Segmental prefabricated box girder hoisting sling
By introducing rotating shaft, centering roller bearing, adjustable steel legs and multiple sets of lifting point connection holes into segment prefabricated box girder lifting equipment, the problems of insufficient lifting safety and complex adjustment in the prior art are solved. , achieving a more efficient and safer lifting process.
Patent Information
- Application Number
- CN202420377259.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-02-28
AI Technical Summary
Among the existing section prefabricated box girder lifting equipment, the 4-point lifting spreader design is insufficient, and the lifting point position adjustment is complex and inefficient, so it cannot effectively adapt to the changes in the size and center of gravity of box girders in different sections.
A section prefabricated box beam hoisting sling including a rotating shaft, a center-aligning roller bearing, adjustable steel legs and multiple sets of lifting point connection holes of different positions and sizes are designed. The spreader and segments are made by the rotating shaft. The segment beam rotates to ensure that the 4 hanging points are subjected to uniform stress, and adapts to uneven surfaces and segment beams of different sizes through height-adjustable steel legs and articulated structure.
It improves lifting safety, ensures that the four lifting points are uniformly subjected to stress, adapts to the changes in the size and center of gravity of box beams in different segments, simplifies the adjustment of lifting points position, and improves lifting efficiency.
Smart Images

Figure CN222006994U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of prefabricated box girder construction, and in particular relates to a segment prefabricated box girder hoisting device. Background Art
[0002] Prefabricated segmental box girder means that the whole span beam is divided into different segments. After being prefabricated in the prefabrication plant, it is transported to the beam erection site and assembled into holes segment by segment by a special segment assembly bridge-erecting machine. There are two existing assembly methods: hole-by-hole assembly by bridge-erecting machine, which is usually suitable for bridges with a span of less than 50 meters; T-structure assembly by bridge-erecting machine, which is suitable for bridges with a span of more than 50 meters.
[0003] Segmental beams are usually hoisted at four points, and the hoisting equipment used is a gantry crane or crawler crane.
[0004] However, in the existing lifting, the design requirements of the slings for 4-point lifting only consider the force on 3 lifting points, and one lifting point is in a relaxed state, which is not safe enough. In addition, in order to adapt to the adjustment of the lifting point positions of box girders in different sections, a sliding bracket solution is mostly used, which has a complex adjustment structure and low adjustment efficiency. Utility Model Content
[0005] The utility model aims to provide a segmental prefabricated box girder hoisting sling, which is a segmental prefabricated box girder hoisting sling capable of rotating the segmental box girder.
[0006] The purpose of the utility model is achieved through the following technical means: a segment prefabricated box beam lifting sling, comprising a first longitudinal beam, a rotating shaft hole vertically penetrating the longitudinal beam is opened at the center of the first longitudinal beam, a rotating shaft is inserted in the rotating shaft hole, the upper side and the lower side of the rotating shaft are respectively connected to the first thrust spherical roller bearing and the second thrust spherical roller bearing, the lower surface of the first thrust spherical roller bearing on the upper side is connected to the first short cross beam, the upper surface of the second thrust spherical roller bearing is connected to the first longitudinal beam, the two sides of the first longitudinal beam are respectively connected to the second longitudinal beam and the third longitudinal beam extending outward, the second longitudinal beam The second longitudinal beam extends outward and tilts downward at the same time, the other end of the second longitudinal beam is connected to the fourth longitudinal beam, the third longitudinal beam extends outward and tilts upward at the same time, the other end of the third longitudinal beam is connected to the fifth longitudinal beam, the fifth longitudinal beam is higher than the fourth longitudinal beam, the fourth longitudinal beam is connected to the second short cross beam, two first ear plates are connected to the lower part of the fifth longitudinal beam, and a third short cross beam is also provided, the two first ear plates and the third short cross beam are both provided with hinged rotation shaft holes, the third short cross beam is clamped between the two first ear plates, and the two first ear plates and the third short cross beam are hinged by inserting the hinged rotation shaft into the hinged rotation shaft hole;
[0007] A plurality of symmetrically arranged hanging point connection holes are provided on the left and right sides of the upper surfaces of the second short cross beam and the third short cross beam, and a plurality of height-adjustable steel legs are connected to the lower surfaces of the second short cross beam and the third short cross beam.
[0008] A plurality of door crane connection points are arranged on the upper surface of the first short cross beam, and door crane connection holes are opened on the door crane connection points.
[0009] The cross-sections of the second and third longitudinal beams are both right-angled trapezoids. The ends of the second and third longitudinal beams connected to the first longitudinal beam have a wider lower base, and the other ends have a narrower lower base. The oblique waist of the second longitudinal beam is located at the top, and tilts downward from the lower base to the upper base; the oblique waist of the third longitudinal beam is located at the bottom, and tilts upward from the lower base to the upper base.
[0010] There are several groups of hanging point connection holes, which are symmetrically distributed on the second short crossbeam and the third short crossbeam along the first longitudinal beam. The distances from the centers of the second short crossbeam and the third short crossbeam of each group of hanging point connection holes are different, and the sizes are different.
[0011] The hanging point connection hole is oblong.
[0012] The height-adjustable steel leg includes two wedge blocks with matching inclined surfaces. The inclined surfaces of the two wedge blocks fit together to form a rectangular parallelepiped. A bolt hole is opened at the height of the center of the inclined surface of the wedge block. The bolt hole passes through the two wedge blocks. A fixing bolt is inserted into the bolt hole, and a nut is tightened on the fixing bolt on the outside of the wedge block.
[0013] The bolt hole is an oblong hole and is larger than the fixing bolt.
[0014] A gasket is also connected to the fixing bolt between the nut and the wedge block.
[0015] The height-adjustable steel leg also includes two second ear plates and a steel leg hinge shaft, a wedge block is clamped between the two second ear plates, and a wedge block and the two second ear plates are hinged through the steel leg hinge shaft.
[0016] The beneficial effects of the utility model are:
[0017] 1. Through the rotating shaft, the entire hanger can rotate, thereby driving the segment beam to rotate.
[0018] 2. One set of lifting points on the second short beam and the third short beam is a rigid structure, and the other set of lifting points is a hinged structure, which ensures that the four lifting points are evenly stressed. Compared with the conventional four-point lifting sling design requirements, only three lifting points are considered to be stressed, and one lifting point is in a relaxed state, which increases the safety of lifting.
[0019] 3. Multiple groups of oblong lifting point holes of different positions and sizes are set on the second short cross beam and the third short cross beam to adapt to the different sizes and centers of gravity of the segmental box girders and the need to adjust the lifting point positions.
[0020] 4. The length of the steel legs is adjustable to accommodate the uneven top surface of the segmental box girder caused by concrete construction errors. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is the front structural diagram of the segmental prefabricated box girder lifting equipment;
[0022] Figure 2 This is the plan structure diagram of the lifting equipment for the segmental prefabricated box girder;
[0023] Figure 3 This is the structural diagram of the third short beam;
[0024] Figure 4 This is the structural diagram of the second short beam;
[0025] Figure 5 This is a structural diagram of the height-adjustable steel legs;
[0026] Figure 6 This is the structural diagram of the height-adjustable steel legs after height adjustment;
[0027] Figure 7 This is a schematic diagram of the use of the lifting equipment for the segmental prefabricated box girder;
[0028] Figure 8 This is a schematic diagram of the second short cross beam end of the segmental prefabricated box girder hoisting sling in use;
[0029] Fig. 9 This is a schematic diagram of the third short cross beam end of the segmental prefabricated box girder hoisting sling in use;
[0030] In the figure, 1 is the first longitudinal beam; 2 is the rotating shaft; 3 is the first thrust spherical roller bearing; 4 is the second thrust spherical roller bearing; 5 is the first short cross beam; 6 is the door crane connection point; 7 is the second longitudinal beam; 8 is the third longitudinal beam; 9 is the fourth longitudinal beam; 10 is the fifth longitudinal beam; 11 is the second short cross beam; 12 is the height-adjustable steel leg; 13 is the first ear plate; 14 is the third short cross beam; 15 is the hinged rotating shaft; 16 is the fixing bolt; 17 is the nut; 18 is the gasket; 19 is the hanging point connection hole; 20 is the second ear plate; 21 is the steel leg hinge axis; 22 is the door crane connection hole; 23 is the wedge block.
[0031] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. DETAILED DESCRIPTION
[0032] [Example 1]
[0033] like Figures 1 to 4As shown, a segmental prefabricated box girder lifting and slinging device comprises a first longitudinal beam 1, a rotating shaft hole which vertically penetrates the longitudinal beam 1 is opened at the center of the first longitudinal beam 1, a rotating shaft 2 is inserted into the rotating shaft hole, a first thrust spherical roller bearing 3 and a second thrust spherical roller bearing 4 are respectively connected to the upper and lower sides of the rotating shaft 2, a first short cross beam 5 is connected to the lower surface of the upper first thrust spherical roller bearing 3, and the upper surface of the second thrust spherical roller bearing 4 is connected to the first longitudinal beam 1, and the two sides of the first longitudinal beam 1 are respectively connected to the second longitudinal beam 7 and the third longitudinal beam 8 which extend outwards, the second longitudinal beam 7 extends outwards and is also inclined downwards, and the second longitudinal beam 7 is connected to the lower surface of the second thrust spherical roller bearing 4. The other end of the third longitudinal beam 8 is connected to a fourth longitudinal beam 9, the third longitudinal beam 8 extends outward and tilts upward, the other end of the third longitudinal beam 8 is connected to a fifth longitudinal beam 10, the fifth longitudinal beam 10 is higher than the fourth longitudinal beam 9, the fourth longitudinal beam 9 is connected to a second short cross beam 11, two first ear plates 13 are connected below the fifth longitudinal beam 10, and a third short cross beam 14 is also provided, both the two first ear plates 13 and the third short cross beam 14 are provided with hinged rotation shaft holes, the third short cross beam 14 is clamped between the two first ear plates 13, and the two first ear plates 13 and the third short cross beam 14 are hinged by inserting a hinged rotation shaft 15 into the hinged rotation shaft hole;
[0034] A plurality of symmetrically arranged suspension point connection holes 19 are provided on the left and right sides of the upper surfaces of the second short cross beam 11 and the third short cross beam 14, and a plurality of height-adjustable steel legs 12 are connected to the lower surfaces of the second short cross beam 11 and the third short cross beam 14.
[0035] A plurality of door hanger connection points 6 are arranged on the upper surface of the first short cross beam 5 , and door hanger connection holes 22 are opened on the door hanger connection points 6 .
[0036] The first longitudinal beam 1 , the second longitudinal beam 7 , the third longitudinal beam 8 , the fourth longitudinal beam 9 and the fifth longitudinal beam 10 are an integral structure.
[0037] The first longitudinal beam 1 is a rectangular structure with a rotation axis hole vertically penetrating the first longitudinal beam 1 in the middle, and the rotation axis 2 is inserted in the middle. The second thrust spherical roller bearing 4 is connected to the rotation axis 2 below the first longitudinal beam 1. The second thrust spherical roller bearing 4 can rotate relative to the rotation axis 2. The upper surface of the second thrust spherical roller bearing 4 is connected to the lower surface of the first longitudinal beam 1 to support the first longitudinal beam 1 so that each longitudinal beam can rotate around the rotation axis 2.
[0038] The rotating shaft 2 extends from the upper surface of the first longitudinal beam 1. The uppermost part of the rotating shaft 2 is connected to the first thrust spherical roller bearing 3. The lower surface of the first thrust spherical roller bearing 3 is connected to the upper surface of the first short cross beam 5. The first short cross beam 5 is fixed in the air. The first short cross beam 5 can rotate relative to the rotating shaft 2.
[0039] A plurality of door hanger connection points 6 are arranged on the upper surface of the first short cross beam 5 , and door hanger connection holes 22 are opened on the door hanger connection points 6 .
[0040] The entire lifting device is lifted through the door lifting connection point 6 and the door lifting connection hole 22.
[0041] The first longitudinal beam 1 is connected to the second longitudinal beam 7 and the third longitudinal beam 8 extending outward on both sides respectively. The second longitudinal beam 7 extends outward and tilts downward. The other end of the second longitudinal beam 7 is connected to the fourth longitudinal beam 9. The third longitudinal beam 8 extends outward and tilts upward. The other end of the third longitudinal beam 8 is connected to the fifth longitudinal beam 10.
[0042] Therefore, the length from the lower surface of the fourth longitudinal beam 9 to the prefabricated segment box beam is short, and it is only necessary to install a number of height-adjustable steel legs 12 on the second short cross beam 11 so that the legs can touch the surface of the prefabricated segment box beam.
[0043] The length from the lower surface of the fifth longitudinal beam 10 to the prefabricated segment box beam is large enough to accommodate the lower first ear plate 13 , the third short cross beam 14 and the hinged rotation axis 15 .
[0044] Specifically, the third short cross beam 14 is clamped between the two first ear plates 13, and the hinged rotation axis holes of the three are aligned and inserted into the hinged rotation axis 15, so that the third short cross beam 14 can rotate relative to the hinged rotation axis 15 to adapt to the uneven surface of the segment box beam.
[0045] like Figure 3 and Figure 4 As shown, the second short cross beam 11 and the third short cross beam 14 are provided with a plurality of suspension point connection holes 19 on both sides.
[0046] There are several groups of the hanging point connection holes 19, which are symmetrically distributed on the second short cross beam 11 and the third short cross beam 14 along the first longitudinal beam 1. Each group of hanging point connection holes 19 has a different distance from the center of the second short cross beam 11 and the third short cross beam 14 and different sizes.
[0047] The hanging point connection hole 19 is an oblong shape.
[0048] The hanging point connection holes 19 are divided into multiple groups, and the two in one group are symmetrically distributed along the center line of the beam, and the distances between the centers are different. In this way, different hanging point positions can be selected according to the different sizes and centers of gravity of the segmental box beam.
[0049] like Figure 1 As shown, the cross-sections of the second longitudinal beam 7 and the third longitudinal beam 8 are both right-angled trapezoids. The ends of the second longitudinal beam 7 and the third longitudinal beam 8 connected to the first longitudinal beam 1 are wider lower bases, and the other ends are narrower lower bases. The oblique waist of the second longitudinal beam 7 is located at the top, and is inclined downward from the lower base to the upper base; the oblique waist of the third longitudinal beam 8 is located at the bottom, and is inclined upward from the lower base to the upper base.
[0050] The left end of the second longitudinal beam 7 is low, and the right end of the third longitudinal beam 8 is high.
[0051] like Figure 5 and Figure 6 As shown, the height-adjustable steel leg 12 includes two wedge blocks 23 with matching inclined surfaces. The inclined surfaces of the two wedge blocks 23 are fitted together to form a rectangular parallelepiped. A bolt hole is opened at the height of the center of the inclined surface of the wedge block 23. The bolt hole passes through the two wedge blocks 23. A fixing bolt 16 is inserted into the bolt hole, and a nut 17 is tightened on the fixing bolt 16 on the outside of the wedge block 23.
[0052] The two wedge-shaped blocks 23 are arranged one above the other to form a rectangular parallelepiped, and the two wedge-shaped blocks 23 are formed by obliquely cutting the rectangular parallelepiped.
[0053] This allows the two wedge blocks 23 to move along the inclined surface, thereby changing the height of the top of the upper wedge block 23 to adapt to the different surface heights of the segment box girder.
[0054] Specifically, a transverse bolt hole is drilled on the inclined surface, and the fixing bolt 16 passes through the two wedge blocks 23 from the hole, and then nuts 17 and washers 18 are arranged on both sides to fix the positions of the two wedge blocks 23.
[0055] When adjusting the height, Figure 6 As shown, the two wedge blocks 23 are slightly offset along the inclined surface. Since the bolt hole is an oblong hole and is larger than the fixing bolt 16, even if a part of the bolt hole is offset and cannot be aligned, the remaining aligned part can still allow the fixing bolt 16 to pass through.
[0056] The bolt hole is an oblong hole and is larger than the fixing bolt 16 .
[0057] A gasket 18 is also connected to the fixing bolt 16 between the nut 17 and the wedge block 23 .
[0058] The height-adjustable steel leg 12 further comprises two second ear plates 20 and a steel leg hinge shaft 21 , a wedge block 23 is clamped between the two second ear plates 20 , and the wedge block 23 and the two second ear plates 20 are hingedly connected via the steel leg hinge shaft 21 .
[0059] Through the second ear plate 20 and the steel leg hinge shaft 21, the wedge block 23 below can rotate around the steel leg hinge shaft 21, which can better adapt to the uneven surface of the segment box girder.
[0060] When using, Figure 7-9 As shown, the height-adjustable steel legs 12 stand on the ground and are connected to the segmental box girder through a plurality of suspension point connection holes 19 on the second short cross beam 11 and the third short cross beam 14 to lift the entire segmental box girder.
Claims
1. A segmental prefabricated box girder hoisting device, characterized in that: The invention comprises a first longitudinal beam (1), wherein a rotating shaft hole which vertically penetrates the first longitudinal beam (1) is opened at the center of the first longitudinal beam (1), a rotating shaft (2) is inserted into the rotating shaft hole, a first thrust spherical roller bearing (3) and a second thrust spherical roller bearing (4) are respectively connected to the upper and lower sides of the rotating shaft (2), a first short cross beam (5) is connected to the lower surface of the first thrust spherical roller bearing (3) on the upper side, and the upper surface of the second thrust spherical roller bearing (4) is connected to the first longitudinal beam (1), and the two sides of the first longitudinal beam (1) are respectively connected to a second longitudinal beam (7) and a third longitudinal beam (8) which extend outwards, the second longitudinal beam (7) extends outwards and tilts downwards, and the other end of the second longitudinal beam (7) is connected to a fourth longitudinal beam (9). A longitudinal beam (9), wherein the third longitudinal beam (8) extends outward and is inclined upward, the other end of the third longitudinal beam (8) is connected to a fifth longitudinal beam (10), the fifth longitudinal beam (10) is higher than the fourth longitudinal beam (9), the fourth longitudinal beam (9) is connected to a second short cross beam (11), two first ear plates (13) are connected below the fifth longitudinal beam (10), and a third short cross beam (14) is also provided, the two first ear plates (13) and the third short cross beam (14) are both provided with hinged rotation axis holes, the third short cross beam (14) is sandwiched between the two first ear plates (13), and the two first ear plates (13) and the third short cross beam (14) are hingedly connected by inserting a hinged rotation axis (15) into the hinged rotation axis hole; A plurality of symmetrically arranged suspension point connection holes (19) are provided on the left and right sides of the upper surfaces of the second short cross beam (11) and the third short cross beam (14), and a plurality of height-adjustable steel legs (12) are connected to the lower surfaces of the second short cross beam (11) and the third short cross beam (14). A plurality of door hanger connection points (6) are arranged on the upper surface of the first short cross beam (5), and door hanger connection holes (22) are opened on the door hanger connection points (6).
2. The segmental prefabricated box girder lifting device according to claim 1, characterized in that: The cross sections of the second longitudinal beam (7) and the third longitudinal beam (8) are both right-angled trapezoids; one end of the second longitudinal beam (7) and the third longitudinal beam (8) connected to the first longitudinal beam (1) is a wider lower base, and the other end is a narrower lower base; the oblique waist of the second longitudinal beam (7) is located at the top and is inclined downward from the lower base to the upper base; the oblique waist of the third longitudinal beam (8) is located at the bottom and is inclined upward from the lower base to the upper base.
3. The segmental prefabricated box girder hoisting device according to claim 1, characterized in that: There are a total of several groups of suspension point connection holes (19), which are symmetrically distributed on the second short cross beam (11) and the third short cross beam (14) along the first longitudinal beam (1), and each group of suspension point connection holes (19) has a different distance from the center of the second short cross beam (11) and the third short cross beam (14) and has different sizes.
4. A segmental prefabricated box girder hoisting device according to claim 1 or 3, characterized in that: The hanging point connection hole (19) is an oblong shape.
5. The segmental prefabricated box girder hoisting device according to claim 1, characterized in that: The height-adjustable steel leg (12) comprises two wedge-shaped blocks (23) whose inclined surfaces match each other. The inclined surfaces of the two wedge-shaped blocks (23) are fitted together to form a rectangular parallelepiped. A bolt hole is opened at the height of the center of the inclined surface of the wedge-shaped block (23). The bolt hole passes through the two wedge-shaped blocks (23). A fixing bolt (16) is inserted into the bolt hole, and a nut (17) is fixed on the fixing bolt (16) outside the wedge-shaped block (23).
6. The segmental prefabricated box girder hoisting device according to claim 5, characterized in that: The bolt hole is an oblong hole and is larger than the fixing bolt (16).
7. The segmental prefabricated box girder hoisting device according to claim 5, characterized in that: A gasket (18) is also connected to the fixing bolt (16) between the nut (17) and the wedge block (23).
8. The segmental prefabricated box girder hoisting device according to claim 5, characterized in that: The height-adjustable steel leg (12) further comprises two second ear plates (20) and a steel leg hinge shaft (21), a wedge block (23) is clamped between the two second ear plates (20), and the wedge block (23) and the two second ear plates (20) are hingedly connected via the steel leg hinge shaft (21).