Efficient ecological river regulation construction structure
By setting up positioning grooves, drainage grooves and connecting rods on the bricks in the river management construction structure, and using positioning plates and positioning rods to achieve rapid positioning and stable connection of bricks, the problem of poor stability of brick splicing in the existing technology is solved. Efficient and stable river management construction has been achieved, and the aesthetics of the river has been improved at night.
Patent Information
- Application Number
- CN202421252795.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-06-04
AI Technical Summary
The existing ecological river management construction structure has poor stability when splicing and is easy to move up and down, affecting the river management construction work.
An efficient ecological river management construction structure was designed. By setting up positioning grooves, drainage grooves and connecting rods on the bricks, using positioning plates and positioning rods to achieve rapid positioning and stable connection of the bricks, and fluorescent lamps were set up on the bricks. To improve nighttime aesthetics.
It improves the stability of brick connections, achieves rapid positioning and connection, avoids damage to the planting trough by excessive rainwater, and improves the aesthetics of the river at night, significantly improving the effectiveness of the management and construction.
Smart Images

Figure CN222435198U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of river channel regulation, in particular to a high-efficiency ecological river channel regulation construction structure. Background Art
[0002] River regulation refers to the regulation, improvement and management of rivers through appropriate engineering measures to achieve the goals of flood control, drainage, water supply, irrigation, power generation, shipping, ecology and other aspects. Ecological regulation usually involves laying slope protection brick structures on the slopes of the river to prevent soil loss.
[0003] A Chinese patent discloses an ecological river management construction structure (Announcement No. CN216739490U). This patented technology allows rainwater to flow directly downward and avoid entering the brick joints through the overlapping connection of connecting strips and inclined surfaces. At the same time, water-avoiding strips A and B are arranged on the top surface of the bricks, which can effectively prevent rainwater from seeping into the planting troughs and brick joints, thereby reducing soil erosion and extending the stability of the slope structure.
[0004] However, there are still some shortcomings in this patent. It can be seen from the attached drawings of this patent that this patent realizes the splicing of bricks by overlapping the connecting strips and the inclined surface, thereby achieving the purpose of river management. This method has poor stability during splicing and is easy to move up and down during use, affecting the river management construction work. Therefore, those skilled in the art provide an efficient and ecological river management construction structure to solve the problems raised in the above background technology. Utility Model Content
[0005] The purpose of the utility model is to provide an efficient ecological river regulation construction structure to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] An efficient and ecological river management construction structure includes a first brick and a second brick arranged on one side of the first brick, the upper surfaces of the first brick and the second brick are both provided with planting grooves, and the upper surfaces of the first brick and the second brick are both provided with drainage grooves on both sides of the planting grooves, the front surface of the first brick is symmetrically provided with first positioning grooves, the front surface of the second brick is symmetrically provided with second positioning grooves, a positioning plate is embedded and installed at the connection between the first positioning groove and the second positioning groove, and the rear surface of the positioning plate is symmetrically provided with positioning rods.
[0008] As a further solution of the utility model: connecting rods are symmetrically arranged on one side of the first brick and the second brick, and connecting holes corresponding to the connecting rods are opened on the other side of the first brick and the second brick.
[0009] As a further solution of the utility model: the drainage groove is opened in a "U" shape, and the width of the drainage groove is the same as the width of the first brick.
[0010] As a further solution of the utility model: the length of the positioning plate is the sum of the lengths of the first positioning groove and the second positioning groove, and the height of the positioning plate is the same as the height of the first positioning groove.
[0011] As a further solution of the utility model: positioning holes are opened inside the first brick and the second brick, and the rear end of the positioning rod is embedded in the positioning hole.
[0012] As a further solution of the utility model: two groups of drainage grooves are opened on the upper surfaces of the first brick and the second brick, and fluorescent lamps are arranged inside the drainage grooves.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. An efficient and ecological river management construction structure can realize the rapid positioning and connection of the first brick and the second brick by embedding the connecting rod arranged on one side of the second brick into the connecting hole opened on one side of the first rotating block. At the same time, the positioning rod on the rear surface of the positioning plate is embedded into the positioning hole to improve the connection stability between the first brick and the second brick, thereby achieving the purpose of river ecological construction management.
[0015] 2. The efficient and ecological river management construction structure can achieve the purpose of drainage by opening drainage grooves on the first brick and the second brick, thereby avoiding damage to the plants inside the planting grooves caused by excessive rainwater. At the same time, the use of fluorescent lights can improve the aesthetics of the river at night, making the management construction effect better. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the efficient ecological river management construction structure;
[0017] Figure 2 It is a structural diagram of the positioning rod in the construction structure of the efficient and ecological river management;
[0018] Figure 3 This is the structural schematic diagram of the first transfer block in the efficient ecological river management construction structure.
[0019] In the figure: 1. first brick; 11. first positioning groove; 2. second brick; 21. second positioning groove; 211. positioning hole; 3. planting groove; 4. drainage groove; 41. fluorescent lamp; 5. positioning plate; 51. positioning rod; 6. connecting hole. DETAILED DESCRIPTION
[0020] See also Figures 1 to 3In the embodiment of the utility model, the efficient ecological river channel management construction structure includes a first brick 1 and a second brick 2 arranged on one side of the first brick 1, the upper surfaces of the first brick 1 and the second brick 2 are both provided with planting grooves 3, and the upper surfaces of the first brick 1 and the second brick 2 are both provided with drainage grooves 4 on both sides of the planting grooves 3, the front surface of the first brick 1 is symmetrically provided with first positioning grooves 11, the front surface of the second brick 2 is symmetrically provided with second positioning grooves 21, a positioning plate 5 is embedded and installed at the connection between the first positioning groove 11 and the second positioning groove 21, and the rear surface of the positioning plate 5 is symmetrically provided with positioning rods 51, which utilize the positioning rods 51 on the rear surface of the positioning plate 5 to be embedded in the interior of the positioning hole 211, so that the first brick 1 can be connected with the second brick 2 to achieve river channel management.
[0021] exist Figure 1 and Figure 3 Middle: Connecting rods are symmetrically arranged on one side of the first brick 1 and the second brick 2, and connecting holes 6 corresponding to the connecting rods are opened on the other side of the first brick 1 and the second brick 2. This arrangement utilizes the connecting rods to be embedded in the connecting holes 6 to achieve the positioning connection between the first brick 1 and the second brick 2.
[0022] exist Figure 1 Middle: The drainage ditch 4 is opened in a "U" shape, and the width of the drainage ditch 4 is the same as the width of the first brick 1. Two groups of drainage ditch 4 are opened on the upper surfaces of the first brick 1 and the second brick 2, and fluorescent lamps 41 are arranged inside the drainage ditch 4. This arrangement utilizes the fluorescent lamps 41 to improve the aesthetics of the managed river channel at night.
[0023] exist Figure 2 Middle: The length of the positioning plate 5 is the sum of the lengths of the first positioning groove 11 and the second positioning groove 21, and the height of the positioning plate 5 is the same as the height of the first positioning groove 11. Positioning holes 211 are provided inside the first brick 1 and the second brick 2, and the rear end of the positioning rod 51 is embedded in the interior of the positioning hole 211. This setting utilizes the positioning rod 51 to be embedded in the interior of the positioning hole 211, thereby achieving the purpose of stabilizing the first brick 1 and the second brick 2.
[0024] The working principle of the utility model is: when the utility model high-efficiency ecological river channel management construction structure is used, the first brick 1 and the second brick 2 are first connected. During the connection, the connecting rod arranged on one side of the second brick 2 can be embedded into the inside of the connecting hole 6 opened on one side of the first brick 1, so that the first brick 1 and the second brick 2 can be positioned and connected. After the connection, the positioning plate 5 is embedded into the first positioning groove 11 and the second positioning groove 21 opened on the front surfaces of the first brick 1 and the second brick 2, and the positioning rod 51 on the rear surface of the positioning plate 5 is embedded into the inside of the positioning hole 211, so as to achieve the stability of the connection between the first brick 1 and the second brick 2, so that the river channel management construction work can be better performed. At the same time, drainage grooves 4 are opened on the upper surfaces of the first brick 1 and the second brick 2, so as to achieve the purpose of rapid drainage guidance. At the same time, the fluorescent lamp 41 can be used to improve the aesthetics of the river channel at night, so that the management construction effect is better.
[0025] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An efficient ecological river channel regulation construction structure, comprising a first brick (1) and a second brick (2) arranged on one side of the first brick (1), characterized in that: The upper surfaces of the first brick (1) and the second brick (2) are both provided with planting grooves (3), and the upper surfaces of the first brick (1) and the second brick (2) are both provided with drainage grooves (4) on both sides of the planting grooves (3); the front surface of the first brick (1) is symmetrically provided with a first positioning groove (11), and the front surface of the second brick (2) is symmetrically provided with a second positioning groove (21); a positioning plate (5) is embedded and installed at the connection between the first positioning groove (11) and the second positioning groove (21), and a positioning rod (51) is symmetrically provided on the rear surface of the positioning plate (5).
2. The high-efficiency ecological river management construction structure according to claim 1 is characterized in that: One side of the first brick (1) and the second brick (2) are both symmetrically provided with connecting rods, and the other sides of the first brick (1) and the second brick (2) are provided with connecting holes (6) corresponding to the connecting rods.
3. The high-efficiency ecological river management construction structure according to claim 1 is characterized in that: The drainage groove (4) is opened in a "U" shape, and the width of the drainage groove (4) is the same as the width of the first brick (1).
4. The high-efficiency ecological river regulation construction structure according to claim 1 is characterized in that: The length of the positioning plate (5) is the sum of the lengths of the first positioning groove (11) and the second positioning groove (21), and the height of the positioning plate (5) is the same as the height of the first positioning groove (11).
5. The high-efficiency ecological river regulation construction structure according to claim 1 is characterized in that: The first brick (1) and the second brick (2) are both provided with positioning holes (211), and the rear end of the positioning rod (51) is embedded in the positioning hole (211).
6. The high-efficiency ecological river regulation construction structure according to claim 1 is characterized in that: The drainage grooves (4) are provided with two groups on the upper surfaces of the first brick (1) and the second brick (2), and fluorescent lamps (41) are arranged inside the drainage grooves (4).