Fire brigade flow testing equipment
By designing a connection mechanism and protective mechanism for easy disassembly in the fire brigade flow testing equipment, the problem of inconvenient disassembly of the test instrument is solved, the convenient maintenance of the flowmeter and the long-term use of flanges and bolts is achieved, and the convenience of the equipment is improved. and service life.
Patent Information
- Application Number
- CN202420493037.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The test instruments in the existing fire brigade flow testing equipment are not convenient to be disassembled separately, resulting in the inability to disassemble and repair or replace when damaged, reducing convenience.
A fire brigade flow testing equipment including a connecting mechanism and a protective mechanism is designed to facilitate the removal and installation of the flowmeter through the design of a docking ring and a sealing gasket, and to provide protection through a combination of protective cover and magnets to prevent flanges and bolts from being affected by Rainwater is soaked, extending service life.
It realizes convenient disassembly and installation of flowmeters, avoids maintenance inconvenience, and improves the service life and maintenance efficiency of the equipment.
Smart Images

Figure CN221981482U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flow testing equipment, in particular to a flow testing equipment for a fire brigade. Background Art
[0002] Firefighting equipment refers to equipment used for emergency firefighting operations, so its two more important parameters are pressure and flow. Pressure mainly represents its impact force and the highest height it can reach, and flow mainly represents the maximum amount of water that can be provided per unit time.
[0003] After searching, the patent with the authorization announcement number CN219764402U proposes a flow pressure test device for fire brigades, including a main body, a first pipe is arranged at one end of the main body, a second pipe is arranged at the other end of the main body, and a connecting mechanism is arranged at the connection between the main body and the first pipe and the second pipe. Extension pipes are arranged on both sides of the main body, a connecting pipe is arranged on one side of the extension pipe, and an explosion-proof mechanism is arranged at the other end of the connecting pipe. The top surface of the explosion-proof mechanism is provided with a test instrument; through the secondary through hole and the spring, the air hole is used to push the shell upward and compress the spring at the same time. At the same time, because the shell moves, the secondary through hole loses its obstruction and can release pressure, thereby effectively avoiding damage to the device due to excessive internal pressure of the device and enhancing the safety of the device. The following problems exist in this technical solution:
[0004] When in use, the flow in the pipeline can be tested by the test instrument. Since the test instrument is not easy to disassemble separately, the test instrument cannot be disassembled for repair or replacement when it is damaged after long-term use, which will bring inconvenience to the maintenance personnel and reduce the convenience;
[0005] In view of the above problems, the present utility model document proposes a flow testing equipment for a fire brigade. Utility Model Content
[0006] The utility model provides a flow testing equipment for fire brigade, which solves the problem in the prior art that the test instrument is not convenient to disassemble separately, resulting in the test instrument being unable to be disassembled for repair or replacement when damaged after long-term use, which in turn causes inconvenience to maintenance personnel and reduces convenience.
[0007] The utility model provides the following technical solutions:
[0008] A fire brigade flow test equipment, comprising:
[0009] A pipeline body, a flow meter is arranged outside the pipeline body, connecting pipes are arranged at both ends of the pipeline body, and a first flange is arranged on the outer wall of one end of each connecting pipe;
[0010] A connecting mechanism, which is arranged on the pipeline body and is used to connect the flow meter;
[0011] The protection mechanism is arranged on the pipeline body and is used to protect the connection between the pipeline body and the connecting pipe.
[0012] In one possible design, the connecting mechanism includes a butt joint tube, a connecting tube, a lower connecting ring, a sealing gasket, an upper connecting ring and a protective assembly. The butt joint tube is arranged at the bottom of the flow meter, the upper connecting ring is fixedly arranged on the outer wall of the butt joint tube, and the connecting tube is connected to the outer wall of the pipeline body.
[0013] In a possible design, the lower connecting ring is fixedly arranged on the outer wall of the connecting tube, the lower connecting ring is fitted with the upper connecting ring, the sealing gasket is arranged on the top side of the lower connecting ring, the sealing gasket is fitted with the bottom side of the upper connecting ring, and the lower connecting ring and the upper connecting ring are fixed by a plurality of connecting bolts.
[0014] In a possible design, the protection component is arranged outside the connecting mechanism, and the protection component includes a first protective cover, a second protective cover, two connecting plates, a magnet and an iron sheet. The first protective cover and the second protective cover are rotatably connected by a hinge. The two connecting plates are respectively fixed on the outer walls of one end of the first protective cover and the second protective cover. The magnet and the iron sheet are respectively arranged on one side of the two connecting plates, and the magnet and the iron sheet are adsorbed on each other.
[0015] In a possible design, the protective mechanism includes two fixed rods, two baffles, four sliding holes and four limit plates. The two fixed rods are symmetrically fixed on the outer wall of the pipe body, the four limit plates are respectively fixed at both ends of the two fixed rods, the two baffles are slidably connected to the outside of the pipe body, the four sliding holes are respectively opened on one side of the two baffles, and the sliding holes are slidably connected to the outer wall of the fixed rods.
[0016] In a possible design, a plurality of positioning rods are fixedly provided on one side of each of the first flanges, a sealing ring is provided on one side of the first flange, second flanges that fit with the first flanges are provided on the outer walls at both ends of the pipe body, a plurality of positioning grooves for the positioning rods to be inserted are provided on one side of the second flange, a sealing groove that fits with the sealing ring is provided on one side of the second flange, and the first flange and the second flange are fixed by a plurality of fixing bolts.
[0017] In the present application, when in use, firstly, the two connecting pipes are connected to the two ends of the pipeline body, the first flange on the outer wall of one end of the connecting pipe will fit with the corresponding second flange, and at the same time, a plurality of positioning rods fixed on one side of the first flange will be inserted into the corresponding positioning groove, which is conducive to quickly positioning and connecting the connecting pipe, improving the installation efficiency, and the sealing ring will be snapped into the corresponding sealing groove, which is conducive to achieving better sealing, and then the first flange and the second flange are fixedly connected using the mounting bolts and mounting nuts, and then the connecting pipe can be installed and fixed to the pipeline body, so as to facilitate the later testing and improve the use effect. After the connecting pipe is connected, the baffle can be pushed on the pipe The outer wall of the pipeline body is slidable, and the sliding hole opened on one side of the shield slides on the outer wall of the fixing rod. The fixing rod can play a sliding limit effect on the shield, thereby improving the stability of the shield sliding. The limit plates fixed at both ends of the fixing rod can further limit the sliding of the shield, so that the shield slides to the outside of the two flanges, so that the shield can be shielded and protected by the shield, so as to prevent the flanges, mounting bolts and mounting nuts from being soaked by rainwater for a long time during the external test of the pipeline body, causing them to rust easily, thereby facilitating disassembly and installation, and improving the service life of the flanges, mounting bolts and mounting nuts.
[0018] After the connection of the connecting pipe is completed, when water flows inside the pipe body and the connecting pipe, the flow rate of the fluid in the pipe can be measured by the flow meter arranged outside the pipe body, so as to achieve the effect of water flow test and improve the convenience. When the flow meter needs to be repaired or replaced, the connecting bolts between the upper connecting ring and the lower connecting ring are removed, and then the upper connecting ring and the lower connecting ring can be disassembled and separated, so as to facilitate the removal of the flow meter. At the same time, during installation, the upper connecting ring and the lower connecting ring are fitted correspondingly, so that the butt joint pipe and the connecting pipe are connected in an anastomotic manner, and then the upper connecting ring and the lower connecting ring are fixedly connected using multiple connecting bolts and connecting nuts. At the same time, the sealing gasket on the lower connecting ring will fit tightly with the upper connecting ring, thereby improving the sealing of the connection and achieving the effect of easy disassembly and installation of the flow meter. , to prevent the flow meter from being damaged after long-term use and being unable to be disassembled for repair or replacement, thus avoiding inconvenience to maintenance personnel and improving convenience. Finally, the first protective cover and the second protective cover are connected by a hinge to clamp the two protective covers to the outside of the two connecting rings. At the same time, the connecting plates fixed on the outer walls of one end of the first protective cover and the second protective cover will fit together, and the magnets and iron sheets on the connecting plates will be attracted to each other, so that the first protective cover and the second protective cover can be adsorbed and fixed. The first protective cover and the second protective cover can protect the two connecting rings, prevent the connecting rings and multiple connecting bolts and connecting nuts from being soaked by rainwater, which may cause rust, avoid the situation where it is difficult to disassemble, improve the convenience of disassembly and installation, and enhance the use effect.
[0019] In the utility model, the flow test equipment for a fire brigade is convenient for disassembling and removing the flow meter through the connection mechanism, and the upper connecting ring and the lower connecting ring can be fixedly connected, so that the flow meter is easy to disassemble and install, and the two connecting rings can be protected to prevent the connecting rings and multiple connecting bolts and connecting nuts from rusting.
[0020] In the utility model, the fire brigade flow test equipment can shield and protect two flanges and a plurality of mounting bolts and mounting nuts through a protective mechanism, so as to prevent the flanges and the mounting bolts and mounting nuts from being soaked by rainwater for a long time when the pipeline body is tested in the outside world, thereby increasing the service life of the flanges and the mounting bolts and mounting nuts;
[0021] The utility model realizes the effect of easy disassembly and installation of the flow meter, prevents the flow meter from being damaged after long-term use and cannot be disassembled for maintenance or replacement, avoids inconvenience to maintenance personnel, and improves convenience. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the main structure of a fire brigade flow test equipment provided by an embodiment of the utility model;
[0023] Figure 2 A schematic diagram of the connecting pipe structure of a fire brigade flow test equipment provided by an embodiment of the utility model;
[0024] Figure 3 A schematic diagram of the pipe body structure of a fire brigade flow test equipment provided by an embodiment of the utility model;
[0025] Figure 4 A schematic diagram of the disassembled structure of a flow meter of a fire brigade flow test equipment provided by an embodiment of the utility model;
[0026] Figure 5 A schematic diagram of the structure of a protective component of a fire brigade flow testing equipment provided in an embodiment of the utility model.
[0027] Reference numerals:
[0028] 1. Pipeline body; 2. Connecting pipe; 3. First flange; 4. Sealing ring; 5. Positioning rod; 6. Second flange; 7. Flow meter; 8. Butt pipe; 9. Fixing rod; 10. Baffle; 11. Sliding hole; 12. Limiting plate; 13. Connecting pipe; 14. Lower connecting ring; 15. Sealing pad; 16. Upper connecting ring; 17. First protective cover; 18. Second protective cover; 19. Connecting plate; 20. Magnet; 21. Iron sheet. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0030] Example 1
[0031] Please refer to Figure 1-Figure 5 , a test equipment, comprising:
[0032] A pipeline body 1, a flow meter 7 is arranged outside the pipeline body 1, connecting pipes 2 are arranged at both ends of the pipeline body 1, and a first flange 3 is arranged on the outer wall of one end of each connecting pipe 2;
[0033] A connecting mechanism, which is arranged on the pipeline body 1 and is used to connect the flow meter 7;
[0034] The protection mechanism is arranged on the pipeline body 1 to protect the connection between the pipeline body 1 and the connecting pipe 2.
[0035] The above technical scheme can achieve the effect of facilitating the disassembly and removal of the flow meter 7 through the connecting mechanism, and at the same time, the upper connecting ring 16 and the lower connecting ring 14 can be fixedly connected, thereby achieving the effect of facilitating the disassembly and installation of the flow meter 7. At the same time, it can also protect the two connecting rings to prevent the connecting rings and multiple connecting bolts and connecting nuts from rusting. The two flanges and multiple mounting bolts and mounting nuts can be shielded and protected by the protective mechanism to prevent the flanges and mounting bolts and mounting nuts from being soaked by rainwater for a long time when the pipeline body 1 is tested in the outside world, thereby improving the service life of the flanges and the mounting bolts and mounting nuts.
[0036] Please refer to Figure 1 and Figure 4 The connecting mechanism includes a butt joint pipe 8, a connecting pipe 13, a lower connecting ring 14, a sealing gasket 15, an upper connecting ring 16 and a protective assembly. The butt joint pipe 8 is arranged at the bottom of the flow meter 7, the upper connecting ring 16 is fixedly arranged on the outer wall of the butt joint pipe 8, and the connecting pipe 13 is connected to the outer wall of the pipeline body 1.
[0037] Please refer to Figure 4 The lower connecting ring 14 is fixedly arranged on the outer wall of the connecting pipe 13, and the lower connecting ring 14 is fitted with the upper connecting ring 16. The sealing gasket 15 is arranged on the top side of the lower connecting ring 14, and the sealing gasket 15 is fitted with the bottom side of the upper connecting ring 16. The lower connecting ring 14 and the upper connecting ring 16 are fixed by a plurality of connecting bolts.
[0038] The above technical scheme can achieve the purpose of dismantling the connecting bolts between the upper connecting ring 16 and the lower connecting ring 14, and then the upper connecting ring 16 and the lower connecting ring 14 can be disassembled and separated, which is convenient for disassembling and removing the flow meter 7. At the same time, during installation, the upper connecting ring 16 and the lower connecting ring 14 are fitted correspondingly, so that the docking pipe 8 is matched and connected with the connecting pipe 13, and then the upper connecting ring 16 and the lower connecting ring 14 are fixedly connected using multiple connecting bolts and connecting nuts. At the same time, the sealing gasket 15 on the lower connecting ring 14 will fit tightly with the upper connecting ring 16, thereby improving the sealing of the connection, and also achieving the effect of easy disassembly and installation of the flow meter 7, preventing the flow meter 7 from being unable to be disassembled for repair or replacement when it is damaged after long-term use, avoiding inconvenience to maintenance personnel, and improving the convenience of the technical effect.
[0039] Please refer to Figure 4 and Figure 5 The protection component is arranged outside the connecting mechanism, and the protection component includes a first protective cover 17, a second protective cover 18, two connecting plates 19, a magnet 20 and an iron sheet 21. The first protective cover 17 and the second protective cover 18 are rotatably connected by a hinge. The two connecting plates 19 are respectively fixedly arranged on the outer walls of one end of the first protective cover 17 and the second protective cover 18. The magnet 20 and the iron sheet 21 are respectively arranged on one side of the two connecting plates 19, and the magnet 20 and the iron sheet 21 are adsorbed on each other.
[0040] The above technical scheme can utilize the rotational connection between the first protective cover 17 and the second protective cover 18 through the hinge to clamp the two protective covers to the outside of the two connecting rings. At the same time, the connecting plate 19 fixed on the outer wall of one end of the first protective cover 17 and the second protective cover 18 will fit together, and the magnet 20 and the iron sheet 21 on the connecting plate 19 will attract each other, so that the first protective cover 17 and the second protective cover 18 can be adsorbed and fixed. The first protective cover 17 and the second protective cover 18 can protect the two connecting rings, prevent the connecting rings and multiple connecting bolts and connecting nuts from being soaked by rainwater, which is easy to rust, avoid the situation that it is difficult to disassemble, improve the convenience of disassembly and installation, and enhance the use effect and technical effect.
[0041] Please refer to Figure 1 and Figure 3 The protective mechanism includes two fixed rods 9, two baffles 10, four sliding holes 11 and four limit plates 12. The two fixed rods 9 are symmetrically fixed on the outer wall of the pipeline body 1, and the four limit plates 12 are respectively fixed at both ends of the two fixed rods 9. The two baffles 10 are slidably connected to the outside of the pipeline body 1. The four sliding holes 11 are respectively opened on one side of the two baffles 10, and the sliding holes 11 are slidably connected to the outer wall of the fixed rods 9.
[0042] The above technical scheme can achieve the goal of pushing the baffle cover 10 to slide on the outer wall of the pipe body 1. At the same time, the sliding hole 11 opened on one side of the baffle cover 10 will slide on the outer wall of the fixing rod 9. The fixing rod 9 can play a sliding limit effect on the baffle cover 10, thereby improving the sliding stability of the baffle cover 10, and the limiting plates 12 fixed at both ends of the fixing rod 9 can further limit the sliding of the baffle cover 10, so that the baffle cover 10 slides to the outside of the two flanges, so that the two flanges and multiple mounting bolts and mounting nuts can be shielded and protected by the baffle cover 10, preventing the pipe body 1 from being soaked in rainwater for a long time during external testing, causing them to rust easily, thereby facilitating disassembly and installation, and improving the service life of the flanges and mounting bolts and mounting nuts.
[0043] The present application can be used in the field of flow testing equipment, and can also be used in other fields applicable to the present application.
[0044] The model of the flow meter 7 is SG-YL-11, and its structure and mechanism will not be described in detail here;
[0045] Example 2
[0046] refer to Figure 2 and Figure 3 , improved on the basis of the first embodiment: a flow test equipment for a fire brigade, which is applied to the field of flow test equipment;
[0047] A plurality of positioning rods 5 are fixedly provided on one side of each first flange 3, a sealing ring 4 is provided on one side of the first flange 3, second flanges 6 that fit with the first flange 3 are provided on the outer walls at both ends of the pipeline body 1, a plurality of positioning grooves for the positioning rods 5 to be inserted are provided on one side of the second flange 6, a sealing groove that fits with the sealing ring 4 is provided on one side of the second flange 6, and the first flange 3 and the second flange 6 are fixed by a plurality of fixing bolts.
[0048] The above technical scheme can achieve the purpose of docking the two connecting pipes 2 to the two ends of the pipeline body 1, and the first flange 3 on the outer wall of one end of the connecting pipe 2 will fit with the corresponding second flange 6. At the same time, multiple positioning rods 5 fixed on one side of the first flange 3 will be inserted into the corresponding positioning groove, which is conducive to quickly positioning and connecting the connecting pipe 2, improving the installation efficiency, and the sealing ring 4 will be snapped into the corresponding sealing groove, which is conducive to better sealing. Then, the first flange 3 and the second flange 6 are fixedly connected using mounting bolts and mounting nuts, and then the connecting pipe 2 can be installed and fixed to the pipeline body 1, so as to facilitate later testing and improve the use effect and technical effect.
[0049] The above are only specific implementations of the utility model, but the protection scope of the utility model is not limited to them. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model; in the absence of conflicts, the embodiments of the utility model and the features in the embodiments can be combined with each other. Therefore, the protection scope of the utility model shall be based on the protection scope of the claims.
Claims
1. A fire brigade flow test equipment, characterized in that: include: A pipeline body (1), a flow meter (7) is arranged outside the pipeline body (1), connecting pipes (2) are arranged at both ends of the pipeline body (1), and a first flange (3) is arranged on the outer wall of one end of each connecting pipe (2); A connecting mechanism, the connecting mechanism being arranged on the pipeline body (1) and used for connecting the flow meter (7); A protection mechanism is arranged on the pipeline body (1) and is used to protect the connection between the pipeline body (1) and the connecting pipe (2).
2. A fire brigade flow test equipment according to claim 1, characterized in that: The connecting mechanism comprises a butt joint pipe (8), a connecting pipe (13), a lower connecting ring (14), a sealing gasket (15), an upper connecting ring (16) and a protective assembly. The butt joint pipe (8) is arranged at the bottom of the flow meter (7), the upper connecting ring (16) is fixedly arranged on the outer wall of the butt joint pipe (8), and the connecting pipe (13) is connected to the outer wall of the pipeline body (1).
3. A fire brigade flow test equipment according to claim 2, characterized in that: The lower connecting ring (14) is fixedly arranged on the outer wall of the connecting pipe (13), the lower connecting ring (14) is fitted with the upper connecting ring (16), the sealing gasket (15) is arranged on the top side of the lower connecting ring (14), the sealing gasket (15) is fitted with the bottom side of the upper connecting ring (16), and the lower connecting ring (14) and the upper connecting ring (16) are fixed by a plurality of connecting bolts.
4. A fire brigade flow test equipment according to claim 3, characterized in that: The protection component is arranged outside the connection mechanism, and comprises a first protection cover (17), a second protection cover (18), two connecting plates (19), a magnet (20) and an iron sheet (21); the first protection cover (17) and the second protection cover (18) are rotatably connected via a hinge; the two connecting plates (19) are respectively fixedly arranged on one end outer wall of the first protection cover (17) and the second protection cover (18); the magnet (20) and the iron sheet (21) are respectively arranged on one side of the two connecting plates (19); and the magnet (20) and the iron sheet (21) are attracted to each other.
5. A fire brigade flow test equipment according to claim 1, characterized in that: The protection mechanism comprises two fixed rods (9), two blocking covers (10), four sliding holes (11) and four limiting plates (12); the two fixed rods (9) are symmetrically fixedly arranged on the outer wall of the pipeline body (1); the four limiting plates (12) are respectively fixedly arranged at both ends of the two fixed rods (9); the two blocking covers (10) are slidably connected to the outside of the pipeline body (1); the four sliding holes (11) are respectively opened on one side of the two blocking covers (10); and the sliding holes (11) are slidably connected to the outer wall of the fixed rods (9).
6. A fire brigade flow test equipment according to claim 5, characterized in that: A plurality of positioning rods (5) are fixedly arranged on one side of each of the first flanges (3); a sealing ring (4) is arranged on one side of the first flange (3); second flanges (6) that fit with the first flanges (3) are arranged on the outer walls at both ends of the pipe body (1); a plurality of positioning grooves for the positioning rods (5) to be inserted are provided on one side of the second flange (6); a sealing groove that fits with the sealing ring (4) is provided on one side of the second flange (6); and the first flange (3) and the second flange (6) are fixed by a plurality of fixing bolts.