Desulfurization regeneration tower

By setting an annular conveying pipe and an inclined flushing pipe on the expander of the desulfurization regeneration tower, combining the air-guided adsorption structure and the annular depression bottom, the problem of sulfur paste agglomeration and blockage is solved, and the effect of efficient sulfur foam extraction and fire water saving is achieved. Reduced production costs.

CN221964945UActive Publication Date: 2024-11-08XIAOYI PENGFEI IND CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420431622.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-08
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

After the existing desulfurization and regeneration tower is running, the sulfur paste in the expander is blocked, causing the foam overflow pipe to be blocked, affecting the export of sulfur foam. The use of fire water to flush the flushing effect is not ideal and consumes a lot, resulting in high production costs.

Method used

A desulfurization regeneration tower is designed, including the arrangement of annular conveying pipe and an inclined flushing pipe on the side wall on the outside of the expander to form a multi-channel cyclone, combining the air-guided adsorption structure and annular depression bottom to facilitate sulfur foam collection and desulfurization treatment. And save fire water through DN32 stainless steel pipes.

Benefits of technology

It realizes efficient sulphur paste in the expander to prevent blockage, ensure suspended sulfur indicators, save fire water, and reduce production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221964945U_ABST
    Figure CN221964945U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of desulfurization regeneration towers, and particularly relates to a desulfurization regeneration tower which comprises a regeneration tower, the bottom of the regeneration tower is connected with a reaction tank through a pipeline, an expander is arranged at the top end of the regeneration tower, and the bottom of the expander is sunken downwards to form an annular sunken bottom. The expander is also provided with a foam overflow pipe, a desulfurization tower overflow pipe, a flushing structure and a gas guide adsorption structure. One end of the foam overflow pipe is communicated with the annular sunken bottom, and the other end is connected with the foam tank; one end of the desulfurization tower overflow pipe is communicated with the side wall of the expander, and the other end is connected with the top of the desulfurization tower; the flushing structure comprises an annular conveying pipe and a flushing pipe, one end of the flushing pipe is communicated with the annular conveying pipe, and the other end of the flushing pipe is tangentially arranged on the side wall of the expander in the circumferential direction of the expander and slightly inclines downwards; the air guide adsorption structure comprises an air guide hopper and an adsorption groove plate. According to the device, small blocks of sulfur paste in the expander can be efficiently flushed off in time, fire fighting water can be saved, and the production cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of desulfurization regeneration towers, in particular to a desulfurization regeneration tower. Background Art

[0002] The desulfurization regeneration tower is mainly an auxiliary equipment for desulfurization of exhaust gas. After the existing desulfurization regeneration tower has been running for a period of time, the sulfur paste in the expander will cause the foam overflow pipe to be blocked, affecting the timely discharge of sulfur foam, and even causing the suspended sulfur to exceed the standard and the tower body to be blocked. In view of the above situation, the workshop stipulates that the regeneration tower expander should be flushed every month to prevent the overflow pipe from being blocked. The fire hose was originally used to connect the fire water for flushing. Due to the poor quality of the fire hose, the fire hose will be damaged after 1-2 times of use; and when this flushing method is used, not only is the flushing effect not very ideal, but the fire water consumption is also very high. Therefore, based on the above problems, how to design a desulfurization regeneration tower that can efficiently flush out the small pieces of sulfur paste in the expander in time, save fire water, and save production costs is a technical problem that needs to be solved urgently. Utility Model Content

[0003] In order to solve the problems existing in the above-mentioned prior art, the utility model provides a desulfurization regeneration tower which can efficiently flush out the small pieces of sulfur paste in the expander in time, save fire water and save production costs.

[0004] The technical solution adopted by the utility model to solve this problem is:

[0005] A desulfurization regeneration tower, comprising a regeneration tower, wherein the bottom of the regeneration tower is connected to a reaction tank through a pipeline, an expander is arranged at the top of the regeneration tower, the bottom of the expander is concave to form an annular concave bottom, and the expander is also provided with:

[0006] A foam overflow pipe, one end of which is connected to the bottom of the annular depression and the other end of which is connected to the foam groove;

[0007] A desulfurization tower overflow pipe, one end of which is connected to the side wall of the expander, and the other end is connected to the top of the desulfurization tower;

[0008] A flushing structure, comprising an annular delivery pipe arranged around the outside of the expander and a plurality of flushing pipes arranged on the side wall of the expander, one end of the flushing pipe is connected to the annular delivery pipe, and the other end is arranged tangentially on the side wall of the expander along the circumference of the expander and slightly inclined downward, and an input interface is arranged on the annular delivery pipe;

[0009] The air guide adsorption structure comprises an air guide hopper arranged in an expander and an adsorption slot plate arranged on the air guide hopper.

[0010] In one embodiment, the diameter of the expander is greater than the diameter of the regeneration tower, and the top of the regeneration tower is integrally connected to the annular recessed bottom of the expander.

[0011] In one embodiment, a dome-shaped cover is provided on the top of the expander.

[0012] In one embodiment, the air guide scoop is disposed between the dome-shaped top cover and the expander, the air guide scoop is an inverted hollow truncated cone structure, the adsorption trough plate is evenly distributed with filter holes, and the adsorption trough plate is provided with an activated carbon adsorption layer.

[0013] In one embodiment, the flushing pipe is located below the air guide scoop, and each of the flushing pipes is arranged in a circular array on the side wall of the expander.

[0014] In one embodiment, the inclination angle between the flushing pipe and the cross section of the expander is between 0-15°.

[0015] In one embodiment, a valve is provided on the foam overflow pipe.

[0016] In one embodiment, an overflow elbow is provided on the desulfurization tower overflow pipe.

[0017] In one embodiment, the reaction tank is connected to the desulfurization tower through a pipeline, and a desulfurization circulation pump is provided on the pipeline between the regeneration tower and the reaction tank. The desulfurization circulation pump is connected to a three-way pipeline, one pipeline of the three-way pipeline is connected to the regeneration tower through a pipeline, and the other pipeline is connected to the input interface of the annular delivery pipe through a DN32 stainless steel pipeline.

[0018] In one embodiment, a valve and a pump are also provided in the pipeline / pipeline.

[0019] The advantages and positive effects of the utility model are:

[0020] 1. In the utility model, a special flushing structure is arranged on the expander, and the flushing structure includes an annular conveying pipe arranged around the outside of the expander and a plurality of flushing pipes arranged on the side wall of the expander. One end of the flushing pipe is connected with the annular conveying pipe, and the other end is arranged on the side wall of the expander tangent to the circumference of the expander and slightly inclined downward. Fire water can be connected through the input interface of the annular conveying pipe. The fire water enters the expander through the flushing pipe tangent to the circumference of the expander, and can form multiple slightly downward vortexes, which can effectively flush out the small pieces of sulfur paste in the expander in time, prevent excessive accumulation from causing blockage of the foam overflow pipe, so that the sulfur foam can be discharged in time to ensure the suspended sulfur index.

[0021] 2. In the utility model, an air-conducting adsorption structure is arranged in the expander, which can adsorb the sulfur-containing substances in the exhaust gas, thereby realizing the desulfurization treatment of the exhaust gas.

[0022] 3. In the utility model, the bottom of the expander is concave to form an annular recessed bottom, and the top of the regeneration tower is integrally connected to the annular recessed bottom of the expander. The annular recessed bottom is annularly concave, which can facilitate the sulfur foam in the expander to gather and discharge into the foam tank through the foam overflow pipe.

[0023] 4. In the utility model, the input interface of the annular delivery pipe can not only be connected to fire water, but also can be connected to the three-way pipeline through a DN32 stainless steel pipe. A DN32 stainless steel pipe is added at the outlet pipe of the desulfurization circulation pump to the top of the regeneration tower to flush the regeneration tower expander, saving fire water and saving production costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The technical solution of the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments, but it should be understood that these drawings are designed only for the purpose of explanation and are not intended to limit the scope of the utility model. In addition, unless otherwise specified, these drawings are only intended to conceptually illustrate the structural configurations described herein and are not necessarily drawn to scale.

[0025] Figure 1 This is a schematic diagram of the structure of the utility model Figure 1 ;

[0026] Figure 2 yes Figure 1 The main view of

[0027] Figure 3 yes Figure 1 Structural diagram of the middle regeneration tower;

[0028] Figure 4 yes Figure 3 The main view of

[0029] Figure 5 yes Figure 3 Exploded diagram of

[0030] Figure 6 yes Figure 5 The main view of

[0031] Figure 7 yes Figure 3 The half-section structure of Figure 1 ;

[0032] Figure 8 yes Figure 7 The main view of

[0033] Fig. 9 yes Figure 3 The half-section structure of Figure 2 ;

[0034] Fig.10yes Fig. 9 A top view of

[0035] Fig.11 This is a schematic diagram of the structure of the utility model Figure 2 ;

[0036] Fig.12 yes Fig.11 Structural diagram of the middle regeneration tower;

[0037] Fig.13 yes Fig.12 Exploded diagram of

[0038] Fig.14 yes Fig.13 The half-section structure of Figure 1 ;

[0039] Fig.15 yes Fig.13 The half-section structure of Figure 2 .

[0040] In the figure: 1-regeneration tower; 2-reaction tank; 3-expander; 4-annular depressed bottom; 5-foam overflow pipe; 6-foam tank; 7-desulfurization tower overflow pipe; 8-annular delivery pipe; 9-flushing pipe; 10-input interface; 11-air guide hopper; 12-arched top cover; 13-overflow elbow; 14-desulfurization circulation pump; 15-three-way pipeline. DETAILED DESCRIPTION

[0041] First of all, it should be noted that the specific structure, features and advantages of the present invention will be specifically described below by way of example, but all descriptions are only for illustration and should not be understood as limiting the present invention in any way. In addition, any single technical feature described or implied in the embodiments mentioned herein, or any single technical feature displayed or implied in the drawings, can still be combined or deleted between these technical features (or their equivalents) to obtain more other embodiments of the present invention that may not be directly mentioned in this document. In addition, in order to simplify the drawings, the same or similar technical features may be marked in only one place in the same drawing.

[0042] In the present utility model, unless otherwise clearly specified and limited, the terms "installation", "setting", "connection", "fixation", "screwing" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined, for ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances. The present utility model is described in detail below in conjunction with the accompanying drawings.

[0043] Embodiment 1:

[0044] A desulfurization regeneration tower comprises a regeneration tower 1, the bottom of the regeneration tower 1 is connected to a reaction tank 2 through a pipeline, an expander 3 is arranged at the top of the regeneration tower 1, the bottom of the expander 3 is concave to form an annular concave bottom 4, and a foam overflow pipe 5, a desulfurization tower overflow pipe 7, a flushing structure and a gas guide adsorption structure are also arranged on the expander 3, wherein:

[0045] A foam overflow pipe 5, one end of which is connected to the annular recessed bottom 4, and the other end of which is connected to the foam groove 6;

[0046] A desulfurization tower overflow pipe 7, one end of which is connected to the side wall of the expander 3, and the other end is connected to the top of the desulfurization tower;

[0047] The flushing structure includes an annular delivery pipe 8 arranged around the outside of the expander 3 and a plurality of flushing pipes 9 arranged on the side wall of the expander 3. One end of the flushing pipe 9 is connected to the annular delivery pipe 8, and the other end is tangentially arranged on the side wall of the expander 3 along the circumference of the expander 3 and slightly inclined downward. An input interface 10 is arranged on the annular delivery pipe 8;

[0048] The air guide adsorption structure comprises an air guide hopper 11 arranged in the expander 3 and an adsorption slot plate arranged on the air guide hopper 11 .

[0049] In this embodiment, the desulfurization regeneration tower is used in conjunction with the desulfurization tower and the regeneration tower. The desulfurization tower and the regeneration tower are respectively connected to the reaction tank 2 through pipelines, and valves and pumps are provided on the pipelines, wherein: the desulfurization tower is lower than the regeneration tower, the expander 3 of the regeneration tower 1 is connected to the top of the desulfurization tower through the desulfurization tower overflow pipe 7, and the expander 3 of the regeneration tower 1 is connected to the foam tank 6 through the foam overflow pipe 5, and valves and foam pumps are provided on the foam overflow pipe 5. Specifically: the coal gas enters from the lower part of the desulfurization tower and is discharged from the top. The lower part of the desulfurization tower is connected to the reaction tank, and the reaction tank is connected to the bottom of the regeneration tower through a pipeline. The top of the regeneration tower is connected to the desulfurization tower through the desulfurization tower overflow pipe, and the foam overflow port at the top of the regeneration tower is provided with a foam overflow pipe connected to the foam tank.

[0050] It should be noted that the above-mentioned desulfurization tower is a conventional desulfurization tower available on the market, which is not the innovation of the present technical solution. Its structural combination and illustration will not be described in detail, and it is not shown in the drawings.

[0051] During operation, after the desulfurization regeneration tower has been running for a period of time, the sulfur paste in the expander will agglomerate, causing the foam overflow pipe to be blocked, affecting the timely discharge of sulfur foam, and even causing the suspended sulfur to exceed the standard and the tower to be blocked. In view of the above situation, the workshop stipulates that the regeneration tower expander should be flushed every month to prevent the overflow pipe from being blocked. The fire hose was originally used to connect the fire water for flushing. Due to the poor quality of the fire hose, the fire hose will be damaged after 1-2 times of use. In order to solve the above problems, a special flushing structure is provided on the expander, which includes an annular conveying pipe 8 arranged around the outside of the expander 3 and a plurality of flushing pipes 9 arranged on the side wall of the expander 3. One end of the flushing pipe 9 is connected to the annular conveying pipe 8, and the other end is arranged on the side wall of the expander 3 tangentially along the circumference of the expander 3 and slightly inclined downward. Fire water can be connected through the input interface 10 of the annular conveying pipe 8. The fire water enters the expander 3 through the flushing pipe 9 tangentially to the circumference of the expander 3, which can form multiple slightly downward vortices, and can efficiently flush out the small pieces of sulfur paste in the expander in time, prevent excessive accumulation from clogging the foam overflow pipe, so that the sulfur foam can be discharged in time to ensure the suspended sulfur index. In addition, an air guide adsorption structure is also provided in the expander 3. The air guide adsorption structure is located above the flushing structure, and includes an air guide hopper 11 and an adsorption tank plate. The adsorption tank plate can adsorb sulfur-containing substances in the exhaust gas, thereby realizing desulfurization of the exhaust gas.

[0052] Furthermore, in the present embodiment, it can also be considered that the diameter of the expander 3 is larger than the diameter of the regeneration tower 1, and the top of the regeneration tower 1 is integrally connected with the annular recessed bottom 4 of the expander 3, and the annular recessed bottom 4 is annularly concave, which can facilitate the sulfur foam in the expander to gather and be discharged into the foam tank 6 through the foam overflow pipe 5.

[0053] Furthermore, in this embodiment, it can also be considered that a dome-shaped top cover 12 is provided at the top end of the expander 3 .

[0054] Furthermore, in the present embodiment, it can also be considered that the air guide scoop 11 is arranged between the dome-shaped top cover 12 and the expander 3, the air guide scoop 11 is an inverted hollow truncated cone structure, the adsorption trough plate is evenly distributed with filter holes, and the adsorption trough plate is provided with an activated carbon adsorption layer, and the activated carbon adsorption layer can adsorb sulfur-containing substances in the exhaust gas, thereby achieving desulfurization of the exhaust gas.

[0055] Furthermore, in the present embodiment, it can also be considered that the flushing pipe 9 is located below the air guide scoop 11 and above the desulfurization tower overflow pipe 7, and each of the flushing pipes 9 is arranged in a circular array on the side wall of the expander 3. Taking the present embodiment as an example, four flushing pipes 9 are arranged in a circular array on the side wall of the expander 3, and four swirls can be formed each time to flush the inner wall of the expander, thereby achieving flushing without dead ends.

[0056] Furthermore, in this embodiment, it can also be considered that the inclination angle between the flushing pipe 9 and the cross section of the expander 3 is between 0-15°.

[0057] Furthermore, in this embodiment, it can also be considered that the foam overflow pipe 5 is provided with a valve.

[0058] Furthermore, in this embodiment, it can also be considered that an overflow elbow 13 is provided on the desulfurization tower overflow pipe 7, and a valve is provided on the desulfurization tower overflow pipe 7.

[0059] Embodiment 2:

[0060] The reaction tank 2 is connected to the desulfurization tower through a pipeline, and a desulfurization circulation pump 14 is provided on the pipeline between the regeneration tower 1 and the reaction tank 2. The desulfurization circulation pump 14 is connected to a three-way pipeline 15, one pipeline of the three-way pipeline 15 is connected to the regeneration tower 1 through a pipeline, and the other pipeline is connected to the input interface 10 of the annular delivery pipe 8 through a DN32 stainless steel pipeline. The input interface 10 of the annular delivery pipe 8 can not only be connected to fire water, but also connected to the three-way pipeline 15 through a DN32 stainless steel pipeline. A DN32 stainless steel pipeline is added at the outlet pipe of the desulfurization circulation pump to the top of the regeneration tower for flushing the regeneration tower expander, saving fire water and saving production costs.

[0061] In this embodiment, a DN32 pipe is added at the outlet pipe of the desulfurization circulation pump of the reaction tank and connected to the top of the regeneration tower, and the regeneration tower expander is flushed with the desulfurization circulation liquid. A fire hose costs 90 yuan per plate, 3 plates are used for flushing, and the regeneration tower is flushed twice a month, which saves about 270 yuan in fire hose costs; about 260 yuan in fire pump startup electricity costs; and about 150 tons of fire water per month.

[0062] Furthermore, in this embodiment, it can also be considered that valves and pumps are also provided in the pipeline / pipeline.

[0063] The above embodiments describe the present invention in detail, but the above contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of application of the present invention shall still fall within the scope of the patent coverage of the present invention.

Claims

1. A desulfurization regeneration tower, comprising a regeneration tower, the bottom of which is connected to a reaction tank through a pipeline, Features: The top of the regeneration tower is provided with an expander, the bottom of the expander is concave to form an annular concave bottom, and the expander is also provided with: A foam overflow pipe, one end of which is connected to the bottom of the annular depression and the other end of which is connected to the foam groove; A desulfurization tower overflow pipe, one end of which is connected to the side wall of the expander, and the other end is connected to the top of the desulfurization tower; A flushing structure, comprising an annular delivery pipe arranged around the outside of the expander and a plurality of flushing pipes arranged on the side wall of the expander, one end of the flushing pipe is connected to the annular delivery pipe, and the other end is arranged tangentially on the side wall of the expander along the circumference of the expander and slightly inclined downward, and an input interface is arranged on the annular delivery pipe; The air guide adsorption structure comprises an air guide hopper arranged in an expander and an adsorption slot plate arranged on the air guide hopper.

2. A desulfurization regeneration tower according to claim 1, Features: The diameter of the expander is greater than the diameter of the regeneration tower, and the top of the regeneration tower is integrally connected with the annular concave bottom of the expander.

3. A desulfurization regeneration tower according to claim 2, Features: The top end of the expander is provided with a dome-shaped top cover.

4. A desulfurization regeneration tower according to claim 3, Features: The air guide scoop is arranged between the round arch top cover and the expander. The air guide scoop is an inverted hollow truncated cone structure. The adsorption tank plate is evenly distributed with filter holes, and the adsorption tank plate is provided with an activated carbon adsorption layer.

5. A desulfurization regeneration tower according to claim 1, Features: The flushing pipe is located below the air guide scoop, and each of the flushing pipes is arranged on the side wall of the expander in a circular array.

6. A desulfurization regeneration tower according to claim 5, Features: The inclination angle between the flushing pipe and the cross section of the expander is between 0-15°.

7. A desulfurization regeneration tower according to claim 1, Features: The foam overflow pipe is provided with a valve.

8. A desulfurization regeneration tower according to claim 1, Features: An overflow elbow is arranged on the desulfurization tower overflow pipe.

9. A desulfurization regeneration tower according to claim 1, Features: The reaction tank is connected to the desulfurization tower through a pipeline. A desulfurization circulation pump is provided on the pipeline between the regeneration tower and the reaction tank. The desulfurization circulation pump is connected to a three-way pipeline. One pipeline of the three-way pipeline is connected to the regeneration tower through a pipeline, and the other pipeline is connected to the input interface of the annular delivery pipe through a DN32 stainless steel pipeline.

10. A desulfurization regeneration tower according to claim 1, Features: The pipeline / pipeline is also provided with valves and pumps.

Citation Information

Cited By

  • Flushing equipment for expanded part of sulfur channel at top of desulfurization regeneration tower

    CN121869797A