Large-volume solid pier concrete cooling structure

By burying PVC pipe fittings in large volume solid pier concrete to form a water circulation system, the water cooling system is used to reduce the hydration heat, the temperature difference caused by hydration heat is solved, cracks are prevented, and the construction quality and durability of the structure are improved. .

CN222024899UActive Publication Date: 2024-11-19ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420402719.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-11-19
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

During the construction process, large-volume solid pier concrete has too large temperature difference between the interior and the exterior due to hydration heat, which is prone to cracks, affecting the bearing capacity and durability of the structure.

Method used

By burying PVC pipe fittings in the pier to form a water circulation system, the water cooling system is used to reduce the internal hydration heat of concrete, reduce the internal and external temperature difference, and prevent the generation of cracks.

Benefits of technology

It effectively reduces the internal hydration heat of concrete, reduces the internal and external temperature difference, prevents the generation of cracks, and improves the construction quality and durability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024899U_ABST
    Figure CN222024899U_ABST
Patent Text Reader

Abstract

A large-size solid pier concrete cooling structure comprises a pier body and a plurality of first pipe fittings which are pre-buried in the pier body and serve as pull rod holes, and further comprises a plurality of second pipe fittings, the second pipe fittings are sequentially connected with the adjacent first pipe fittings end to end to connect the first pipe fittings in series, a water inlet pipe is arranged at the end of the first pipe fitting at the first position, and a water outlet pipe is arranged at the end of the second pipe fitting at the second position. A water outlet pipe is arranged at the end of the last first pipe fitting, the water pump is arranged on the water inlet pipeline or the water outlet pipeline, the water outlet pipeline is communicated with the water outlet pipe and the water tank, the water inlet pipeline is communicated with the water inlet pipe and the water tank, and the water outlet pipe is communicated with the water tank. The pull rod hole of the solid pier body is used for water circulation, hydration heat in concrete is effectively reduced, the temperature difference between the inside and the outside of the concrete is reduced, and cracks are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of bridge construction, and in particular to a large-volume solid pier concrete cooling structure. Background Art

[0002] In large-volume concrete construction, a considerable amount of hydrothermalization will occur after concrete pouring. Among them, cement hydrothermalization generally occurs in the early stage, that is, shortly after concrete pouring. During this period, the temperature of the concrete will rise rapidly until it reaches a certain temperature and then begins to drop. However, due to the poor thermal conductivity of concrete, the heat generated by cement hydration needs a long time to dissipate, which will lead to inconsistency between the internal temperature and the surface temperature of the concrete during construction, and then surface cracks. In addition, during the cooling stage of concrete, deformation will cause tensile stress due to various reasons caused by volume shrinkage. When the tensile stress exceeds the tensile capacity of concrete, it often causes concrete cracking. Cracks will greatly affect the bearing capacity, waterproofness and durability of the structure. Controlling the temperature change of concrete is an effective means to prevent it from generating temperature stress.

[0003] At present, in the process of mass concrete construction, effective control of the temperature difference between inside and outside is an effective way to reduce concrete cracks caused by temperature difference. Conventionally, cooling pipes and their ancillary measures are set in mass concrete to reduce the occurrence of mass concrete cracks caused by temperature difference and ensure construction quality.

[0004] However, most of the time, there are no cooling water pipes inside the solid piers of bridges. After the large-volume solid pier concrete is poured, the hydration heat is large and the temperature difference between the inside and outside of the concrete is large. If it is not properly maintained, shrinkage cracks or temperature difference cracks are likely to occur. Utility Model Content

[0005] The main purpose of this application is to provide a large-volume solid pier concrete cooling structure, which utilizes the tie rod holes in the solid pier body to enable water circulation, effectively reduce the hydration heat inside the concrete, narrow the temperature difference between the inside and outside of the concrete, and prevent the occurrence of cracks.

[0006] In order to achieve the above-mentioned objectives, in a first aspect, the present application provides a large-volume solid pier concrete cooling structure, comprising a pier body, a plurality of first pipe fittings pre-embedded in the pier body as tie rod holes, and a plurality of second pipe fittings, wherein the second pipe fittings are connected end to end in sequence to adjacent first pipe fittings to connect the first pipe fittings in series, a water inlet pipe is provided at the end of the first pipe fitting in the first position, and a water outlet pipe is provided at the end of the last pipe fitting in the first position, and further comprising a water inlet pipe, a water tank, a water outlet pipe and a water pump, wherein the water pump is provided on the water inlet pipe or the water outlet pipe, the water outlet pipe connects the water outlet pipe with the water tank, and the water inlet pipe connects the water inlet pipe with the water tank.

[0007] A further improvement is that both the first pipe fitting and the second pipe fitting are made of PVC pipes.

[0008] A further improvement is that the first pipe fitting and the second pipe fitting are fixedly connected by hot melting.

[0009] A further improvement is that the diameter of the second pipe is smaller than the diameter of the first pipe.

[0010] A further improvement is that the water inlet pipe and the water outlet pipe are hoses.

[0011] A further improvement is that it also includes a first thermometer for measuring the internal temperature of the concrete and a second thermometer for measuring the water temperature of the water outlet pipe.

[0012] A further improvement is that a filter screen is provided at the connection between the water outlet pipe and the water tank.

[0013] A further improvement is that each of the pier bodies is provided with at least two layers of the cooling structure along the up and down directions.

[0014] The utility model provides a large-volume solid pier concrete cooling structure, which has the beneficial effect, compared with the prior art, of utilizing the PVC pipes pre-buried in the existing pier body as tie rod holes, connecting them in series through a second pipe fitting to form a water cooling system for water circulation, thereby effectively reducing the hydration heat inside the concrete, narrowing the temperature difference between the inside and outside of the concrete, and preventing the generation of cracks. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0016] Figure 1 It is a cross-sectional view of the utility model;

[0017] Figure 2 It is a side view of the utility model.

[0018] Among them: 1. Pier body; 2. First pipe fitting; 3. Second pipe fitting; 4. Water inlet pipe; 5. Water outlet pipe. DETAILED DESCRIPTION

[0019] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0020] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0021] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0022] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0023] In addition, the term "plurality" shall mean two or more.

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] like Figure 1-Figure 2As shown, a large-volume solid pier concrete cooling structure includes a pier body 1 and a plurality of first pipe fittings 2 pre-embedded in the pier body 1 as tie rod holes. In actual construction, tie rod holes for tension bolts are arranged at a certain interval during the construction of the pier body 1. The tie rod holes are pre-embedded in the pier body 1 using the first pipe fittings 2. The function of the tie rod holes is to insert tie rods, reinforce the formwork, and ensure the stability of the formwork system during the concrete pouring process. The innovation of the utility model is to utilize the above-mentioned existing first pipe fitting 2 to manufacture a water cooling system. During the manufacture, after the concrete pouring is completed and the concrete strength reaches 2.5MPa, the formwork is removed and the pull rod is pulled out to ensure that the PVC pull rod hole is in a through state. Specifically: it also includes a plurality of second pipe fittings 3, and the second pipe fittings 3 are connected end to end with adjacent first pipe fittings 2 to connect the first pipe fittings 2 in series. An inlet pipe 4 is provided at the end of the first pipe fitting 2 in the first position, and an outlet pipe 5 is provided at the end of the last first pipe fitting 2. It also includes 4 inlet pipes, a water tank, 5 outlet pipes and a water pump. The water pump is arranged on the inlet pipe 4 or the outlet pipe 5. The outlet pipe 5 connects the outlet pipe 5 with the water tank, and the inlet pipe 4 connects the inlet pipe 4 with the water tank.

[0026] The inlet and outlet water temperatures should be strictly controlled. Therefore, a first thermometer for measuring the internal temperature of the concrete and a second thermometer for measuring the water temperature of the outlet pipe 5 are also included. The water inlet temperature of the cooling water pipe and the maximum temperature inside the concrete are guaranteed to be less than 20°C, and a special person is assigned to measure the concrete temperature through the first thermometer. Generally, the internal temperature of the concrete will reach a peak 2 to 3 days after the concrete is poured. During this period, the number of water passes and the temperature measurement frequency should be appropriately increased according to the temperature measurement records. In this way, the water cooling system can be used to hydrate the large-volume solid pier concrete to avoid cracks in the concrete. After the concrete is demolded, it is covered with geotextile and plastic film, and an automatic water cooling system is installed to spray and cure the surface of the pier body 1.

[0027] Preferably, the first pipe fitting 2 and the second pipe fitting 3 are both made of PVC pipes. For the convenience of connection, it is further improved that the first pipe fitting 2 and the second pipe fitting 3 are fixedly connected by hot melt. It is further improved that the diameter of the second pipe fitting 3 is smaller than the diameter of the first pipe fitting 2.

[0028] In order to avoid the rupture of the connecting water pipes, the water inlet pipe 4 and the water outlet pipe 5 are flexible pipes, which can withstand certain deformation and ensure the long-term operation of the water cooling system.

[0029] In order to prevent the impurities and debris remaining in the first pipe 2 from clogging the water cooling system and affecting its operation when the pull rod is pulled out, a filter is provided at the connection between the water outlet pipe 5 and the water tank.

[0030] Each of the pier bodies 1 is provided with at least two layers of the cooling structure along the up-down direction, with four layers arranged, two water inlets and two water outlets, so as to cool and cure the inside of the concrete, and the cooling and curing effect is good.

[0031] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A large solid pier concrete cooling structure, comprising a pier body, and a plurality of first pipes pre-buried in the pier body as tie rod holes, characterized in that: It also includes a plurality of second pipe fittings, which are connected end to end in sequence to adjacent first pipe fittings to connect the first pipe fittings in series, an inlet pipe is provided at the end of the first pipe fitting in the first position, and an outlet pipe is provided at the end of the last pipe fitting in the first position, and also includes an inlet pipe, a water tank, an outlet pipe and a water pump, the water pump is provided on the inlet pipe or the outlet pipe, the outlet pipe connects the outlet pipe and the water tank, and the inlet pipe connects the inlet pipe and the water tank.

2. A large solid pier concrete cooling structure as claimed in claim 1, characterized in that: The first pipe fitting and the second pipe fitting are both made of PVC pipes.

3. A large solid pier concrete cooling structure as claimed in claim 2, characterized in that: The first pipe fitting and the second pipe fitting are fixedly connected by hot melting.

4. A large solid pier concrete cooling structure as claimed in claim 3, characterized in that: The diameter of the second pipe is smaller than the diameter of the first pipe.

5. A large solid pier concrete cooling structure as claimed in claim 1, characterized in that: The water inlet pipe and the water outlet pipe are hoses.

6. A large solid pier concrete cooling structure as claimed in claim 1, characterized in that: It also includes a first thermometer for measuring the internal temperature of the concrete and a second thermometer for measuring the water temperature of the water outlet pipe.

7. A large solid pier concrete cooling structure as claimed in claim 1, characterized in that: A filter screen is arranged at the connection between the water outlet pipe and the water tank.

8. A large solid pier concrete cooling structure as claimed in claim 1, characterized in that: Each of the pier bodies is provided with at least two layers of the cooling structure along the up and down directions.