By designing a new intermediate well structure, the problem of water intake reduction caused by sea organism attachment in nuclear power water intake tunnels is solved, and a convenient path for robot placement and recycling is provided, and the inner wall of the tunnel is cleaned to facilitate sea organism removal.

CN221972484UActive Publication Date: 2024-11-08ZHONGCHUAN NO 9 DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323356572.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-11
Publication Date
2024-11-08
Estimated Expiration
2033-12-11

AI Technical Summary

Technical Problem

In nuclear power water intake tunnels, sea organisms adhere to reduce the amount of water intake per unit cross-section of the tunnel, affecting the work of the nuclear power plant, and the placement and recycling of underwater robots in the tunnel are inconvenient.

Method used

A new intermediate well structure combining underwater cleaning robots was designed, including a square well body, a lifting cover plate, a cleaning machine drop groove and a patrol machine drop groove. The tunnel body is connected through an arc transition section to provide convenient robots. Placement and recycling paths.

Benefits of technology

It realizes the convenient placement and recycling of underwater robots in tunnels, simplifies the work of sea organism attachment removal, and has a reasonable overall structure and convenient use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972484U_ABST
    Figure CN221972484U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel underwater robots, and particularly discloses a novel middle well structure combined with an underwater cleaning robot, which comprises a well body, the bottom of the well body is communicated with a tunnel body, and the connection part is connected with the tunnel body through an arc-shaped transition section; the whole well body is of a square structure, and an opening type cover plate is arranged at the top of the well body; a cleaning machine descending groove and an inspection machine descending groove are formed in the inner wall of the well body, the cleaning machine descending groove and the inspection machine descending groove are vertically formed, and the cleaning machine descending groove is formed in the inner wall, parallel to the central axis of the tunnel body, of the well body; the inspection machine descending groove is formed in the inner wall, perpendicular to the central axis of the tunnel body, of the well body. The middle well provided by the utility model can be used for placing and recovering the underwater robot, and is convenient for removing marine organisms attached to the inner wall of a tunnel; the overall structure is reasonable in design and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel underwater robots, in particular to a novel intermediate well structure combined with an underwater cleaning robot. Background Art

[0002] The water diversion tunnel is the most common structure in nuclear power water diversion, water conservancy and hydropower engineering and other special water diversion processes. At present, in the process of using nuclear power water intake tunnels, many marine organisms will attach to them over a long period of time. The attachment of marine organisms will reduce the water intake per unit cross-section of the tunnel, affecting the work of the entire nuclear power plant. The attached marine organisms are generally composed of shellfish, and their shells have a certain degree of hardness.

[0003] The future development trend of water intake tunnels is towards long-distance tunnels; in long-distance tunnels, robot tunnel cleaning will become an efficient way. When the robot cleans the inside of the tunnel, it is necessary to put the robot in from the shore and recover the robot after the cleaning work is completed; the tunnel is usually underground, and it is inconvenient for the robot to enter the tunnel and recover it from the tunnel. Based on this, the utility model provides a new intermediate well structure combined with an underwater cleaning robot to facilitate the robot's placement process in the tunnel. Utility Model Content

[0004] The purpose of the utility model is to provide a new intermediate well structure combined with an underwater cleaning robot to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a new intermediate well structure combined with an underwater cleaning robot, comprising a well body and a lift-up cover, wherein the bottom of the well body is communicated with the tunnel body, and the connecting parts of the two are connected by an arc-shaped transition section; the well body is a square structure as a whole, and a lift-up cover is arranged on the top of the well body; the inner wall of the well body is provided with a cleaning machine descending trough and an inspection machine descending trough, the cleaning machine descending trough and the inspection machine descending trough are both vertically arranged, and the cleaning machine descending trough is arranged on the inner wall of the well body parallel to the central axis of the tunnel body, and the inspection machine descending trough is arranged on the inner wall of the well body perpendicular to the central axis of the tunnel body.

[0006] Preferably, four cleaning machine descending grooves are symmetrically arranged on two opposite side walls of the well body, and the cross-section of the cleaning machine descending groove is arranged to be a square structure.

[0007] Preferably, the inspection machine descending trough is arranged in the middle part of the two opposite side walls of the well body, and an embedded plate is embedded in the well body. The embedded plate is arranged as a C-shaped structure, and the opening side of the embedded plate is arranged toward the central axis of the well body to form the inspection machine descending trough.

[0008] Preferably, the embedded plate is made of copper plate or steel plate, and is provided with first embedded bars and second embedded bars; wherein the first embedded bars are arranged in the direction of the embedded plate facing away from the center axis of the well body, and the second embedded bars are symmetrically arranged on both sides of the embedded plate.

[0009] Preferably, a HDPE barrier film is provided at the notch portion of the embedded plate, the HDPE barrier film seals the inspection machine descending groove, and an inspection machine positioning piece is provided in the inspection machine descending groove.

[0010] Preferably, the flip-up cover is hinged at the top opening of the well body in a split-open manner, and integral cover plates are provided on both sides of the flip-up cover.

[0011] Preferably, the bottom of the well body is provided with cage placing corbels, and two of the cage placing corbels are arranged side by side; and the corners of the inner wall of the well body are provided with concrete corbels.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: the intermediate well provided by the utility model is used for placing the underwater robot in the placement cage, and the placement cage slides down from the intermediate well along the descending trough of the cleaning machine to enter the tunnel, and can rise along the descending trough of the cleaning machine to carry the robot and recover it from the tunnel, and can be used for the placement and recovery of the underwater robot, so as to facilitate the removal of marine organisms attached to the inner wall of the tunnel; the overall structural design is reasonable and easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the utility model;

[0014] Figure 2 It is a schematic diagram of the top of the well body of the utility model;

[0015] Figure 3 for Figure 1 Middle AA section;

[0016] Figure 4 for Figure 1 Middle BB section;

[0017] Figure 5 for Figure 1 Middle CC section;

[0018] Numbers in the figure: 1. Well body; 2. Tunnel body; 3. Arc-shaped transition section; 4. Openable cover; 5. Cleaning machine descent chute; 6. Inspection machine descent chute; 7. Placement cage shelving corbel; 8. Integral cover; 9. Embedded plate; 10. Inspection machine positioning piece; 11. HDPE barrier film; 12. First embedded rebar; 13. Second embedded rebar; 14. Concrete corbel. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0021] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0022] See also Figure 1-5 The utility model provides a technical solution: a new intermediate well structure combined with an underwater cleaning robot, comprising a well body 1 and a lift-up cover plate 4, the bottom of the well body 1 is communicated with the tunnel body 2, and the connecting parts of the two are connected by an arc-shaped transition section 3; the well body 1 is a square structure as a whole, and a lift-up cover plate 4 is arranged on the top of the well body 1; the inner wall of the well body 1 is provided with a cleaning machine descending groove 5 and an inspection machine descending groove 6, the cleaning machine descending groove 5 and the inspection machine descending groove 6 are both vertically arranged, and the cleaning machine descending groove 5 is arranged on the inner wall of the well body 1 parallel to the central axis of the tunnel body 2, and the inspection machine descending groove 6 is arranged on the inner wall of the well body 1 perpendicular to the central axis of the tunnel body 2.

[0023] Furthermore, four cleaning machine descending grooves 5 are symmetrically arranged on two opposite side walls of the well body 1, and the cross-section of the cleaning machine descending groove 5 is arranged to be a square structure.

[0024] Furthermore, the inspection machine descending groove 6 is arranged in the middle part of the two opposite side walls of the well body 1, and an embedded plate 9 is embedded in the well body 1. The embedded plate 9 is arranged as a C-shaped structure, and the opening side of the embedded plate 9 is arranged toward the central axis of the well body 1 to form the inspection machine descending groove 6.

[0025] Furthermore, the embedded plate 9 is made of copper plate or steel plate, and is provided with a first embedded rebar 12 and a second embedded rebar 13; wherein the first embedded rebar 12 is arranged in the direction of the embedded plate 9 facing away from the central axis of the well body 1, and the second embedded rebar 13 is symmetrically arranged on both sides of the embedded plate 9.

[0026] Furthermore, a HDPE barrier film 11 is provided at the notch portion of the embedded plate 9 , and the HDPE barrier film 11 seals the inspection machine descending groove 6 , and an inspection machine positioning piece 10 is provided in the inspection machine descending groove 6 .

[0027] Furthermore, the flip-up cover plate 4 is hinged at the top opening of the well body 1 in a split manner, and integral cover plates 8 are provided on both sides of the flip-up cover plate 4 .

[0028] Furthermore, a cage placing corbel 7 is provided at the bottom of the well body 1 , and two cage placing corbels 7 are provided side by side; and concrete corbels 14 are provided at the corners of the inner wall of the well body 1 .

[0029] Working principle: When the underwater robot moves in the well body 1, it needs to be set in the placement cage, and it can enter and exit the placement cage. The placement cage is raised and lowered by a winch, and the winch and the motor are both set on the ground on the shore; the two sides of the placement cage can be stuck in the cleaning machine descending groove 5, so as to limit its moving direction and prevent it from deflecting; on the shore, a towing rope and a driving motor for recovering the robot can also be set. One end of the towing rope is fixed to the robot. After the robot fails underwater, it is towed back to the placement cage through the towing rope for unified recovery. The placement cage support bracket 7 is used to support the placement cage when it falls to the bottom, and the concrete bracket 14 is used to place the placement cage in the well body 1.

[0030] The inspection machine descending groove 6 is formed by the embedded plate 9, and the HDPE barrier film 11 is used on the outside to form a sealing condition inside the groove. The inspection machine descending groove 6 can be provided with an inspection device that slides along the inspection machine positioning piece 10 to perform a patrol scanning inspection on the entire well body 1.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel intermediate well structure combined with an underwater cleaning robot, characterized in that: The invention comprises a well body (1) and a lift-up cover plate (4), wherein the bottom of the well body (1) is in communication with a tunnel body (2), and the connection portion of the two is connected via an arc-shaped transition section (3); the well body (1) is in a square structure as a whole, and a lift-up cover plate (4) is arranged on the top of the well body (1); the inner wall of the well body (1) is provided with a cleaning machine descending groove (5) and an inspection machine descending groove (6), and the cleaning machine descending groove (5) and the inspection machine descending groove (6) are both arranged vertically, and the cleaning machine descending groove (5) is arranged on the inner wall of the well body (1) parallel to the central axis of the tunnel body (2), and the inspection machine descending groove (6) is arranged on the inner wall of the well body (1) perpendicular to the central axis of the tunnel body (2).

2. A novel intermediate well structure combined with an underwater cleaning robot according to claim 1, characterized in that: Four cleaning machine descending grooves (5) are symmetrically arranged on two opposite side walls of the well body (1), and the cross-section of the cleaning machine descending groove (5) is arranged to be a square structure.

3. The novel intermediate well structure combined with an underwater cleaning robot according to claim 1 is characterized in that: The inspection machine descending groove (6) is arranged in the middle of two opposite side walls of the well body (1), and an embedded plate (9) is embedded in the well body (1). The embedded plate (9) is arranged in a C-shaped structure, and the opening side of the embedded plate (9) is arranged toward the central axis of the well body (1), thereby forming the inspection machine descending groove (6).

4. The novel intermediate well structure combined with an underwater cleaning robot according to claim 3 is characterized in that: The embedded plate (9) is made of copper plate or steel plate, and is provided with a first embedded bar (12) and a second embedded bar (13); wherein the first embedded bar (12) is arranged in the direction of the embedded plate (9) facing away from the central axis of the well body (1), and the second embedded bar (13) is symmetrically arranged on both sides of the embedded plate (9).

5. The novel intermediate well structure combined with an underwater cleaning robot according to claim 3 is characterized in that: A HDPE barrier film (11) is provided at the notch of the embedded plate (9), and the HDPE barrier film (11) seals the inspection machine descending groove (6). An inspection machine positioning piece (10) is provided in the inspection machine descending groove (6).

6. The novel intermediate well structure combined with an underwater cleaning robot according to claim 1 is characterized in that: The flip-up cover plate (4) is hinged at the top opening of the well body (1) in a split-open manner, and integral cover plates (8) are arranged on both sides of the flip-up cover plate (4).

7. The novel intermediate well structure combined with an underwater cleaning robot according to claim 1 is characterized in that: The bottom of the well body (1) is provided with a cage placing bracket (7), and two cage placing brackets (7) are arranged side by side; and the corners of the inner wall of the well body (1) are provided with concrete brackets (14).