a hard pipe, and at least one end of the two ends of the water seepage main pipe is connected with an externally extending hose.
3. A drain pipe with an automatically opened water seepage hole as claimed in claim 2, characterized in that: One end of the water seepage main pipe is connected with an extended hose, and the other end is plugged with a plug.
4. A drain pipe with an automatically opened water seepage hole as claimed in claim 2, characterized in that: Both ends of the water seepage main pipe are connected with externally extending hoses, and a valve is connected to one of the externally extending hoses.
5. A drain pipe with automatically opened water seepage holes as claimed in claim 2, 3 or 4, characterized in that: A heat shrink tube is sleeved between the extended hose and the water seepage main pipe.
6. A drain pipe with an automatically opened water seepage hole as claimed in claim 1, characterized in that: A groove is arranged on the water seepage main pipe along the axial direction, and the water seepage hole is arranged in the groove; when pouring concrete, the groove of the water seepage main pipe is placed downward.
7. A drain pipe with automatically opened water seepage holes as claimed in claim 6, characterized in that: Protruding annular ribs are provided on the outside of the seepage main pipe.
8. The drain pipe with automatically opened water seepage holes as claimed in claim 1, characterized in that: The water-impermeable substrate is a plastic film, and the plastic film can be one of a polyester film, a PVC film, a polyethylene film, an acrylic film, and a polyimide film.
9. A drain pipe with an automatically opened water seepage hole as claimed in claim 1, characterized in that: The material of the adhesive layer can be one of polyvinyl alcohol-based water-based adhesives, vinyl acetate-based water-based adhesives, acrylic-based water-based adhesives, polyurethane-based water-based adhesives, epoxy-based adhesives, phenolic-based water-based adhesives, silicone-based water-based adhesives, and rubber-based water-based adhesives.
Citation Information
Cited By
Drainage pipe and use method thereof in anti-seepage construction of tunnel construction joint
CN118008387A
Drainage pipe capable of automatically opening water seepage holes
CN223974687U