Temporary wiring equipment for wind power construction

By designing temporary wire-mounting equipment for wind power construction and adjusting the cable arc using the drive motor and electric telescopic rod system, the problems of excessive cable arc and lack of tensioning mechanism in existing equipment are solved, and construction efficiency and equipment stability are improved.

CN221978586UActive Publication Date: 2024-11-08CHINA RESOURCES NEW ENERGY (ANDA) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420563191.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-08
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

During wind power construction, temporary wired equipment is used due to the excessive arc of the cable and the lack of tensioning mechanism, which affects the construction efficiency.

Method used

A temporary wire-mounting equipment for wind power construction was designed, including bottom plate, rotary folding assembly, rectangular frame plate, drive motor, screw rod, slider, winding wheel and electric telescopic rod. The drive motor drives the screw rod to rotate, and the slider is The traction winding wheel moves downward, adjust the cable arc, and use electric telescopic rods and gear systems to achieve folding and unfolding the frame plate to ensure the stable installation of the cable.

Benefits of technology

The cable arc adjustment and tension are realized, which reduces interference to construction, and improves the stability and convenience of use of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221978586U_ABST
    Figure CN221978586U_ABST
Patent Text Reader

Abstract

The utility model discloses temporary stringing equipment for wind power construction, which relates to the technical field of stringing equipment and comprises a bottom plate, a rotary folding component is arranged at the top of the bottom plate, a rectangular frame plate is arranged on the rotary folding component, the rotary folding component is used for adjusting an included angle between the bottom plate and the rectangular frame plate, and a driving motor is arranged at the bottom of the rectangular frame plate. A lead screw is rotationally connected between the upper inner wall and the lower inner wall of the rectangular frame plate through a bearing, the lead screw is driven by a driving motor, a sliding block is in threaded connection with the lead screw, and a first U-shaped block is fixed to one side of the sliding block. The driving motor is used for driving the lead screw to rotate, the lead screw can pull the sliding block to slide in the rectangular frame plate in a lead screw transmission mode, the sliding block pulls the first winding wheel to move downwards, and a cable which passes through the first winding wheel and is arranged in a V shape with the two second winding wheels can be folded and tensioned, so that the hanging radian of the cable after stringing can be adjusted, and the cable stringing efficiency is improved. And the interference on construction is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wiring equipment, in particular to temporary wiring equipment for wind power construction. Background Art

[0002] Wind power generation refers to the conversion of wind kinetic energy into electrical energy. Wind is a pollution-free energy source. Using wind power to generate electricity is very environmentally friendly and can generate huge amounts of electricity. Therefore, more and more countries are paying more attention to wind power generation. As a clean and renewable energy source, wind energy is increasingly valued by countries around the world. It has a huge reserve and can meet usage needs.

[0003] During wind power construction, cables are used to conduct electricity. In some special environments, temporary cable stringing equipment is needed to string up the cables to prevent the cables from blocking the normal construction. When using common temporary cable stringing equipment for wind power construction, it simply lifts the cables off the ground. After being lifted up, the cables will be arranged in an arc shape due to their own gravity. If the arc is too large and there is a lack of necessary tensioning mechanisms, the cables will also affect the actual construction after being stringed, making it difficult to meet the use requirements. Utility Model Content

[0004] The purpose of the present application is to provide a temporary wiring device for wind power construction, so as to solve the problem that the existing temporary wiring device for wind power construction proposed in the above-mentioned background technology simply lifts the cable off the ground when in use, and after the cable is lifted up, it will be arranged in an arc shape due to its own gravity. If the arc is too large and there is a lack of necessary tensioning mechanism, the cable will also affect the actual construction after being wired, and thus it is difficult to meet the use requirements.

[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a temporary line-laying equipment for wind power construction, comprising a base plate, a rotating and folding assembly is arranged on the top of the base plate, a rectangular frame plate is arranged on the rotating and folding assembly, and the rotating and folding assembly is used to adjust the angle between the base plate and the rectangular frame plate, a driving motor is arranged at the bottom of the rectangular frame plate, a screw rod is rotatably connected between the upper and lower inner walls of the rectangular frame plate through a bearing, the screw rod is driven by the driving motor, a slider is threadedly connected on the screw rod, a first U-shaped block is fixed to one side of the slider, a first winding wheel is rotatably connected between the opposite inner walls of the first U-shaped block through a bearing, a second U-shaped block is fixed to one side of the rectangular frame plate, the second U-shaped block is located directly above the first U-shaped block, two second winding wheels are rotatably connected between the opposite inner walls of the second U-shaped block through bearings, and the first winding wheel and the two second winding wheels are arranged in an isosceles triangle shape.

[0006] Furthermore, two rotating rods are provided through the bottom plate, and the joints between the bottom plate and the rotating rods are rotatably connected via bearings, and rollers are fixed at both ends of the rotating rods.

[0007] Furthermore, a bolt is threadedly connected to the bottom plate, and the bottom end of the bolt is rotatably connected to a stop plate via a bearing, and the stop plate is arranged parallel to the bottom plate.

[0008] Furthermore, two guide rods are fixed on the top of the stop plate, and through holes for the guide rods to slide are opened on the bottom plate.

[0009] Furthermore, the rotating folding assembly includes a support plate, which is fixedly mounted on the base plate, a supporting column is fixedly passed through the support plate, and the joint between the support plate and the supporting column is rotatably connected via a bearing, a support plate is fixedly mounted at one end of the supporting column, two fixed plates are fixedly mounted on the top of the support plate, and the rectangular frame plate is fixedly mounted between the two fixed plates.

[0010] Furthermore, a gear is fixed to the other end of the supporting column, a fixing block is fixed to the top of the supporting plate, and an electric telescopic rod is arranged on the fixing block.

[0011] Furthermore, a carrier block is fixedly mounted on the output end of the electric telescopic rod, a rack is fixed on the bottom of the carrier block, the electric telescopic rod is arranged parallel to the rack, and the rack and the gear are meshed with each other.

[0012] In summary, the technical effects and advantages of the utility model are:

[0013] 1. In the utility model, a driving motor is used to drive the screw rod to rotate. The screw rod can pull the slider to slide inside the rectangular frame plate in a screw rod transmission manner. The slider pulls the first winding wheel downward, so that the cable passing through the first winding wheel and the two second winding wheels arranged in a "V" shape can be folded and tensioned. In this way, the vertical arc of the cable after the cable is erected can be adjusted to reduce its interference with the construction.

[0014] 2. In the utility model, four rollers are used to make it more convenient to transfer the wiring equipment. By tightening the bolts with a wrench, the stop plate can be pushed down so that the stop plate rests on the ground, preventing the wiring equipment from slipping and ensuring the stability of the wiring equipment during use. The electric telescopic rod is used to push the rack to move, and the rack and the gear are meshed with each other to drive the rack to rotate, so that the rack pulls the rectangular frame plate to rotate 90°, so as to realize the folding or unfolding of the rectangular frame plate and the bottom plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art description are briefly introduced below.

[0016] Figure 1 This is a schematic diagram of the three-dimensional structure of a temporary wiring device for wind power construction in an embodiment of the present application;

[0017] Figure 2 It is a schematic diagram of the structure of the lead screw, the slider, the first winding wheel and the second winding wheel in the embodiment of the present application;

[0018] Figure 3 This is a schematic diagram of the structure of the bottom plate, rollers, bolts and stop plate in the embodiment of the present application;

[0019] Figure 4 It is a schematic diagram of the structure of the rotating and folding assembly in the embodiment of the present application.

[0020] In the figure: 1, bottom plate; 2, rectangular frame plate; 3, driving motor; 4, screw rod; 5, slider; 6, first U-shaped block; 7, first winding wheel; 8, second U-shaped block; 9, second winding wheel; 10, rotating rod; 11, roller; 12, bolt; 13, stop plate; 14, guide rod; 15, support plate; 16, supporting column; 17, supporting plate; 18, fixing plate; 19, gear; 20, fixing block; 21, electric telescopic rod; 22, carrying block; 23, rack. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Example: Reference Figure 1-4 A temporary line-laying device for wind power construction shown in the figure comprises a base plate 1, a rotating and folding assembly is arranged on the top of the base plate 1, a rectangular frame plate 2 is arranged on the rotating and folding assembly, and the rotating and folding assembly is used to adjust the angle between the base plate 1 and the rectangular frame plate 2, a driving motor 3 is arranged at the bottom of the rectangular frame plate 2, a screw rod 4 is rotatably connected between the upper and lower inner walls of the rectangular frame plate 2 through a bearing, the screw rod 4 is driven by the driving motor 3, a slider 5 is threadedly connected to the screw rod 4, a first U-shaped block 6 is fixed to one side of the slider 5, a first winding wheel 7 is rotatably connected between the opposite inner walls of the first U-shaped block 6 through a bearing, a second U-shaped block 8 is fixed to one side of the rectangular frame plate 2, the second U-shaped block 8 is located directly above the first U-shaped block 6, two second winding wheels 9 are rotatably connected between the opposite inner walls of the second U-shaped block 8 through bearings, and the first winding wheel 7 and the two second winding wheels 9 are arranged in an isosceles triangle shape.

[0023] The driving motor 3 is used to drive the screw rod 4 to rotate. The screw rod 4 can pull the slider 5 to slide inside the rectangular frame plate 2 in a screw transmission manner. The slider 5 pulls the first winding wheel 7 downward, so that the cable passing through the first winding wheel 7 and the two second winding wheels 9 arranged in a "V" shape can be folded and tensioned. In this way, the vertical arc of the cable after the cable is erected can be adjusted to reduce its interference with the construction.

[0024] Among them, two rotating rods 10 are arranged through the bottom plate 1, and the joint of the bottom plate 1 and the rotating rod 10 is rotatably connected through a bearing, rollers 11 are fixed at both ends of the rotating rod 10, a bolt 12 is threadedly connected to the bottom plate 1, and the bottom end of the bolt 12 is rotatably connected to a stop plate 13 through a bearing, the stop plate 13 is arranged parallel to the bottom plate 1, and two guide rods 14 are fixed on the top of the stop plate 13, and a through hole for the guide rod 14 to slide is opened on the bottom plate 1.

[0025] With the help of four rollers 11, the wiring equipment is more convenient to transfer. By tightening the bolt 12 with a wrench, the stop plate 13 can be pushed down so that the stop plate 13 rests on the ground, preventing the wiring equipment from slipping and ensuring the stability of the wiring equipment when in use.

[0026] Among them, the rotating and folding component includes a support plate 15, which is fixedly installed on the base plate 1, and a supporting column 16 is fixed through the support plate 15, and the joint of the support plate 15 and the supporting column 16 is rotatably connected through a bearing, a support plate 17 is fixed at one end of the supporting column 16, two fixed plates 18 are fixed on the top of the support plate 17, and the rectangular frame plate 2 is fixedly installed between the two fixed plates 18. A gear 19 is fixed at the other end of the supporting column 16, a fixed block 20 is fixed on the top of the support plate 15, and an electric telescopic rod 21 is arranged on the fixed block 20, and a supporting block 22 is fixedly installed on the output end of the electric telescopic rod 21, and a rack 23 is fixed at the bottom of the supporting block 22, and the electric telescopic rod 21 is arranged parallel to the rack 23, and the rack 23 and the gear 19 are meshed with each other.

[0027] The electric telescopic rod 21 is used to push the rack 23 to move. With the help of the meshing of the rack 23 and the gear 19, the rack 23 can be driven to rotate, so that the rack 23 pulls the rectangular frame plate 2 to rotate 90°, so as to realize the folding or unfolding of the rectangular frame plate 2 and the bottom plate 1.

[0028] How this utility works:

[0029] When in use, the cable stringing device is transferred to a designated position with the help of four rollers 11. After reaching the designated position, the bolt 12 is tightened with a wrench, so that the bolt 12 pushes the stop plate 13 down to the ground, preventing the roller 11 from continuing to roll, and the cable is passed through the first winding wheel 7 and the two second winding wheels 9, so that the cables are arranged in a "V" shape between the three. The electric telescopic rod 21 is controlled to push the rack 23 to move, and the rack 23 and the gear 19 are meshed with each other, so that the gear 19 can be pulled to rotate, so that the gear 19 pulls the rectangular frame plate 2 to rotate, so that the rectangular frame plate 2 and the bottom plate 1 are changed from a parallel state to a vertical state, and the cable is now erected;

[0030] If the cable sags greatly, the drive motor 3 can be controlled to drive the screw rod 4 to rotate, forcing the screw rod 4 to pull the slider 5 downward in a screw rod transmission manner. The slider 5 uses the first U-shaped block 6 to pull the first winding wheel 7 downward, so that the cable arranged in a "V" shape between the first winding wheel 7 and the two second winding wheels 9 is folded, thereby completing the cable tensioning process, reducing the cable sag and reducing the interference with wind power construction.

[0031] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A temporary wiring device for wind power construction, comprising a bottom plate (1), Features: A rotating folding assembly is arranged on the top of the bottom plate (1), a rectangular frame plate (2) is arranged on the rotating folding assembly, and the rotating folding assembly is used to adjust the angle between the bottom plate (1) and the rectangular frame plate (2), a driving motor (3) is arranged at the bottom of the rectangular frame plate (2), a screw rod (4) is rotatably connected between the upper and lower inner walls of the rectangular frame plate (2) via a bearing, the screw rod (4) is driven by the driving motor (3), a slider (5) is threadedly connected to the screw rod (4), and the slider (5) A first U-shaped block (6) is fixed on one side of the rectangular frame plate (2); a first winding wheel (7) is rotatably connected between opposite inner walls of the first U-shaped block (6) via a bearing; a second U-shaped block (8) is fixed on one side of the rectangular frame plate (2); the second U-shaped block (8) is located directly above the first U-shaped block (6); two second winding wheels (9) are rotatably connected between opposite inner walls of the second U-shaped block (8) via a bearing; the first winding wheel (7) and the two second winding wheels (9) are arranged in an isosceles triangle shape.

2. A temporary wiring equipment for wind power construction according to claim 1, Features: Two rotating rods (10) are provided through the bottom plate (1), and the joint between the bottom plate (1) and the rotating rods (10) is rotatably connected via a bearing, and rollers (11) are fixed at both ends of the rotating rods (10).

3. A temporary wiring equipment for wind power construction according to claim 1, Features: The bottom plate (1) is threadedly connected with a bolt (12), the bottom end of the bolt (12) is rotatably connected with a stop plate (13) via a bearing, and the stop plate (13) is arranged parallel to the bottom plate (1).

4. A temporary wiring equipment for wind power construction according to claim 3, Features: Two guide rods (14) are fixed on the top of the stop plate (13), and through holes for the guide rods (14) to slide are provided on the bottom plate (1).

5. A temporary wiring equipment for wind power construction according to claim 1, Features: The rotary folding assembly comprises a support plate (15), wherein the support plate (15) is fixedly mounted on the bottom plate (1), a support column (16) is fixedly penetrated on the support plate (15), and the joint between the support plate (15) and the support column (16) is rotatably connected via a bearing, a support plate (17) is fixedly mounted on one end of the support column (16), two fixed plates (18) are fixedly mounted on the top of the support plate (17), and the rectangular frame plate (2) is fixedly mounted between the two fixed plates (18).

6. A temporary wiring equipment for wind power construction according to claim 5, Features: A gear (19) is fixed to the other end of the support column (16), a fixing block (20) is fixed to the top of the support plate (15), and an electric telescopic rod (21) is arranged on the fixing block (20).

7. A temporary wiring equipment for wind power construction according to claim 6, Features: A carrier block (22) is fixedly mounted on the output end of the electric telescopic rod (21), a rack (23) is fixed on the bottom of the carrier block (22), the electric telescopic rod (21) and the rack (23) are arranged in parallel, and the rack (23) and the gear (19) are meshed with each other.