Adjustable building construction scaffold base

By designing an adjustable structure on the scaffolding base, combining locking pins and anchors, the problems of insufficient base height adjustment capability and poor stability in the prior art are solved, and the base height is adjusted according to the ground flatness and construction safety is ensured.

CN221972973UActive Publication Date: 2024-11-08JIANGXI YANGMING CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421052685.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-11-08
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

The existing scaffolding base lacks height adjustment capability, and the lifting structure with simple thread adjustment has poor stability, which is prone to unstable connection due to external disturbances, affecting construction safety.

Method used

An adjustable building construction scaffolding base is designed, using a combined structure of sheath, upper support, butt plug, screw groove, lower support, stud, slip ring, locking pin, through hole, locking hole and anchor. Adjust the height by rotating the studs in the screw groove, and using locking pins and anchors to ensure that the base does not become stable when disturbed by external forces.

Benefits of technology

The base height is adjusted according to the floor flatness, ensuring the stability of the scaffolding, and the design of locking pins and anchors prevents the threaded transmission structure from being instable due to external force disturbance, improving construction safety and overall stability of the base.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972973U_ABST
    Figure CN221972973U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of scaffolds, in particular to an adjustable building construction scaffold base which comprises a sheath, an upper support, a butt joint plug, a screw groove, a lower support, a stud, a sliding ring, a locking pin, a through hole, a locking hole and an anchoring part. On the basis of an existing scaffold base with the fixed height, the lower support structure adjusted through thread transmission is additionally arranged at the bottom of the scaffold base, the height of the whole base can be adjusted according to the difference of ground flatness in actual use, the locking pins are perpendicularly inserted into the through holes and the locking holes, and after the height of the base is adjusted, the locking pins are inserted into the through holes and the locking holes. The threaded transmission lifting adjusting structure is locked, the situation that connection of the threaded transmission lifting adjusting structure is unstable due to the fact that the scaffold is disturbed by external force is avoided, and the problems that an existing scaffold base does not have the height adjusting capacity, and the stability of the simple threaded transmission lifting adjusting structure on the base is poor are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of scaffolds, in particular to an adjustable building construction scaffold base. Background Art

[0002] Scaffolding is a common working platform support structure in engineering construction operations. It is assembled from multiple horizontal, longitudinal and diagonal steel pipes. Adjacent pipes are fixed by assembly connectors. The lowest layer of longitudinal steel pipes is directly supported on the hardened ground. In order to increase the contact area between the scaffolding and the ground, a base structure is generally added to the bottom of the scaffolding to further improve the stability of the scaffolding on the ground.

[0003] Today's scaffolding bases are generally enlarged supports with fixed heights and do not have the function of height adjustment. When installed on an uneven hardened floor, the scaffolding will shake because the bottom base cannot be tightly against the ground, which greatly affects construction safety. If a simple threaded adjustment lifting structure is used on the scaffolding base, although the base has the ability to adjust the height, the threaded connection can easily become loose due to the structural gap. As the scaffolding is constantly disturbed by the climbing of people and machinery during use, the threaded connection structure will undergo a slight relative rotation, which will lead to an unstable base height and a safety hazard in the use of the scaffolding.

[0004] Therefore, in view of the fact that the above-mentioned existing scaffolding base does not have the ability to adjust the height, and the simple threaded adjustment lifting structure on the base has the problem of poor stability, a scaffolding base that can lock the threaded adjustment lifting structure can be designed. While the height of the base can be easily adjusted, it can also ensure that during the use of the scaffolding, the threaded adjustment lifting structure will not become unstable due to external force disturbance. Utility Model Content

[0005] In order to overcome the problem that the existing scaffolding base has no height adjustment capability, and a simple threaded adjustment lifting structure has poor stability on the base.

[0006] The technical scheme of the utility model is: an adjustable construction scaffold base, including a sheath, an upper support, a docking plug, a screw groove, a lower support, a stud, a slip ring, a locking pin, a through hole, a locking hole, and an anchor; the sheath is a cylindrical structure and the longitudinal steel pipe of the scaffold is inserted in the sheath, the lower end of the sheath is integrally connected and fixed with a truncated cone-shaped upper support, the upper end of the upper support is fixedly connected with a docking plug with a hollow screw groove inside, the docking plug is arranged in the sheath and the outer diameter is the same as the inner diameter of the longitudinal steel pipe of the scaffold, and the lower support is provided with a Placed below the upper support, the upper end of the lower support is fixedly installed with a stud threaded in the screw groove, a slip ring is sleeved on the outside of the sheath, the lower end of the slip ring is fixedly connected with four locking pins equidistantly around itself, the surface of the upper support is provided with four through holes corresponding to the locking pins one by one, and the through holes penetrate and connect to the lower surface of the upper support, the upper surface of the lower support is provided with 40-60 locking holes equidistantly around the circle, the through holes are located above the locking holes, the lower end of the lower support is provided with a screw mouth extending upward to the inside of the stud, and the anchor is threadedly connected in the screw mouth.

[0007] Preferably, the distance between the upper support and the lower support is adjusted by rotating the stud in the screw groove, thereby changing the height of the entire base structure to ensure that after all the longitudinal rods of the scaffolding are inserted into the sheath, all the lower supports can fit into the ground at their locations to ensure the overall stability of the scaffolding. The locking pin is longitudinally inserted into the through hole and the locking hole to lock the lower support and the upper support, so that when the base is disturbed by external force, the stud cannot rotate in the screw groove, the base has better integrity, and is safer to install and use.

[0008] Preferably, the anchor is a No. 1 anchor rod, the upper end of which is fixedly connected to a screw head threaded in a screw mouth, the lower end of which is provided with a cross notch, and the outer wall of which is provided with an annular groove. When erecting a scaffold of a larger scale and span, high requirements are placed on the installation stability of the scaffold. It is selected to unscrew the No. 1 anchor rod from the screw mouth, and then pour concrete on the hardened floor and wrap it around the No. 1 anchor rod. After hardening, a pad block supporting the lower support is formed, and the base is permanently fixed to the floor, so that after the scaffold is installed, its bottom stability is very high.

[0009] Preferably, the anchor consists of a No. 2 anchor rod, an overlapping groove and a tie rod. The upper end of the No. 2 anchor rod is fixedly connected with a screw head threaded in the screw mouth, and the lower end of the No. 2 anchor rod is provided with a cross groove. The outer wall of the No. 2 anchor rod is provided with four overlapping grooves, and one end of the tie rod is rotatably connected to the bottom end of the overlapping groove by a hinge. When erecting scaffolding of a larger scale and span, the installation stability of the scaffolding is required to be very high. It is selected to unscrew the No. 2 anchor rod from the screw mouth, and the tie rod is rotated out of the overlapping groove by a hinge and is relatively perpendicular to the No. 2 anchor rod. Concrete is poured on the hardened floor and wrapped around the No. 1 anchor rod and the tie rod. After hardening, a pad supporting the lower support is formed. The base is permanently fixed on the floor, so that after the scaffolding is installed, the bottom stability is very high.

[0010] Preferably, the upper end of the sheath is fixedly connected to a top plate, and a socket is provided on the upper surface of the top plate. A sliding rod is inserted into the socket, and the lower end of the sliding rod is fixedly connected to the slip ring. The sliding rod moves longitudinally along the socket to adjust the height of the slip ring and enter the through hole and the locking hole to allow the locking pin to be inserted or pulled out, thereby locking and unlocking the upper support and the lower support.

[0011] Preferably, a spring sleeved on the outside of the slide rod is installed between the upper end of the slip ring and the lower end of the top plate, and a handle is fixedly connected to the upper end of the slide rod. The spring has elastic elongation properties and elastically elongates downward based on the top plate, pushing the slip ring downward and continuously applying extrusion force, so that the locking pin is inserted into the through hole and the locking hole, thereby locking the upper support and the lower support.

[0012] Preferably, the docking plug is a plastic column with a sharp end. The outer wall of the docking plug is covered with a layer of rough rubber sleeve. The center of the docking plug overlaps with the center of the sleeve. After the longitudinal steel pipe of the scaffolding is inserted into the sleeve, the docking plug is inserted into the steel pipe together. The rubber sleeve on the surface of the docking plug is used to increase the friction between it and the inner wall of the steel pipe, thereby improving the connection strength between the steel pipe and the base.

[0013] Preferably, an annular gasket is glued and fixed to the lower surface of the lower support. The gasket is made of hard rubber material. There is a large static friction between the annular gasket and the hard floor, so that the lower support will not slide easily, and the support stability of the upper scaffolding is good.

[0014] Beneficial effects of the utility model:

[0015] 1. By adding a lower support structure adjusted by threaded transmission to the bottom of the existing fixed-height scaffolding base, the height of the entire base can be adjusted according to the flatness of the ground in actual use to ensure that when the scaffolding is horizontal, all bases can be close to the ground to ensure the stability of the scaffolding installation. The locking pin is vertically inserted into the through hole and the locking hole. After the base height is adjusted, the threaded transmission adjustment and lifting structure is locked to prevent the scaffolding from being disturbed by external forces, causing the connection of the threaded transmission adjustment and lifting structure to be unstable, making installation and use safer;

[0016] 2. Use the elastic pushing effect of the spring to generate longitudinal extrusion force on the slip ring to ensure that the bottom of the locking pin is in the locking hole and will not fall out due to slight external force disturbance, which has a good locking effect on the screw groove and stud;

[0017] 3. Through the threaded retractable anchors set in the lower support, according to the installation scale and use requirements of the scaffolding, the base can be completely fixed on the hardened floor by wrapping the anchors with cast-in-place concrete in advance to prevent the base from sliding on the hardened floor and causing the scaffolding to become unstable. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 Shown is a first three-dimensional structural schematic diagram of an adjustable building construction scaffolding base of the utility model;

[0019] Figure 2 Shown is a second three-dimensional structural schematic diagram of the adjustable building construction scaffolding base of the utility model;

[0020] Figure 3 Shown is a schematic diagram of the third three-dimensional structure of the adjustable building construction scaffolding base of the utility model;

[0021] Figure 4 What is shown is a schematic diagram of a vertical section of a three-dimensional structure of an adjustable building construction scaffolding base of the utility model;

[0022] Figure 5 The diagram shows the exploded three-dimensional structure of the adjustable building construction scaffolding base sheath and studs of the utility model;

[0023] Figure 6 The diagram shows the exploded three-dimensional structure of the adjustable building construction scaffolding base sheath and the slip ring of the utility model;

[0024] Figure 7 The present invention is a schematic diagram of the three-dimensional structure of the adjustable anchor member for the construction scaffolding base according to the first embodiment of the present invention;

[0025] Figure 8 What is shown is a three-dimensional structural schematic diagram of a second embodiment of the adjustable building construction scaffolding base anchor of the present utility model.

[0026] Explanation of the reference numerals in the accompanying drawings: 1. sheath; 2. upper support; 3. docking plug; 4. screw groove; 5. lower support; 6. stud; 7. slip ring; 8. locking pin; 9. through hole; 10. locking hole; 12. screw mouth; 13. top plate; 14. jack; 15. slide rod; 16. spring; 17. handle; 18. gasket; 1101. anchor rod No. 1; 1102. anchor rod No. 2; 1103. overlapping groove; 1104. tie rod. DETAILED DESCRIPTION

[0027] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0028] See also Figure 1-3The utility model provides an adjustable construction scaffold base, including a sheath 1, an upper support 2, a docking plug 3, a screw groove 4, a lower support 5, a stud 6, a slip ring 7, a locking pin 8, a through hole 9, a locking hole 10, and an anchor; the sheath 1 is a cylindrical structure and the longitudinal steel pipe of the scaffold is inserted in the sheath 1, the lower end of the sheath 1 is integrally connected and fixed with a truncated cone-shaped upper support 2, the upper end of the upper support 2 is fixedly connected with a docking plug 3 with a hollow screw groove 4 inside, the docking plug 3 is arranged in the sheath 1 and the outer diameter is the same as the inner diameter of the longitudinal steel pipe of the scaffold, the lower support 5 is arranged below the upper support 2, the upper end of the lower support 5 is fixedly installed with a stud 6 threadedly connected in the screw groove 4, the outer side of the sheath 1 is sleeved with a slip ring 7, the lower end of the slip ring 7 is equidistantly fixedly connected with four locking pins 8 around itself, and the surface of the upper support 2 is provided with four locking pins 8 that are aligned with the locking pins 8 A corresponding through hole 9 is formed and the through hole 9 passes through and is connected to the lower surface of the upper support 2. 40-60 locking holes 10 are equidistantly arranged around the upper surface of the lower support 5. The through hole 9 is above the locking hole 10. A screw hole 12 extending upward to the inside of the stud 6 is formed at the lower end of the lower support 5. The anchor is threadedly connected in the screw hole 12. The distance between the upper support 2 and the lower support 5 is adjusted by rotating the stud 6 in the screw groove 4, thereby changing the height of the entire base structure to ensure that all the longitudinal rods of the scaffolding can fit the ground surface at their locations after the sheath 1 is inserted into the scaffolding to ensure the overall stability of the scaffolding. The locking pin 8 is longitudinally inserted into the through hole 9 and the locking hole 10 to lock the lower support 5 with the upper support 2, so that when the base is disturbed by external force, the stud 6 cannot rotate in the screw groove 4, the base has better integrity, and is safer to install and use.

[0029] See also Figure 4-6 The upper end of the sheath 1 is fixedly connected to a top plate 13, and a socket 14 is provided on the upper surface of the top plate 13. A slide bar 15 is inserted into the socket 14. The lower end of the slide bar 15 is fixedly connected to the slip ring 7. The slide bar 15 moves longitudinally along the socket 14 to adjust the height of the slip ring 7, so that the locking pin 8 is inserted into or pulled out of the through hole 9 and the locking hole 10, which plays a role in locking and unlocking the upper support 2 and the lower support 5. A spring 16 is installed between the upper end of the slip ring 7 and the lower end of the top plate 13 and is sleeved on the outer side of the slide bar 15. A handle 17 is fixedly connected to the upper end of the slide bar 15, and the spring 16 has an elastic extension. Long performance, elastically stretching downward based on the top plate 13, pushing the sliding ring 7 downward and continuously applying extrusion force, so that the locking pin 8 is inserted into the through hole 9 and the locking hole 10, and the upper support 2 and the lower support 5 are locked. The docking plug 3 is a plastic column with a sharp end. The outer wall of the docking plug 3 is covered with a layer of rubber sleeve with a rough surface. The center of the docking plug 3 overlaps with the center of the sheath 1. After the longitudinal steel pipe of the scaffolding is inserted into the sheath 1, the docking plug 3 is inserted into the steel pipe together. The rubber sleeve on the surface of the docking plug 3 is used to increase the friction between it and the inner wall of the steel pipe, thereby improving the connection firmness between the steel pipe and the base.

[0030] Example 1: Please refer to Figure 7 In this embodiment, the anchor is anchor rod No. 1101, the upper end of anchor rod No. 1101 is fixedly connected with a screw head threaded in the screw mouth 12, the lower end of anchor rod No. 1101 is provided with a cross notch, and the outer wall of anchor rod No. 1101 is provided with an annular groove. When erecting a scaffold of a larger scale and span, the installation stability of the scaffold is required to be very high. It is selected to unscrew anchor rod No. 1101 from the screw mouth 12, and then pour concrete on the hardened floor and wrap it around anchor rod No. 1101. After hardening, a pad supporting the lower support 5 is formed, and the base is permanently fixed on the floor, so that after the scaffold is installed, its bottom stability is very high.

[0031] Example 2: Please refer to Figure 8 In this embodiment, the anchor is composed of a second anchor rod 1102, a superposition groove 1103 and a tie rod 1104. The upper end of the second anchor rod 1102 is fixedly connected with a screw head threaded in the screw mouth 12, and the lower end of the second anchor rod 1102 is provided with a cross notch. The outer wall of the second anchor rod 1102 is provided with four superposition grooves 1103. One end of the tie rod 1104 is rotatably connected to the bottom end of the superposition groove 1103 through a hinge. When erecting a scaffold of a larger scale and span, the installation stability of the scaffold is very high. It is selected to Rod 1102 is unscrewed from the screw mouth 12, and the tie rod 1104 is rotated out of the overlapping groove 1103 through the hinge and is relatively perpendicular to the No. 2 anchor rod 1102. Concrete is poured on the hardened floor and wrapped around the No. 1 anchor rod 1101 and the tie rod 1104. The No. 1 anchor rod 1101 and the tie rod 1104 form a longitudinal and horizontal tie structure, which is more firmly combined with the concrete. After the concrete hardens, a pad supporting the lower support 5 is formed, and the base is permanently fixed on the floor, so that after the scaffolding is installed, its bottom stability is very high.

[0032] See also Figure 7-8 An annular gasket 18 is glued and fixed to the lower surface of the lower support 5. The gasket 18 is made of hard rubber material. There is a large static friction between the annular gasket 18 and the hard floor, so that the lower support 5 will not slide easily, and the support stability of the upper scaffolding is good.

[0033] When working, the user marks the installation points of the longitudinal rods of the scaffold on the hard floor by laying out the lines, and then casts concrete pads at each point through a mold according to the marked points, and places the base before the concrete initially sets. First, use a screwdriver to insert the cross notch on the anchor, turn the anchor out of the screw hole 12, and then insert the anchor into the concrete pad, and wait for the concrete to finally set to fix the base;

[0034] Then use a level or other measuring instrument to measure the top surface elevation of each base, and adjust the height of the corresponding base according to the measurement result to ensure that all the bases are of the same height in the end. When adjusting, first pull the handle 17 upward to drive the slip ring 7 to move upward, and the locking pin 8 will come out of the locking hole 10, and then rotate the sleeve 1 and the upper support 2. Using the threaded connection structure of the screw groove 4 and the stud 6, the sleeve 1 and the upper support 2 continue to rise until they reach the specified elevation, and then release the handle 17. Under the elastic action of the spring 16, push the slip ring 7 downward and continue to apply extrusion force. The locking pin 8 is inserted into the through hole 9 and the locking hole 10 to lock the upper support 2 and the lower support 5;

[0035] Finally, insert the bottom of each longitudinal steel pipe of the scaffolding into the sheath 1. At the same time, squeeze the docking plug 3 into the steel pipe. Use the rubber sleeve on the surface of the docking plug 3 to increase the friction between it and the inner wall of the steel pipe, thereby improving the connection firmness between the steel pipe and the base. Then, relying on the longitudinal steel pipe installed at the bottom layer, continuously set up various rods upward to form a scaffolding construction platform.

[0036] Through the above steps, on the basis of the existing scaffolding base with a fixed height, a lower support 5 structure adjusted by threaded transmission is installed at its bottom. In actual use, the height of the entire base can be adjusted according to the flatness of the ground to ensure that when the scaffolding is horizontal, all the bases can be close to the ground to ensure the stability of the scaffolding installation. The locking pin 8 is vertically inserted into the through hole 9 and the locking hole 10. After the height of the base is adjusted, the threaded transmission adjustment and lifting structure is locked to prevent the scaffolding from being disturbed by external forces and causing unstable connections at the threaded transmission adjustment and lifting structure. The installation and use are safer, so as to solve the problem that the existing scaffolding base does not have the ability to adjust the height, and the simple threaded adjustment and lifting structure has poor stability on the base.

Claims

1. An adjustable construction scaffolding base, comprising a sheath (1) and an upper support (2); characterized in that: It also includes a docking plug (3), a screw groove (4), a lower support (5), a stud (6), a slip ring (7), a locking pin (8), a through hole (9), a locking hole (10), and an anchor. The sheath (1) is a cylindrical structure and the longitudinal steel pipe of the scaffold is inserted into the sheath (1). The lower end of the sheath (1) is integrally connected and fixed with a truncated cone-shaped upper support (2). The upper end of the upper support (2) is fixedly connected with a docking plug (3) having a hollow screw groove (4) inside. The docking plug (3) is arranged in the sheath (1) and has an outer diameter that is the same as the inner diameter of the longitudinal steel pipe of the scaffold. The lower support (5) is arranged below the upper support (2). The upper end of the lower support (5) is fixedly installed A stud (6) is threadedly connected in the screw groove (4), a slip ring (7) is sleeved on the outer side of the sleeve (1), and four locking pins (8) are fixedly connected to the lower end of the slip ring (7) at equal intervals around itself. The surface of the upper support (2) is provided with four through holes (9) corresponding to the locking pins (8) one by one, and the through holes (9) penetrate and connect to the lower surface of the upper support (2), and 40-60 locking holes (10) are evenly spaced around the upper surface of the lower support (5), and the through holes (9) are located above the locking holes (10). The lower end of the lower support (5) is provided with a screw hole (12) extending upward to the inside of the stud (6), and the anchor is threadedly connected in the screw hole (12).

2. The adjustable building construction scaffolding base according to claim 1 is characterized in that: The anchoring piece is a No. 1 anchor rod (1101), the upper end of the No. 1 anchor rod (1101) is fixedly connected with a screw head threaded in a screw hole (12), the lower end of the No. 1 anchor rod (1101) is provided with a cross notch, and the outer wall of the No. 1 anchor rod (1101) is provided with an annular groove.

3. The adjustable building construction scaffolding base according to claim 1 is characterized in that: The anchoring piece is composed of a No. 2 anchor rod (1102), a superimposed groove (1103) and a tie rod (1104); the upper end of the No. 2 anchor rod (1102) is fixedly connected with a screw head threaded in a screw hole (12); the lower end of the No. 2 anchor rod (1102) is provided with a cross groove; the outer wall of the No. 2 anchor rod (1102) is provided with four superimposed grooves (1103); one end of the tie rod (1104) is rotatably connected to the bottom end of the superimposed groove (1103) via a hinge.

4. The adjustable building construction scaffolding base according to claim 1 is characterized in that: The upper end of the sheath (1) is fixedly connected to a top plate (13), an insertion hole (14) is provided on the upper surface of the top plate (13), a slide rod (15) is inserted into the insertion hole (14), and the lower end of the slide rod (15) is fixedly connected to the slip ring (7).

5. The adjustable building construction scaffolding base according to claim 4 is characterized in that: A spring (16) sleeved on the outside of the slide rod (15) is installed between the upper end of the slide ring (7) and the lower end of the top plate (13), and a handle (17) is fixedly connected to the upper end of the slide rod (15).

6. The adjustable building construction scaffolding base according to claim 1 is characterized by: The butt plug (3) is a plastic column with a sharp end. The outer wall of the butt plug (3) is covered with a layer of rubber sleeve with a rough surface. The center of the butt plug (3) overlaps with the center of the sleeve (1).

7. The adjustable building construction scaffolding base according to claim 1 is characterized by: An annular gasket (18) is adhesively fixed to the lower surface of the lower support (5), and the gasket (18) is made of hard rubber material.