Splicing mechanism for erecting steel box girder

By designing the steel box girder splicing mechanism that combines the insertion rod and limiting components, the problems of prone to cracking and complicated operation of the steel box girder welds are solved, and stable connection and efficient construction are achieved, which extends the service life and reduces maintenance needs.

CN222008627UInactive Publication Date: 2024-11-15SHANGHAI YUANTONG ROAD&BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420600279.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The welds of the steel box girders are prone to crack when they are subjected to dynamic loads, which affects the stability of the connection. The existing splicing mechanisms are cumbersome, time-consuming and labor-intensive, making it difficult to ensure the stability of the connection and construction efficiency.

Method used

A splicing mechanism for erecting steel box girders including a first connecting mechanism and a second connecting mechanism is designed. The steel box girder is realized by combining the slider and the shock absorbing component. The middle and both ends are fixed to facilitate operation and enhance the firmness of the connection.

Benefits of technology

It realizes the stable connection of steel box girders, simplifies the operating process, improves construction efficiency, enhances the integrity and service life of the connection, and reduces the needs of later maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008627U_ABST
    Figure CN222008627U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel box girder splicing, in particular to a splicing mechanism for erecting steel box girders, which comprises a first connecting mechanism and a second connecting mechanism which are arranged between two steel box girders, and the first connecting mechanism comprises a first plate body and a second plate body which are arranged in parallel. A damping assembly is arranged between the first plate body and the second plate body, the first plate body and the second plate body are both fixedly connected with a limiting assembly, the steel box girder penetrates through an insertion rod, and one end of the insertion rod is limited to the limiting assembly; the second connecting mechanism comprises a shell and a sliding block sliding in the shell, the shell and the sliding block are fixedly connected with the two steel box girders respectively, one end of the sliding block is connected with a limiting block in a sliding mode, the limiting block is limited to the side walls of the steel box girders, and a wedge-shaped block pushing the limiting block to slide is arranged in the shell. The middle of the steel box girder can be fixedly connected through the first connecting mechanism and the second connecting mechanism, operation is easy, and time and labor are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel box girder splicing, and more specifically, particularly relates to a splicing mechanism for erecting a steel box girder. Background Art

[0002] Steel box girders have broad application prospects and play an important role in the fields of highways, railways, etc. The assembly of steel box girders is generally carried out by welding, but long-term dynamic loads make the welds prone to cracking, affecting the stability of the connection.

[0003] Announcement No. CN216712704U discloses a splicing mechanism for erecting prefabricated steel box girders, which includes a first splicing surface and a second splicing surface arranged on the steel box girder, and two adjacent steel box girders are connected to each other through an installation assembly, and the installation assembly includes a plurality of fixing plates arranged on the first splicing surface, and a plurality of fixing grooves matching the fixing plates are correspondingly opened on the second splicing surface, and a plurality of fixing bolts are passed through and threadedly connected on the steel box girder, and a connection hole matching the fixing bolt is opened on the fixing plate, and an installation groove matching the fixing bolt is opened on the groove wall of the fixing groove, and a plurality of fixing plates are respectively correspondingly inserted into the fixing grooves of adjacent steel box girders, and the fixing bolts pass through the connection holes and are threadedly connected in the installation grooves. Under the restriction of a plurality of fixing bolts, the fixing plate is difficult to be separated from the fixing groove, thereby achieving the effect of stably connecting the steel box girders. In the utility model, it is necessary to pay attention to screwing a plurality of bolts at the connection position to connect the two steel box girders, and the operation is relatively cumbersome, time-consuming and labor-intensive. Utility Model Content

[0004] In order to overcome the above-mentioned shortcomings, the utility model aims to provide a splicing mechanism for erecting a steel box girder, which can solve the above-mentioned problems.

[0005] A splicing mechanism for erecting a steel box beam, comprising a first connecting mechanism and a second connecting mechanism arranged between two steel box beams, wherein the first connecting mechanism is connected to the middle of the connecting position of the two steel box beams, and the second connecting mechanism is connected to both sides of the connecting position of the two steel box beams;

[0006] The first connection mechanism comprises a first plate body and a second plate body arranged in parallel, a shock absorbing assembly is arranged between the first plate body and the second plate body, the first plate body and the second plate body are both fixedly connected to a limiting assembly, the steel box beam passes through a plug rod, and one end of the plug rod is limited to the limiting assembly;

[0007] The second connecting mechanism includes a shell and a slider sliding in the shell, the shell and the slider are fixedly connected to two steel box girders respectively, one end of the slider is slidably connected to a limit block, the limit block is limited to the side wall of the steel box girder, and a wedge block is arranged in the shell to push the limit block to slide.

[0008] Furthermore, the limiting assembly includes two symmetrically arranged fixing plates, the opposite side walls of the two fixing plates are fixedly connected to the telescopic rod, the telescopic rod is sleeved with a first spring, the other end of the telescopic rod is fixedly connected to a clamping block, and one end of the insertion rod is clamped between the two clamping blocks.

[0009] Furthermore, the side wall of the card block close to the insertion rod is provided with an inclined portion and a card slot, the inclined portion is provided at the upper and lower ends of the card slot, and the side wall of one end of the insertion rod is adapted to the side wall profile close to the card block.

[0010] Furthermore, the insertion rod is arranged in a T-shape, and the steel box girder is provided with a stepped hole adapted to the insertion rod.

[0011] Furthermore, the outer side walls of the shell are respectively fixedly connected to the top wall and two side walls of the steel box girder, the slider is fixedly connected to the side wall of another steel box girder, and the outer contour of the slider is adapted to the inner contour of the shell.

[0012] Furthermore, the sliding block is fixedly connected to a sliding bar, and an inner wall of the housing is provided with a sliding groove matched with the sliding bar.

[0013] Furthermore, the shock absorbing assembly includes a rod body fixedly connected to the first plate body and the second plate body, the bottom end of the rod body is sleeved on the limiting plate, and the bottom end of the rod body is fixedly connected to the buffer block.

[0014] Furthermore, the limiting plate is in a "X" shape, a second spring is arranged between the rod body and the top wall of the limiting plate, and the second spring is sleeved on the rod body.

[0015] When in use, the first connecting mechanism is set at the connection of the steel box girder, the step hole and the through hole correspond one to one, the insertion rod is inserted into the step hole and the through hole in turn, the bottom end of the insertion rod is plugged into the limiting assembly, and the limiting assembly limits the insertion rod. The two steel box girders are docked, the slider is inserted into the shell, and under the guidance and push of the wedge block, the limiting block gradually enters the side wall of the steel box girder, so that the side walls of the two steel box girders are fixed. The insertion rod is inserted into the other steel box girder, and after the insertion rod is limited by the limiting assembly, the overall fixation is completed. When welding the connection seam, the exposed gap between the insertion rod and the steel box girder and the exposed gap between the limiting block and the steel box girder can also be welded to make the whole more solid.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] ① Due to the provision of the first connecting mechanism and the second connecting mechanism, the middle part of the steel box girder can be fixedly connected by the insertion rod penetrating the steel box girder and the first plate body or the second plate body and limited to the limit assembly. When the two steel box girders are butt-jointed, the slider slides into the shell, and at the same time, the limit block enters the side wall of the steel box girder under the guidance of the wedge block, so that the two ends of the steel box girder are connected and reinforced. The operation is relatively simple, which saves labor and working time, and improves the construction efficiency while making the connection more stable.

[0018] ② Due to the setting of the limiting component, one end of the plug rod is limited in the step hole, and the outer contour of the other end is matched with the clamping block. The other end of the plug rod is clamped by the clamping block, so that two adjacent steel box girders can be connected, thereby enhancing the integrity of the structural connection; under the action of the shock-absorbing component, the dynamic load pressure at the connection can be relieved, the firmness of the connection position can be enhanced, the service life can be extended, and the rework rate of later maintenance can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0020] Figure 1 It is a schematic diagram of the overall structure of the splicing mechanism for erecting the steel box girder in this embodiment.

[0021] Figure 2 It is a schematic diagram of the structure of the shock absorbing assembly of the splicing mechanism for erecting the steel box girder in this embodiment.

[0022] Figure 3 It is a schematic diagram of the steel box girder structure of the splicing mechanism for erecting the steel box girder in this embodiment.

[0023] Figure 4 It is a schematic diagram of the slider structure of the splicing mechanism for erecting the steel box girder in this embodiment.

[0024] Figure 5 It is a schematic diagram of the shell structure of the splicing mechanism for erecting the steel box girder in this embodiment.

[0025] Figure 6 It is a schematic diagram of the structure of the limiting components of the splicing mechanism for erecting the steel box girder in this embodiment.

[0026] In the figure: 1. steel box girder; 2. first plate body; 3. second plate body; 4. limit assembly; 401. fixed plate; 402. telescopic rod; 403. first spring; 404. clamping block; 405. inclined portion; 406. clamping slot; 5. shock absorbing assembly; 501. rod body; 502. limit plate; 503. buffer block; 504. second spring; 6. plug rod; 7. step hole; 8. through hole; 9. shell; 10. slider; 11. limit block; 12. wedge block; 13. sliding bar; 14. slide slot. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] This embodiment provides a splicing mechanism for erecting a steel box girder, such as Figure 1 As shown, it includes a first connecting mechanism and a second connecting mechanism arranged between the two steel box girders 1, the first connecting mechanism is connected to the middle of the connection position of the two steel box girders 1, the top end of the first connecting mechanism is fixed to the top wall of the connection position of the two steel box girders 1, and the bottom end is fixedly connected to the bottom wall of the connection position of the two steel box girders 1; the second connecting mechanism is connected to both sides of the connection position of the two steel box girders 1, and the steel box girder 1 is supported by the first connecting mechanism and the second connecting mechanism.

[0029] Specifically, the first connection mechanism includes a first plate body 2, a second plate body 3, a damping assembly 5, a limiting assembly 4 and an insertion rod 6. The damping assembly 5 is arranged between the first plate body 2 and the second plate body 3. The limiting assembly 4 limits the insertion rod 6 to prevent the insertion rod 6 from moving. The first plate body 2 and the second plate body 3 are arranged in parallel, and the two are respectively abutted against the top and bottom of the inner cavity of the steel box beam 1. The steel box beam 1 is supported by the damping assembly 5 to increase the bearing and bending resistance of the steel box beam 1. When the top of the steel box beam 1 is subjected to a large dynamic load, the damping assembly 5 uses its elastic potential energy to compensate for the bending of the steel box beam 1. The limiting assembly 4 is fixedly connected to the first plate body 2 or the second plate body 3. Through the mutual cooperation of the limiting assembly 4 and the insertion rod 6, the first plate body 2 or the second plate body 3 is connected and fixed to the steel box beam 1, so that the connection of the steel box beam 1 is more firm, and the downward pressure stress of the dynamic load at the connection can be buffered, thereby improving the service life of the connection.

[0030] The insertion rod 6 passes through the steel box girder 1, the first plate body 2 or the second plate body 3 in sequence, and one end of the insertion rod 6 is limited to the limit assembly 4, and the insertion rod 6 is locked by the limit assembly 4. Figure 6As shown, the limit assembly 4 includes a fixed plate 401, a telescopic rod 402, a first spring 403 and a clamping block 404. The steel box girder 1 is provided with a step hole 7 for passing the insertion rod 6. The first plate body 2 and the second plate body 3 are both provided with a through hole 8 compatible with the insertion rod 6. Each group of limit assemblies 4 is provided with two fixed plates 401 symmetrically arranged with the through hole 8 as the center. The two ends of the telescopic rod 402 are respectively fixedly connected to the fixed plate 401 and the clamping block 404. The fixed plate 401, the telescopic rod 402 and the clamping block 404 are horizontally distributed. The first spring 403 is sleeved on the outer wall of the telescopic rod 402. The end of the insertion rod 6 away from the step hole 7 is clamped between the two clamping blocks 404, and the insertion rod 6 is clamped by the clamping block 404. The side wall of the block 404 near the plug rod 6 is provided with an inclined portion 405 and a slot 406. The inclined portion 405 is provided at the upper and lower ends of the slot 406. The side wall of one end of the plug rod 6 is adapted to the side wall profile near the block 404. After the plug rod 6 penetrates into the inner cavity of the steel box beam 1, when the plug rod 6 abuts against the inclined portion 405, the two relatively arranged blocks 404 move toward each other until the bottom end of the plug rod 6 is inserted into the block 404 and is firmly engaged with the block 404. The plug rod 6 is arranged in a T-shape, and its end away from the limiting assembly 4 is limited to the step hole 7, see Figure 3 , and is flush with the outer surface of the steel box girder 1. After the insertion limit, the exposed gap between the insertion rod 6 and the steel box girder 1 can be welded to make the overall connection more firm.

[0031] Please also see Figure 4 and Figure 5 The second connection mechanism includes a shell 9 and a slider 10 that slides in the shell 9. The shell 9 and the slider 10 support and fix the two sides of the inner cavity of the steel box beam 1 to enhance the supporting force of the corner. The shell 9 and the slider 10 are fixedly connected to two adjacent steel box beams 1 respectively. One end of the slider 10 is slidably connected to a limit block 11. The limit block 11 is limited to the side wall of the steel box beam 1. A wedge block 12 is arranged in the shell 9 to push the limit block 11 to slide. When the slider 10 slides into the shell 9, the limit block 11 moves toward the side wall of the steel box beam 1 with the wedge block 12. The outer side walls of the shell 9 are fixedly connected to the top wall and two side walls of the steel box beam 1 respectively. The slider 10 is fixedly connected to the side wall of another steel box beam 1, and the outer contour of the slider 10 is adapted to the inner contour of the shell 9, so that the slider 10 can be embedded in the shell 9. The slider 10 is fixedly connected to the slide bar 13 , and the inner wall of the housing 9 is provided with a slide groove 14 adapted to the slide bar 13 . When the slider 10 enters the housing 9 , the slide bar 13 slides on the track of the slide groove 14 , so that the slider 10 slides into the housing 9 more smoothly.

[0032] like Figure 2As shown, the shock absorbing assembly 5 includes a rod 501, a limiting plate 502, a buffer block 503, and a second spring 504. The two ends of the rod 501 are respectively fixedly connected to the two rods 501 of the first plate 2 and the second plate 3. The rod 501 is arranged perpendicular to the first plate 2 or the second plate 3, so that the rod 501 can support the first plate 2 and the second plate 3. The limiting plate 502 is in a "X" shape. The bottom end of the rod 501 is sleeved on the limiting plate 502. The bottom end of the rod 501 is fixedly connected to the buffer block 503. The buffer block 503 can buffer the pressure of the steel box girder 1 on the rod 501. A second spring 504 is arranged between the rod 501 and the top wall of the limiting plate 502. The second spring 504 is sleeved on the rod 501 to increase the buffering capacity of the steel box girder 1.

[0033] The working principle of the splicing mechanism for erecting steel box beams in this embodiment is as follows: when in use, the first connecting mechanism is set at the connection of the steel box beam 1, the step hole 7 corresponds to the through hole 8 one by one, the plug rod 6 is inserted into the step hole 7 and the through hole 8 in turn, the bottom end of the plug rod 6 is plugged into the limit assembly 4, and the limit assembly 4 limits the plug rod 6. The two steel box beams 1 are docked, the slider 10 is inserted into the housing 9, and under the guidance and push of the wedge block 12, the limit block 11 gradually enters the side wall of the steel box beam 1, so that the side walls of the two steel box beams 1 are fixed. The plug rod 6 is inserted into the other steel box beam 1, and the plug rod 6 is limited to the limit assembly 4, and then the overall fixation is completed. When welding the connection seam, the exposed gap between the plug rod 6 and the steel box beam 1 and the exposed gap between the limit block 11 and the steel box beam 1 can also be welded to make the whole more solid.

[0034] In the splicing mechanism for erecting steel box beams of this embodiment, due to the provision of the first connection mechanism and the second connection mechanism, the insertion rod 6 penetrates the steel box beam 1 and the first plate body 2 or the second plate body 3 and is limited to the limit assembly 4, so that the middle part of the steel box beam 1 can be fixedly connected. When the two steel box beams 1 are butted, the slider 10 slides into the housing 9, and the limit block 11 enters the side wall of the steel box beam 1 under the guidance of the wedge block 12, so that the two ends of the steel box beam 1 are connected and reinforced. The operation is relatively simple, which saves labor and operation time, and improves the construction efficiency while making the connection more stable. Due to the provision of the limit assembly 4, one end of the insertion rod 6 is limited to the step hole 7, and the outer contour of the other end is matched with the clamping block 404. The other end of the insertion rod 6 is clamped by the clamping block 404, so that two adjacent steel box beams 1 can be connected, and the integrity of the structural connection is enhanced; under the action of the damping assembly 5, the dynamic load pressure at the connection can be relieved, the firmness of the connection position can be enhanced, the service life can be enhanced, and the rework rate of later maintenance can be reduced.

[0035] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0036] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A splicing mechanism for erecting a steel box girder, characterized in that: It comprises a first connecting mechanism and a second connecting mechanism which are arranged between two steel box girders (1), wherein the first connecting mechanism is connected to the middle of the connecting position of the two steel box girders (1), and the second connecting mechanism is connected to both sides of the connecting position of the two steel box girders (1); The first connection mechanism comprises a first plate body (2) and a second plate body (3) arranged in parallel, a shock absorbing assembly (5) is arranged between the first plate body (2) and the second plate body (3), the first plate body (2) and the second plate body (3) are both fixedly connected to a limiting assembly (4), the steel box beam (1) passes through a plug rod (6), and one end of the plug rod (6) is limited to the limiting assembly (4); The second connection mechanism comprises a housing (9) and a slider (10) sliding in the housing (9); the housing (9) and the slider (10) are respectively fixedly connected to two steel box beams (1); one end of the slider (10) is slidably connected to a limit block (11); the limit block (11) is limited to a side wall of the steel box beam (1); and a wedge block (12) is provided in the housing (9) for pushing the limit block (11) to slide.

2. The splicing mechanism for erecting a steel box girder according to claim 1, characterized in that: The limiting assembly (4) comprises two symmetrically arranged fixing plates (401), the opposite side walls of the two fixing plates (401) are fixedly connected to a telescopic rod (402), the telescopic rod (402) is sleeved with a first spring (403), the other end of the telescopic rod (402) is fixedly connected to a clamping block (404), and one end of the insertion rod (6) is clamped between the two clamping blocks (404).

3. The splicing mechanism for erecting a steel box girder according to claim 2, characterized in that: The block (404) is provided with an inclined portion (405) and a slot (406) on a side wall close to the insertion rod (6); the inclined portion (405) is provided at the upper and lower ends of the slot (406); and the side wall at one end of the insertion rod (6) is adapted to the side wall profile close to the block (404).

4. The splicing mechanism for erecting a steel box girder according to claim 3, characterized in that: The insertion rod (6) is arranged in a T-shape, and the steel box beam (1) is provided with a stepped hole (7) adapted to the insertion rod (6).

5. The steel box girder erection splicing mechanism according to claim 4, characterized in that: The outer side walls of the shell (9) are respectively fixedly connected to the top wall and two side walls of the steel box girder (1), the slider (10) is fixedly connected to the side wall of another steel box girder (1), and the outer contour of the slider (10) is adapted to the inner contour of the shell (9).

6. The steel box girder erection splicing mechanism according to claim 5, characterized in that: The sliding block (10) is fixedly connected to a sliding bar (13), and a sliding groove (14) matching the sliding bar (13) is provided on the inner wall of the housing (9).

7. The steel box girder erection splicing mechanism according to claim 1, characterized in that: The shock absorbing assembly (5) comprises a rod body (501) fixedly connected to the first plate body (2) and the second plate body (3); the bottom end of the rod body (501) is sleeved on the limit plate (502); and the bottom end of the rod body (501) is fixedly connected to a buffer block (503).

8. The steel box girder erection splicing mechanism according to claim 7, characterized in that: The limiting plate (502) is in a "X" shape, and a second spring (504) is arranged between the rod body (501) and the top wall of the limiting plate (502), and the second spring (504) is sleeved on the rod body (501).