Waterproof structure for horizontal construction joint of side wall in cover and excavation top-down construction
Patent Information
- Application Number
- CN202420368162.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-27
Smart Images

Figure CN221972699U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction joints of side walls, and in particular to a waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction. Background Art
[0002] During the concrete pouring process, if the design or construction requirements require segmented pouring, the joint formed between the first and later poured concrete is called a construction joint.
[0003] During the top-down construction process, the construction order of the side wall structure is to build the side wall after the construction of each underground roof and floor structure is completed. Therefore, the side wall structure will form two horizontal construction joints. In order to reduce the probability of water seepage from the construction joints of the side wall, waterproof structures are usually required at the two horizontal construction joints. The bottom construction joint is waterproofed by pouring the upper return platform and welding the water-stop steel plate, while the upper horizontal construction joint cannot be welded because the casting formwork and formwork support system need to be set at the bottom of the roof, thus affecting the waterproof effect of the upper horizontal construction joint. Utility Model Content
[0004] In order to improve the waterproofing effect of the side wall construction joint, the present application provides a waterproofing structure for the side wall horizontal construction joint in the cover-excavation reverse construction.
[0005] The present application provides a waterproof structure for the horizontal construction joint of the side wall in the cover-excavation reverse construction, which adopts the following technical solution:
[0006] A waterproof structure for horizontal construction joints of side walls in cover-excavation top-down construction comprises a pre-cast strip and a post-cast strip, wherein the pre-cast strip is located above the post-cast strip, and the connection between the pre-cast strip and the post-cast strip is a construction joint. A groove is preset at the bottom of the pre-cast strip, and the groove extends along the length direction of the pre-cast strip. The extension length of the groove is the same as the length of the pre-cast strip. A water stop strip is clamped in the groove, and the water stop strip protrudes into the post-cast strip.
[0007] By adopting the above technical scheme, wooden strips are placed at the bottom of the precast strip in advance when supporting the formwork at the bottom of the precast strip, and then a formwork support system is set at the bottom of the formwork. After the strength of the precast strip reaches the design strength, the formwork and the formwork support system are removed, and all the wooden strips are chiseled out to leave grooves, and then waterstop strips are inserted in the grooves. Since the waterstop strips protrude into the postcast strip, after the postcast strip is poured, the waterstop strips can play a role in blocking water from the construction joints, thereby improving the waterproof effect of the side wall construction joints.
[0008] Optionally, the water stop strip is a water stop adhesive that expands when exposed to water.
[0009] By adopting the above technical scheme, the water-swellable waterstop adhesive can absorb water and expand after contacting water. When the water-swellable waterstop adhesive is saturated with water, it expands to the maximum limit, making the connection between the first pouring strip and the post pouring strip tighter, and the subsequent water flow will be blocked by the water-swelling waterstop adhesive, thereby making the water-blocking effect of the waterstop strip on the construction joint better.
[0010] Optionally, a first grouting pipe, a second grouting pipe and a third grouting pipe are provided on the top of the post-cast strip, the first grouting pipe and the second grouting pipe are located on both sides of the groove, the tops of the first grouting pipe and the second grouting pipe both extend to the construction joint, the third grouting pipe connects the first grouting pipe and the second grouting pipe at the same time, and the third grouting pipe passes through the post-cast strip.
[0011] By adopting the above technical scheme, after the post-casting strip is poured and reaches the designed strength, a pressure grouting machine is used to inject grout toward one end of the post-casting strip through the third grouting pipe. After the cement slurry passes through the third grouting pipe, it is injected into the construction joint by the first grouting pipe and the second grouting pipe respectively, thereby increasing the connection strength between the first cast-in-place strip and the post-casting strip, and further improving the waterproof effect of the construction joint.
[0012] Optionally, the third grouting pipe includes an inner wall pipe and an outer wall pipe, the inner wall pipe is located inside the post-cast strip, the outer wall pipe is located outside the post-cast strip, and the outer wall pipe is threadedly connected to the inner wall pipe.
[0013] By adopting the above technical solution and setting the inner wall tube and the outer wall tube, after grouting through the third grouting tube is completed, there is no need to cut off the part of the third grouting tube that passes through the post-casting strip. It is only necessary to rotate the outer wall tube out of the inner wall tube, which saves time and effort.
[0014] Optionally, a check cylinder is provided in the pipe inside the wall, and the check cylinder is open.
[0015] By adopting the above technical solution, the check cylinder is arranged in the pipe inside the wall, and the opening is facing the pipe outside the wall. The check cylinder opening is open, which will not hinder the injection of cement slurry, but can limit the backflow of cement slurry to a certain extent, thereby reducing the grouting pressure, improving the grouting safety, and saving energy; and when the slurry solidifies, the check cylinder can also prevent the solidified slurry from falling out.
[0016] Optionally, the construction joint is arranged at an angle, and the height of the construction joint gradually increases from the outer side to the inner side of the post-casting zone.
[0017] By adopting the above technical scheme, the outer side of the post-cast strip refers to the outdoor side of the side wall. If the water on the outdoor side of the post-cast strip passes through the construction joint, it will flow into the room in a downward form under the action of gravity, and the upward inclined setting of the construction joint can block the inflow of water, thereby improving the waterproof effect of the construction joint.
[0018] Optionally, it also includes a reinforced waterproof layer arranged on the outside of the first pouring zone and the post pouring zone, and the reinforced waterproof layer includes a waterproof membrane layer, a buffer layer and a surface layer arranged in sequence from close to the post pouring zone to away from the post pouring zone.
[0019] By adopting the above technical scheme, the surface layer can protect and insulate the side wall, the buffer layer can act as a buffer against the force applied to the side wall, and the waterproof membrane layer can reduce the probability of water on the outside of the side wall reaching and passing through the construction joint. The waterproof membrane layer, buffer layer and surface layer work together to further improve the waterproof effect of the side wall construction joint.
[0020] Optionally, the cross-section of the water stop strip is trapezoidal.
[0021] By adopting the above technical solution, the trapezoidal waterstop structure can provide good stability and bearing capacity. Since the trapezoidal shape has an inclined surface, it can effectively disperse and transfer the load, reduce structural deformation and stress concentration, and enable the side wall to have better seismic resistance and bearing capacity.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. The setting of the groove and the water stop strip enables the construction joint between the first pouring strip and the post pouring strip to be separated by the water stop strip, thereby preventing water from leaking from the construction joint and improving the waterproof effect of the side wall construction joint. The structure is simple and easy to install;
[0024] 2. The first grouting pipe, the second grouting pipe and the third grouting pipe are arranged so that cement slurry can be injected into the construction joint of the side wall, thereby connecting the first pouring strip and the post pouring strip more firmly and tightly, further improving the waterproof effect of the construction joint;
[0025] 3. The coordinated setting of the waterproof membrane layer, buffer layer and surface layer can protect the pre-cast strip and the post-cast strip, reduce the probability of the external water flow of the side wall contacting the construction joint of the side wall, and further improve the waterproof effect of the construction joint of the side wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0028] Figure 2 It is a schematic diagram of the cross-sectional structure of an embodiment of the present application.
[0029] Figure numerals: 1. Pre-cast strip; 11. Groove; 2. Post-cast strip; 3. Waterstop strip; 4. Reinforced waterproof layer; 41. Waterproof membrane layer; 42. Buffer layer; 43. Surface layer; 5. Construction joint grouting device; 51. First grouting pipe; 52. Second grouting pipe; 53. Third grouting pipe; 531. Pipe inside the wall; 5311. Internal thread; 5312. Check cylinder; 532. Pipe outside the wall; 6. Construction joint. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-2 This application is described in further detail.
[0031] The present application embodiment discloses a waterproof structure for the horizontal construction joint of the side wall in the cover-excavation reverse construction. Figure 1 The waterproof structure of the horizontal construction joint of the side wall in the cover-excavation top-down construction includes a pre-cast strip 1, a post-cast strip 2, a water stop strip 3, a reinforced waterproof layer 4 and a construction joint grouting device 5.
[0032] The precast strip 1 and the postcast strip 2 together form the side wall, the precast strip 1 is located directly above the postcast strip 2, and the surface where the precast strip 1 and the postcast strip 2 are connected is the construction joint 6, the construction joint 6 is inclined, and the height of the construction joint 6 gradually increases from the outdoor side of the side wall to the indoor side of the side wall, and the inclination angle of the construction joint 6 ranges from 5° to 15°, and 10° is used in this application. Under the action of gravity, if the water flow outside the side wall penetrates into the room through the construction joint 6, it will tend to fall, and the construction joint 6 inclined upward can hinder the water flow that tends to fall, thereby improving the waterproof effect of the construction joint 6.
[0033] A groove 11 is preset on the bottom wall of the precast strip 1. The method for setting the groove 11 is as follows: when supporting the template for casting the precast strip 1, a wooden strip is fixed in the middle of the upper surface of the bottom template, and then a template support system is set under the template to support the template. After the precast strip 1 reaches the required strength, the template support system and the template are removed, and the wooden strip is chiseled to obtain the groove 11. The groove 11 extends along the length direction of the precast strip 1, and the length of the groove 11 is consistent with the length of the precast strip 1, and the cross-section of the groove 11 is set to be trapezoidal, and the width of the notch of the groove 11 is greater than the width of the bottom of the groove 11.
[0034] The water stop strip 3 is made of water-swellable water stop glue, which is formed by filling the groove 11 with the water-swellable water stop glue and solidifying it. The water-swellable water stop glue protrudes from the construction joint 6 by no less than 5 mm, that is, when the post-casting strip 2 is cast, the water stop strip 3 is also formed in the post-casting strip 2. The water-swellable water stop glue can expand when it encounters water. When water outside the side wall penetrates through the construction joint 6, the water-swellable water stop glue absorbs water and expands, so that the construction joint 6 can have a better water blocking effect.
[0035] Reference Figure 2The construction joint grouting device 5 includes a first grouting pipe 51, a second grouting pipe 52 and a third grouting pipe 53. The first grouting pipe 51 and the second grouting pipe 52 are preset in the post-casting strip 2, and the first grouting pipe 51 and the second grouting pipe 52 are symmetrically arranged on both sides of the width direction of the groove 11. The first grouting pipe 51 and the second grouting pipe 52 are both perpendicular to the construction joint 6, and the end faces of the tops of both are flush with the construction joint 6. The third grouting pipe 53 includes an inner wall pipe 531 and an outer wall pipe 532. The inner wall pipe 531 is horizontally preset in the post-casting strip 2, and the inner wall pipe 531 is connected to the first grouting pipe 51 and the second grouting pipe 52 at the same time. The end of the inner wall pipe 531 away from the first grouting pipe 51 extends to the wall surface on the side of the side wall indoor, and the inner wall pipe 531 is close to the inner wall of the side wall indoor end. An internal thread 5311 is provided. One end of the external wall pipe 532 is threadedly connected to the internal thread 5311 of the internal wall pipe 531 , and the length of the external wall pipe 532 is not less than 500 mm.
[0036] After the post-casting strip 2 is cast and formed, a pressure grouting machine is used to inject cement slurry into the outer wall pipe 532. After the cement slurry passes through the outer wall pipe 532 and the inner wall pipe 531 in sequence, it is injected onto the construction joint 6 through the first grouting pipe 51 and the second grouting pipe 52. After solidification, the cement slurry can fill the small gap at the construction joint 6, so that the connection between the first cast strip 1 and the post-casting strip 2 is tighter and more reliable, thereby further improving the waterproof effect of the construction joint 6. When the cement slurry is injected and solidified, it is only necessary to rotate the outer wall pipe 532 out of the inner wall pipe 531 and no longer be threadedly connected to the inner wall pipe 531.
[0037] In addition, in order to reduce the probability of cement mortar backflow after injection, a check cylinder 5312 is coaxially welded and fixed inside the inner wall tube 531. The opening of one end of the check cylinder 5312 is open, that is, the diameter of one end of the check cylinder 5312 is larger than the diameter of the other end of the check cylinder 5312, and the end of the check cylinder 5312 with a larger diameter faces the outer wall tube 532. When the cement slurry flows into the inner wall tube 531, the check cylinder 5312 will not block the cement slurry, and the cement slurry flowing through the check cylinder 5312 will be blocked to a certain extent by the cylinder wall of the check cylinder 5312 when it flows outward. On the one hand, the check cylinder 5312 can reduce the injection pressure of the cement slurry and reduce the danger of grouting; on the other hand, when the cement slurry solidifies, the setting of the check cylinder 5312 can also reduce the probability of the cement slurry in the solidified state coming out, thereby improving the strength and stability of the post-casting strip 2.
[0038] The reinforced waterproof layer 4 includes a waterproof roll layer 41, a buffer layer 42 and a surface layer 43. The waterproof roll layer 41 is directly laid on the wall surface on the outdoor side of the side wall. The waterproof roll layer 41 adopts a 1.5mm thick self-adhesive film waterproof roll. The waterproof roll layer 41 can isolate the water on the outside of the side wall from the side wall, reduce the probability of water on the outside of the side wall penetrating into the side wall through the construction joint 6, and improve the waterproof effect of the construction joint 6. The buffer layer 42 is bonded and fixed on the side of the waterproof roll layer 41 away from the side wall. The buffer layer 42 adopts a non-woven fabric with a pressure of 12KN / m³. The buffer layer 42 can buffer the force on the side wall. The surface layer 43 is arranged on the side of the buffer layer 42 away from the waterproof roll layer 41. The surface layer 43 is cast and formed by reinforced concrete. The surface layer 43 plays a protective and heat-insulating role on the side wall.
[0039] The implementation principle of the waterproof structure of the horizontal construction joint of the side wall in the cover-excavation reverse construction of the embodiment of the present application is as follows: when casting and forming the precast strip 1, a groove 11 is reserved at the bottom of the precast strip 1, and then the groove 11 is filled with water-swelling waterproofing glue, and the water-swelling waterproofing glue protrudes out of the groove 11 until it is inserted into the postcast strip 2, and the water-swelling waterproofing glue separates the construction joint 6, thereby playing a waterproofing role for the construction joint 6; and the water-swelling waterproofing glue expands after absorbing water, which can further improve the waterproofing effect of the construction joint 6, and the inclined construction joint 6 can further improve the water-blocking effect. The coordinated arrangement of the first grouting pipe 51, the second grouting pipe 52 and the third grouting pipe 53 allows cement slurry to be injected into the construction joint 6, so that the connection between the precast strip 1 and the postcast strip 2 is tighter and more reliable, thereby improving the waterproofing effect of the construction joint 6.
[0040] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction, comprising a pre-cast strip (1) and a post-cast strip (2), wherein the pre-cast strip (1) is located above the post-cast strip (2), and the connection between the pre-cast strip (1) and the post-cast strip (2) is a construction joint (6), characterized in that: A groove (11) is preset at the bottom of the precast strip (1), the groove (11) extends along the length direction of the precast strip (1), the extension length of the groove (11) is the same as the length of the precast strip (1), a water stop strip (3) is clamped in the groove (11), and the water stop strip (3) protrudes into the post-cast strip (2); A first grouting pipe (51), a second grouting pipe (52) and a third grouting pipe (53) are arranged in the post-cast strip (2); the first grouting pipe (51) and the second grouting pipe (52) are located on both sides of the groove (11); the tops of the first grouting pipe (51) and the second grouting pipe (52) both extend to the construction joint (6); the third grouting pipe (53) is connected to the first grouting pipe (51) and the second grouting pipe (52) at the same time; the third grouting pipe (53) passes through the post-cast strip (2); the third grouting pipe (53) comprises an inner wall pipe (531) and an outer wall pipe (532); the inner wall pipe (531) is located in the post-cast strip (2); the outer wall pipe (532) is located outside the post-cast strip (2); the outer wall pipe (532) is threadedly connected to the inner wall pipe (531).
2. A waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction according to claim 1, characterized in that: The water stop strip (3) is a water stop glue that expands when in contact with water.
3. The waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction according to claim 1 is characterized in that: A check cylinder (5312) is provided in the wall inner tube (531), and the check cylinder (5312) is open.
4. The waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction according to claim 1, characterized in that: The construction joint (6) is arranged at an angle, and the height of the construction joint (6) gradually increases from the outside to the inside of the post-casting strip (2).
5. The waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction according to claim 1, characterized in that: It also includes a reinforced waterproof layer (4) arranged outside the pre-cast strip (1) and the post-cast strip (2), wherein the reinforced waterproof layer (4) includes a waterproof roll material layer (41), a buffer layer (42) and a surface layer (43) arranged in sequence from close to the post-cast strip (2) to away from the post-cast strip (2).
6. The waterproof structure for horizontal construction joints of side walls in cover-excavation reverse construction according to claim 1, characterized in that: The cross section of the water stop strip (3) is trapezoidal.