Wallboard
Through the design of chain structure and cement-based formwork, the gap problem between prefabricated wall panels and on-site cast concrete is solved, and the formwork is not removed and high-quality dry hanging is achieved, which improves the overall quality and construction efficiency of the building.
Patent Information
- Application Number
- CN202420258105.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-01
Smart Images

Figure CN221989699U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction, in particular to a wall panel. Background Art
[0002] Reinforced concrete panel components processed in prefabrication plants or construction sites for building assembly are referred to as prefabricated wall panels or prefabricated siding panels. Using prefabricated wall panels to build assembled large-panel buildings can improve the degree of factory-based and mechanized construction, reduce on-site wet operations, save on-site labor, overcome seasonal influences, and shorten the construction period. At present, the forming mold used in the production of prefabricated wall panels is a forming groove structure with an upper end open surrounded by each side mold and the bottom mold. In order to ensure that the joints between the side molds do not leak when pouring concrete, the adjacent side mold joints are close together, which brings great inconvenience to the removal of the side molds after the prefabricated wall panels are hardened.
[0003] In addition, the coefficients of thermal expansion and contraction between the cast-in-place concrete and the prefabricated walls are inconsistent, resulting in gaps between the cast-in-place concrete and the prefabricated walls. At the same time, traditional dry hanging is connected through slotted dovetail grooves. On the one hand, this dry hanging method has poor safety, and on the other hand, the positioning accuracy and installation accuracy cannot be guaranteed.
[0004] Therefore, how to eliminate the gap between the cast-in-place concrete and the prefabricated wall without removing the formwork and improving the quality of dry hanging is a technical problem that urgently needs to be solved. Utility Model Content
[0005] The problem solved by the utility model is to provide a wall panel, which can realize the non-disassembly of formwork and eliminate the gap between the prefabricated wall panel and the on-site cast concrete, and has a wider application range.
[0006] In order to solve the above problems, the utility model provides a wall panel, comprising: a chain frame, the chain frame comprising a plurality of chain shafts and a steel mesh fixed on the chain shafts, the end of the chain shaft having two pairs of grooves, the steel mesh being fixed in the grooves, and the grooves extending along the axial direction of the chain shaft; a cement-based formwork connected to at least one end of the chain shaft, the cement-based formwork being located on the surface of the steel mesh, and the cement-based formwork having a plurality of protruding steel bars on the surface facing the steel mesh.
[0007] Optionally, it also includes: a first connecting piece connecting the cement-based formwork and the chain shaft, and the first connecting piece is detachably connected to the end of the chain shaft.
[0008] Optionally, the inner wall of the end of the chain shaft has a thread.
[0009] Optionally, it also includes: a second connecting member connected to the end of the chain shaft, and the second connecting member is detachably connected to the end of the chain shaft.
[0010] Optionally, the chain shaft is a tubular structure.
[0011] Optionally, the surface of the steel bar column has a plurality of ridge-shaped protrusions.
[0012] Optionally, the two pairs of grooves include a first pair of grooves and a second pair of grooves, the first pair of grooves include a first sub-groove and a second sub-groove, the first sub-groove and the second sub-groove are symmetrically distributed along the axial direction of the chain axis, the second pair of grooves include a third sub-groove and a fourth sub-groove, the third sub-groove and the fourth sub-groove are symmetrically distributed along the axial direction of the chain axis, and one of the third sub-groove and the fourth sub-groove is spaced between the first sub-groove and the second sub-groove.
[0013] Optionally, the steel mesh includes a plurality of first steel bars and a plurality of second steel bars connected to each other, the first steel bars are fixed in the first pair of grooves, and the second steel bars are fixed in the second pair of grooves.
[0014] Optionally, when the number of the cement-based templates is two, the two cement-based templates are respectively connected to opposite ends of the chain shaft.
[0015] Optionally, it also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, and the composite plate is detachably connected to the end of the chain shaft.
[0016] Optionally, the composite panel includes an outer panel and a functional panel connected to the outer panel, and the functional panel is located between the steel mesh and the outer panel.
[0017] Optionally, the functional panel includes a thermal insulation panel and an insulating panel; and the outer panel includes a polycarbonate panel.
[0018] Optionally, it also includes a third connecting member located inside the outer plate and the functional plate, one end of the third connecting member protrudes from the surface of the functional plate, and the third connecting member is detachably connected to the end of the chain shaft.
[0019] Optionally, it also includes a concrete layer, which fills the hollow layer between the cement-based formwork and the steel mesh, and the hollow layer between adjacent steel meshes.
[0020] Optionally, it also includes a concrete layer, which fills the hollow layer between the cement-based formwork and the steel mesh, the hollow layer between adjacent steel meshes, and the hollow layer between the steel mesh and the composite board.
[0021] Optionally, the cross-sectional shape of the chain axis perpendicular to the axial direction of the chain axis includes a hollow circle, an outer octagonal hollow circle, and an outer rounded hollow circle.
[0022] Compared with the prior art, the technical solution of the utility model has the following advantages:
[0023] In the technical solution of the wall panel of the utility model, the end of the chain shaft is provided with two pairs of grooves, the steel mesh is fixed in the grooves, the grooves extend along the axial direction of the chain shaft and are symmetrically distributed, at least one end of the chain shaft is connected with a cement-based formwork, the cement-based formwork is located on the surface of the steel mesh, and the surface of the cement-based formwork facing the steel mesh has a plurality of raised steel bars. On the one hand, the grooves are used to quickly fix the steel mesh and the chain shaft, avoiding the traditional need to insert steel bars one by one into the chain shaft to fix the steel mesh and the chain shaft, thereby improving production efficiency; on the other hand, in the subsequent process of pouring concrete, due to the plurality of raised steel bars on the surface of the cement-based formwork, the bite force between the concrete and the cement-based formwork is enhanced, and there is no need to remove the formwork additionally, which greatly improves production efficiency. At the same time, there will be no difference in thermal expansion and contraction coefficients when pouring concrete as a whole on site, and the gap between the concrete poured on site and the wall panel is eliminated, which has a wider range of uses.
[0024] Furthermore, it also includes a first connecting piece connecting the cement-based plate and the chain shaft. The first connecting piece is detachably connected to the end of the chain shaft, and the cement-based plate and the chain shaft are effectively fixed by using the first connecting piece, so that concrete can be poured directly between the cement-based plate and the steel mesh on site; at the same time, the first connecting piece can be used directly as a dry hanging piece without being removed after pouring the concrete, thereby improving the quality of the dry hanging; and due to the existence of the first connecting piece, the steel mesh can also be tightly pressed against the groove by using the first connecting piece, eliminating the problem of mutual displacement between the steel mesh and the chain shaft.
[0025] Furthermore, it also includes a second connecting piece connected to the end of the chain shaft. The second connecting piece can play a positioning role in the subsequent pouring of concrete between the steel meshes and between the steel meshes and the cement-based formwork. It can effectively and accurately predict the height of the poured concrete and improve the pouring efficiency. The second connecting piece locks the steel mesh tightly in the groove, ensuring the stability of the connection between the steel mesh and the chain shaft, avoiding scattering during subsequent transportation.
[0026] Furthermore, it also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, the composite plate and the cement-based formwork are respectively located at the two ends of the chain shaft, and the wall of this structure is used as an exterior wall. In the subsequent process of pouring concrete between the composite plate, the steel mesh and the cement-based formwork, the entire wall is poured together, and no concrete is poured in the wall in advance. This will avoid problems such as gaps caused by different coefficients of thermal expansion and contraction between the cast-in-place concrete and the wall, which greatly improves the quality of the final wall and has a wider range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a schematic diagram of the structure of the chain shaft in one embodiment of the utility model;
[0028] Figure 2 for Figure 1 Left view of
[0029] Figure 3 This is a schematic structural diagram of a chain shaft in another embodiment of the utility model;
[0030] Figure 4 This is a schematic structural diagram of a chain shaft in yet another embodiment of the utility model;
[0031] Figure 5 This is a structural schematic diagram of a chain frame in one embodiment of the utility model;
[0032] Figure 6 It is a schematic diagram of the structure of a chain shaft and steel bars in a steel mesh in one embodiment of the utility model;
[0033] Figure 7 A cross-sectional view of a cement-based formwork in one embodiment of the utility model;
[0034] Figure 8 A cross-sectional view of a wall panel in one embodiment of the utility model;
[0035] Fig. 9 for Figure 8 Cross-section view after pouring concrete;
[0036] Fig.10 is a cross-sectional view of a wall panel in another embodiment of the utility model;
[0037] Fig.11 for Fig.10 Cross-section view after pouring concrete;
[0038] Fig.12 This is a cross-sectional view of a wall panel in yet another embodiment of the present invention;
[0039] Fig.13 for Fig.12Cross-section after pouring concrete. DETAILED DESCRIPTION
[0040] At present, there are usually some wall panels on construction sites that are prefabricated in factories, transported to the site, and then poured with concrete.
[0041] After analysis, the utility model inventor found that, on the one hand, traditional prefabricated wall panels need to be dismantled during the production process, and on the other hand, traditional prefabricated wall panels will leave some gaps after pouring part of the concrete for subsequent on-site pouring of concrete. This leads to the problem of inconsistent thermal expansion and contraction coefficients between the on-site poured concrete and the prefabricated wall panels, resulting in gaps between the on-site poured concrete and the prefabricated wall panels, affecting the quality of the final formed wall and greatly reducing the quality of the building.
[0042] Through research, the inventor of the utility model discovered that, on the one hand, the groove is used to fix the steel mesh and the chain shaft, avoiding the traditional need to insert the steel bars into the chain shaft one by one to connect the steel mesh and the chain shaft, thereby improving production efficiency; on the other hand, in the subsequent process of pouring concrete, since the surface of the cement-based formwork has steel bars, the bite force between the concrete and the cement-based formwork is enhanced, and there is no need to remove the formwork additionally, which greatly improves production efficiency. At the same time, there will be no difference in the thermal expansion and contraction coefficients when the concrete is poured as a whole on site, and the gap between the concrete poured on site and the wall panels is eliminated, which has a wider range of uses.
[0043] The inventor of the utility model also discovered through research that the cement-based plate and the chain shaft can be fixedly connected by the first connecting piece, and the cement-based plate and the chain shaft can be effectively fixed by the first connecting piece, so that concrete can be poured directly between the cement-based plate and the steel mesh on site, without removing the formwork; at the same time, the first connecting piece can be left intact before pouring the concrete and can be directly used as a dry hanging piece, thereby improving the quality of the dry hanging.
[0044] Through research, the utility model inventor also found that the other end of the chain shaft is connected to a composite plate, the composite plate is located on the surface of the steel mesh, the composite plate and the cement-based formwork are respectively located at both ends of the chain shaft, and the wall of this structure is used as an exterior wall. In the subsequent process of pouring concrete between the composite plate, the steel mesh and the cement-based formwork, the entire wall panel is poured together, and no concrete is pre-poured in the wall. This will avoid problems such as gaps caused by different coefficients of thermal expansion and contraction between the cast-in-place concrete and the prefabricated wall, greatly improving the quality of the final wall and having a wider range of applications.
[0045] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0046] First, please refer to Figure 1 to Figure 2 The chain shaft 100 includes two opposite ends.
[0047] In this embodiment, the chain shaft 100 includes a first end 100a and a second end 100b opposite to each other.
[0048] The end of the chain shaft 100 has two pairs of grooves, and the grooves provide space for the subsequent fixing of the steel mesh.
[0049] In this embodiment, the first end 100a and the second end 100b have two pairs of grooves respectively.
[0050] In this embodiment, the groove includes a first sub-groove 101a, a second sub-groove 101b, a third sub-groove 102a and a fourth sub-groove 102b, wherein the first sub-groove 101a and the second sub-groove 101b constitute a first pair of grooves 101, the third sub-groove 102a and the fourth sub-groove 102b constitute a second pair of grooves 102, the first sub-groove 101a and the second sub-groove 101b are symmetrically distributed along the axial direction of the chain axis 100, the third sub-groove 102a and the fourth sub-groove 102b are symmetrically distributed along the axial direction of the chain axis 100, and one of the third sub-groove 102a and the fourth sub-groove 102b is distributed between the first sub-groove 101a and the second sub-groove 101b.
[0051] It should be noted here that the plane where the first sub-groove 101a and the second sub-groove 101b are located is perpendicular to the plane where the third sub-groove 102a and the fourth sub-groove 102b are located. The purpose of this arrangement is that since the steel mesh itself is welded by a plurality of first steel bars arranged along the first direction and a plurality of second steel bars arranged along the second direction, the first steel bars and the second steel bars are generally arranged vertically for welding, and the surface where the first pair of grooves 101 are located is perpendicular to the surface where the second pair of grooves 102 are located, the steel mesh is placed in the two pairs of grooves, the first steel bar can be fixed in the first pair of grooves 101, and the second steel bar can be fixed in the second pair of grooves 102, so as to avoid the steel mesh from falling off the chain shaft 100 due to unbalanced force.
[0052] In this embodiment, the first pair of grooves 101 and the second pair of grooves 102 have different sizes.
[0053] In this embodiment, the first sub-groove 101a and the second sub-groove 101b have the same size, and the third sub-groove 102a and the fourth sub-groove 102b have the same size.
[0054] In other embodiments, the sizes of the first sub-groove 101a, the second sub-groove 101b, the third sub-groove 102a, and the fourth sub-groove 102b may be different.
[0055] In this embodiment, the groove is in a "U"-shaped structure.
[0056] In other embodiments, the groove may also be in a “V”-shaped structure, an arc-shaped structure, etc.
[0057] In this embodiment, the depth of the groove is greater than the diameter of the steel bars in the steel mesh.
[0058] In this embodiment, the inner wall of the end of the chain shaft has a thread for subsequent detachable connection with a connecting piece.
[0059] In other embodiments, a pair of the grooves may be provided on only one end of the chain shaft 100 .
[0060] In this embodiment, the chain shaft 100 is a tubular structure, that is, it is hollow in the middle.
[0061] In other embodiments, the chain shaft 100 may also be a solid columnar structure.
[0062] In this embodiment, the cross-section of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is a hollow circle (the dotted line corresponds to the top view).
[0063] For other embodiments, please refer to Figure 3 The cross-sectional shape of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is an octagonal outer hollow circle (the dotted line corresponds to the top view).
[0064] In another embodiment, please refer to Figure 4 The cross-sectional shape of the chain shaft 100 perpendicular to the axial direction of the chain shaft 100 is a hollow circle with rounded corners on the outside and a rounded corner on the inside (the top view corresponding to the dotted line).
[0065] In this embodiment, the material of the chain shaft 100 is construction steel.
[0066] In this embodiment, please refer to Figure 6 , further comprising: a second connecting member 103 connected to the end of the chain shaft 100.
[0067] In this embodiment, the second connecting member 103 is a bolt or a stud, and the specific shape of the second connecting member 103 is selected according to actual needs.
[0068] In this embodiment, the second connecting member 103 is threadedly connected to the end of the chain shaft 100 .
[0069] In other embodiments, the second connecting member 103 and the end of the chain shaft 100 may be snap-fitted, etc.
[0070] Please refer to Figure 5 to Figure 6 , a chain frame 104, wherein the chain frame 104 includes a plurality of chain shafts 100 and a steel mesh 105 fixed on the chain shafts 100.
[0071] In this embodiment, the steel mesh 105 includes a plurality of first steel bars 105a arranged along a first direction and a plurality of second steel bars 105b arranged along a second direction. The plurality of first steel bars 105a and the plurality of second steel bars 105b are fixed by welding to form the steel mesh 105.
[0072] In this embodiment, the first direction is perpendicular to the second direction.
[0073] In this embodiment, due to the presence of the groove, the chain shaft 100 connects the two steel meshes 105, and only the first steel bar 105a and the second steel bar 105b in the steel mesh 105 need to be directly placed in the groove, instead of the traditional method of inserting the first steel bar 105a or the second steel bar 105b one by one into the chain shaft 100 to achieve fixation with the chain shaft 100, which greatly saves labor costs and improves production efficiency.
[0074] In this embodiment, the first steel bars 105 a are located in the first pair of grooves 101 , and the second steel bars 105 b are located in the second pair of grooves 102 .
[0075] Please refer to Figure 7 and Figure 8 , a wall panel 107 includes a chain link frame 104 and a cement-based formwork 108.
[0076] In this embodiment, the chain frame 104 includes the chain shaft 100 and the steel mesh 105 fixed on the chain shaft 100, and the steel mesh 105 is placed in the grooves by using the two pairs of grooves on the end of the chain shaft 100 to achieve rapid fixation of the steel mesh 105 and the chain shaft 100; a cement-based template 108 is connected to at least one end of the chain shaft 100, specifically, one end of the chain shaft 100 is connected to the cement-based template 108, the cement-based template 108 is located on the surface of the steel mesh, and the surface of the cement-based template 108 facing the steel mesh 105 has a plurality of steel columns 106.
[0077] In this embodiment, the wall panel 107 is used as a floor decking panel.
[0078] In this embodiment, the steel bar column 106 is buried in the cement-based formwork 108 , and the steel bar column 106 and the cement-based formwork 108 are integrally formed.
[0079] In this embodiment, after the steel meshes 105 are fixed to both ends of the chain shaft 100 , a hollow layer is provided between adjacent steel meshes 105 .
[0080] In this embodiment, a first connecting member 109 is further included. The first connecting member 109 fixedly connects the cement-based template 108 and the chain shaft 100. The first connecting member 109 is detachably connected to the end of the chain shaft.
[0081] In this embodiment, the first connecting member 109 is a bolt or a stud, and the specific shape of the first connecting member 109 is selected according to actual needs.
[0082] In this embodiment, the surface of the steel bar column 106 has a plurality of prismatic protrusions. The purpose of this is that in the subsequent process of pouring concrete between the cement-based formwork 108 and the steel mesh 105 to form a concrete layer 110, the prismatic protrusions can increase the friction between the steel bar column 106 and the concrete layer 110. Then, the formed concrete layer 110 will be tightly "bite" by the steel bar column 106, thereby increasing the connection strength between the cement-based formwork 108 and the concrete layer 110.
[0083] In this embodiment, there is a hollow layer between the cement-based template 108 and the steel mesh 105, and there is a hollow layer between adjacent steel meshes 105. Concrete is poured into the hollow layer to form a concrete layer 110 (please refer to Fig. 9 ).
[0084] In this embodiment, the entire wall panel 107 is poured together, and there is no pre-poured concrete in the wall panel 107, so there will be no problem of difference in thermal expansion and contraction coefficient between the currently poured concrete and the concrete of the wall panel 107, thereby avoiding the existence of gaps in the final wall. At the same time, the steel column 106 is used to tightly lock the concrete layer 110, thereby improving the bite force between the cement-based formwork 108 and the concrete layer 110, thereby enhancing the bending and tensile resistance of the final wall, and the strength of the final wall is enhanced.
[0085] In this embodiment, the second connecting member 103 is located at the end of the chain shaft 100 away from the cement-based template 108, and the second connecting member 103 is detachably connected to the end of the chain shaft.
[0086] In this embodiment, the second connecting member 103 serves as a positioning indicator during the concrete pouring process, and can effectively and accurately predict the height of the poured concrete, thereby improving the pouring efficiency.
[0087] In this embodiment, after the concrete layer 110 is formed, the first connecting member 109 is removed or not removed. If it is not removed, the first connecting member 109 can be used as a dry hanging member to improve the quality of dry hanging.
[0088] In another embodiment, please refer to Figure 10 to Figure 11 , a wall panel 111 includes a chain link frame 104 and two cement-based formworks 108.
[0089] In this embodiment, the chain frame 104 includes a plurality of chain shafts 100 and a steel mesh 105 fixed on the chain shafts 100 . The ends of the chain shafts 100 have two pairs of grooves. The steel mesh 105 is fixed in the two pairs of grooves. The grooves extend along the axial direction of the chain shafts 100 .
[0090] Specifically, the number of the cement-based templates 108 is two, and the cement-based templates 108 are respectively connected to the opposite ends of the chain shaft 100. Specifically, the first connecting members 109 are respectively used to fix the cement-based templates 108 and the chain shaft 100.
[0091] In this embodiment, the wall panel 111 is used as an inner wall.
[0092] In this embodiment, there is a hollow layer between the cement-based template 108 and the steel mesh 105, and between adjacent steel meshes 105, and concrete is poured into the hollow layer to form a concrete layer 110 (please refer to Fig.11 ), due to the existence of the steel bar column 106, the concrete layer 110 and the cement-based formwork 108 are tightly interlocked together, thereby enhancing the strength of the final wall and the corresponding flexural and tensile strengths; and the wall panel 111 does not need to be demolded and can be directly transported to the site for use, which simplifies the production process of the wall panel 111.
[0093] In another embodiment, please refer to Figure 12 to Figure 13 , a wall panel 112 includes a chain link frame 104, a cement-based formwork 108 and a composite panel 113.
[0094] In this embodiment, the wall panel 112 is used as an exterior wall.
[0095] In this embodiment, the composite plate 113 is located on the surface of the steel mesh 105 , and the composite plate 113 is detachably connected to the groove.
[0096] In this embodiment, the composite plate 113 includes an outer plate 113a and a functional plate 113b connected to the outer plate 113a, and the functional plate 113b is located between the steel mesh 105 and the outer plate 113a.
[0097] Specifically, the functional plate 113b is a heat-insulating plate, and the outer plate 113a is a polycarbonate plate (PC plate).
[0098] In other embodiments, the functional board 113b may also be an insulating board or the like.
[0099] In this embodiment, the composite panel 113 is also prefabricated in a factory and then transported to the site for use.
[0100] In this embodiment, a third connecting member 113c is further included, which is located inside the outer plate 113a and the functional plate 113b. One end of the third connecting member 113c protrudes from the surface of the functional plate 113b. The third connecting member 113c is detachably connected to the end of the chain shaft 100.
[0101] In this embodiment, the end of the third connecting member 113c has a thread, and the third connecting member 113c is threadedly connected to the end of the chain shaft.
[0102] In this embodiment, there is a hollow layer between the composite plate 113 and the steel mesh 105, there is also a hollow layer between the cement-based template 108 and the steel mesh 105, and there is also a hollow layer between adjacent steel meshes 105. Concrete is poured into the hollow layer to form a concrete layer 110 (please refer to Fig.13 ), due to the existence of the steel bar column 106, the concrete layer 110 and the cement-based formwork 108 are tightly interlocked together, thereby enhancing the strength, bending resistance and tensile resistance of the formed wall panel 112; and there is no need to demold the wall panel 112, and it can be directly transported to the site for use, which simplifies the production process of the wall panel 112.
[0103] In this embodiment, during the process of pouring concrete between the composite plate 113, the steel mesh 105 and the cement-based formwork 108, the entire wall panel 112 is poured together, and no concrete is pre-poured in the wall panel 112. This avoids problems such as gaps caused by different coefficients of thermal expansion and contraction between the concrete cast on site and the wall panel 112, thereby greatly improving the quality of the final wall and having a wider range of applications.
[0104] Although the utility model is disclosed as above, the utility model is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the utility model. Therefore, the protection scope of the utility model shall be subject to the scope defined by the claims.
Claims
1. A wall panel, characterized in that: include: A chain frame, the chain frame comprising a plurality of chain shafts and a steel mesh fixed on the chain shafts, the ends of the chain shafts having two pairs of grooves, the steel mesh being fixed in the grooves, and the grooves extending along the axial direction of the chain shafts; A cement-based template connected to at least one end of the chain shaft, the cement-based template is located on the surface of the steel mesh, and the surface of the cement-based template facing the steel mesh has a plurality of protruding steel bars.
2. The wall panel according to claim 1, characterized in that Also includes: A first connecting piece is provided for connecting the cement-based formwork and the chain shaft, wherein the first connecting piece is detachably connected to the end of the chain shaft.
3. The wall panel according to claim 1, characterized in that The inner wall of the end portion of the chain shaft is provided with threads.
4. The wall panel according to claim 1, characterized in that Also includes: A second connecting member is connected to the end of the chain shaft, and the second connecting member is detachably connected to the end of the chain shaft.
5. The wall panel according to claim 1, characterized in that The chain shaft is in a tubular structure.
6. The wall panel according to claim 1, characterized in that The surface of the steel bar column is provided with a plurality of ridge-shaped protrusions.
7. The wall panel according to claim 1, characterized in that The groove includes a first sub-groove, a second sub-groove, a third sub-groove and a fourth sub-groove, the first sub-groove and the second sub-groove constitute a first pair of grooves, the third sub-groove and the fourth sub-groove constitute a second pair of grooves, the first sub-groove and the second sub-groove are symmetrically distributed along the axial direction of the chain axis, the third sub-groove and the fourth sub-groove are symmetrically distributed along the axial direction of the chain axis, and one of the third sub-groove and the fourth sub-groove is spaced between the first sub-groove and the second sub-groove.
8. The wall panel according to claim 7, characterized in that The steel mesh includes a plurality of first steel bars and a plurality of second steel bars connected to each other, the first steel bars are fixed in the first pair of grooves, and the second steel bars are fixed in the second pair of grooves.
9. The wall panel according to claim 1, characterized in that When the number of the cement-based templates is two, the two cement-based templates are respectively connected to opposite ends of the chain shaft.
10. The wall panel according to claim 1, characterized in that It also includes a composite plate connected to the other end of the chain shaft, the composite plate is located on the surface of the steel mesh, and the composite plate is detachably connected to the end of the chain shaft.
11. The wall panel according to claim 10, characterized in that The composite plate comprises an outer plate and a functional plate connected to the outer plate, wherein the functional plate is located between the steel mesh and the outer plate.
12. The wall panel according to claim 11, characterized in that The functional panels include a heat preservation panel and an insulating panel; The outer panel comprises a polycarbonate panel.
13. The wall panel according to claim 11, characterized in that It also includes a third connecting member located inside the outer plate and the functional plate, one end of the third connecting member protrudes from the surface of the functional plate, and the third connecting member is detachably connected to the end of the chain shaft.
14. The wall panel according to claim 1, wherein The cross-sectional shape of the chain shaft perpendicular to the axial direction of the chain shaft includes a hollow circle, an outer octagonal hollow circle, and an outer rounded hollow circle.
