Permeable ground structure of sponge city
By introducing hydrophobic mechanisms and connection mechanisms into the ground permeable structure of sponge cities, effective drainage and collection of rainwater is achieved, the problem of single penetration method in the existing technology is solved, the infiltration effect and water resource utilization efficiency are improved, and the water resource utilization efficiency is enhanced, and the The installation stability of permeable bricks.
Patent Information
- Application Number
- CN202323516357.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-22
AI Technical Summary
Due to the single penetration method of the existing sponge city, the ground permeable structure cannot effectively guide and collect rainwater, resulting in poor infiltration effect and insufficient water resources.
A sponge urban permeable floor structure including permeable bricks, hydrophobic mechanisms and water diversion boards is designed. The first and second water diversion grooves are arranged on the surface of the permeable bricks, flow water diversion grooves are arranged on the inner side, water diversion plates and filter plates are arranged on the inner side of the permeable base layer, and the inner side of the roadbed is installed. The pipes and connecting pipes realize the drainage, collection and transportation of rainwater through the hydrophobic mechanism and connecting mechanism, and filter the sand and gravel through the filter plate and the filter mesh.
It improves the seepage effect and collection quality of rainwater, realizes the effective utilization of rainwater, enhances the installation stability of permeable bricks, reduces water splashing, and improves the water resource management capabilities of sponge cities.
Smart Images

Figure CN221989008U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sponge cities, in particular to a sponge city water permeable ground structure. Background Art
[0002] Sponge city is a new generation of urban stormwater management concept. It means that the city can adapt to environmental changes and respond to natural disasters caused by rainwater like a sponge. It has good elasticity. It can also be called a "water-elastic city". Ground permeable structure refers to a ground structure that allows rainwater to quickly penetrate into the surface, effectively replenish groundwater, and alleviate the urban heat island effect. This structure usually uses permeable bricks in small urban ground facilities such as urban sidewalks, pedestrian streets, and squares. Permeable bricks are a kind of ground paving material with high permeability. Through the setting of ground permeable structure, rainwater can quickly penetrate into the ground, reduce surface runoff, and thus make better use of rainwater resources. At the same time, it can increase the humidity of the surface, thereby alleviating the urban heat island effect and reducing the pollution caused by surface runoff to the environment. It plays an important role in improving the urban environment and protecting the lives and property of urban residents.
[0003] In the prior art, the permeable ground of sponge cities is usually made by paving a combination of permeable bricks and gravel. Although it can play a role in the infiltration of rainwater, due to the relatively single infiltration method, it cannot guide the rainwater well, and thus cannot collect the rainwater well. The infiltration effect needs to be improved, and water resources cannot be well utilized. Therefore, in order to solve the above problems, a sponge city permeable ground structure is proposed. Utility Model Content
[0004] The purpose of the utility model is to provide a sponge city permeable ground structure to solve the problem mentioned in the above background technology that due to the relatively single infiltration method, rainwater cannot be well guided and thus rainwater cannot be well collected, the infiltration effect needs to be improved, and water resources cannot be well utilized.
[0005] To achieve the above object, the utility model provides the following technical solution: a sponge city permeable ground structure, comprising a road surface, the road surface comprising a roadbed, a permeable base layer is arranged above the roadbed, and permeable bricks are arranged on the top of the permeable base layer;
[0006] A drainage mechanism is arranged on the surface of the permeable brick, and the drainage mechanism includes a first water diversion groove, which is arranged on the upper surface of the permeable brick, a second water diversion groove is arranged on the upper surface of the permeable brick, a water flow groove is arranged on the inner side of the permeable brick, a water diversion plate is arranged on the inner side of the permeable base layer, a pipeline is fixedly installed on the inner side of the roadbed, a connecting pipe is fixedly installed on the upper surface of the pipeline, and a through groove is arranged at the bottom end of the water diversion plate.
[0007] Preferably, the water-repellent mechanism further comprises a filter plate, the filter plate is fixedly connected to the inner surface of the water guide plate, and a filter screen is fixedly connected to the lower surface of the filter plate.
[0008] Preferably, the first water diversion grooves are formed into four groups and are opened on the upper surface of the permeable bricks, and the second water diversion grooves are formed into two groups and are opened on the upper surface of the permeable bricks, and the second water diversion grooves are connected to the first water diversion grooves and the water flow grooves.
[0009] Preferably, the connecting pipe is arranged on the inner side of the roadbed and the permeable base layer, and the bottom end of the through groove is fixedly connected to the connecting pipe.
[0010] Preferably, a connecting mechanism is provided on the surface of the permeable brick, and the connecting mechanism includes a first clamping block, the first clamping block is fixedly connected to the surface of the permeable brick, a first clamping groove is provided at one end of the permeable brick away from the first clamping block, a second clamping block is fixedly connected to the surface of the permeable brick, and a second clamping groove is provided at one end of the permeable brick away from the second clamping block.
[0011] Preferably, the first clamping blocks are in two groups fixedly connected to the permeable bricks, the first clamping slots are in two groups opened on the surface of the permeable bricks, the second clamping blocks are in two groups fixedly connected to the permeable bricks, and the second clamping slots are in two groups opened on the surface of the permeable bricks.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The first water diversion trough and the second water diversion trough are provided to facilitate drainage of rainwater. Rainwater can be collected into the flow trough under the action of the second water diversion trough, which is convenient for rainwater to infiltrate better. The water diversion plate is provided to guide rainwater that infiltrates into the permeable base layer, so that rainwater can enter the inner side of the middle pipe through the through groove and the connecting pipe after collecting on the inner side of the water diversion plate, thereby realizing the collection and transportation of rainwater by the pipe, which is convenient for the utilization of rainwater. At the same time, the filter plate and the filter net are provided to block gravel, thereby achieving the effect of filtering water, which can improve the quality of rainwater collection and thus improve the permeability of the sponge city.
[0014] 2. The arrangement of the first clamping block and the first clamping groove facilitates the transverse splicing of the permeable bricks. The arrangement of the second clamping block and the second clamping groove facilitates the longitudinal splicing of the permeable bricks. Therefore, when the permeable bricks are installed, the permeable bricks can be connected and positioned, which makes it easier to fill the joints of the permeable bricks later, thereby achieving a better installation effect. At the same time, when the roadbed and the permeable base layer sink, the loosening of the permeable bricks can be reduced, thereby making the installation of the permeable bricks more secure, which is beneficial to improving the effect of the permeable bricks on the water seepage of the sponge city. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic cross-sectional front view of the structure of the utility model;
[0016] Figure 2 It is a schematic side cross-sectional view of the structure of the utility model;
[0017] Figure 3 For this utility model Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0018] Figure 4 It is a schematic top view of the structure of the permeable brick and the first clamping block of the utility model.
[0019] In the figure: 1, roadbed; 11, permeable base; 12, permeable bricks; 2, first water diversion channel; 21, second water diversion channel; 22, water flow channel; 23, water diversion plate; 24, filter plate; 25, filter screen; 26, pipeline; 27, connecting pipe; 28, through groove; 3, first clamping block; 31, first clamping slot; 32, second clamping block; 33, second clamping slot. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-4 , an embodiment provided by the utility model:
[0022] A sponge city permeable ground structure comprises a road surface, the road surface comprises a roadbed 1, a permeable base layer 11 is arranged above the roadbed 1, a permeable brick 12 is arranged on the top of the permeable base layer 11, the permeable base layer 11 is mainly composed of gravel and crushed stone, etc., which can play the role of water infiltration and carrying surface runoff. Through the arrangement of the permeable brick 12, rainwater can quickly infiltrate the surface, effectively replenish groundwater, and alleviate the urban heat island effect;
[0023] A drainage mechanism is provided on the surface of the permeable brick 12, and the drainage mechanism includes a first water diversion groove 2, the first water diversion groove 2 is opened on the upper surface of the permeable brick 12, a second water diversion groove 21 is opened on the upper surface of the permeable brick 12, a water flow groove 22 is opened on the inner side of the permeable brick 12, a water diversion plate 23 is arranged on the inner side of the permeable base layer 11, a pipe 26 is fixedly installed on the inner side of the roadbed 1, a connecting pipe 27 is fixedly installed on the upper surface of the pipe 26, and a through groove 28 is opened at the bottom end of the water diversion plate 23. Through the setting of the water diversion plate 23, the water that penetrates into the permeable base layer 11 can be guided, so that the water can flow into the inner side of the water diversion plate 23 for collection, and then enter the pipe 26 through the connecting pipe 27, so as to realize the collection and transportation of rainwater.
[0024] Furthermore, the water-repellent mechanism also includes a filter plate 24, which is fixedly connected to the inner surface of the water guide plate 23, and a filter screen 25 is fixedly connected to the lower surface of the filter plate 24. Through the arrangement of the filter plate 24 and the filter screen 25, gravel and stone can be blocked, and the gravel and stone can be prevented from entering the inner side of the water guide plate 23, which can play a role in filtering water.
[0025] Furthermore, the first water diversion grooves 2 are formed into four groups and are opened on the upper surface of the permeable brick 12, and the second water diversion grooves 21 are formed into two groups and are opened on the upper surface of the permeable brick 12. The second water diversion grooves 21 are connected to the first water diversion grooves 2 and the flow grooves 22. By opening the first water diversion grooves 2 and the second water diversion grooves 21, rainwater can be drained, so that rainwater can be concentrated under the action of the first water diversion grooves 2 and the second water diversion grooves 21 and flow into the permeable base layer 11 through the flow grooves 22, thereby facilitating subsequent collection.
[0026] Furthermore, the connecting pipe 27 is arranged on the inner side of the roadbed 1 and the permeable base layer 11, and the bottom end of the through groove 28 is fixedly connected to the connecting pipe 27. By connecting the connecting pipe 27 and the through groove 28, the water in the water guide plate 23 can enter the inner side of the pipe 26 through the connecting pipe 27, thereby facilitating the collection and drainage of rainwater through the pipe 26, thereby realizing the utilization of water resources.
[0027] Furthermore, a connecting mechanism is provided on the surface of the permeable brick 12, and the connecting mechanism includes a first clamping block 3, the first clamping block 3 is fixedly connected to the surface of the permeable brick 12, a first clamping groove 31 is provided at one end of the permeable brick 12 away from the first clamping block 3, a second clamping block 32 is fixedly connected to the surface of the permeable brick 12, and a second clamping groove 33 is provided at one end of the permeable brick 12 away from the second clamping block 32. Through the cooperation of the first clamping block 3 and the first clamping groove 31, and the second clamping block 32 and the second clamping groove 33, it is convenient to connect the permeable bricks 12, and then it is convenient to better fill the seams of the permeable bricks 12 in the subsequent installation, so that the permeable bricks 12 are not easy to loosen, and thus the situation of splashing water caused by stepping on the permeable bricks 12 sinking can be reduced.
[0028] Furthermore, the first clamping blocks 3 are in two groups and fixedly connected to the permeable bricks 12, the first clamping grooves 31 are in two groups and are opened on the surface of the permeable bricks 12, the second clamping blocks 32 are in two groups and fixedly connected to the permeable bricks 12, and the second clamping grooves 33 are in two groups and are opened on the surface of the permeable bricks 12. Through the cooperation of the first clamping blocks 3 and the first clamping grooves 31, it is convenient to connect the permeable bricks 12 horizontally, so that the permeable bricks 12 are not easily misaligned when being installed.
[0029] Working principle: When in use, rainwater falls on the permeable brick 12 and enters the inner side of the first water diversion groove 2 and the second water diversion groove 21, and the rainwater in the first water diversion groove 2 is also collected in the second water diversion groove 21, so that the rainwater is guided by the second water diversion groove 21, and then the rainwater infiltrates through the water flow groove 22, and the infiltrated rainwater enters the permeable base layer 11, and enters the inner side of the water diversion plate 23 through the permeable base layer 11, and the filter plate 24 and the filter screen 25 block the gravel and gravel, and filter the infiltrated rainwater. When the rainwater enters the water diversion plate 23, it enters the connecting pipe 27 through the through groove 28, and enters the inner side of the pipe 26 through the connecting pipe 27, so as to collect and transport the rainwater;
[0030] By correspondingly engaging the first clamping block 3 and the first clamping groove 31, and correspondingly engaging the second clamping block 32 and the second clamping groove 33, the permeable bricks 12 can be connected horizontally and vertically, thereby avoiding the misalignment of the permeable bricks 12, facilitating the subsequent caulking and installation of the permeable bricks 12, and when the roadbed 1 and the permeable base layer 11 sink, the cooperation of the first clamping block 3 and the first clamping groove 31 and the second clamping block 32 and the second clamping groove 33 can reduce the direct loosening of the permeable bricks 12, thereby reducing the splashing of the permeable bricks 12 caused by stepping on them.
[0031] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.
Claims
1. A sponge city permeable ground structure, comprising a road surface, wherein the road surface comprises a roadbed (1), a permeable base layer (11) is arranged above the roadbed (1), and a permeable brick (12) is arranged on the top of the permeable base layer (11); It is characterized in that The surface of the permeable brick (12) is provided with a drainage mechanism, the drainage mechanism comprising a first water diversion groove (2), the first water diversion groove (2) is provided on the upper surface of the permeable brick (12), the upper surface of the permeable brick (12) is provided with a second water diversion groove (21), the inner side of the permeable brick (12) is provided with a water flow groove (22), the inner side of the permeable base layer (11) is provided with a water diversion plate (23), the inner side of the roadbed (1) is fixedly installed with a pipeline (26), the upper surface of the pipeline (26) is fixedly installed with a connecting pipe (27), and the bottom end of the water diversion plate (23) is provided with a through groove (28).
2. A sponge city permeable ground structure according to claim 1, characterized in that: The water-draining mechanism further comprises a filter plate (24), wherein the filter plate (24) is fixedly connected to the inner surface of the water guide plate (23), and a filter screen (25) is fixedly connected to the lower surface of the filter plate (24).
3. The sponge city permeable ground structure according to claim 1, characterized in that: The first water diversion grooves (2) are formed into four groups and are opened on the upper surface of the permeable brick (12); the second water diversion grooves (21) are formed into two groups and are opened on the upper surface of the permeable brick (12); the second water diversion grooves (21) are connected to the first water diversion grooves (2) and the water flow groove (22).
4. The sponge city permeable ground structure according to claim 1, characterized in that: The connecting pipe (27) is arranged on the inner side of the roadbed (1) and the permeable base layer (11), and the bottom end of the through groove (28) is fixedly connected to the connecting pipe (27).
5. The sponge city permeable ground structure according to claim 1, characterized in that: The surface of the permeable brick (12) is provided with a connection mechanism, the connection mechanism comprising a first clamping block (3), the first clamping block (3) is fixedly connected to the surface of the permeable brick (12), one end of the permeable brick (12) away from the first clamping block (3) is provided with a first clamping groove (31), the surface of the permeable brick (12) is fixedly connected with a second clamping block (32), and one end of the permeable brick (12) away from the second clamping block (32) is provided with a second clamping groove (33).
6. The sponge city permeable ground structure according to claim 5, characterized in that: The first clamping blocks (3) are in two groups and fixedly connected to the permeable brick (12); the first clamping grooves (31) are in two groups and are opened on the surface of the permeable brick (12); the second clamping blocks (32) are in two groups and fixedly connected to the permeable brick (12); and the second clamping grooves (33) are in two groups and are opened on the surface of the permeable brick (12).
