Automatic control drainage pipeline for peak and valley power utilization
By designing peak and valley power-controlled drainage pipelines in the air branch circulating pool, and using the controller to automatically control the start and stop of the water pump, the poor economy and lack of intelligent control in the long-term high-load operation state of the air branch circulating pool are solved. The problem has achieved the economic operation and environmental protection of the water pump.
Patent Information
- Application Number
- CN202420166280.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-23
AI Technical Summary
In the long-term high-load operation state, the air sub-station circulation pool has poor operating economy and lacks intelligent peak-to-valley ladder power control, resulting in energy waste and environmental pollution.
Design a peak-to-valley electricity-controlled drainage pipeline, including a pool, filter pipe, water pump group, filter, drainage pipe and controller. The automatic start-stop control of the water pump is realized through the controller, combined with the peak-to-valley time-sharing electricity-controlled control strategy , optimize the operating status of the water pump.
The economic operation of the water pump is achieved, energy consumption is reduced, poor economic performance and lack of intelligent control under long-term high-load operation states are solved, and the operation efficiency and environmental protection of the circulating water tank are improved.
Smart Images

Figure CN221958688U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of circulating water pools in air separation stations, and in particular relates to a peak-valley electricity automatic drainage pipeline. Background Art
[0002] The circulating water pool of an air separation station refers to a pool or water tank used to recycle water resources in an air separation station or air separation unit. The air separation station is a device used for air separation, purification and storage, and usually produces a large amount of wastewater. In order to save water resources and reduce environmental pollution, the circulating water pool is designed to collect, treat and recycle these wastewaters. The wastewater is first collected in the circulating water pool, purified by treatment equipment to remove pollutants and impurities, and then pumped back to the air separation station or air separation unit for recycling, reducing the demand for fresh water resources, while reducing water treatment costs and environmental impact.
[0003] In daily operation, the circulating water pool of the air separation station is often in a state of long-term high-load operation. The operation economy of the filter pump is poor, and the start and stop control of the filter pump is manual. There is poor flexibility in matching the production organization of the station area with the peak and valley tiered electricity consumption, and the peak and valley tiered electricity consumption strategy is not followed, and there is no intelligent control.
[0004] Combined with the development of green environmental protection work in steel plants, the on-site working environment has been significantly improved. In daily work, the water filter pump is stopped regularly for a period of time every day, which can save energy while meeting the requirements. Therefore, a peak-valley electricity automatic control drainage pipeline is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a peak-valley electricity self-controlled drainage pipeline with a circulating water pool start and stop control function, which solves the problems of long-term high-load operation in the prior art, poor operating economy, failure to follow the peak-valley step-by-step electricity consumption strategy, and lack of intelligent control.
[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is that the utility model provides a peak-valley electricity automatic drainage pipeline, including a pool, a filter pipe is arranged at the bottom of the pool, a water pump group is arranged on the filter pipe, the filter pipe is connected to the filter and then connected back to the top of the pool, a drainage pipe is led out from the filter pipe, and a drainage valve is arranged on the drainage pipe.
[0007] Preferably, the water pump group includes two bypass filter water pumps connected in parallel.
[0008] Preferably, the filter is a shallow sand filter.
[0009] Preferably, the drainage pipe is arranged after the filter on the filter pipe.
[0010] Preferably, a bracket is provided on the top of the pool, and a fan is provided on the bracket.
[0011] Preferably, the water pump group is electrically connected to a controller.
[0012] Preferably, the end of the drainage pipe is connected to a drainage ditch.
[0013] Compared with the prior art, the advantages and positive effects of the utility model are:
[0014] 1. The utility model uses automatic start-stop control to achieve automatic selection and switching, and combines the peak-valley and equal-time electricity control strategy to achieve economical operation of the water pump;
[0015] 2. The utility model has the function of starting and stopping the circulating water pool, which solves the problems of the prior art in long-term high-load operation, poor operation economy, failure to follow the strategy of peak-valley ladder electricity consumption, and lack of intelligent control. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the following is a brief introduction to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor.
[0017] Figure 1 This is a schematic diagram of the structure of a peak-valley electricity automatic control drainage pipeline;
[0018] In the above figure, 1. water pool, 2. filter pipe, 3. water pump group, 4. filter, 5. drainage pipe, 6. drainage ditch, 7. drainage valve, 8. bracket, 9. fan, 10. side filter water pump, 11. controller. DETAILED DESCRIPTION
[0019] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0020] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0021] Embodiment 1, as Figure 1As shown, a peak-valley electricity automatic drainage pipeline includes a pool 1, which is used to collect and store wastewater. A filter pipe 2 is arranged at the bottom of the pool 1, and the internal water is led out from the bottom of the pool 1 through the filter pipe 2. A water pump group 3 is arranged on the filter pipe 2, and the water pump group 3 provides a pumping force for the filter pipe 2 to pump the water in the pool 1 out of the filter pipe 2. The filter pipe 2 is connected to the filter 4 and then back to the top of the pool 1. The filter 4 is responsible for filtering the water flowing in the filter pipe 2. A drainage pipe 5 is led out from the filter pipe 2. The drainage pipe 5 is used to discharge the treated water out of the pool 1. A drainage valve 7 is arranged on the drainage pipe 5, and the drainage valve 7 controls the drainage flow and drainage time.
[0022] The following is a detailed description of the design of the above key components:
[0023] The water pump group 3 includes two bypass filter water pumps 10 connected in parallel. The bypass filter water pumps 10 connected in parallel can improve the reliability and stability of the water pumps. When one water pump has a problem, the other water pump can continue to operate to ensure the normal operation of the system. The parallel connection can also improve the delivery capacity of the system.
[0024] The filter 4 is a shallow sand filter 4. The shallow sand filter 4 has high filtering efficiency and low resistance, and can effectively remove solid particles, suspended matter and organic matter in the wastewater to ensure the purification effect of water quality.
[0025] The drainage pipe 5 is arranged after the filter 4 on the filter pipe 2. It can ensure that the treated water can be fully purified and discharged from the pool 1 after removing impurities, ensuring that the quality of the discharged water meets the requirements.
[0026] A support 8 is provided on the top of the pool 1, and a fan 9 is provided on the support 8. The fan 9 blows air to enhance the convection heat exchange of the water surface, increase the dissolved oxygen content of the water, improve the water quality, ensure the sufficiency of oxygen in the water, and is conducive to the growth of microorganisms in the water body and the decomposition of organic matter in the wastewater.
[0027] The water pump group 3 is electrically connected to a controller 11. The controller 11 can realize automatic start and stop control, automatically adjust the operation state of the water pump group 3 according to needs, and realize economic operation of the water pump and save energy by combining the peak and valley power consumption control strategy.
[0028] The end of the drainage pipe 5 is connected to the drainage ditch 6 to safely and effectively discharge the discharged water out of the system, avoid water retention and secondary pollution, and ensure the environmental protection of drainage.
[0029] When in use, the controller 11 is connected to the DCS control system through design and construction by electrical and instrumentation professionals, so that the water pump group 3 can be switched between the three different states of local, remote and maintenance, and the switch of the water pump group 3 is placed in the remote position.
[0030] Example 2, a peak-valley power consumption automatic drainage pipeline as described in Example 1, four selection buttons are designed on the controller 11. According to the peak-valley-flat power consumption control strategy, programming is performed on the DCS operating system to develop selection buttons for four different seasons. Each button corresponds to the start and end time of the peak power consumption time, and the time is used as the control time for the bypass filter water pump 10 to stop and start. When one of the buttons is selected, the bypass filter water pump 10 automatically realizes the start and stop control according to the pre-designed stop and start time; the drain valve 7 is matched with the design time of the selection button.
[0031] The contents not described in detail in this specification belong to the prior art known to professionals in this field.
[0032] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A peak-valley electricity automatic drainage pipeline, characterized in that: It includes a pool, a filter pipe is provided at the bottom of the pool, a water pump group is provided on the filter pipe, the water pump group is electrically connected with a controller, the filter pipe is connected to the filter and then connected back to the top of the pool, a drainage pipe is led out from the filter pipe, a drainage valve is provided on the drainage pipe, and the water pump group includes two bypass filter water pumps connected in parallel; Four selection buttons for different seasons are developed. Each selection button corresponds to the start and end time of peak electricity consumption. The time is used as the control time for stopping and starting the bypass filter water pump. The bypass filter water pump automatically starts and stops according to the stop and start time, and the drain valve is matched with the design time of the selection button.
2. The peak-valley electricity automatic drainage pipeline according to claim 1 is characterized in that: The filter is a shallow sand filter.
3. The peak-valley electricity automatic drainage pipeline according to claim 1 is characterized in that: The drainage pipe is arranged behind the filter on the filter pipe.
4. The peak-valley electricity automatic drainage pipeline according to claim 1 is characterized in that: A bracket is arranged on the top of the pool, and a fan is arranged on the bracket.
5. The peak-valley electricity automatic drainage pipeline according to claim 3 is characterized in that: The end of the drainage pipe is connected to the drainage ditch.