Conveying device for building material pipe pile machining
By designing an adjustable conveying device, the problem that traditional devices cannot effectively support pipe piles of different lengths and short lengths is solved, stable and safe conveying of pipe piles is achieved, and production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202420779869.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-16
AI Technical Summary
Traditional pipe pile conveying devices are inefficient and have poor safety, and cannot effectively support pipe piles of different lengths, which affects production efficiency and product quality.
A conveying device for building materials pipe pile processing is designed. By adjusting the position of the two bearing plates left and right, and using the design of the inner concave support and restriction plates, we ensure that pipe piles of different lengths are stable and safe during the conveying process. The device includes a fixed bottom frame, a universal wheel, a sliding load bearing frame, an adjustment block, a reset rod, a limiting plate and a threaded rod to ensure the fixation and stability of the pipe pile during the conveying process.
It realizes stable support and safe transportation of pipe piles of different lengths and short lengths, prevents shaking and falling, and improves production efficiency and product quality.
Smart Images

Figure CN221969574U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe pile processing and transportation, in particular to a transportation device used for processing building material pipe piles. Background Art
[0002] With the acceleration of urbanization, the construction industry is developing rapidly. Among many building materials, pipe piles are widely used in the foundation support of important projects such as high-rise buildings, bridges, and subways due to their excellent bearing capacity and construction convenience. However, in the production and processing of pipe piles, the traditional transportation method is inefficient and unsafe, which seriously restricts the production efficiency and product quality of pipe pile manufacturers. Therefore, the development of an efficient and safe construction material pipe pile processing and transportation device is of great significance to improving the efficiency of pipe pile production and processing and ensuring production safety.
[0003] During the processing and transportation of building material pipe piles, due to the different lengths and types of the pipe piles, it is necessary to adjust the positions of the two bearing plates, otherwise the two bearing plates cannot carry the pipe piles of different lengths. Once the lengths of the processed pipe piles change, the conveying device will not be able to transport the processed pipe piles. Utility Model Content
[0004] The disclosed embodiment relates to a conveying device for processing building material pipe piles. According to the different lengths of the pipe piles, the positions of two bearing plates are adjusted left and right, and the concave surfaces of the two bearing plates are used to support the two ends of the pipe piles. At the same time, the two ends of the pipe piles can be restricted. The conveying device can support pipe piles of different lengths to ensure the safety and stability of transportation.
[0005] In a first aspect of the present disclosure, a conveying device for processing building material pipe piles is provided, which specifically comprises: a fixed bottom frame; universal wheels are respectively installed at the four corners of the bottom of the fixed bottom frame; a bearing frame is slidably installed at the upper end of the top of the fixed bottom frame; grooves are respectively provided at the bottoms of both ends of the bearing frame; two through-holes are respectively provided at both ends of the bearing frame; symmetrical adjustment blocks are slidably installed on the bearing frame, and a rectangular groove is provided in the middle of the adjustment block;
[0006] Track grooves are respectively provided at both ends of the two adjustment blocks; mutually symmetrical reset rods are respectively fixedly connected to the opposite ends of the two adjustment blocks, and springs are sleeved on the annular side walls of the reset rods; a connecting plate is fixedly installed at the left ends of the two reset rods at the left end; a connecting plate is fixedly installed at the right ends of the two reset rods at the right end, and a handle is fixedly installed on the connecting plate;
[0007] Support blocks are fixedly installed at the rectangular grooves in the middle of the two adjustment blocks, arc-shaped bearing plates are fixedly installed at the upper ends of the two support blocks, and a limiting plate is fixedly installed on the inner concave surface of the bearing plate, and two through sliding holes are respectively opened on the two limiting plates, and extended notches are respectively opened at the lower ends of the two bearing plates facing away from one end, and a through threaded hole is opened in the middle of the extended notch;
[0008] A threaded rod is rotatably installed at the threaded holes of the two extended slots, and a bearing ring is rotatably installed at the upper end of the threaded rod. A threaded cylinder is rotatably installed on the two threaded rods, and an adjustment plate is fixedly installed at the outer rings of the two bearing rings. Mutually symmetrical slides are fixedly installed at the opposite ends of the two adjustment plates, and an arc-shaped limit plate is fixedly installed on the side wall of the other end of the slide.
[0009] In at least some embodiments, symmetrical traction blocks are fixedly installed on the right side wall of the fixed bottom frame, and a penetrating hook hole is opened on the traction block, vertically upward guide rods are fixedly installed at the four corners of the fixed bottom frame, and electric push rods are fixedly installed at both ends of the top of the fixed bottom frame.
[0010] In at least some embodiments, track bars are fixedly mounted on the bottoms of both ends of the carrying frame, and penetrating guide holes are respectively opened at the four corners of the carrying frame.
[0011] The utility model provides a conveying device for processing building material pipe piles, which has the following beneficial effects:
[0012] When the conveying device of the utility model is in use, the positions of the two bearing plates are adjusted left and right according to the different lengths of the pipe piles, and the inner concave surfaces of the two bearing plates are used to support the two ends of the pipe piles, and at the same time, the two ends of the pipe piles can be restricted. The conveying device can support pipe piles of different lengths, ensuring the safety and stability of transportation.
[0013] The anti-slip strip at the outer end of the limit plate will be pressed tightly against the bottom of the side wall of the inner cavity of the pipe pile, and then the threaded tube will be grasped and rotated to move upward, and the top of the threaded tube will be squeezed tightly against the side wall of the extended groove to fix and limit the threaded rod. The two limit plates squeeze and fix the two ends of the inner cavity of the pipe pile downward, fix and limit the two ends of the pipe pile to prevent shaking and falling during transportation, thereby stably transporting the pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the drawings of the embodiment will be briefly introduced below.
[0015] The drawings described below only relate to some embodiments of the present invention, but are not intended to limit the present invention.
[0016] In the attached picture:
[0017] Figure 1 The schematic diagram of the upper left front axial structure of the present application is shown;
[0018] Figure 2 The schematic diagram of the lower right front axial structure of the present application is shown;
[0019] Figure 3 A schematic diagram of the partially disassembled structure of the bearing frame and the adjustment block of the present application is shown;
[0020] Figure 4 A schematic diagram of a partially disassembled structure of a support block of the present application is shown.
[0021] Reference numerals list
[0022] 1. Fixed bottom frame; 101. Pulling block; 102. Guide rod; 103. Electric push rod; 2. Carrying frame; 201. Track bar; 202. Guide hole; 3. Adjustment block; 301. Track groove; 302. Reset rod; 303. Connecting plate; 4. Support block; 401. Carrying plate; 402. Limiting plate; 403. Sliding hole; 404. Extension notch; 405. Threaded rod; 406. Bearing ring; 407. Threaded barrel; 408. Adjustment plate; 409. Slide plate; 410. Limiting plate. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution of the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings of the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Example 1: Please refer to Figures 1 to 4 :
[0025] The utility model proposes a conveying device for processing building material pipe piles, comprising: a fixed bottom frame 1; universal wheels are respectively installed at the four corners of the bottom of the fixed bottom frame 1; the universal wheels are installed to facilitate pushing the entire device and moving the entire device; a bearing frame 2 is slidably installed at the upper end of the top of the fixed bottom frame 1; grooves are respectively provided at the bottoms of the two ends of the bearing frame 2; two penetrating circular holes are respectively provided at the two ends of the bearing frame 2; track bars 201 are respectively fixedly installed at the bottoms of the two ends of the bearing frame 2, and the track bars 201 are slidably installed in the track grooves 301 When the adjustment block 3 slides left and right, the track groove 301 on the adjustment block 3 is restricted by the track bar 201, and the adjustment block 3 can only slide left and right to prevent the adjustment block 3 from being offset or tilted when sliding left and right. The four corners of the carrier frame 2 are respectively provided with penetrating guide holes 202, and the carrier frame 2 is slidably mounted with mutually symmetrical adjustment blocks 3, and the middle of the adjustment block 3 is provided with a rectangular groove; the two ends of the two adjustment blocks 3 are respectively provided with track grooves 301; the back ends of the two adjustment blocks 3 are respectively fixedly connected with mutually symmetrical reset rods 302 , and a spring is sleeved on the annular side wall of the reset rod 302; the reset rod 302 passes through the circular holes at both ends of the carrying frame 2, and a connecting plate 303 is fixedly installed at the left end of the two reset rods 302 at the left end; a connecting plate 303 is fixedly installed at the right end of the two reset rods 302 at the right end, and a handle is fixedly installed on the connecting plate 303; grab the handles on the two connecting plates 303 and pull them backwards, then the reset rods 302 at the left and right ends will also move backwards, and the springs on the reset rods 302 are squeezed and contracted by the adjustment block 3 and the side wall of the carrying frame 2, At the same time, the two adjustment blocks 3 will also slide back to back. According to the length of the pipe pile, the bearing plates 401 on the two adjustment blocks 3 are adjusted to a suitable spacing, and the two ends of the pipe pile are placed on the inner concave surfaces of the two bearing plates 401. Then, the handles at both ends are released, and the springs on the reset rods 302 will push the two adjustment blocks 3 toward each other. At this time, the two side walls of the pipe pile are in contact with the side walls of the two limiting plates 402. Support blocks 4 are fixedly installed at the rectangular grooves in the middle of the two adjustment blocks 3, and the lower ends of the support blocks 4 are fixedly inserted in the rectangular grooves in the middle of the adjustment blocks 3.
[0026] Among them, symmetrical traction blocks 101 are fixedly installed on the right side wall of the fixed bottom frame 1, and a through hook hole is opened on the traction block 101. The hook on the trolley is inserted into the hook hole of the traction block 101 for connection. The whole conveying device is pulled by the trolley to transport and convey the processed building material pipe piles. Vertically upward guide rods 102 are fixedly installed at the four corners of the fixed bottom frame 1. The guide rods 102 slide through the guide holes 202. When the bearing frame 2 slides up and down, the guide holes 202 on the bearing frame 2 are restricted by the guide rods 102. The bearing frame 2 can only slide up and down to prevent the bearing frame 2 from shifting or tilting when sliding up and down, and the bearing plate 401 on the bearing frame 2 cannot stably support the pipe piles. Electric push rods 103 are fixedly installed at both ends of the top of the fixed bottom frame 1. The upper ends of the electric push rods 103 are fixedly inserted in the grooves at the bottom of the two ends of the bearing frame 2. The electric push rods 103 are used to push and pull the bearing frame 2 up and down, thereby adjusting the position of the bearing plate 401 up and down, so that the pipe piles are conveniently placed on the inner concave surfaces of the two bearing plates 401. After the pipe piles move upward, they are conveniently loaded and unloaded by a crane.
[0027] The upper ends of the two support blocks 4 are respectively fixedly mounted with arc-shaped bearing plates 401, and the inner concave surface of the bearing plates 401 is fixedly mounted with a limiting plate 402, and two through sliding holes 403 are respectively opened on the two limiting plates 402, and the lower ends of the two bearing plates 401 facing away from one end are respectively opened with extension slots 404, and the middle part of the extension slots 404 is opened with through threaded holes, and through threaded rods 405 are respectively rotatably mounted at the threaded holes of the two extension slots 404, and the threaded rods 405 are respectively rotatably mounted. The lower end of the rod 405 is fixedly installed with a stopper. The stopper on the threaded rod 405 is grasped and rotated to move downward. At this time, the adjustment plate 408 and the limit plate 410 connected to the upper end of the threaded rod 405 will also slide downward. When the limit plate 410 slides downward, the anti-slip strip at the outer end of the limit plate 410 will be pressed tightly against the bottom of the side wall of the inner cavity of the pile. Then, the threaded tube 407 is grasped and rotated to move upward, and the top end of the threaded tube 407 is squeezed tightly against the side wall of the extension slot 404 to fix and limit the threaded rod 405. The limiting plate 410 squeezes and fixes the two ends of the inner cavity of the pipe pile downward, and fixes and limits the two ends of the pipe pile to prevent the pipe pile from shaking and falling when it is transported. The upper end of the threaded rod 405 is rotatably mounted with a bearing ring 406, and the two threaded rods 405 are respectively rotatably mounted with threaded cylinders 407. The outer rings of the two bearing rings 406 are respectively fixed with adjustment plates 408. The opposite ends of the two adjustment plates 408 are respectively fixed with symmetrical slide plates 409, and the slide plates 409 slide through the slide holes. In 403, when the adjustment plate 408 slides up and down, the slide plate 409 is restricted by the slide hole 403, and the adjustment plate 408 can only slide up and down, preventing the adjustment plate 408 from deflecting or tilting when sliding up and down, and the limit plate 410 will also tilt. The inclined limit plate 410 cannot squeeze and limit the lower end of the side wall of the inner cavity of the pipe pile, and an arc-shaped limit plate 410 is fixedly installed on the side wall of the other end of the slide plate 409, and an anti-slip strip is evenly fixedly installed on the side wall of the outer end of the limit plate 410.
[0028] Embodiment 2, based on embodiment 1, as Figure 1 and Figure 4 As shown, symmetrical traction blocks 101 are fixedly installed on the right side wall of the fixed bottom frame 1, and a penetrating hook hole is opened on the traction block 101. The traction block 101 is partially removed, and then the entire conveying device is pushed by hand. In this way, only relatively light and small pipe piles can be transported and transferred. When the traction block 101 is not used, some material costs will be saved.
[0029] The working principle of this embodiment is as follows: when in use, the upper end of the electric push rod 103 is fixedly inserted into the grooves at the bottom of the two ends of the bearing frame 2, and the electric push rod 103 is used to push and pull the bearing frame 2 up and down, thereby adjusting the position of the bearing plate 401 up and down, so that the pipe pile is placed on the inner concave surface of the two bearing plates 401, and the handles on the two connecting plates 303 are grasped and pulled backwards. At this time, the reset rods 302 at the left and right ends will also move backwards, and the springs on the reset rods 302 will be squeezed and contracted by the adjustment blocks 3 and the side walls of the bearing frame 2. At the same time, the two adjustment blocks 3 will also slide backwards. According to the length of the pipe pile, the bearing plates 401 on the two adjustment blocks 3 are adjusted to the appropriate The two ends of the pipe pile are placed on the inner concave surfaces of the two bearing plates 401, and then the handles at both ends are released. The springs on the reset rod 302 will push the two adjustment blocks 3 towards each other. At this time, the two side walls of the pipe pile are in contact with the side walls of the two limiting plates 402. Grasp the stopper on the threaded rod 405 and rotate it downward. At this time, the adjustment plate 408 and the limit plate 410 connected to the upper end of the threaded rod 405 will also slide downward. The two limit plates 410 squeeze and fix the two ends of the inner cavity of the pipe pile downward, and the hook on the trolley is passed through the hook hole of the traction block 101 for connection. The entire conveying device is pulled by the trolley to transfer and convey the processed building material pipe piles.
[0030] In this article, there are a few points to note:
[0031] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0032] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0033] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A conveying device for processing building material pipe piles, comprising: A fixed bottom frame (1); universal wheels are respectively installed at the four corners of the bottom of the fixed bottom frame (1); a carrying frame (2) is slidably installed at the upper end of the top of the fixed bottom frame (1); grooves are respectively provided at the bottoms of both ends of the carrying frame (2); two through-holes are respectively provided at both ends of the carrying frame (2); it is characterized in that mutually symmetrical adjustment blocks (3) are slidably installed on the carrying frame (2), and a rectangular groove is provided in the middle of the adjustment block (3); track grooves are respectively provided at both ends of the two adjustment blocks (3) (301); the two adjustment blocks (3) are respectively fixedly connected at their back ends with mutually symmetrical reset rods (302), and a spring is sleeved on the annular side wall of the reset rod (302); a connecting plate (303) is fixedly installed at the left end of the two reset rods (302) at the left end; a connecting plate (303) is fixedly installed at the right end of the two reset rods (302) at the right end, and a handle is fixedly installed on the connecting plate (303); and a supporting block (4) is respectively fixedly installed at the rectangular groove in the middle of the two adjustment blocks (3).
2. A conveying device for processing building material pipe piles according to claim 1, characterized in that: The right side wall of the fixed bottom frame (1) is fixedly mounted with symmetrical traction blocks (101), and a penetrating hook hole is provided on the traction block (101). Vertically upward guide rods (102) are respectively fixedly mounted at the four corners of the fixed bottom frame (1), and electric push rods (103) are respectively fixedly mounted at both ends of the top of the fixed bottom frame (1).
3. A conveying device for processing building material pipe piles according to claim 1, characterized in that: Track bars (201) are fixedly mounted at the bottoms of both ends of the carrying frame (2), and penetrating guide holes (202) are respectively provided at the four corners of the carrying frame (2).
4. A conveying device for processing building material pipe piles according to claim 1, characterized in that: An arc-shaped bearing plate (401) is fixedly mounted at the upper ends of the two support blocks (4), and a limiting plate (402) is fixedly mounted on the inner concave surface of the bearing plate (401). Two penetrating sliding holes (403) are respectively opened on the two limiting plates (402).
5. A conveying device for processing building material pipe piles according to claim 4, characterized in that: An extension slot (404) is respectively provided at the lower end of the two bearing plates (401) facing away from one end, and a through threaded hole is provided in the middle of the extension slot (404). A through threaded rod (405) is rotatably installed at the threaded holes of the two extension slots (404), and a bearing ring (406) is rotatably installed at the upper end of the threaded rod (405).
6. A conveying device for processing building material pipe piles according to claim 5, characterized in that: The two threaded rods (405) are rotatably mounted with threaded cylinders (407), and the outer rings of the two bearing rings (406) are fixedly mounted with adjustment plates (408).
7. A conveying device for processing building material pipe piles according to claim 6, characterized in that: A symmetrical sliding plate (409) is fixedly mounted on the opposite ends of the two adjustment plates (408), and an arc-shaped limiting plate (410) is fixedly mounted on the side wall of the other end of the sliding plate (409).
