Electric power engineering construction pipeline supporting device
Through the combination of design support units and buffer units, the problem of complex and lack of buffering in pipeline support structure in power engineering construction is solved, simple positioning support and effective buffering of pipelines are realized, and construction costs and risks are reduced.
Patent Information
- Application Number
- CN202420549905.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During power construction, the fixed structure of pipeline support is complex, the installation and positioning are inconvenient, and there is no buffer structure, which can easily lead to pipeline damage.
A pipeline support device including a support unit, an installation unit, a clamping unit and a buffering unit is designed. The positioning support and buffering of the pipeline is realized through components such as arc-shaped clamping plates, positioning insert plates, return springs and rotating seats, simplifying installation. and disassembly process, and improve the buffering effect of impact vibration through double cushioning springs.
It realizes simple and easy-to-operate positioning support and buffering of the pipeline, reduces installation and maintenance costs, avoids damage to the pipeline under impact and vibration, and improves construction efficiency and safety.
Smart Images

Figure CN221961552U_ABST
