Climbing device and paint make-up equipment for bridge pier column

By designing climbing devices and piers repair equipment, the problem of difficulty in safe and efficient rust removal and tuning in bridge road maintenance is solved, and efficient operation without manual climbing is achieved to adapt to piers of different sizes and shapes.

CN221989132UActive Publication Date: 2024-11-12YONGZHOU HIGHWAY BRIDGE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420281934.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-11-12
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

During the maintenance of bridge roads, it is difficult to remove rust and repaint the difficult-to-reach bridge piers safely and efficiently. Workers need to climb high and carry heavy paint spray equipment, and the working environment is harsh.

Method used

A climbing device is designed, including a connecting frame, a radial frame, a climbing wheel, a power supply mechanism and a tension adjustment mechanism. It can combine the climbing device according to the size and shape of the bridge pier, climb upward around the bridge pier, and is equipped with rust removal and repair. The paint mechanism is used to remove rust and repaint through remote control operation.

Benefits of technology

The piers without manual climbing are achieved, which reduces the risk of workers, improves work efficiency, and adapts to piers of different sizes and shapes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989132U_ABST
    Figure CN221989132U_ABST
Patent Text Reader

Abstract

The utility model discloses a climbing device which comprises a connecting frame, a radial frame, climbing wheels, a power supply mechanism and a tension adjusting mechanism. The two ends of each connecting frame are provided with assembling mechanisms used for being connected with the other connecting frame. A sliding sleeve is arranged on the connecting frame, and the radial frame is arranged in the sliding sleeve in a sleeved mode and can slide along the sliding sleeve. The climbing wheel is arranged at the front end of the radial frame, and the power supply mechanism is arranged on the radial frame and used for supplying power to the climbing wheel; the tension adjusting mechanism is arranged between the connecting frame and the radial frame and used for adjusting the tension between the connecting frame and the radial frame. The utility model further discloses paint make-up equipment for the bridge pier column. With the adoption of the climbing device, a plurality of climbing devices can be combined according to the size and the shape of upright objects such as a pier to be climbed so as to surround the upright objects and climb upwards, so that rust removal and paint repair operation can be carried out on the pier, the danger of manual climbing is avoided, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge maintenance equipment, in particular to a climbing device and a paint touch-up device for bridge piers. Background Art

[0002] During the maintenance of bridges and roads, it is often necessary to remove rust and repaint bridge piers. The existing method is to use a special aerial work vehicle to lift workers and spray painting equipment to a predetermined location, and then manually perform the repainting work. However, some bridge piers are located in places that are difficult for vehicles to reach. Even with a special climbing ladder, it is very dangerous for workers to climb up the bridge piers, and they need to carry heavy spray painting equipment, and the working environment is harsh. Utility Model Content

[0003] In order to solve the defects of the prior art, the utility model provides a climbing device and a repainting equipment for bridge piers. According to the size and shape of upright objects such as bridge piers to be climbed, a number of climbing devices can be combined to surround the upright objects and climb upwards, so as to remove rust and repaint the bridge piers, avoid the danger of manual climbing, and improve work efficiency.

[0004] In order to solve the above technical problems, the utility model provides a climbing device, including a connecting frame, a radial frame, a climbing wheel, a power supply mechanism and a tension adjustment mechanism; both ends of the connecting frame are provided with assembly mechanisms for connecting with another connecting frame; the connecting frame is provided with a sliding sleeve, the radial frame is sleeved in the sliding sleeve and can slide along the sliding sleeve; the climbing wheel is arranged at the front end of the radial frame, the power supply mechanism is arranged on the radial frame, and is used to supply power to the climbing wheel; the tension adjustment mechanism is arranged between the connecting frame and the radial frame, and is used to adjust the tension between the connecting frame and the radial frame.

[0005] As an improvement of the above solution, the assembly mechanism includes an assembly plate, and the assembly plate is provided with connecting holes.

[0006] As an improvement of the above-mentioned scheme, the tension adjustment mechanism includes a spring, a tension sensor, an electric push rod and a top plate arranged on the radial frame; the electric push rod is fixed on the connecting frame, the electric push rod is also connected to the tension sensor, and the spring is arranged between the tension sensor and the top plate; the electric push rod can adjust the position of the tension sensor, thereby controlling the tension between the connecting frame and the radial frame.

[0007] As an improvement of the above solution, the climbing wheel is arranged to be inclined upward.

[0008] As an improvement of the above solution, the connecting frame includes two arc-shaped rods arranged in parallel.

[0009] As an improvement of the above solution, the power supply mechanism includes a battery and a remote control receiving module.

[0010] As an improvement of the above solution, the climbing device further comprises a secondary connecting frame, and the assembling mechanism is provided at both ends of the secondary connecting frame.

[0011] Correspondingly, the utility model also provides a repainting device for bridge piers, including the climbing device as described above, wherein the climbing device is provided with a rust removal mechanism and a repainting mechanism, the rust removal mechanism includes a rust remover box and a rust removal robotic arm; the repainting mechanism includes a paint box and a repainting robotic arm.

[0012] As an improvement of the above solution, two or more climbing devices are independently assembled into an annular climbing mechanism surrounding the object to be climbed, or two or more climbing devices cooperate with the auxiliary connecting frame to be assembled into an annular climbing mechanism surrounding the object to be climbed.

[0013] The implementation of this utility model has the following beneficial effects:

[0014] By using the above-mentioned climbing device, a number of climbing devices can be combined according to the size and shape of the upright objects such as bridge piers to be climbed, so as to surround the upright objects and climb upwards. After climbing to the predetermined height of the upright objects, the piers can be rust-removed and repainted through the remote-controlled repainting equipment carried by the climbing device, thereby eliminating the danger of manual climbing and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of a climbing device of the utility model;

[0016] Figure 2 It is a structural schematic diagram of the tension adjustment mechanism of the utility model;

[0017] Figure 3 It is a structural schematic diagram of a paint touch-up device for bridge piers of the utility model;

[0018] Figure 4 This is a schematic diagram of an assembly method of a bridge pier repainting device of the utility model;

[0019] Figure 5 The utility model is a schematic diagram of another assembly method of a bridge pier repainting device. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail with reference to the accompanying drawings. It is hereby stated that the directional words such as up, down, left, right, front, back, inside, outside, etc. that appear or will appear in the text of the utility model are only based on the accompanying drawings of the utility model, and are not specific limitations of the utility model.

[0021] like Figure 1 and Figure 2 As shown, the first embodiment of the utility model provides a climbing device, including a connecting frame 1, a radial frame 2, a climbing wheel 3, a power supply mechanism 4 and a tension adjustment mechanism 5; both ends of the connecting frame 1 are provided with assembly mechanisms 6 for connecting with another connecting frame 1; the connecting frame 1 is provided with a sliding sleeve 7, the radial frame 2 is sleeved in the sliding sleeve 7, and can slide along the sliding sleeve 7; the climbing wheel 3 is arranged at the front end of the radial frame 2, and the power supply mechanism 4 is arranged on the radial frame 2 for supplying power to the climbing wheel 3; the tension adjustment mechanism 5 is arranged between the connecting frame 1 and the radial frame 2, and is used to adjust the tension between the connecting frame 1 and the radial frame 2.

[0022] By using the above-mentioned climbing device, a number of climbing devices can be combined according to the size and shape of the upright objects such as bridge piers to be climbed, so as to surround the upright objects and climb upwards. After climbing to the predetermined height of the upright objects, the piers can be rust-removed and repainted through the remote-controlled repainting equipment carried by the climbing device, thereby eliminating the danger of manual climbing and improving work efficiency.

[0023] Preferably, the assembly mechanism 6 includes an assembly plate 61, and the assembly plate 61 is provided with a connection hole 62. Adjacent connection frames 1 are connected to each other through the assembly plates 61 at their ends. The specific method is to select a number of climbing devices according to the size and shape of the vertical objects such as the bridge piers to be climbed, surround the climbing devices on the side of the bridge piers, and connect adjacent assembly plates 61 together by passing bolts through the connection holes 62.

[0024] In order to ensure stable climbing, the pressure between the climbing wheel 3 and the bridge pier must be maintained within a predetermined range. In order to adjust the pressure between the climbing wheel 3 and the bridge pier, the climbing device is also provided with a tension adjustment mechanism 5. The tension adjustment mechanism 5 includes a spring 51, a tension sensor 52, an electric push rod 53 and a top plate 54 provided on the radial frame 2; the electric push rod 53 is fixed on the connecting frame 1, the electric push rod 53 is also connected to the tension sensor 52, and the spring 51 is provided between the tension sensor 52 and the top plate 54; the electric push rod 53 can adjust the position of the tension sensor 52, thereby controlling the tension between the connecting frame 1 and the radial frame 2. The tension sensor 52 is used to obtain the real-time tension of the spring 51. When the tension of the spring 51 is too large, the electric push rod 53 drives the tension sensor 52 to extend toward the top plate 54 to reduce the stretching stroke of the spring 51; when the tension of the spring 51 is too small, the electric push rod 53 drives the tension sensor 52 away from the top plate 54 to increase the stretching stroke of the spring 51.

[0025] Preferably, the climbing wheel 3 is arranged to be tilted upward. When used to climb a cylindrical bridge pier, the climbing wheel 3 arranged tilted can be used to reduce the power required for climbing and reduce the possibility of falling. Correspondingly, the climbing wheel 3 can also be arranged along the setting direction of the bridge pier to facilitate rapid climbing.

[0026] Preferably, the connecting frame 1 includes two arc-shaped rods arranged in parallel. It should be noted that the arc-shaped rods are subjected to a relatively uniform force, and the two arc-shaped rods arranged in parallel can form a relatively strong frame to avoid deformation of the frame.

[0027] The power supply mechanism 4 may include a battery and a remote control receiving module. The climbing wheel 3 is composited with a drive motor 31. The battery is used to provide power to the climbing wheel 3. The remote control receiving module is used to receive remote control instructions from ground personnel and drive the climbing wheel 3 to rotate according to the instructions.

[0028] In order to adapt to bridge piers of more sizes and shapes, the climbing device further comprises a secondary connecting frame 11, and the two ends of the secondary connecting frame 11 are provided with the assembly mechanism 6. When it is necessary to change the arc diameter formed by the connecting frame 1 of the climbing device, the number of climbing devices can be changed, and the secondary connecting frames 11 of different lengths and numbers can also be added.

[0029] Combination Figure 3 As shown, the second embodiment of the utility model provides a repainting device for bridge piers, including the climbing device as described above, the climbing device is provided with a rust removal mechanism and a repainting mechanism, the rust removal mechanism includes a rust remover box 81 and a rust removal mechanical arm 82; the repainting mechanism includes a paint box 91 and a repainting mechanical arm 92. The rust remover box 81 is provided with a rust remover and a first pump, the rust removal mechanical arm 82 is provided with a rust removal nozzle connected to the rust remover box 81, the first pump can pump the rust remover from the rust removal nozzle to perform rust removal operations; the paint box 91 is provided with paint and a second pump, the repainting mechanical arm 92 is provided with a paint spraying head connected to the paint box 91, the second pump can pump paint from the paint spraying head to perform painting operations.

[0030] Combination Figure 4 and Figure 5 As shown, two or more climbing devices are independently assembled into a ring-shaped climbing mechanism surrounding the object to be climbed, or two or more climbing devices cooperate with the auxiliary connecting frame 11 to be assembled into a ring-shaped climbing mechanism surrounding the object to be climbed. By using the above climbing device, a number of climbing devices can be combined according to the size and shape of the vertical objects such as bridge piers to be climbed, so as to surround the vertical objects and climb upwards. After climbing to the predetermined height of the vertical objects, the rust removal mechanism and paint touch-up mechanism carried by the climbing device can be used to remove rust and touch up the paint on the bridge piers, thereby eliminating the danger of manual climbing and improving work efficiency.

[0031] The above is a preferred embodiment of the present utility model. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present utility model.

Claims

1. A climbing device, It is characterized in that It includes a connecting frame, a radial frame, a climbing wheel, a power supply mechanism and a tension adjustment mechanism; Both ends of the connecting frame are provided with an assembly mechanism for connecting with another connecting frame; The connecting frame is provided with a sliding sleeve, and the radial frame is sleeved in the sliding sleeve and can slide along the sliding sleeve; The climbing wheel is arranged at the front end of the radial frame, and the power supply mechanism is arranged on the radial frame for supplying power to the climbing wheel; The tension adjustment mechanism is arranged between the connecting frame and the radial frame, and is used to adjust the tension between the connecting frame and the radial frame.

2. The climbing device according to claim 1, It is characterized in that The assembling mechanism comprises an assembling plate, and the assembling plate is provided with connecting holes.

3. A climbing device according to claim 1 or 2, It is characterized in that The tension adjustment mechanism includes a spring, a tension sensor, an electric push rod and a top plate arranged on the radial frame; the electric push rod is fixed on the connecting frame, the electric push rod is also connected to the tension sensor, and the spring is arranged between the tension sensor and the top plate; the electric push rod can adjust the position of the tension sensor, thereby controlling the tension between the connecting frame and the radial frame.

4. The climbing device according to claim 1, It is characterized in that The climbing wheel is arranged to be inclined upward.

5. The climbing device according to claim 1, It is characterized in that The connecting frame comprises two arc-shaped rods arranged in parallel.

6. The climbing device according to claim 1, It is characterized in that The power supply mechanism includes a battery and a remote control receiving module.

7. The climbing device according to claim 1, It is characterized in that It also includes a secondary connecting frame, and the assembling mechanism is arranged at both ends of the secondary connecting frame.

8. A paint touch-up device for bridge piers. It is characterized in that It comprises a climbing device as described in any one of claims 1 to 6, wherein a rust removal mechanism and a paint touch-up mechanism are provided on the climbing device, the rust removal mechanism comprises a rust remover box and a rust removal mechanical arm; the paint touch-up mechanism comprises a paint box and a paint touch-up mechanical arm.

9. The paint touch-up device for bridge piers as claimed in claim 8, It is characterized in that The climbing device also includes a secondary connecting frame, and the assembling mechanism is provided at both ends of the secondary connecting frame; two or more climbing devices are independently assembled into an annular climbing mechanism surrounding the object to be climbed, or two or more climbing devices cooperate with the secondary connecting frame to be assembled into an annular climbing mechanism surrounding the object to be climbed.