Internal dredging tool for underground drainage pipeline based on hydraulic ram principle
Through the dredging tool based on the principle of water hammer pump, the static pressure water flow generates high head energy, and automatically impacts and dilutes the coal sludge in the underground drainage pipeline, solving the problem of time-consuming, labor-intensive and low efficiency in the underground drainage pipeline, realizing the problem of dredging of underground drainage pipelines. The functions of powerless equipment and portable mobile have significantly reduced labor consumption and cost.
Patent Information
- Application Number
- CN202420029162.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-05
AI Technical Summary
The underground drainage pipeline is blocked due to coal silt, which is time-consuming and labor-intensive, and has low operating efficiency. The existing methods require electrical equipment and are inconvenient to move, which poses a safety hazard for personnel.
The silting tool based on the principle of water hammer pump, including static pressure water inlet pipe, booster device and reverse nozzle, generate high head energy through static pressure water flow, and use mechanical action to drive the reverse nozzle to automatically penetrate into the pipeline, impact and dilute coal mud, realizes electrically-free and portable dredging operation.
It effectively solves the problem of time-consuming, labor-intensive and low efficiency for dredging of underground drainage pipelines, and realizes the functions of powerless equipment and portable mobile, significantly reduces labor consumption and cost, and improves work efficiency.
Smart Images

Figure CN221989541U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of coal mine production auxiliary devices, and in particular relates to an internal silt removal tool for underground drainage pipelines based on the principle of a water hammer pump. Background Art
[0002] In the underground production process of coal mines, the static pressure water pipe is responsible for supplying water sources to various locations, the static pressure air duct supplies air pressure to various locations, and the drainage pipeline is responsible for draining sewage from various locations to the underground centralized water tank, and the water in the water tank is discharged to the ground through the high-power water pump in the water tank. The three pipelines are collectively called the three major underground pipeline systems. The installation standard of the three major pipelines is the national standard 6-inch pipeline. The length of the pipeline is 10m each and it is connected by a flange. Because the static pressure water pressure requires a water pressure of more than 0.4mpa and a saturated water volume of 0.6m 3 / min and ensure long-term water supply, and when conveying water on the ground, it is required to remove impurities in the water through the filtration system. After entering the well, it passes through the three-stage filtration device to make the suspended matter in the water reach less than 30mg / liter. Therefore, there is no sediment accumulation in the static pressure water pipe, and it will not cause sedimentation in the pipe. In the drainage pipe, because the actual water inflow and sewage discharge volume of each mining area and each working face are not fixed, there is a situation of interruption and reduction of drainage flow, and the impurity content in the water flow before the sewage enters the drainage pipe is huge. When the flow rate is reduced, coal slime and sediment precipitation will occur, especially in the bending and climbing areas of the pipe, which is very easy to cause silt deposition. At present, the method for desilting coal slime in drainage pipes is to dismantle the drainage pipe connecting flanges section by section, and use static pressure water to flush the silt inside the drainage pipe every 10m. This method is time-consuming and labor-intensive. When the static pressure head is far away from the coal slime accumulation, the water pressure cannot reach the kinetic energy to loosen the accumulation. In addition, the flange plate is dismantled every 10m, which results in a huge workload and extremely low work efficiency. If electrical equipment is used to connect the internal desilting machine of the pipeline for cleaning, there is a problem that the power supply cannot move with the personnel and the work site is humid, which poses a risk of electric shock to personnel.
[0003] Therefore, it is extremely important to seek a portable internal desilting tool for underground drainage pipelines that can reduce manpower time and can move with operators without power supply. Utility Model Content
[0004] Aiming at the problem that the main drainage pipelines at various locations underground are blocked by coal slime accumulation, the internal desilting of the pipelines is time-consuming and labor-intensive, and the operation efficiency is low, the utility model provides an internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump, which can realize the function of having no supporting electrical equipment and being able to move with personnel.
[0005] The utility model adopts the following technical solutions:
[0006] The utility model discloses an internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump, comprising a static pressure water inlet pipe, a pressure boosting device, a water delivery pipe and a reverse nozzle, wherein one end of the static pressure water inlet pipe is connected to the underground static pressure pipe, and the other end is connected to the water inlet of the pressure boosting device, one end of the water delivery pipe is connected to the pressure boosting device, the reverse nozzle is located at the other end of the water delivery pipe, the pressure boosting device is provided with a pressure relief valve water pipe, and one end of the water delivery pipe provided with a reverse nozzle and one end of the water outlet of the pressure relief valve water pipe are tied and fixed and extended into the sewage pipe.
[0007] Furthermore, the boosting device includes a pump body, one end of which is provided with a power water pipe, i.e., a water inlet, the static pressure water inlet pipe is connected to the power water pipe, a buffer cylinder and a drain outlet are provided above the pump body, a water supply valve is provided in the buffer cylinder, the drain outlet is provided with a drain valve, a water lifting pipe is provided on one side of the buffer cylinder, the water supply pipe is connected to the water lifting pipe, and the pressure relief valve water pipe is connected to the drain outlet.
[0008] Furthermore, magnetic gap springs are respectively provided at the bottom of the water delivery valve and the drainage valve.
[0009] Furthermore, the cross section of the water delivery valve is an inverted trapezoid, and the cross section of the drainage valve is a regular trapezoid.
[0010] Furthermore, the water outlet end of the pressure relief valve water pipe is located at the rear end of the reverse nozzle end.
[0011] Furthermore, the reverse nozzle includes a nozzle pipe, one end of which is provided with a nozzle, the bottom of the nozzle is provided with three water spraying ports with an aperture of 1.5 mm, and the side of the nozzle forms an angle of 45° with the nozzle pipe.
[0012] The beneficial effects of the utility model are as follows:
[0013] By using the utility model, the problem that the main drainage pipelines at various locations underground are blocked by coal slime siltation, the internal silt removal of the pipelines is time-consuming and labor-intensive, and the operation efficiency is low can be solved. At the same time, the utility model can realize the function of moving with personnel without supporting electrical equipment.
[0014] After the static pressure water enters the boosting device, the utility model uses the static pressure water flow as the power to produce a water hammer effect through mechanical action. After the low head energy is converted into high head energy, the high head energy enters the reverse nozzle through the water pipe of the boosting device to generate high pressure. Since the reverse nozzle sprays water to generate power moving forward in the direction inside the drainage pipeline, it drives the water pipe of the boosting device and the water pipe of the pressure relief valve to automatically penetrate into the main drainage pipeline until the coal slime is deposited. Then, the high head energy water flow is used to spray through the nozzle to impact the coal slime, so that the coal slime is diluted and mixed with the water flow flowing out of the pressure relief water pipe, and then flows out of the drainage pipeline in the opposite direction, thereby realizing the main drainage pipeline desilting. After clearing the first coal slime deposit, the nozzle continues to move forward to the next coal slime deposit, thereby realizing the internal desilting operation of the long-distance main drainage pipe without removing the flange. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the structure of the boosting device of the utility model;
[0017] Figure 3 It is a structural schematic diagram of a reverse nozzle;
[0018] Figure 4 This is a schematic diagram of the use state of the utility model;
[0019] Among them: 1-static pressure water inlet pipe; 2-water delivery pipe; 3-reverse nozzle; 4-static pressure pipe; 5-pressure relief valve water pipe; 6-drain pipe; 7-pump body; 8-power water pipe; 9-buffer cylinder; 10-water delivery valve; 11-drain valve; 12-water lifting pipe; 13-magnetic gap spring; 14-spray pipe; 15-nozzle; 16-water spray outlet. DETAILED DESCRIPTION
[0020] The utility model is further described with reference to the accompanying drawings.
[0021] As shown in the figure, an internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump includes a static pressure water inlet pipe 1, a booster device, a water pipe 2 and a reverse nozzle 3. One end of the static pressure water inlet pipe 1 is connected to the underground static pressure pipe 4, and the other end is connected to the water inlet of the booster device. One end of the water pipe is connected to the booster device. The reverse nozzle 3 is located at the other end of the water pipe 2. The booster device is provided with a pressure relief valve water pipe 5. When in use, one end of the water pipe 2 provided with the reverse nozzle 3 and one end of the water outlet of the pressure relief valve water pipe 5 are tied and fixed and extended into the sewage pipe 6.
[0022] The water outlet end of the pressure relief valve water pipe 5 is located at the rear end of the reverse nozzle 3 end.
[0023] The booster device refers to the working principle of the water hammer pump, and is mainly composed of a pump body 7, a power water pipe 8, a buffer cylinder 9, a water delivery valve 10, a drain valve 11, a water lifting pipe 12, and a magnetic gap spring 13. It is a simple machine that can convert kinetic energy into pressure energy. The water hammer pump can be used to raise the water flowing in the water inlet pipe by about 15% to a height equivalent to 5 times the height difference of the water inlet pipe, which is approximately equivalent to a pressure of more than 4 times the inlet water pressure. The high head generated by the height difference can impact the coal sludge deposits through the nozzle to loosen the coal sludge. This structure is a purely mechanical structure without electrical drive, thus avoiding the problem that the power supply cannot move with the personnel and the risk of electric shock to personnel due to humidity at the work site.
[0024] The reverse nozzle 3 is made of 316L stainless steel, and the nozzle outlet is at a 45-degree angle to the water inlet pipe for reverse flushing. Since the water pressure in the static pressure water pipe is above 0.4 MPa, the water pressure can theoretically reach above 1.6 MPa after using the booster device. Therefore, the reverse nozzle is determined to be a 1.5mm size front-to-back three-hole structure. This structure can make the rear hole jet produce recoil, push the nozzle to drive the water pipe forward, and at the same time flush the coal sludge deposits to loosen it.
[0025] After the static pressure water enters the boosting device, the static pressure water flow is used as the power to produce a water hammer effect through mechanical action. After the low head energy is converted into high head energy, the high head energy enters the reverse nozzle through the boosting device water pipe to generate high pressure. Since the reverse nozzle sprays water to generate power along the internal direction of the drainage pipeline, it drives the boosting device water pipe and the pressure relief valve water pipe to automatically penetrate into the main drainage pipeline until the coal slime is deposited. Then, the high head energy water flow is used to spray through the nozzle to impact the coal slime, so that the coal slime is diluted and mixed with the water flow flowing out of the pressure relief water pipe, and then flows out of the drainage pipeline in the opposite direction, thereby desilting the main drainage pipeline. After clearing the first coal slime accumulation, the nozzle continues to move forward to the next coal slime accumulation, thereby realizing the desilting operation inside the long-distance main drainage pipeline without removing the flange.
[0026] Working principle and usage of booster device:
[0027] Before the booster device works, the drain valve 11 is in an open state under the action of the magnetic gap spring 13, and the water delivery valve 10 is in a closed state under the action of the magnetic gap spring 13 and its own weight. When the static water enters the pump body 7, the drain valve 11 is manually controlled to open → close → open → close repeatedly for several times, and the booster device can automatically operate.
[0028] The static water flows out through the power water pipe 8 (water inlet pipe) through the opened drain valve 11. When the pressure inside the drain valve 11 increases to a level greater than the pressure of the magnetic gap spring 13 of the drain valve 11, the flowing water pushes the drain valve 11 to close quickly, i.e., water hammer occurs. At this time, the water pressure in the pump body 7 rises sharply, forcing the water delivery valve 10 to open, and part of the water is pressed into the buffer cylinder 9. When the pressure inside the drain valve 11 drops rapidly to a level less than the pressure in the buffer cylinder 9, the drain valve 11 reopens under the action of the magnetic gap spring 13 and the negative pressure, and the water delivery valve 10 closes again under the action of its own weight, the pressure of the magnetic gap spring 13, and the water pressure in the air chamber of the buffer cylinder 9. Under the action of the water flow, the above actions automatically run over and over again. When the water pressure in the buffer cylinder 9 increases to a level greater than the pressure in the water lifting pipe 12, water flows out from the water outlet.
[0029] The utility model is simple to manufacture, has low material price and excellent use effect. It can fundamentally solve the problem that the main drainage pipelines at various locations underground are blocked by coal sludge accumulation, the internal silt removal of the pipelines is time-consuming and labor-intensive, and the operation efficiency is low. At the same time, it can realize the function of having no supporting electrical equipment and being able to move with personnel.
[0030] At present, the length of the main drainage pipeline laid in the belt lane of Sima Coal Industry Company is 10,100m. In 2022, the dredging length of the main drainage pipe will be 1,200m, and the dredging length per shift will be 50m. The number of working shifts consumed is 24 shifts, with 6 workers per shift and a total of 144 workers. In 2023, the dredging length of the main drainage pipe will be 1,100m, and the dredging length per shift will be 100m. Each shift will employ 6 people, with a total of 66 workers. Compared with the same period, 78 workers were saved. Based on the current company's employee salary of 424 yuan per shift, a total of 33,072 yuan was saved, achieving the effect of reducing costs and increasing efficiency.
Claims
1. An internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump, characterized by: The invention comprises a static pressure water inlet pipe (1), a pressure boosting device, a water delivery pipe (2) and a reverse nozzle (3), wherein one end of the static pressure water inlet pipe (1) is connected to an underground static pressure pipe (4), and the other end is connected to a water inlet of the pressure boosting device; one end of the water delivery pipe (2) is connected to the pressure boosting device; the reverse nozzle (3) is located at the other end of the water delivery pipe (2); a pressure relief valve water pipe (5) is provided on the pressure boosting device; one end of the water delivery pipe (2) is provided with a reverse nozzle (3) and one end of the water outlet of the pressure relief valve water pipe (5) are tied and fixed and extend into a sewage discharge pipe (6).
2. According to claim 1, an internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump, characterized in that: The boosting device comprises a pump body (7), one end of the pump body (7) is provided with a power water pipe (8), i.e., a water inlet, a static pressure water inlet pipe (1) is connected to the power water pipe (8), a buffer cylinder (9) and a drain outlet are provided above the pump body (7), a water delivery valve (10) is provided in the buffer cylinder, a drain valve (11) is provided at the drain outlet, a water lift pipe (12) is provided on one side of the buffer cylinder (9), a water delivery pipe (2) is connected to the water lift pipe (12), and a pressure relief valve water pipe (5) is connected to the drain outlet.
3. According to claim 2, an internal desilting tool for underground drainage pipelines based on the principle of a water hammer pump is characterized by: A magnetic gap spring (13) is provided at the bottom of each of the water delivery valve (10) and the drainage valve (11).
4. The internal desilting tool for underground drainage pipelines based on the water hammer pump principle according to claim 3 is characterized by: The cross section of the water delivery valve (10) is in the shape of an inverted trapezoid, and the cross section of the drainage valve (11) is in the shape of a regular trapezoid.
5. The internal desilting tool for underground drainage pipelines based on the water hammer pump principle according to claim 1, characterized in that: The water outlet end of the pressure relief valve water pipe (5) is located at the rear end of the reverse nozzle (3).
6. The internal desilting tool for underground drainage pipelines based on the water hammer pump principle according to claim 1, characterized in that: The reverse nozzle (3) comprises a nozzle (14), one end of the nozzle (14) is provided with a nozzle (15), the bottom of the nozzle (15) is provided with three water spraying ports (16) with a hole diameter of 1.5 mm, and the side surface of the nozzle (15) forms an angle of 45° with the nozzle (14).