Cast-in-place high pier concrete internal water storage maintenance structure

By setting up a water storage chamber and drip irrigation system in the cast-in-place high bridge pier, the problems of water evaporation and shrinkage deformation are solved, water resource conservation and construction cost reduction are achieved, concrete quality and appearance are improved, and concrete is suitable for large-volume concrete structures .

CN221989128UActive Publication Date: 2024-11-12金华市婺城区交智工程技术服务部
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420432899.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-12
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

The construction conditions of cast-in-place high bridge pier concrete are poor, inconvenient to operate, and the rapid evaporation of moisture leads to surface shedding and shrinking deformation, which poses safety and quality hazards, and the large amount of water consumption is not conducive to water conservation and energy conservation and environmental protection.

Method used

There is a water storage chamber along the axis line in the bridge pier, the lower end is connected to the embedded drainage pipe in the support platform, a water storage geotextile is laid on the top, and the water is regularly and quantitatively replenished by the drip irrigation component, the outer surface is wrapped in a curing film, and a rubber airbag is used to use a rubber airbag Form a water storage chamber to reduce concrete usage and construction costs.

Benefits of technology

It effectively reduces moisture evaporation and shrinkage deformation, saves water resources and construction costs, improves the quality of concrete curing and appearance aesthetics, and is suitable for large-volume concrete structures, with good cooling effect and minimizes cracking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989128U_ABST
    Figure CN221989128U_ABST
Patent Text Reader

Abstract

The utility model discloses a cast-in-place high bridge pier concrete internal water storage maintenance structure which comprises a reinforced concrete bridge pier which is cast on a bearing platform of a plurality of pile foundations in a segmented mode through bridge pier reinforcing steel bars in combination with a bridge pier formwork, and a water storage cavity arranged along the axis is formed in each section of the bridge pier. The lower end of the water storage cavity in the first section of the bridge pier is communicated with a drainage pipe embedded in the bearing platform, water storage geotechnical cloth, a water pipe and a drip irrigation assembly are laid on the surface of the top of each section of the bridge pier, water is supplied to the water pipe through a water pump, the water pipe and the drip irrigation assembly are filled in the water storage cavity, and the drip irrigation assembly conducts drip irrigation on the water storage geotechnical cloth in a timed and quantitative mode. The outer surface of each section of pier is wrapped with a curing film after the pier template is removed; therefore, the cast-in-place high bridge pier concrete internal water storage maintenance structure is simple in structure, safe, economical, ecological, environmentally friendly, energy-saving and emission-reducing, and has high economic benefits, energy-saving and emission-reducing benefits and social benefits by being combined with a corresponding implementation method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of energy-saving ecological bridge construction, in particular to an internal water storage and maintenance structure of cast-in-place high bridge pier concrete. Background Art

[0002] The poor construction conditions, inconvenient operation and difficult quality assurance of cast-in-place high bridge pier concrete are one of the key points, difficulties and key points of high bridge pier construction. At present, the common curing methods of cast-in-place high bridge pier concrete are to fix the spray at the top of the pier or install a spray pipe on the pier body, paste the curing film on the outside of the pier body or install a combined curing film with water retention function, and spray the curing agent on the surface of the pier body. These measures have played a certain role in ensuring the quality of cast-in-place high bridge pier concrete. However, due to the complex environmental conditions of cast-in-place high bridge pier concrete, the water content of cast-in-place concrete evaporates too quickly under high altitude conditions, which will not only cause the surface of the pier body concrete to fall off in flakes or powders, forming honeycombs, rough surfaces and other apparent quality defects, but also cause the pier body concrete to shrink and deform greatly, and shrinkage cracks will appear, which poses a safety and quality hazard; at the same time, in order to keep the surface of the cast-in-place concrete moist, a considerable amount of water needs to be consumed, which is not conducive to saving water resources and energy conservation and environmental protection. Utility Model Content

[0003] The technical problem to be solved by the utility model is to overcome the defects of the prior art and provide a cast-in-place high bridge pier concrete internal water storage and maintenance structure which is simple in structure, safe, economical, ecologically friendly, and energy-saving and emission-reducing.

[0004] The technical problem of the utility model is achieved through the following technical solutions:

[0005] A cast-in-place high bridge pier concrete internal water storage and maintenance structure, including a reinforced concrete bridge pier cast in sections on a cap of multiple pile foundations through bridge pier steel bars and combined with a bridge pier formwork, each section of the bridge pier is provided with a water storage cavity along the axis, the water storage cavities in the piers of each section are connected end to end in sequence, the lower end of the water storage cavity in the first section of the bridge pier is connected to a drainage pipe buried in the cap, forming a multi-section cast-in-place high bridge pier concrete internal water storage and maintenance structure; a water storage geotextile is laid on the top surface of each section of the bridge pier, and a water pipe is supplied with water by a water pump and fills the water storage cavity, a drip irrigation component is provided on the water pipe, and the drip irrigation component drips the water storage geotextile at a fixed time and quantity; the outer surface of each section of the bridge pier is wrapped with a maintenance film after the pier formwork is removed.

[0006] Each section of the pier is provided with an inflatable rubber airbag positioned and installed along the axis line in the vertical pier reinforcement, and after the pier reinforcement is combined with the pier formwork to cast concrete in sections, the rubber airbag of each section of the pier is deflated and taken out, thereby forming each section of water storage cavity arranged along the axis line vertically in the pier section by section.

[0007] The rubber airbag is composed of an airbag wall, a central steel rod in the airbag wall and a valve arranged on the airbag wall; the airbag wall is composed of a circular hollow wall in the middle and truncated cone-shaped hollow walls at the upper and lower ends; the upper and lower ends of the central steel rod respectively pass through the truncated cone-shaped hollow walls at the upper and lower ends to form a fastening, thereby constituting the positioning and installation of the rubber airbag vertically along the axis line in the pier steel bar; the rubber airbag can also use other fixed templates that do not need to be inflated and have the same shape as the rubber airbag after inflation, and a water storage cavity is formed after the fixed template is removed.

[0008] The cast-in-place concrete of each section of the pier and the water storage cavity of this section are reserved synchronously by rubber air bags. The cast-in-place concrete of the first section of the pier directly connected to the abutment has a lower fixed plate on the top of the water storage cavity. The lower fixed plate is provided with a bottom pocket, and the bottom of the rubber air bag reserved for the water storage cavity in the cast-in-place concrete of the previous section of the pier is fixed. The cast-in-place concrete of each section of the pier and the water storage cavity of this section are completed in this cycle, that is, a multi-section cast-in-place high pier concrete internal water storage maintenance structure.

[0009] The lower fixing plate is a steel or plastic, circular hollow thick plate, the diameter of the central circular hole is 1cm to 2cm larger than the outer diameter of the rubber airbag, and is fixed by welding the connecting steel bar to the top of the bridge pier steel bar. The circular hollow part of the lower fixing plate is inserted into the bottom pocket, and then the truncated cone-shaped part of the lower end of the rubber airbag is inserted into the bottom pocket. The central steel rod of the rubber airbag passes through the small steel bar ring II at the bottom of the bottom pocket, which plays a role in fixing the lower part of the rubber airbag; the bottom pocket is a truncated cone-shaped mesh structure with a large upper part and a small lower part. The top is a steel ring, the inner diameter of which is the same as the outer diameter of the central circular hole of the lower fixed plate. A small steel ring I is set at the outer edge of the bottom of the bottom pocket. The inner diameter of the small steel ring I is the same as the outer diameter of the truncated cone-shaped part of the rubber airbag in contact with it. A small steel ring II is set near the center of the bottom. The inner diameter of the small steel ring II is 1cm to 2cm larger than the outer diameter of the central steel rod. The steel ring, small steel ring I, and small steel ring II are cross-wound and woven from top to bottom by multiple strands of steel wire into a truncated cone-shaped steel mesh structure with a large top and a small bottom.

[0010] When constructing the cast-in-place concrete of the pier and the water storage cavity of this section in sections and the cast-in-place concrete of the first section of the pier and the water storage cavity of this section, a pair of vertical steel sections are welded to the upper end of the pier reinforcement and a horizontal steel section is installed on the pair of vertical steel sections, a pre-buried lower steel plate is provided in the pedestal, the upper end of the central steel rod is detachably positioned and connected to the horizontal steel section, the lower end of the central steel rod is made into a hemispherical lower end fulcrum, and the lower end fulcrum is embedded in the reserved groove on the lower steel plate to form a positioning installation.

[0011] A pair of vertical steel sections of each section of the pier are symmetrically formed with the center of the pier cross section and welded to the upper end of the pier reinforcement. A screw is welded to the top of each vertical steel section. The two ends of the horizontal steel section are respectively inserted into the screws on the top of a pair of vertical steel sections through the reserved bolt holes, and then detachably installed by fixing nuts. A positioning hole is provided in the middle of the horizontal steel section, and an upper nut and a lower nut are provided on the upper side and the lower side of the horizontal steel section respectively at the upper end of the central steel rod. After the upper end of the central steel rod passes through the positioning hole in the middle of the horizontal steel section, it is detachably positioned and installed by the upper nut and the lower nut.

[0012] The upper end of the central steel rod of the rubber airbag of each section of the pier is detachably connected to the hook through the connecting bolts, and the rubber airbag is lifted and taken out by the hook; before the rubber airbag is lifted and taken out, the lower nut is rotated downward to exit the lower side of the horizontal steel section, and the upper nut is also rotated downward to drive the central steel rod to drive the rubber airbag to move upward as a whole, and the lower end fulcrum of the lower end of the central steel rod is separated from the reserved groove on the lower steel plate; the drainage pipe is a PVC pipe, and a valve is provided at the end of the drainage pipe, and the valve is closed when the cast-in-place concrete piers are maintained, and the valve is opened to drain after the maintenance of the cast-in-place concrete piers is completed.

[0013] After the cast-in-place concrete of the segmented pier construction and the water storage cavity of that section and the highest section pier concrete and water storage cavity are constructed and manufactured, in order to increase the maintenance head and enhance the maintenance effect, the upper fixing plate at the lower end of the water storage pipe at the top of the water storage cavity is connected with the lower fixing plate reserved at the top of the lower section water storage cavity by bottom bolts, and a plurality of bracket steel bars are welded to the top of the steel bars of the highest section pier and the annular steel bars covering the upper part of the water storage pipe to fix the water storage pipe together; the cross-sectional shape of the water storage cavity is a cylindrical outer diameter hole when the rubber airbag is filled with air, which is used for water storage and maintenance inside the cast-in-place high pier concrete.

[0014] The cross-sectional shape of the water storage cavity is similar to or identical to the cross-sectional shape of the bridge pier, such as a rectangle, rhombus, ellipse or other special shapes. The optimal ratio of the total cross-sectional area of ​​the water storage cavity to the cross-sectional area of ​​the pier is determined by experiments or analogy. For large-volume bridge piers or other large-volume concrete structures, the number of water storage cavities, the optimal ratio of the total cross-sectional area of ​​the water storage cavity to the cross-sectional area of ​​the large-volume bridge piers or other large-volume concrete structures, and the arrangement on the cross-section are also determined by experiments or analogy. Prefabricated piers can also use the above principle to reserve water storage cavities for concrete curing.

[0015] Compared with the prior art, the utility model mainly provides a cast-in-place high bridge pier concrete internal water storage and maintenance structure, which is provided with a water storage cavity arranged along the axis line in the bridge pier, the lower end of the water storage cavity is connected with the drainage pipe buried in the pedestal, the upper end of the water storage cavity is connected section by section and runs through the top of the bridge pier, and a water storage geotextile is laid on the top surface of the bridge pier, and a water pipe supplied by a water pump and filled with water in the water storage cavity, a drip irrigation component is provided on the water pipe, and the drip irrigation component is used to drip irrigation to the water storage geotextile regularly and quantitatively to supplement the concrete hydration and water evaporation loss, and the outer surface of the bridge pier is also wrapped with a maintenance film. Through the above structural design, the utility model has the following advantages: First, it overcomes the problem of complex environmental conditions of cast-in-place high bridge pier concrete, eliminates quality problems such as too fast evaporation of curing water, shrinkage and deformation, especially using drip irrigation and water storage and curing methods inside the water storage cavity, It not only saves water resources and is energy-efficient and environmentally friendly, but also eliminates the maintenance defects of cast-in-place concrete, and also plays a cooling role for cast-in-place concrete, which is beneficial to improving the maintenance quality of cast-in-place concrete; secondly, by reserving a water storage cavity, the amount of cast-in-place concrete used in the bridge pier is reduced, the cost-effectiveness of the construction and maintenance of the bridge pier is improved, and the construction cost is saved; thirdly, the water storage cavity reserved in the bridge pier can be used to install a drain pipe to drain the bridge deck water in the later stage, thereby improving the appearance of the bridge pier; fourthly, it has a wide range of applications. For example, for large-volume cement concrete commonly seen in engineering, the structural method of the utility model can also be used to solve the problem of hydration heat and the resulting volume deformation, thereby minimizing cracking; fifthly, the calculation method provided has a clear principle, is scientific and reasonable, and is practical and easy to implement, which can guide the implementation of the internal water storage and maintenance structure of the cast-in-place high bridge pier concrete, so as to save costs and improve safety and quality performance. Therefore, the utility model is a simple structure, safe and economical, ecological and environmentally friendly, energy-saving and emission-reducing cast-in-place high bridge pier concrete internal water storage and maintenance structure, which is combined with the corresponding implementation method and has high economic benefits, energy-saving and emission-reduction benefits and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the first section of the water storage cavity for maintaining the concrete structure of the bridge pier of the utility model.

[0017] Figure 2 for Figure 1 Top view of the .

[0018] Figure 3 The utility model is a schematic diagram of the water storage cavity structure made in the first section of the bridge pier.

[0019] Figure 4 for Figure 3 Top view of the .

[0020] Figure 5 This is a schematic diagram of the highest section water storage cavity for maintaining the concrete structure of the bridge pier in the utility model.

[0021] Figure 6 for Figure 5Top view of the .

[0022] Figure 7 It is a schematic diagram of the structure of the rubber airbag.

[0023] Figure 8 This is a schematic diagram of the structure of the bottom pocket.

[0024] Fig. 9 for Figure 8 Stereoscopic diagram. DETAILED DESCRIPTION

[0025] The embodiments of the present invention will be described in detail below according to the above-mentioned drawings.

[0026] like Figures 1 to 9 As shown, 1. pile foundation, 2. cap, 21. cap steel bar, 3. bridge pier, 31. bridge pier steel bar, 311. support steel bar, 32. bridge pier formwork, 4. rubber airbag, 41. center steel rod, 411. airbag wall, 412. lower end support, 42. water storage cavity, 421. water storage pipe, 422. upper fixing plate, 43. valve, 51. lower steel plate, 52. vertical steel, 53. horizontal steel, 54. Fixing nut, 55. Upper nut, 56. Lower nut, 57. Lower fixing plate, 571. Connecting steel bars, 58. Bottom bolts, 59. Bottom pocket, 591. Wire mesh, 592. Steel bar ring, 593. Small steel bar ring I, 594. Small steel bar ring II, 61. Water pump, 62. Water pipe, 63. Drip irrigation assembly, 7. Drain pipe, 81. Curing membrane, 82. Water storage geotextile, 9. Hook, 91. Connecting bolts.

[0027] Internal water storage and maintenance structure and implementation method of cast-in-place high bridge pier concrete, such as Figure 1 to Figure 9 As shown, it belongs to the field of energy-saving and ecological bridge construction. Its structure includes a reinforced concrete pier 3 cast in sections on the pedestal 2 of multiple pile foundations 1 through pier steel bars 31 and combined with pier formwork 32, and each section of the pier 3 is provided with a water storage cavity 42 arranged along the axis line, and the water storage cavities 42 in each section of the pier 3 are connected end to end in sequence, and the lower end of the water storage cavity 42 in the first section of the pier 3 is connected with the drainage pipe 7 buried in the pedestal 2, so as to form a multi-section cast-in-place high pier concrete internal water storage and maintenance structure; the top surface of each section of the pier 3 is paved with a water storage geotextile 82, and a water pipe 62 supplied by a water pump 61 and filled with water in the water storage cavity 42, the water pipe is provided with a drip irrigation component 63, and the drip irrigation component is used to drip irrigation to the water storage geotextile 82 at a fixed time and quantity; the outer surface of each section of the pier 3 is wrapped with a maintenance film 81 after the pier formwork 32 is removed.

[0028] Among them, the pile foundation 1 is the foundation of the pier 3. Multiple pile foundations 1 are connected together by a cap 2 to form the foundation of the pier. The cap 2 is composed of cement concrete and cap steel bars 21. The cap steel bars are composed of multiple steel bar skeletons that are crisscrossed and overlapped up and down.

[0029] The pier 3 is formed by connecting the pre-buried steel bars extending out of the cap 2 to form pier steel bars 31, and then setting up the pier formwork 32 and pouring cement concrete. As the lower supporting structure of the bridge, the height of the pier 3 is determined by the height of the bridge, and the quality of the cast-in-place concrete maintenance of the high pier is related to the appearance and internal quality, and is one of the key points, difficulties and keys to the quality assurance of bridge construction.

[0030] The water storage chamber 42 is formed in such a way that an inflatable rubber airbag 4 is positioned and installed along the axis line in the vertical pier reinforcement 31 of each section of the pier 3, and after the pier 3 is cast in sections with concrete by combining the pier reinforcement 31 with the pier formwork 32, the rubber airbag 4 of each section of the pier 3 is deflated and taken out, thereby forming each section of the water storage chamber 42 arranged along the axis line vertically in the pier 3 section by section.

[0031] Among them, the rubber airbag 4 is composed of an airbag wall 411, a central steel rod 41 in the airbag wall and a valve 43 arranged on the airbag wall; the airbag wall 411 is composed of a middle circular hollow wall and a 20cm to 50cm truncated cone-shaped hollow wall at the upper and lower ends. The central steel rod 41 passes through the circular hollow wall in the middle to the truncated cone-shaped hollow wall at the lower end to form an axial penetration. The penetration between the central steel rod 41 and the airbag wall 411 needs to be sealed. The upper and lower ends of the central steel rod 41 are exposed to a certain length of the truncated cone-shaped hollow wall at the upper and lower ends, and the upper and lower ends of the central steel rod 41 pass through the truncated cone-shaped hollow walls at the upper and lower ends respectively to form a fastening, thereby constituting the positioning and installation of the rubber airbag 4 along the axis line in the pier steel bar 31.

[0032] The rubber airbag can also adopt other fixed templates which do not need to be inflated and have the same shape as the rubber airbag after being inflated, and the water storage cavity is formed after the fixed templates are removed.

[0033] The valve 43 is used for inflating and exhausting the rubber airbag 4. During the construction of cast-in-place concrete bridge piers, the rubber airbag 4 is inflated through the valve 43 to retain the water storage cavity 42. After the rubber airbag 4 is exhausted through the valve 43, the rubber airbag 4 can be conveniently hoisted out for standby use.

[0034] The cast-in-place concrete of each section of the pier 3 and the water storage cavity 42 of this section are reserved synchronously by the rubber air bag 4. The cast-in-place concrete of the first section of the pier directly connected to the base 2 and the top of the water storage cavity 42 of this section are provided with a lower fixed plate 57, and a bottom pocket 59 is provided in the lower fixed plate, and the bottom of the rubber air bag 4 of the water storage cavity 42 of this section is fixed in the cast-in-place concrete of the previous section of the pier 3. The cast-in-place concrete of each section of the pier and the water storage cavity 42 of this section are completed in this cycle, that is, the internal water storage and maintenance structure of the concrete of multiple sections of cast-in-place high piers.

[0035] The lower fixing plate 57 is a steel or plastic, circular hollow thick plate, the diameter of the central circular hole is 1cm to 2cm larger than the outer diameter of the rubber airbag 4, and is welded and fixed to the top of the bridge pier steel bar 31 by connecting the steel bar 571. The circular hollow part of the lower fixing plate 57 is inserted into the bottom pocket 59, and then the truncated cone-shaped part of the lower end of the rubber airbag 4 is inserted into the bottom pocket. The central steel rod 41 of the rubber airbag 4 passes through the small steel bar ring II 594 at the bottom of the bottom pocket 59; the bottom pocket 59 is a large upper and small lower truncated cone mesh structure, and the top of the bottom pocket 59 is a steel bar ring 592 The inner diameter of the steel ring is the same as the outer diameter of the central circular hole of the lower fixed plate 57. A small steel ring I 593 is set at the outer edge of the bottom of the bottom pocket 59. The inner diameter of the small steel ring I is the same as the outer diameter of the truncated cone-shaped part of the rubber airbag 4 in contact with it. A small steel ring II 594 is set near the center of the bottom. The inner diameter of the small steel ring II is 1cm to 2cm larger than the outer diameter of the central steel rod 41. The steel ring 592, small steel ring I 593, and small steel ring II 594 are cross-wound and woven from top to bottom by multiple strands of steel wire to form a steel wire mesh 591 structure with a large upper and a small lower truncated cone.

[0036] In the above-mentioned segmented construction of the cast-in-place concrete of the pier 3 and the water storage cavity 42 of the segment, when the cast-in-place concrete of the first segment of the pier and the water storage cavity 42 of the segment are constructed, a pair of vertical steel sections 52 are welded to the upper end of the pier reinforcement 31. The pair of vertical steel sections are symmetrically welded to the upper end of the pier reinforcement 31 with the center of the pier cross section, that is, the axial line of the pier. A screw is welded to the top of each vertical steel section 52. A horizontal steel section 53 is installed on the pair of vertical steel sections 52. The two ends of the horizontal steel section are welded to the upper end of the pier reinforcement 31. After the ends are respectively inserted into a pair of screws on the top of the vertical steel 52 through the reserved bolt holes, they are detachably installed by the fixing nut 54. A positioning hole is provided in the middle of the horizontal steel 53. The upper end of the central steel rod 41 is turned into a screw and is provided with an upper nut 55 located on the upper side of the horizontal steel 53 and a lower nut 53 on the lower side. After the upper end of the central steel rod 41 passes through the positioning hole in the middle of the horizontal steel 53, it can be detachably positioned and installed by the upper nut 55 and the lower nut 56.

[0037] After the fixing nuts 54 at both ends of the horizontal steel 53 fix the horizontal steel 53, the lower nut 56 at the upper end of the central steel rod 41 is rotated to be close to the lower side of the horizontal steel 53, and then together with the lower end fulcrum 412 and the lower steel plate 51, the rubber airbag 4 can be fixed along the axis line in the pier to prevent the rubber airbag 4 from being offset or floating when the concrete is poured in place. When the rubber airbag 4 is hoisted out, the upper nut 55 is loosened to remove the horizontal steel 53, and the hook 9 can be detachably connected with the connecting bolt 91, and the rubber airbag 4 can be hoisted out by the hook.

[0038] The thickness of the connecting bolt 91 is not less than twice the thickness of the upper nut 55 or the lower nut 56, and is used to connect the upper end of the central steel rod 41 and the lower end of the hook 9. The upper end of the hook is a circular ring and is used to lift the rubber airbag 4 into the pier steel bar 31 or lift it out of the pier steel bar; before the rubber airbag 4 is lifted and taken out, the lower nut 56 rotates downward to exit the lower side of the horizontal steel section 53, and the upper nut 55 also rotates downward to drive the central steel rod 41 to drive the rubber airbag 4 to move upward as a whole, and the lower end fulcrum 412 of the lower end of the central steel rod is separated from the reserved groove on the lower steel plate 51.

[0039] The lower steel plate 51 is embedded in the base 2. The lower steel plate 51 is a square thick steel plate. The lower end of the central steel rod 41 is made into a hemispherical lower end fulcrum 412, and the lower end fulcrum is embedded in the hemispherical reserved groove on the lower steel plate 51 to form a positioning installation.

[0040] The upper end of the water storage chamber 42 passes through the top of the pier 3, and the lower end of the water storage chamber 42 is connected to the drainage pipe 7 buried in the pedestal 2. The drainage pipe is a PVC pipe. In order to make the pier 3 beautiful, when it is necessary to set a drainage pipe in the center of the pier to drain the bridge surface water, the drainage pipe 7 buried in the pedestal is adopted. A valve is set at the end of the drainage pipe. The valve is closed during the curing of the cast-in-place concrete. When the curing of the cast-in-place concrete is completed and the bridge is built and put into operation, the valve is opened to discharge the bridge surface water into the underground municipal drainage pipe.

[0041] A water-storage geotextile 82 is laid on the top surface of the pier 3, and a water pipe 62 is supplied with water by a water pump 61 and fills the water storage cavity 42. A drip irrigation assembly 63 is provided on the water pipe. When the water pump 61 starts to pump water, water is injected into the water storage cavity 42 through the water pipe 62 to form water storage inside the pier 3, which is mainly used as water for curing the cast-in-place concrete of the pier. After the pier formwork 32 is removed, the outer surface of the pier is wrapped with a curing film 81 to reduce the evaporation of curing water. The water-storage geotextile 82 laid on the top surface of the pier 3 can control the curing water to drip onto the water-storage geotextile 82 in a timely and quantitative manner through the drip irrigation assembly 63, thereby replenishing the curing water that penetrates the water storage cavity 42 into the pier 3 and the water consumed by evaporation on the pier surface.

[0042] At the same time, the cross-section of the pier can be square, oval or other special-shaped cross-sections, the rubber airbag 4 can be single or multiple, the cross-sectional shape of the rubber airbag can be the same or different from the cross-sectional shape of the pier, and the optimal ratio of the cross-sectional area of ​​the pier to the cross-sectional area of ​​the water storage chamber 42 can all be determined by test results according to actual conditions.

[0043] After the cast-in-place concrete of the pier 3 constructed in sections and the water storage chamber 42 of that section, and the construction of the highest section pier concrete and the water storage chamber 42 are completed, in order to increase the maintenance head and enhance the maintenance effect, the upper fixing plate 422 at the lower end of the water storage pipe 421 at the top of the water storage chamber 42 is connected with the lower fixing plate 57 reserved at the top of the lower section water storage chamber 42 by bottom bolts 58, and a plurality of support steel bars 311 are welded to the top of the highest section pier steel bars 31 and to the annular steel bars covering the upper part of the water storage pipe 421, so as to fix the water storage pipe 421 together; the cross-sectional shape of the water storage chamber 42 is a cylindrical outer diameter hole when the rubber airbag 4 is filled with air; the cross-sectional shape of the water storage chamber 42 is similar to that of the cross-sectional shape of the pier 3.

[0044] The utility model is a cast-in-place high bridge pier concrete internal water storage and maintenance structure with simple structure, safety, economy, ecological environment protection, energy saving and emission reduction. Combined with the corresponding implementation method, it has high economic benefit, energy saving and emission reduction benefit and social benefit.

[0045] The embodiments of the present invention are only used to illustrate the present invention and are not used to limit the scope of the present invention. It should also be understood that after reading the contents of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the claims attached to this application.

Claims

1. A cast-in-place high bridge pier concrete internal water storage and maintenance structure, comprising a reinforced concrete bridge pier (3) cast in sections on a cap (2) of a plurality of pile foundations (1) through bridge pier steel bars (31) and in combination with a bridge pier formwork (32), characterized in that Each section of the bridge pier (3) is provided with a water storage cavity (42) arranged along the axis, and the water storage cavities (42) in each section of the bridge pier (3) are connected end to end in sequence, and the lower end of the water storage cavity (42) in the first section of the bridge pier (3) is connected to the drainage pipe (7) buried in the foundation (2); the top surface of each section of the bridge pier (3) is paved with a water storage geotextile (82), and a water pipe (62) supplied with water by a water pump (61) and filled with water in the water storage cavity (42), and a drip irrigation component (63) is provided on the water pipe, and the drip irrigation component drips the water storage geotextile (82) at a fixed time and in a fixed quantity; after the bridge pier formwork (32) of each section of the bridge pier (3) is removed, the outer surface is wrapped with a curing film (81).

2. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 1 is characterized in that Each section of the pier (3) is provided with an inflatable rubber airbag (4) positioned and installed along the axis line in the vertical pier reinforcement (31), and after the pier reinforcement (31) is combined with the pier formwork (32) to cast the pier (3) in sections with concrete, the rubber airbag (4) of each section of the pier (3) is deflated and removed, thereby vertically forming each section of the water storage cavity (42) arranged along the axis line in the pier (3) section by section.

3. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 2 is characterized in that The rubber airbag (4) is composed of an airbag wall (411), a central steel rod (41) in the airbag wall, and a valve (43) arranged on the airbag wall; the airbag wall (411) is composed of a circular hollow wall in the middle and truncated cone-shaped hollow walls at the upper and lower ends; the upper and lower ends of the central steel rod (41) respectively pass through the truncated cone-shaped hollow walls at the upper and lower ends to form a fastening, thereby constituting the positioning and installation of the rubber airbag (4) vertically along the axis line in the pier steel bar (31).

4. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 3, characterized in that The cast-in-place concrete of each section of the bridge pier (3) and the water storage cavity (42) of the section are reserved synchronously by the rubber air bag (4), and the cast-in-place concrete of the first section of the bridge pier directly connected to the pedestal (2) and the top of the water storage cavity (42) of the section are provided with a lower fixing plate (57), and the lower fixing plate is provided with a bottom pocket (59) and fixes the bottom of the rubber air bag (4) of the water storage cavity (42) reserved in the cast-in-place concrete of the section of the bridge pier (3), and the cast-in-place concrete of each section of the bridge pier and the water storage cavity (42) of the section are completed in this cycle.

5. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 4, characterized in that The lower fixing plate (57) is a steel or plastic, circular hollow thick plate, the diameter of the central circular hole is 1 cm to 2 cm larger than the outer diameter of the rubber airbag, and is fixed by welding the connecting steel bar (571) to the top of the bridge pier steel bar (31). The circular hollow part of the lower fixing plate (57) is inserted into the bottom pocket (59), and then the truncated cone-shaped part of the lower end of the rubber airbag (4) is inserted into the bottom pocket. The central steel rod (41) of the rubber airbag (4) passes through the small steel bar ring II (594) at the bottom of the bottom pocket (59); the bottom pocket (59) is a truncated cone-shaped mesh structure with a large upper part and a small lower part, and the top of the bottom pocket (59) is a steel bar ring (5 92), the inner diameter of the steel ring is the same as the outer diameter of the central circular hole of the lower fixing plate (57), a small steel ring I (593) is provided at the outer edge of the bottom of the bottom pocket (59), the inner diameter of the small steel ring I is the same as the outer diameter of the truncated cone-shaped portion of the rubber airbag (4) in contact therewith, a small steel ring II (594) is provided near the center of the bottom, the inner diameter of the small steel ring II is 1 cm to 2 cm larger than the outer diameter of the central steel rod (41), and the steel ring (592), the small steel ring I (593), and the small steel ring II (594) are cross-wound and woven from top to bottom by multiple strands of steel wire to form a truncated cone-shaped steel mesh (591) structure with a large top and a small bottom.

6. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 4, characterized in that The cast-in-place concrete of the bridge pier (3) and the water storage cavity (42) of this section are constructed in sections. When the cast-in-place concrete of the first section of the bridge pier and the water storage cavity (42) are constructed, a pair of vertical steel sections (52) and a horizontal steel section (53) installed on the pair of vertical steel sections are welded to the upper end of the bridge pier reinforcement (31), and a pre-buried lower steel plate (51) is provided in the pedestal (2). The upper end of the central steel rod (41) is detachably positioned and connected to the horizontal steel section (53), and the lower end of the central steel rod (41) is made into a hemispherical lower end support (412), and the lower end support is embedded in a reserved groove on the lower steel plate (51) to form a positioning installation.

7. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 6, characterized in that A pair of vertical steel sections (52) of each section of the pier (3) are symmetrically formed with the center of the pier cross section and welded to the upper end of the pier reinforcement (31). A screw is welded to the top of each vertical steel section (52). The two ends of the horizontal steel section (53) are respectively inserted into the screws on the top of the pair of vertical steel sections (52) through the reserved bolt holes, and then detachably installed by fixing nuts (54). A positioning hole is provided in the middle of the horizontal steel section (53), and an upper nut (55) and a lower nut (56) are provided at the upper end of the central steel rod (41) respectively located on the upper side of the horizontal steel section and on the lower side. After the upper end of the central steel rod (41) passes through the positioning hole in the middle of the horizontal steel section (53), it is detachably positioned and installed by the upper nut (55) and the lower nut (56).

8. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 7, characterized in that The upper end of the central steel rod (41) of the rubber airbag (4) of each section of the pier (3) is detachably connected to the hook (9) via the connecting bolt (91), and the rubber airbag (4) is lifted and taken out by the hook (9); before the rubber airbag (4) is lifted and taken out, the lower nut (56) rotates downward to exit the lower side of the horizontal steel section (53), and the upper nut (55) also rotates downward to drive the central steel rod (41) to drive the rubber airbag (4) to move upward as a whole, and the lower end support (412) of the lower end of the central steel rod (41) is separated from the reserved groove on the lower steel plate (51); the drainage pipe (7) is a PVC pipe, and a valve is provided at the end of the drainage pipe (7), and the valve is closed when the cast-in-place concrete pier is maintained, and the valve is opened to drain water after the maintenance of the cast-in-place concrete pier is completed.

9. The cast-in-place high bridge pier concrete internal water storage and maintenance structure according to claim 7, characterized in that The cast-in-place concrete of the bridge pier (3) and the water storage chamber (42) of this section are constructed in sections. After the construction of the highest section of the bridge pier concrete and the water storage chamber (42) is completed, in order to increase the maintenance head and enhance the maintenance effect, the upper fixing plate (422) at the lower end of the water storage pipe (421) at the top of the water storage chamber (42) is connected to the lower fixing plate (57) reserved at the top of the lower section of the water storage chamber (42) by bottom bolts (58), and a plurality of support steel bars (311) are welded to the top of the highest section of the bridge pier steel bar (31) and the annular steel bar covering the upper part of the water storage pipe (421) to fix the water storage pipe (421) together; the cross-sectional shape of the water storage chamber (42) is a cylindrical outer diameter hole when the rubber airbag (4) is filled with air; the cross-sectional shape of the water storage chamber (42) is similar to the cross-sectional shape of the bridge pier (3).