Condensation, adsorption and recovery device for dichloromethane gas
By using resin adsorbent and gas recycler cooling technology in dichloromethane waste gas treatment, combined with nitrogen purge and indirect melt frost design, the problems of adsorbent desorption and corrosion of Freon refrigeration system are solved, and efficient Dichloromethane removal and environmentally friendly emissions.
Patent Information
- Application Number
- CN202323441407.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-16
AI Technical Summary
The prior art has problems such as carbon ash generated when desorbing adsorbents, difficulty in maintaining equipment, corrosion and leakage of Freon refrigeration system when dealing with dichloromethane exhaust gas, and it is difficult to meet strict emission standards and environmental protection requirements.
A condensation and adsorption recovery device for dichloromethane gas is designed, and the room temperature adsorption and high temperature steam desorption are used to combine nitrogen purge and cooling, and the cooling capacity is recovered by gas-gas heat recycler, using indirect condensation and indirect melting. The refrigeration unit structure of the frost avoids direct contact between Freon refrigerant and aqueous dichloromethane.
It effectively solves the carbon ash problem during adsorbent desorption, reduces equipment maintenance costs, achieves efficient dichloromethane removal rate, avoids corrosion and leakage of Freon refrigeration system, and meets strict emission standards and environmental protection requirements.
Smart Images

Figure CN222019231U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of waste gas treatment, and in particular relates to a condensation adsorption recovery system for gas. Background Art
[0002] The Petrochemical Industry Pollutant Emission Standard GB31571-2015 requires that the removal rate of non-methane total hydrocarbons at the organic waste gas outlet be ≥ 97%, and the emission limit of dichloromethane, an organic characteristic pollutant in the waste gas, be 100 mg / m 3 .
[0003] As VOCs waste gas emission standards become increasingly stringent, the traditional -70℃ condensation plus pressure swing adsorption (vacuum pump desorption) system and process are facing severe challenges. At the same time, in the existing technology, the activated carbon adsorbent is prone to produce carbon ash under pressure when it is purged after desorption. There will be problems such as black smoke blowing out of the emptying cylinder during adsorption of the activated carbon adsorbent, and the carbon ash produced by the activated carbon adsorbent is easy to clog the vacuum pump and adsorption valve. At the same time, the ratio of activated carbon is very large, and it is also faced with the cost pressure of replacing the solid waste and environmental protection issues.
[0004] Therefore, how to recover dichloromethane from tail gas / waste gas in a greener and more environmentally friendly way is a problem that deserves to be studied and solved urgently.
[0005] At the same time, dichloromethane (CH2Cl2) has a boiling point of 39.8°C. It is a colorless, transparent, volatile liquid with a pungent aromatic odor. It is toxic when inhaled. It is volatile at a low boiling point. Its vapor can form an explosive mixture with air. It is easy to evaporate during industrial production and cause environmental pollution. Dry dichloromethane is non-corrosive, but it is corrosive when it contains water (because it contains free chlorine Cl - , so it is corrosive), its strength varies with Cl - The content varies. - It is the main cause of pitting and crevice corrosion of stainless steel, and can cause perforation accidents in severe cases. This characteristic of dichloromethane is particularly detrimental to the refrigeration unit in the gas condensation adsorption recovery process. At the same time, the Freon refrigeration system of the refrigeration unit cannot leak, so it is mostly welded, making equipment maintenance and replacement very difficult.
[0006] Therefore, in the recovery of dichloromethane gas / waste gas, how to obtain a recovery process that can safely liquefy dichloromethane, discharge it in an environmentally friendly manner, and significantly reduce or even avoid corrosion, pollution or leakage to the Freon refrigeration system of the refrigeration unit is also a problem that deserves study and needs to be solved urgently. Summary of the invention
[0007] Purpose of the invention: In order to overcome the deficiencies in the prior art, the utility model provides a condensation adsorption recovery device for dichloromethane gas.
[0008] Technical solution: The utility model provides a condensation adsorption recovery device for dichloromethane gas, which includes a gas transmission unit, a gas-to-gas heat recovery unit connected to the gas path of the gas transmission unit, a main condensation unit connected to the gas path of the gas-to-gas heat recovery unit, a carrier unit connected to the main condensation unit, a refrigeration unit connected to the carrier unit, a resin adsorption unit connected to the gas-to-gas heat recovery unit, a desorption cooling unit connected to the resin adsorption unit, and an exhaust unit connected to the resin adsorption unit;
[0009] The resin adsorption unit includes more than two adsorption tanks, each of which is filled with a resin adsorbent, and each of which is provided with an adsorption inlet valve, an adsorption outlet valve, a desorption inlet valve, a purge inlet valve and a desorption outlet valve adapted thereto; each desorption inlet valve is connected to a desorption steam inlet; each purge inlet valve is connected to a purge nitrogen inlet.
[0010] Preferably, the gas delivery unit includes a gas delivery induced draft fan, and an anti-explosion type air intake flame arrester connected to the air path of the gas delivery induced draft fan; an oil and gas pressure transmitter is also provided on the gas pipeline whose air intake end of the air intake flame arrester is connected to the dichloromethane gas inlet;
[0011] The resin adsorption unit is provided with an adsorption bypass valve; the air inlet end of the adsorption bypass valve is connected to the main condensation unit, and the air outlet end is connected to the exhaust unit.
[0012] Preferably, the gas-to-gas heat recovery unit includes an gas-to-gas heat regenerator, the hot side air inlet end of the gas-to-gas heat regenerator is connected to the air supply induced draft fan, the hot side air outlet end of the gas-to-gas heat regenerator is connected to the air inlet end of the main condensing unit, the main condensing unit air outlet end is connected to the cold side air inlet end of the gas-to-gas heat regenerator, and the liquid outlet of the gas-to-gas heat regenerator is connected to the liquid inlet of the condenser.
[0013] Preferably, the main condensing unit comprises a gas circuit switching valve A, a gas circuit switching valve B, a main condenser A, a main condenser B, a one-way valve A, a one-way valve B and a coalescer;
[0014] The gas path inlets of the gas path switching valve A and the gas path switching valve B are both connected to the hot side gas outlet of the gas-to-gas heat regenerator; the liquid outlets of the main condenser A and the main condenser B are both connected to the coalescer; the coalescer separates the sewage and dichloromethane and outputs them separately;
[0015] The gas path outlet of the gas path switching valve A is connected to the air inlet end of the main condenser A, the air outlet end of the main condenser A is connected to the air inlet end of the one-way valve A, and the air outlet end of the one-way valve A is connected to the cold side air inlet end of the air-to-air regenerator;
[0016] The gas path outlet of the gas path switching valve B is connected to the air inlet end of the main condenser B; the air outlet end of the main condenser B is connected to the air inlet end of the one-way valve B, and the air outlet end of the one-way valve B is connected to the cold side air inlet end of the air-to-air heat exchanger.
[0017] Further preferably, the resin adsorption unit includes an adsorption tank A, an adsorption tank B, an adsorption inlet valve A, an adsorption inlet valve B, an adsorption outlet valve A, an adsorption outlet valve B, a desorption inlet valve A, a desorption inlet valve B, a purge inlet valve A, a purge inlet valve B, a desorption outlet valve A, a desorption outlet valve B, and an adsorption bypass valve;
[0018] The cold side gas outlet end of the gas-to-gas regenerator is connected to one end of the adsorption bypass valve, one end of the adsorption inlet valve A and one end of the adsorption inlet valve B; the other end of the adsorption bypass valve is connected to the exhaust unit; the other end of the adsorption inlet valve A is connected to the lower end of the adsorption tank A, and the other end of the adsorption inlet valve B is connected to the lower end of the adsorption tank B;
[0019] The upper end of the adsorption tank A is connected to one end of the adsorption outlet valve A, and the upper end of the adsorption tank B is connected to one end of the adsorption outlet valve B;
[0020] The other end of the adsorption outlet valve A and the other end of the adsorption outlet valve B are both connected to the exhaust unit.
[0021] Further preferably, one end of the desorption inlet valve A is connected to the upper end of the adsorption tank A, and one end of the desorption inlet valve B is connected to the upper end of the adsorption tank B; the other end of the desorption inlet valve A and the other end of the desorption inlet valve B are both connected to the desorption steam inlet;
[0022] One end of the purge inlet valve A is connected to the upper end of the adsorption tank A, and one end of the purge inlet valve B is connected to the upper end of the adsorption tank B; the other end of the purge inlet valve A and the other end of the purge inlet valve B are both connected to the purge nitrogen inlet;
[0023] One end of the desorption outlet valve A is connected to the lower end of the adsorption tank A, and one end of the desorption outlet valve B is connected to the lower end of the adsorption tank B;
[0024] The other end of the desorption outlet valve A and the other end of the desorption outlet valve B are both connected to the input end of the multi-stage cooler of the analytical cooling unit.
[0025] Preferably, the exhaust unit comprises an exhaust cylinder, an anti-explosion type outlet flame arrester, and a concentration detector; the concentration detector is arranged in the middle of the tube body of the exhaust cylinder;
[0026] The air inlet of the emptying cylinder is connected with the other end of the adsorption bypass valve, the other end of the adsorption outlet valve A and the other end of the adsorption outlet valve B through the anti-explosion type outlet flame arrester.
[0027] More preferably, the carrier unit includes an intermediate heat exchanger, a cold carrier pump, a cold carrier inlet valve A, a cold carrier inlet valve B, a cold carrier outlet valve A, a cold carrier outlet valve B, a cold carrier expansion tank, a heat carrier pump, a heat carrier inlet valve A, a heat carrier inlet valve B, a heat carrier outlet valve A, a heat carrier outlet valve B, and a heat carrier expansion tank; the condensation adsorption recovery device is also provided with a carrier refrigeration circulation system and a carrier defrosting circulation system;
[0028] The carrier refrigeration cycle system comprises: a carrier cold liquid outlet valve A and a carrier cold liquid outlet valve B arranged in parallel, an intermediate heat exchanger, a carrier cold pump, a carrier cold liquid inlet valve A and a carrier cold liquid inlet valve B arranged in parallel, which are connected in sequence;
[0029] The outlet of the cold-carrying pump is connected to the carrier inlet of the main condenser A through the cold-carrying liquid inlet valve A, the carrier outlet of the main condenser A is connected to the cold-carrying liquid outlet valve A, the other end of the cold-carrying liquid outlet valve A is connected to the cold-carrying inlet of the intermediate heat exchanger, and the cold-carrying outlet of the intermediate heat exchanger is connected to the inlet of the cold-carrying pump;
[0030] The outlet of the cold-carrying pump is connected to the carrier inlet of the main condenser B through the cold-carrying liquid inlet valve B, the carrier outlet of the main condenser B is connected to the cold-carrying liquid outlet valve B, the other end of the cold-carrying liquid outlet valve B is connected to the cold-carrying inlet of the intermediate heat exchanger, and the cold-carrying outlet of the intermediate heat exchanger is connected to the inlet of the cold-carrying pump;
[0031] The carrier defrost circulation system comprises: a heat carrier outlet valve A and a heat carrier outlet valve B arranged in parallel, a supercooler, a heat carrier pump, and a heat carrier inlet valve A and a heat carrier inlet valve B arranged in parallel, which are connected in sequence;
[0032] The outlet of the heat carrier pump is connected to the carrier inlet of the main condenser A through the heat carrier inlet valve A, the carrier outlet of the main condenser A is connected to the heat carrier outlet valve A, the other end of the heat carrier outlet valve A is connected to the heat carrier inlet of the subcooler, and the heat carrier outlet of the subcooler is connected to the inlet of the heat carrier pump;
[0033] The outlet of the heat carrier pump is connected to the carrier inlet of the main condenser B through the heat carrier inlet valve B, the carrier outlet of the main condenser B is connected to the heat carrier outlet valve B, the other end of the heat carrier outlet valve B is connected to the heat carrier inlet of the subcooler, and the heat carrier outlet of the subcooler is connected to the inlet of the heat carrier pump.
[0034] More preferably, a cooling expansion tank is provided on the pipeline connecting the intermediate heat exchanger and the cooling pump.
[0035] More preferably, a heat expansion tank is provided on the pipeline connecting the subcooler and the heat pump.
[0036] Preferably, the analytical cooling unit comprises a multi-stage cooler and a coalescing separation tank; the gas outlet end of the multi-stage cooler is connected to the gas inlet end of the gas inlet flame arrester of the gas transmission unit; the liquid outlet end of the multi-stage cooler is connected to the liquid inlet end of the coalescing separation tank;
[0037] The refrigeration unit comprises a refrigeration compressor, a water-cooled condenser, a subcooler and a refrigeration throttling device connected in sequence;
[0038] The other end of the refrigeration throttling device is communicated with the refrigerant inlet of the intermediate heat exchanger, and the refrigerant outlet of the intermediate heat exchanger is communicated with the input end of the refrigeration compressor;
[0039] The heat carrier outlet of the subcooler is connected to the inlet of the heat carrier pump, and the heat carrier inlet of the subcooler is connected to the other end of the heat carrier liquid outlet valve A and the other end of the heat carrier liquid outlet valve B.
[0040] Beneficial effects: The condensation adsorption recovery device for dichloromethane gas provided by the utility model has the following advantages over the prior art:
[0041] (1) Based on the structure and construction of the condensation adsorption recovery device of dichloromethane gas provided by the utility model, the traditional pressure swing adsorption (after normal temperature adsorption, vacuum pump is used for desorption) can be replaced by temperature swing adsorption (first adsorption at room temperature, then high temperature desorption, and then purging and cooling after desorption). On the one hand, a specific resin adsorbent is selected for normal temperature adsorption, on the other hand, high temperature steam is used for desorption / analysis, and on the third hand, nitrogen is used for purging and cooling. When nitrogen is purged with the resin adsorbent, the fine adsorbent will enter the sewage tank together with the water and will not be discharged into the air to pollute the environment. This effectively improves the problems of the traditional activated carbon adsorbent producing carbon ash under pressure when purging after desorption, black smoke blowing out of the emptying tube during adsorption of the activated carbon adsorbent, and the carbon ash produced by the activated carbon adsorbent easily clogging the vacuum pump and the adsorption valve. This is not only green and environmentally friendly, but also safer, and effectively reduces maintenance costs.
[0042] (2) In the condensation adsorption recovery device for dichloromethane gas provided by the utility model, a specific resin adsorbent is selected and steam is used for desorption without vacuuming. On the one hand, there is no need for vacuum pumps, cooling systems and other equipment required by traditional desorption methods. On the other hand, it effectively solves the problem that traditional activated carbon desorption requires vacuuming and the wall thickness of the adsorption tank needs to be increased to meet safety requirements. In the condensation adsorption recovery device for dichloromethane gas provided by the utility model, the wall thickness of the adsorption tank does not need to be increased, and the equipment and structure are more streamlined, ingenious and reasonable, while greatly reducing the equipment cost; at the same time, the utility model adopts resin adsorption, which is hydrophobic, and solves the problem that the adsorption effect of conventional activated carbon is greatly affected by moisture, and the adsorption performance is significantly reduced after multiple stripping and regeneration, and the tail gas does not meet the standard. In the utility model, the humidity and moisture of the dichloromethane tail gas have no effect on the performance of the hydrophobic resin adsorbent, the adsorption performance is stable, easy to regenerate and does not need to be replaced, effectively reducing the large-scale generation of hazardous waste.
[0043] (3) Furthermore, the main condenser of the utility model is connected in parallel with two circuits. When the water vapor in the dichloromethane gas / exhaust gas frosts and blocks the exhaust gas channel at low temperature, the two circuits can be switched alternately (the two circuits are switched alternately by the gas circuit switching valve A and the gas circuit switching valve B), thereby stably ensuring the continuous operation of the entire system.
[0044] (4) Furthermore, based on the structure and construction provided by the utility model, the coldness of the dichloromethane gas / tail gas can be recovered and utilized through an air-to-air heat exchanger (also called an air-cooled recovery device): the dichloromethane gas / tail gas at room temperature of about 30°C enters the air-to-air heat exchanger device, is first pre-cooled to 6±3°C in the air-to-air heat exchanger, and then enters the main condenser for multi-stage cooling to -65±5°C, and then the low-concentration dichloromethane gas / tail gas returns to the air-to-air heat exchanger 201 again and the temperature rises to 20-25°C, and the low-concentration dichloromethane gas / tail gas at room temperature exits the condensation recovery unit and enters the resin adsorption unit; in the above process, the coldness of the gas circuit is efficiently recovered and utilized, and at the same time, there is no need to configure the air-to-air heat exchanger with related equipment to provide a cold source, thereby reducing the configuration of the main cooler load, greatly reducing the power consumption of the overall device, and being more energy-saving and environmentally friendly.
[0045] (5) Further, based on the structure and construction provided by the utility model, the Freon refrigeration cycle of the refrigeration unit realizes indirect condensation of the main condenser through the refrigerant, and the Freon refrigeration cycle of the refrigeration unit realizes indirect defrosting of the main condenser through the heat carrier, ensuring the stability of the multi-stage cold field temperature of the main condenser. Experimental verification shows that the methylene chloride concentration at the outlet of the main condenser can be stabilized at 10g / m 3 After that, it is transferred back to the gas-to-gas heat recovery unit for cold recovery and then safely enters the resin adsorption unit. After adsorption by the high-efficiency resin, the concentration of dichloromethane can reach 60mg / m 3The following is to achieve environmentally friendly emissions.
[0046] (6) Further, based on the structure and construction provided by the utility model, the condensation of the utility model is indirect condensation. During condensation, the Freon refrigerant in the refrigeration unit does not use the same heat exchanger as the dichloromethane tail gas for heat exchange (the Freon refrigeration cycle provides cooling capacity for the intermediate heat exchanger; the Freon refrigerant in the Freon refrigeration cycle exchanges heat with the secondary coolant in the carrier refrigeration cycle in the intermediate heat exchanger, and the secondary coolant in the carrier refrigeration cycle exchanges heat with the dichloromethane gas / tail gas in the main condenser of the main condensing unit); at the same time, based on the structure and construction provided by the utility model, the defrosting of the utility model is indirect defrosting. During defrosting, the Freon refrigerant in the refrigeration unit does not use the same heat exchanger as the dichloromethane tail gas for heat exchange (the Freon refrigeration cycle provides cooling capacity for the intermediate heat exchanger; the Freon refrigerant in the Freon refrigeration cycle exchanges heat with the secondary coolant in the carrier refrigeration cycle in the intermediate heat exchanger, and the secondary coolant in the carrier refrigeration cycle exchanges heat with the dichloromethane gas / tail gas in the main condensing unit). The subcooler provides heat; the Freon refrigerant in the Freon refrigeration cycle exchanges heat with the heat carrier in the carrier defrost cycle in the subcooler, and the heat carrier in the carrier defrost cycle exchanges heat with dichloromethane gas / exhaust gas in the main condenser of the main condensing unit); based on the above structure and construction provided by the utility model, not only is it effectively avoided that the aqueous dichloromethane solution causes corrosion / pollution to the heat exchanger in the Freon refrigeration cycle of the refrigeration unit (the intermediate heat exchanger and subcooler in the Freon refrigeration cycle), but also the risk of direct contamination of the Freon refrigerant by the aqueous dichloromethane solution is greatly reduced, the risk of leakage of the Freon refrigeration system is effectively avoided / mitigated, and the possibility of on-site repair welding and hot work in the Freon refrigeration cycle of the refrigeration unit is also effectively avoided / reduced.
[0047] (7) Furthermore, the utility model directly condenses dichloromethane gas / tail gas through the refrigerant in the carrier refrigeration cycle. The temperature difference between the refrigerant entering and leaving the same main condenser is about 5°C. The refrigerant is a closed cycle without phase change in the carrier refrigeration cycle. The condensation temperature of the dichloromethane tail gas fluctuates little, and the system operating temperature is stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 This is a schematic diagram of the structure of a condensation adsorption recovery device for dichloromethane gas provided in this embodiment.
[0049] In the figure, 100-gas transmission unit, 200-gas-gas heat recovery unit, 300-main condensing unit, 400-resin adsorption unit, 500-exhaust unit, 600-refrigeration unit, 700-carrier unit, 800-analysis cooling unit; 101-gas transmission induced draft fan, 102-air intake flame arrester, 103-oil and gas pressure transmitter, 201-gas-gas heat recovery unit A, 301-gas path switching valve A, 302-gas circuit switching valve A, 303-gas circuit switching valve B, 304-gas circuit switching valve C, 305-gas circuit switching valve A, 306-gas circuit switching valve C, 307-gas circuit switching valve B, 308-gas transmission induced draft fan, 102-air intake flame arrester, 103-oil and gas pressure transmitter, 104-gas-gas heat recovery unit A, 104-gas circuit switching valve A, 104-gas circuit switching valve C, 104-gas circuit switching valve A, 104-gas transmission induced draft fan, 104-gas intake flame arrester, 104-gas pressure transmitter 02-gas circuit switching valve B, 303-main condenser A, 304-main condenser B, 305-check valve A, 306-check valve B, 307-coalescer; 401-adsorption tank A, 402-adsorption tank B, 404-adsorption inlet valve A, 405-adsorption inlet valve B, 407-adsorption outlet valve A, 408-adsorption outlet valve B, 410-desorption inlet valve A, 411-desorption inlet valve B, 412-desorption outlet valve B, 413-desorption outlet valve A, 414-desorption outlet valve B, 415-desorption outlet valve A, 416-desorption outlet valve B, 417-desorption outlet valve A, 418-desorption outlet valve B, 419-desorption outlet valve A, 420-desorption outlet valve B, 421-desorption outlet valve A, 422-desorption outlet valve B, 423-desorption outlet valve A, 424-desorption outlet valve B, 425-desorption outlet valve A, 426-desorption outlet valve B, 427-desorption outlet valve A, 428-desorption outlet valve B, 429-desorption outlet valve A, 430-desorption outlet valve B, 431-desorption outlet valve A, 432-desorption outlet valve B, 433-desorption outlet valve A, 434-desorption outlet valve B, 435-desorption outlet valve A, 436-desorption outlet valve B, 437-desorption outlet valve A, 438-desorption outlet valve B, 439-desorption outlet valve 3-Purge inlet valve A, 414-Purge inlet valve B, 416-Desorption outlet valve A, 417-Desorption outlet valve B, 419-Adsorption bypass valve; 501-Emptying cylinder, 502-Anti-explosion type outlet flame arrester, 503-Concentration detector; 601-Refrigeration compressor, 602-Water-cooled condenser, 603-Subcooler, 604-Refrigeration throttling device; 701-Intermediate heat exchanger, 702-Cooling pump , 703-cooling liquid inlet valve A, 704-cooling liquid inlet valve B, 705-cooling liquid outlet valve A, 706-cooling liquid outlet valve B, 707-cooling expansion tank, 708-heat pump, 709-heat inlet valve A, 710-heat inlet valve B, 711-heat outlet valve A, 712-heat outlet valve B, 713-heat expansion tank; 801-multi-stage cooler, 802-coagulation and separation tank. DETAILED DESCRIPTION
[0050] The present invention will be further described in detail below in conjunction with the embodiments and drawings. The following embodiments do not limit the present invention.
[0051] This embodiment provides a condensation adsorption recovery device for dichloromethane gas, which is as follows Figure 1 As shown, it includes a gas transmission unit 100, a gas-to-gas heat recovery unit 200 connected to the gas transmission unit 100 by gas circuit, a main condensing unit 300 connected to the gas-to-gas heat recovery unit 200 by gas circuit, a carrier unit 700 connected to the carrier pipeline of the main condensing unit 300, a refrigeration unit 600 connected to the carrier unit 700 (it can also be said to be a refrigeration unit 600 that exchanges heat with the carrier unit 700), a resin adsorption unit 400 connected to the gas-to-gas heat recovery unit 200, a desorption cooling unit 800 connected to the resin adsorption unit 400, and an exhaust unit 500 connected to the resin adsorption unit 400;
[0052] The resin adsorption unit 400 includes more than two adsorption tanks, each of which is filled with a resin adsorbent, and each of which is provided with an adsorption inlet valve, an adsorption outlet valve, a desorption inlet valve, a purge inlet valve, and a desorption outlet valve adapted thereto; each desorption inlet valve is connected to a desorption steam inlet; each purge inlet valve is connected to a purge nitrogen inlet. Specifically in this embodiment, the resin adsorption unit 400 has two adsorption tanks, each of which is equipped with an adsorption inlet valve, an adsorption outlet valve, a desorption inlet valve, a purge inlet valve, and a desorption outlet valve.
[0053] In this embodiment, the resin adsorption unit 400 is provided with an adsorption bypass valve 419 ; the air inlet end of the adsorption bypass valve 419 is connected to the main condensing unit 300 , and the air outlet end is connected to the exhaust unit 500 .
[0054] In this embodiment, the gas delivery unit 100 includes a gas delivery fan 101, and an anti-explosion type air intake flame arrester 102 (also referred to as an anti-detonation type air intake flame arrester) connected to the air path of the gas delivery fan 101; an oil and gas pressure transmitter 103 is also provided on the gas pipeline whose air inlet end is connected to the dichloromethane gas inlet.
[0055] In this embodiment, the above-mentioned air-to-air heat recovery unit 200 includes an air-to-air heat exchanger 201, the hot side air inlet end of the air-to-air heat exchanger 201 is connected to the air supply fan 101, the hot side air outlet end of the air-to-air heat exchanger 201 is connected to the air inlet end of the main condensing unit 300, the air outlet end of the main condensing unit 300 is connected to the cold side air inlet end of the air-to-air heat exchanger 201 through a one-way valve, and the liquid outlet of the air-to-air heat exchanger 201 is connected to the liquid inlet of the coalescer 307 (also known as a liquid collecting tank or a first coalescing and separation tank).
[0056] In this embodiment, the main condensing unit 300 includes a gas circuit switching valve A301, a gas circuit switching valve B302, a main condenser A303, a main condenser B304, a one-way valve A305, a one-way valve B306 and a coalescer 307;
[0057] The gas path inlets of the gas path switching valve A301 and the gas path switching valve B302 are both connected to the hot side gas outlet end of the gas-to-gas heat exchanger 201; the gas path outlets (i.e., gas outlet ends) of the one-way valve A305 and the one-way valve B306 are both connected to the cold side gas inlet end of the gas-to-gas heat exchanger 201; the liquid outlets of the main condenser A303 and the main condenser B304 are both connected to the coalescer 307; the coalescer 307 separates the sewage and dichloromethane and outputs / transports them to the user-specified location respectively;
[0058] The gas outlet of the gas circuit switching valve A301 is connected to the air inlet of the main condenser A303, the gas outlet of the main condenser A303 is connected to the air inlet of the one-way valve A305, and the gas outlet of the one-way valve A305 is connected to the cold side air inlet of the gas-to-gas regenerator 201;
[0059] The gas outlet of the gas circuit switching valve B302 is connected to the air inlet end of the main condenser B304; the gas outlet end of the main condenser B304 is connected to the air inlet end of the one-way valve B306, and the gas outlet end of the one-way valve B306 is connected to the cold side air inlet end of the air-to-air heat exchanger 201.
[0060] In this embodiment, two adsorption tanks are configured for dichloromethane waste gas adsorption, of which one tank is used for adsorption and the other tank is used for desorption and purging. That is: through two adsorption tanks, one for adsorption and one for analysis, normal temperature resin adsorption, high temperature steam analysis and nitrogen purging and cooling are performed alternately according to the set cycle. The adsorption tank A and the adsorption tank B of the temperature-swing adsorption unit take turns to perform normal temperature adsorption-high temperature steam analysis-nitrogen purging and cooling (such as first adsorption tank A performs normal temperature adsorption, adsorption tank B performs high temperature steam analysis and nitrogen purging and cooling and is ready for use, and then adsorption tank B performs normal temperature adsorption, adsorption tank A performs high temperature steam analysis and nitrogen purging and cooling and is ready for use...), completing one adsorption cycle after another.
[0061] In this embodiment, the resin adsorption unit 400 includes two adsorption tanks: an adsorption tank A401 and an adsorption tank B402. Figure 1 As shown, the resin adsorption unit 400 includes an adsorption tank A401, an adsorption tank B402, an adsorption inlet valve A404, an adsorption inlet valve B405, an adsorption outlet valve A407, an adsorption outlet valve B408, a desorption inlet valve A410, a desorption inlet valve B411, a purge inlet valve A413, a purge inlet valve B414, a desorption outlet valve A416, a desorption outlet valve B417, and an adsorption bypass valve 419;
[0062] The cold side gas outlet end of the gas-to-gas regenerator 201 is connected to one end of the adsorption bypass valve 419, one end of the adsorption inlet valve A404 and one end of the adsorption inlet valve B405; the other end of the adsorption bypass valve 419 is connected to the exhaust unit 500; the other end of the adsorption inlet valve A404 is connected to the lower end of the adsorption tank A401, and the other end of the adsorption inlet valve B405 is connected to the lower end of the adsorption tank B402;
[0063] The upper end of the adsorption tank A401 is connected to one end of the adsorption outlet valve A407, and the upper end of the adsorption tank B402 is connected to one end of the adsorption outlet valve B408;
[0064] The other end of the adsorption outlet valve A407 and the other end of the adsorption outlet valve B408 are both connected to the exhaust unit 500.
[0065] One end of the desorption inlet valve A410 is connected to the upper end of the adsorption tank A401, and one end of the desorption inlet valve B411 is connected to the upper end of the adsorption tank B402; the other end of the desorption inlet valve A410 and the other end of the desorption inlet valve B411 are both connected to the desorption steam inlet;
[0066] One end of the purge inlet valve A413 is connected to the upper end of the adsorption tank A401, and one end of the purge inlet valve B414 is connected to the upper end of the adsorption tank B402; the other end of the purge inlet valve A413 and the other end of the purge inlet valve B414 are both connected to the purge nitrogen inlet;
[0067] One end of the above-mentioned desorption outlet valve A416 is connected to the lower end of the adsorption tank A401, and one end of the desorption outlet valve B417 is connected to the lower end of the adsorption tank B402;
[0068] The other end of the desorption outlet valve A416 and the other end of the desorption outlet valve B417 are both connected to the input end (inlet end) of the multi-stage cooler 801 of the analytical cooling unit 800.
[0069] In this embodiment, the exhaust unit 500 includes an exhaust tube 501, an anti-explosion type outlet flame arrester 502, and a concentration detector 503; the concentration detector 503 is arranged in the middle of the tube body of the exhaust tube 501 (such as the center of the tube body).
[0070] The air inlet of the above-mentioned emptying cylinder 501 is connected to the other end of the adsorption bypass valve 419, the other end of the adsorption outlet valve A407 and the other end of the adsorption outlet valve B408 through the anti-explosion type outlet flame arrester 502.
[0071] In this embodiment, specifically, the above-mentioned carrier unit 700 includes an intermediate heat exchanger 701, a cold carrier pump 702, a cold carrier liquid inlet valve A703, a cold carrier liquid inlet valve B704, a cold carrier liquid outlet valve A705, a cold carrier liquid outlet valve B706, a cold carrier expansion tank 707, a heat carrier pump 708, a heat carrier liquid inlet valve A709, a heat carrier liquid inlet valve B710, a heat carrier liquid outlet valve A711, a heat carrier liquid outlet valve B712, and a heat carrier expansion tank 713; the condensation adsorption recovery device is also provided with a carrier refrigeration cycle system and a carrier defrost cycle system; the refrigeration unit 600 provides cold air for the cold carrier in the carrier refrigeration cycle system, and provides heat for the heat carrier in the carrier defrost cycle system; the carrier refrigeration cycle system provides cold air for the main condensation unit 300, and the carrier defrost cycle system provides heat for the main condensation unit 300.
[0072] The carrier refrigeration cycle system includes: a carrier cold liquid outlet valve A705 and a carrier cold liquid outlet valve B706 arranged in parallel, an intermediate heat exchanger 701, a carrier cold pump 702, and a carrier cold liquid inlet valve A703 and a carrier cold liquid inlet valve B704 arranged in parallel;
[0073] The outlet of the cold-carrying pump 702 is connected to the carrier inlet of the main condenser A303 via the cold-carrying liquid inlet valve A703 (that is, the outlet cold liquid of the cold-carrying pump 702 can be sent to the carrier inlet of the main condenser A303 via the cold-carrying liquid inlet valve A703), the carrier outlet of the main condenser A303 is connected to the cold-carrying liquid outlet valve A705, the other end of the cold-carrying liquid outlet valve A705 is connected to the cold-carrying inlet of the intermediate heat exchanger 701, and the cold-carrying outlet of the intermediate heat exchanger 701 is connected to the inlet of the cold-carrying pump 702;
[0074] The outlet of the cold-carrying pump 702 is connected to the carrier inlet of the main condenser B304 through the cold-carrying liquid inlet valve B704 (that is, the outlet cold liquid of the cold-carrying pump 702 can be sent to the carrier inlet of the main condenser B304 through the cold-carrying liquid inlet valve B704), the carrier outlet of the main condenser B304 is connected to the cold-carrying liquid outlet valve B706, the other end of the cold-carrying liquid outlet valve B706 is connected to the cold-carrying inlet of the intermediate heat exchanger 701, and the cold-carrying outlet of the intermediate heat exchanger 701 is connected to the inlet of the cold-carrying pump 702;
[0075] The carrier defrosting circulation system includes: a heat carrier outlet valve A711 and a heat carrier outlet valve B712 arranged in parallel, a subcooler 603, a heat carrier pump 708, and a heat carrier inlet valve A709 and a heat carrier inlet valve B710 arranged in parallel, which are connected in sequence;
[0076] The outlet of the heat carrier pump 708 is connected to the carrier inlet of the main condenser A303 via the heat carrier inlet valve A709 (that is, the hot liquid at the outlet of the heat carrier pump 708 can be sent to the carrier inlet of the main condenser A303 via the heat carrier inlet valve A709), the carrier outlet of the main condenser A303 is connected to the heat carrier outlet valve A711, the other end of the heat carrier outlet valve A711 is connected to the heat carrier inlet of the subcooler 603, and the heat carrier outlet of the subcooler 603 is connected to the inlet of the heat carrier pump 708;
[0077] The outlet of the heat pump 708 is connected to the carrier inlet of the main condenser B304 through the heat carrier inlet valve B710 (that is, the hot liquid at the outlet of the heat pump 708 can be delivered to the carrier inlet of the main condenser B304 through the heat carrier inlet valve B710), the carrier outlet of the main condenser B304 is connected to the heat carrier outlet valve B712, the other end of the heat carrier outlet valve B712 is connected to the heat carrier inlet of the subcooler 603, and the heat carrier outlet of the subcooler 603 is connected to the inlet of the heat pump 708.
[0078] In this embodiment, one end of the cold-carrying liquid inlet valve A703 and one end of the hot-carrying liquid inlet valve A709 are both connected to the liquid carrier inlet of the main condenser A303, and one end of the cold-carrying liquid outlet valve A705 and one end of the hot-carrying liquid outlet valve A711 are both connected to the liquid carrier outlet of the main condenser A303. One end of the cold-carrying liquid inlet valve B704 and one end of the hot-carrying liquid inlet valve B710 are both connected to the liquid carrier inlet of the main condenser B304, and one end of the cold-carrying liquid outlet valve B706 and one end of the hot-carrying liquid outlet valve B712 are both connected to the liquid carrier outlet of the main condenser B304. It can also be said that when the main condenser is cooling, its liquid carrier inlet / outlet is the cooling pipeline inlet / outlet, and when the main condenser is heating / defrosting, its liquid carrier inlet / outlet is the defrosting pipeline inlet / outlet.
[0079] In certain preferred embodiments, Figure 1 As shown, a cooling expansion tank 707 is provided on the pipeline connecting the intermediate heat exchanger 701 and the cooling pump 702. In some preferred embodiments, a heating expansion tank 713 is provided on the pipeline connecting the subcooler 603 and the heating pump 708.
[0080] In this embodiment, the above-mentioned analysis cooling unit 800 includes a multi-stage cooler 801 and a coalescing and separating tank 802 (also referred to as a second coalescing and separating tank); the cold source of the multi-stage cooler 801 is circulating cooling water or circulating chilled water; the gas outlet end of the multi-stage cooler 801 is connected to the gas inlet end of the air inlet flame arrester 102 located in the gas transmission unit 100 and connected to the dichloromethane gas inlet; the liquid outlet end of the multi-stage cooler 801 is connected to the liquid inlet end of the coalescing and separating tank 802; the coalescing and separating tank 802 separates and processes dichloromethane and water and outputs them separately, or it can be said that the condensate and sewage after stratification are transported to the user-specified location respectively.
[0081] In this embodiment, the refrigeration unit 600 includes a refrigeration compressor 601, a water-cooled condenser 602, a subcooler 603 and a refrigeration throttling device 604 connected in sequence; the other end of the refrigeration throttling device 604 is connected to the refrigerant inlet of the intermediate heat exchanger 701, and the refrigerant outlet of the intermediate heat exchanger 701 is connected to the input end of the refrigeration compressor 601; the cold source of the water-cooled condenser 602 is circulating cooling water; the heat carrier outlet of the subcooler 603 is connected to the inlet of the heat pump 708 (also called the heat carrier inlet), and the heat carrier inlet of the subcooler 603 is connected to the other end of the heat carrier liquid outlet valve A711 and the other end of the heat carrier liquid outlet valve B712.
[0082] In some preferred embodiments, the adsorption tank of the resin adsorption unit 400 uses spherical adsorption resin with a diameter of 0.3-1.2 mm as the adsorbent.
[0083] In certain preferred embodiments, the devices in the above-mentioned carrier unit 700 are connected by flanges.
[0084] In this embodiment, the heat carrier and the coolant are both propanol.
[0085] In some preferred embodiments, the resin adsorption unit 400 uses DLJ type polymer adsorption resin as the adsorbent.
[0086] In some preferred embodiments, a grid plate is provided at the bottom of the adsorption bed layer of each adsorption tank in the resin adsorption unit 400 to ensure strength, and a first filter mesh layer, a second steel mesh layer, and a third steel mesh layer are provided on the grid plate from bottom to top in sequence; a first layer of porcelain balls is filled between the first filter mesh layer and the second steel mesh layer to play a role in compaction and flow balance; a resin adsorbent is filled between the second steel mesh layer and the third steel mesh layer (i.e., an adsorption resin bed is formed to adsorb the solvent dichloromethane); a second layer of porcelain balls is laid on the third steel mesh layer to prevent splashing during adsorption and play a role in stabilizing flow. In some preferred embodiments, the first filter mesh layer is a 50-mesh 254SMO steel filter mesh for leak prevention.
[0087] Taking the condensation adsorption recovery device of dichloromethane gas provided in the above embodiment as an example, the relevant working principle / workflow is illustrated as follows: the dichloromethane gas is sequentially transported by the gas delivery unit 100 delivery fan (i.e., the gas delivery induced draft fan), firstly undergoes a preliminary pre-cooling treatment in the gas-to-gas heat recovery unit 200, and then enters the main condensation unit 300 for multi-stage condensation and liquid separation to precipitate most of the dichloromethane condensate, and the unprecipitated low-concentration dichloromethane gas / tail gas returns to the cold side air inlet end of the gas-to-gas heat exchanger 201 and enters the gas-to-gas heat exchanger for cold recovery, so that its temperature rises to 20-25°C, and then is output from the cold side air outlet end of the gas-to-gas heat exchanger 201 to the resin adsorption unit; the low-concentration dichloromethane gas is adsorbed and enriched in the resin adsorption unit 400 (normal temperature 20-25°C, normal pressure 5000Pa-6000Pa), and the qualified waste gas is discharged through the exhaust unit 500 after adsorption, completing the condensation adsorption recovery process of the dichloromethane gas.
[0088] After adsorption and enrichment in the resin adsorption unit 400, the dichloromethane aqueous solution is subjected to high-temperature steam analysis and nitrogen purging cooling, and then cooled, allowed to stand, aggregated, and separated in the analysis cooling unit 800 to obtain a large amount of condensed water and a small amount of dichloromethane (the relative density of dichloromethane is 1.33 (water = 1), and its solubility in water (20°C) is 10-20 g / L, with a low solubility in water and a large relative density to water); the dichloromethane condensate precipitated from the multi-stage condensation separation in the main condensation unit 300 is also buffered, allowed to stand, aggregated, and separated to obtain a large amount of dichloromethane and a small amount of sewage; thus, the treatment of the dichloromethane liquid solvent is completed.
[0089] Taking a certain adsorption tank as an example, the relevant working principles / workflows of normal temperature resin adsorption, high-temperature steam analysis and nitrogen purge cooling are illustrated as follows: the dichloromethane gas output by the main condensing unit 300 is recovered through the gas-to-gas heat exchanger and the temperature is raised, and then enters the corresponding adsorption tank through the corresponding adsorption inlet valve. The adsorption tank uses DLJ type polymer adsorption resin as an adsorbent to adsorb dichloromethane in the exhaust gas at normal temperature (at this time, the adsorption inlet valve and the adsorption outlet valve corresponding to the adsorption tank are both open, and the desorption inlet valve, the purge inlet valve and the desorption outlet valve corresponding to the adsorption tank are all closed). After a cycle of normal temperature adsorption is completed, the polymer adsorption resin is desorbed and regenerated with high-temperature steam, and the dichloromethane vapor generated by desorption and regeneration can be condensed, separated and recovered. The specific adsorption process is: the low-concentration methylene chloride waste gas discharged from the main condenser is recovered by the gas-to-gas heat exchanger and the temperature rises, and then enters the adsorption tank from the bottom to contact evenly with the polymer adsorption resin bed. The adsorption state is at room temperature of 20℃~25℃ and normal pressure of 5000Pa~6000Pa (here is the temperature and pressure of the gas in the adsorption tank in the adsorption state). The qualified waste gas after full adsorption by the resin is discharged from the emptying tube at high altitude, and the methylene chloride concentration in the qualified waste gas discharged at high altitude is not higher than 54.8mg / m 3 The removal rate of dichloromethane by the resin adsorption unit can reach over 99%.
[0090] After a certain period of normal temperature resin adsorption is completed, the adsorption inlet valve and the adsorption outlet valve corresponding to the adsorption tank are closed, and the desorption inlet valve and the desorption outlet valve corresponding to the adsorption tank are opened at the same time to enter the high-temperature steam desorption / analysis mode, and the high-polymer adsorption resin is desorbed / analyzed and regenerated with high-temperature low-pressure steam of 0.1MPa to 0.2MPa: high-temperature low-pressure steam is evenly sprayed from the top of the adsorption tank through a steam distributor (that is, a steam flow equalizer, and the steam distributor has a certain injection height from the top of the adsorption resin bed) onto the adsorption resin bed, and high-temperature low-pressure steam is passed into the adsorption resin bed for displacement desorption (that is, the high-temperature steam is in direct and sufficient contact with the adsorption resin bed for analytical regeneration of the adsorption resin). In this embodiment, the desorption state is adjustable at a high temperature of 110°C to 130°C (here is the temperature of the high-temperature steam during steam desorption / analysis), preferably 120°C, and the desorption time is adjustable from 1h to 2h to complete the displacement desorption.
[0091] After displacement desorption, the temperature of the adsorption resin bed is high. Close the desorption inlet valve corresponding to the adsorption tank, open the purge inlet valve corresponding to the adsorption tank, and introduce nitrogen at room temperature or pre-cooled to cool the adsorption resin bed and purge the steam until the adsorption bed drops to room temperature. After the nitrogen purge cooling work is completed, the adsorption tank enters the standby state and waits for the next adsorption cycle to adsorb again. The gas-liquid mixture output by the high-temperature steam analysis and nitrogen purge cooling in the adsorption tank is output to the multi-stage cooler through the desorption outlet valve corresponding to the adsorption tank for cooling and other related treatments.
[0092] The cold source of the main condensing unit 300 in the condensing mode is provided by the carrier refrigeration cycle (also known as the carrier refrigeration cycle system) of the carrier unit 700, and the heat source of the main condensing unit 300 in the defrosting mode is provided by the carrier defrosting cycle (also known as the carrier defrosting cycle system) of the carrier unit 700. The cold source of the carrier refrigeration cycle of the carrier unit 700 and the heat source of the carrier defrosting cycle are both provided by the Freon refrigeration cycle (also known as the Freon refrigeration cycle system) of the refrigeration unit 600.
[0093] In the refrigeration unit 600, specifically: the Freon refrigeration cycle provides cooling for the intermediate heat exchanger 701 and heat for the subcooler 603: the Freon refrigerant passes through the refrigeration compressor 601, the water-cooled condenser 602 and the subcooler 603 in sequence, and is then input into the intermediate heat exchanger 701 through the refrigeration throttling device 604, and then enters the refrigeration compressor 601 after being output from the intermediate heat exchanger 701 to form a Freon refrigeration cycle; in the Freon refrigeration cycle, the water-cooled condenser 602 and the subcooler 603 are the high-temperature side (that is, the condensation side, which is an exothermic process of changing from gas to liquid), and the intermediate heat exchanger 701 is the low-temperature side (that is, the evaporation side, which is an endothermic process of changing from liquid to gas).
[0094] Take the main condenser A303 as an example: close its corresponding heat carrier inlet valve A709 and heat carrier outlet valve A711, open its corresponding cold carrier inlet valve A703 and cold carrier outlet valve A705, and the main condenser A303 is in condensing mode. Take the main condenser B304 as an example: close its corresponding heat carrier inlet valve B710 and heat carrier outlet valve B712, open its corresponding cold carrier inlet valve B704 and cold carrier outlet valve B706, and the main condenser B304 is in condensing mode.
[0095] For the main condenser in the condensing mode with its corresponding heat carrier inlet valve and heat carrier outlet valve closed and its corresponding cold carrier inlet valve and cold carrier outlet valve opened, the carrier refrigeration cycle is as follows: after the coolant exchanges heat with the Freon refrigeration cycle in the intermediate heat exchanger 701, it is output from the cold carrier outlet of the intermediate heat exchanger 701, and is input into the main condenser (from the carrier inlet of the main condenser to provide cooling capacity / cold source for the main condenser) through the cold carrier pump 702 and the corresponding cold carrier inlet valve, and then is output from the main condenser (from the carrier outlet of the main condenser), and is input into the intermediate heat exchanger 701 (from the cold carrier inlet of the intermediate heat exchanger) through the corresponding cold carrier outlet valve to form a carrier refrigeration cycle.
[0096] Take the main condenser A303 as an example: open its corresponding heat carrier inlet valve A709 and heat carrier outlet valve A711, close its corresponding cold carrier inlet valve A703 and cold carrier outlet valve A705, and the main condenser A303 is in defrost mode. Take the main condenser B304 as an example: open its corresponding heat carrier inlet valve B710 and heat carrier outlet valve B712, close its corresponding cold carrier inlet valve B704 and cold carrier outlet valve B706, and the main condenser B304 is in defrost mode.
[0097] For the main condenser in the defrost mode with its corresponding heat carrier inlet valve and heat carrier outlet valve opened and its corresponding cold carrier inlet valve and cold carrier outlet valve closed, the carrier defrost cycle is as follows: after the heat carrier exchanges heat with the Freon refrigeration cycle in the subcooler 603, it is output from the heat carrier outlet of the subcooler 603, and is input into the main condenser (from the carrier inlet of the main condenser to provide heat / heat source for the main condenser) through the heat carrier pump 708 and the corresponding heat carrier inlet valve, and then is output from the main condenser (from the carrier outlet of the main condenser), and is input into the subcooler 603 (from the heat carrier inlet of the subcooler) through the corresponding heat carrier outlet valve to form a carrier defrost cycle.
[0098] Freon refrigeration systems are mostly welded because they cannot leak, and equipment maintenance and replacement are difficult. In the utility model, the equipment in the carrier unit / system is connected by flanges, and the carrier (including the coolant and the heat carrier) is easy to fill. Therefore, the indirect condensation and indirect defrosting that can be achieved based on the structure and construction provided by the utility model not only effectively avoids the corrosion / pollution that may be caused by the aqueous dichloromethane solution to the heat exchanger in the Freon refrigeration cycle of the refrigeration unit (including the intermediate heat exchanger 701 and the subcooler 603 in the Freon refrigeration cycle), but also greatly reduces the risk of direct contamination of the Freon refrigerant by the aqueous dichloromethane solution, effectively avoids / mitigates the risk of leakage in the Freon refrigeration system, and also well avoids / reduces the possibility of repair welding and hot work on the site of the Freon refrigeration cycle of the refrigeration unit due to corrosion, pollution, leakage, etc.
[0099] The carrier refrigeration cycle described in the article may also be referred to as a refrigerant refrigeration cycle, or a carrier cooling cycle, or a refrigerant cycle. The carrier defrost cycle described in the article may also be referred to as a heat carrier defrost cycle, or a carrier heating cycle, or a heat carrier heating cycle, or a carrier heat transfer cycle, or a heat carrier cycle. The carrier refrigeration cycle system described in the article may also be referred to as a carrier cooling / refrigeration cycle system, or a refrigerant cooling / refrigeration cycle system, or a refrigerant circulation system. The carrier defrost cycle system described in the article may also be referred to as a carrier heat transfer / heating cycle system, or a heat carrier heat transfer / heating cycle system, or a heat carrier circulation system. The cold in the carrier refrigeration cycle, carrier defrost cycle, and Freon refrigeration cycle described in the article may also be referred to as a cold source, and the heat may also be referred to as a heat source. The coldness related to the carrier refrigeration cycle, the carrier defrost cycle and the Freon refrigeration cycle in this article can also be called a cold source, and the heat related to the carrier refrigeration cycle, the carrier defrost cycle and the Freon refrigeration cycle in this article can also be called a heat source.
[0100] The inlet end described in the text may also be referred to as one end or the inlet end, or simply as the inlet or the inlet end or the inlet end. The outlet end described in the text may also be referred to as the other end, or simply as the outlet or the outlet end. The dichloromethane gas described in the text may also be referred to as dichloromethane tail gas, or dichloromethane waste gas, or dichloromethane-containing waste gas / tail gas / body. The desorption inlet valve described in the text may also be referred to as the analysis inlet valve or the steam inlet valve. The desorption outlet valve described in the text may also be referred to as the analysis outlet valve or the steam outlet valve, or the desorption / analysis purge outlet valve. The defrost pipeline described in the text may also be referred to as the heating pipeline. The gas inlet / outlet described in the text may also be referred to as the inlet / outlet or the inlet / outlet end. The hot side gas inlet / outlet described in the text may also be referred to as the high-temperature gas inlet / outlet or the high-temperature inlet / outlet or the high-temperature inlet / outlet end. The gas circuit switching valve described in the text may also be referred to as the air inlet switching valve. The “ / ” mentioned in this document means or.
[0101] The above embodiments do not limit the present invention. Various changes and modifications made by relevant staff without departing from the technical concept of the present invention are all within the protection scope of the present invention.
Claims
1. A condensation adsorption recovery device for dichloromethane gas, characterized in that: The invention comprises a gas transmission unit (100), a gas-to-gas heat recovery unit (200) connected to the gas circuit of the gas transmission unit (100), a main condensation unit (300) connected to the gas circuit of the gas-to-gas heat recovery unit (200), a carrier unit (700) connected to the main condensation unit (300), a refrigeration unit (600) connected to the carrier unit (700), a resin adsorption unit (400) connected to the gas-to-gas heat recovery unit (200), a desorption cooling unit (800) connected to the resin adsorption unit (400), and an exhaust unit (500) connected to the resin adsorption unit (400); The resin adsorption unit (400) comprises more than two adsorption tanks, each of which is filled with a resin adsorbent, and each of which is provided with an adsorption inlet valve, an adsorption outlet valve, a desorption inlet valve, a purge inlet valve and a desorption outlet valve adapted thereto; each desorption inlet valve is connected to a desorption steam inlet; and each purge inlet valve is connected to a purge nitrogen inlet.
2. The condensation adsorption recovery device for dichloromethane gas according to claim 1, characterized in that: The gas delivery unit (100) comprises a gas delivery induced draft fan (101), and an anti-explosion type air intake flame arrester (102) connected to the air path of the gas delivery induced draft fan (101); an oil and gas pressure transmitter (103) is also provided on the gas delivery pipeline whose air intake end of the air intake flame arrester (102) is connected to the dichloromethane gas inlet; The resin adsorption unit (400) is provided with an adsorption bypass valve (419); the air inlet end of the adsorption bypass valve (419) is connected to the main condensation unit (300), and the air outlet end is connected to the exhaust unit (500).
3. The condensation adsorption recovery device for dichloromethane gas according to claim 2, characterized in that: The air-to-air heat recovery unit (200) comprises an air-to-air heat recovery device (201), wherein the hot side air inlet end of the air-to-air heat recovery device (201) is connected to the air supply induced draft fan (101), the hot side air outlet end of the air-to-air heat recovery device (201) is connected to the air inlet end of the main condensing unit (300), the air outlet end of the main condensing unit (300) is connected to the cold side air inlet end of the air-to-air heat recovery device (201), and the liquid outlet of the air-to-air heat recovery device (201) is connected to the liquid inlet end of the coalescer (307).
4. The condensation adsorption recovery device for dichloromethane gas according to claim 3, characterized in that: The main condensing unit (300) comprises a gas circuit switching valve A (301), a gas circuit switching valve B (302), a main condenser A (303), a main condenser B (304), a one-way valve A (305), a one-way valve B (306) and a coalescer (307); The gas path inlets of the gas path switching valve A (301) and the gas path switching valve B (302) are both connected to the hot side gas outlet of the gas-to-gas heat regenerator (201); the liquid outlets of the main condenser A (303) and the main condenser B (304) are both connected to the coalescer (307); the coalescer (307) separates the sewage and dichloromethane and outputs them separately; The gas path outlet of the gas path switching valve A (301) is connected to the gas inlet end of the main condenser A (303), the gas outlet end of the main condenser A (303) is connected to the gas inlet end of the one-way valve A (305), and the gas outlet end of the one-way valve A (305) is connected to the cold side gas inlet end of the gas-to-gas regenerator (201); The gas path outlet of the gas path switching valve B (302) is connected to the air inlet end of the main condenser B (304); the gas outlet end of the main condenser B (304) is connected to the air inlet end of the one-way valve B (306), and the gas outlet end of the one-way valve B (306) is connected to the cold side air inlet end of the air-to-air heat exchanger (201).
5. The condensation adsorption recovery device for dichloromethane gas according to claim 3, characterized in that: The resin adsorption unit (400) comprises an adsorption tank A (401), an adsorption tank B (402), an adsorption inlet valve A (404), an adsorption inlet valve B (405), an adsorption outlet valve A (407), an adsorption outlet valve B (408), a desorption inlet valve A (410), a desorption inlet valve B (411), a purge inlet valve A (413), a purge inlet valve B (414), a desorption outlet valve A (416), a desorption outlet valve B (417), and an adsorption bypass valve (419); The cold side gas outlet end of the gas-to-gas regenerator (201) is connected to one end of the adsorption bypass valve (419), one end of the adsorption inlet valve A (404), and one end of the adsorption inlet valve B (405); the other end of the adsorption bypass valve (419) is connected to the exhaust unit (500); the other end of the adsorption inlet valve A (404) is connected to the lower end of the adsorption tank A (401), and the other end of the adsorption inlet valve B (405) is connected to the lower end of the adsorption tank B (402); The upper end of the adsorption tank A (401) is connected to one end of the adsorption outlet valve A (407), and the upper end of the adsorption tank B (402) is connected to one end of the adsorption outlet valve B (408); The other end of the adsorption outlet valve A (407) and the other end of the adsorption outlet valve B (408) are both connected to the exhaust unit (500).
6. The condensation adsorption recovery device for dichloromethane gas according to claim 5, characterized in that: One end of the desorption inlet valve A (410) is connected to the upper end of the adsorption tank A (401), and one end of the desorption inlet valve B (411) is connected to the upper end of the adsorption tank B (402); the other end of the desorption inlet valve A (410) and the other end of the desorption inlet valve B (411) are both connected to the desorption steam inlet; One end of the purge inlet valve A (413) is connected to the upper end of the adsorption tank A (401), and one end of the purge inlet valve B (414) is connected to the upper end of the adsorption tank B (402); the other end of the purge inlet valve A (413) and the other end of the purge inlet valve B (414) are both connected to the purge nitrogen inlet; One end of the desorption outlet valve A (416) is connected to the lower end of the adsorption tank A (401), and one end of the desorption outlet valve B (417) is connected to the lower end of the adsorption tank B (402); The other end of the desorption outlet valve A (416) and the other end of the desorption outlet valve B (417) are both connected to the input end of the multi-stage cooler (801) of the desorption cooling unit (800).
7. The condensation adsorption recovery device for dichloromethane gas according to claim 5, characterized in that: The exhaust unit (500) comprises an exhaust tube (501), an explosion-proof and flame-retardant outlet flame arrester (502), and a concentration detector (503); the concentration detector (503) is arranged in the middle of the tube body of the exhaust tube (501); The air inlet of the emptying cylinder (501) is connected to the other end of the adsorption bypass valve (419), the other end of the adsorption outlet valve A (407) and the other end of the adsorption outlet valve B (408) through the anti-explosion type outlet flame arrester (502).
8. The condensation adsorption recovery device for dichloromethane gas according to claim 1, characterized in that: The agent carrier unit (700) comprises an intermediate heat exchanger (701), a cold carrier pump (702), a cold carrier liquid inlet valve A (703), a cold carrier liquid inlet valve B (704), a cold carrier liquid outlet valve A (705), a cold carrier liquid outlet valve B (706), a cold carrier expansion tank (707), a heat carrier pump (708), a heat carrier liquid inlet valve A (709), a heat carrier liquid inlet valve B (710), a heat carrier liquid outlet valve A (711), a heat carrier liquid outlet valve B (712), and a heat carrier expansion tank (713); the condensation adsorption recovery device is also provided with an agent carrier refrigeration circulation system and an agent carrier defrosting circulation system; The carrier refrigeration cycle system comprises: a carrier cold liquid outlet valve A (705) and a carrier cold liquid outlet valve B (706) arranged in parallel, an intermediate heat exchanger (701), a carrier cold pump (702), a carrier cold liquid inlet valve A (703) and a carrier cold liquid inlet valve B (704) arranged in parallel, which are connected in sequence; The outlet of the cold-carrying pump (702) is connected to the carrier inlet of the main condenser A (303) via the cold-carrying liquid inlet valve A (703), the carrier outlet of the main condenser A (303) is connected to the cold-carrying liquid outlet valve A (705), the other end of the cold-carrying liquid outlet valve A (705) is connected to the cold-carrying inlet of the intermediate heat exchanger (701), and the cold-carrying outlet of the intermediate heat exchanger (701) is connected to the inlet of the cold-carrying pump (702); The outlet of the cold-carrying pump (702) is connected to the agent inlet of the main condenser B (304) through the cold-carrying liquid inlet valve B (704), the agent outlet of the main condenser B (304) is connected to the cold-carrying liquid outlet valve B (706), the other end of the cold-carrying liquid outlet valve B (706) is connected to the cold-carrying inlet of the intermediate heat exchanger (701), and the cold-carrying outlet of the intermediate heat exchanger (701) is connected to the inlet of the cold-carrying pump (702); The carrier defrosting circulation system comprises: a heat carrier outlet valve A (711) and a heat carrier outlet valve B (712) arranged in parallel, a subcooler (603), a heat carrier pump (708), and a heat carrier inlet valve A (709) and a heat carrier inlet valve B (710) arranged in parallel, which are connected in sequence; The outlet of the heat carrier pump (708) is connected to the carrier inlet of the main condenser A (303) via the heat carrier inlet valve A (709), the carrier outlet of the main condenser A (303) is connected to the heat carrier outlet valve A (711), the other end of the heat carrier outlet valve A (711) is connected to the heat carrier inlet of the subcooler (603), and the heat carrier outlet of the subcooler (603) is connected to the inlet of the heat carrier pump (708); The outlet of the heat pump (708) is connected to the agent inlet of the main condenser B (304) through the heat carrier inlet valve B (710), the agent outlet of the main condenser B (304) is connected to the heat carrier outlet valve B (712), the other end of the heat carrier outlet valve B (712) is connected to the heat carrier inlet of the subcooler (603), and the heat carrier outlet of the subcooler (603) is connected to the inlet of the heat pump (708).
9. The condensation adsorption recovery device for dichloromethane gas according to claim 8, characterized in that: A cooling expansion tank (707) is provided on the pipeline connecting the intermediate heat exchanger (701) and the cooling pump (702); and / or A heat expansion tank (713) is provided on the pipeline connecting the subcooler (603) and the heat pump (708).
10. The condensation adsorption recovery device for dichloromethane gas according to claim 8, characterized in that: The analytical cooling unit (800) comprises a multi-stage cooler (801) and a coalescing separation tank (802); the gas outlet end of the multi-stage cooler (801) is connected to the gas inlet end of the gas inlet flame arrester (102) of the gas transmission unit (100); the liquid outlet end of the multi-stage cooler (801) is connected to the liquid inlet end of the coalescing separation tank (802); The refrigeration unit (600) comprises a refrigeration compressor (601), a water-cooled condenser (602), a subcooler (603) and a refrigeration throttling device (604) connected in sequence; The other end of the refrigeration throttling device (604) is in communication with the refrigerant inlet of the intermediate heat exchanger (701), and the refrigerant outlet of the intermediate heat exchanger (701) is in communication with the input end of the refrigeration compressor (601); The heat carrier outlet of the subcooler (603) is connected to the inlet of the heat carrier pump (708), and the heat carrier inlet of the subcooler (603) is connected to the other end of the heat carrier liquid outlet valve A (711) and the other end of the heat carrier liquid outlet valve B (712).