Self-embedded ecological soil retaining brick

By designing the bumps, V-shaped ports, embedded holes and water leakage hole structures of self-embedded ecological retaining bricks, the problem of poor seismic resistance of existing self-embedded retaining wall tiles is solved, and the ecological protection of river channels and the reduction of water pressure is achieved. Effect.

CN222024973UInactive Publication Date: 2024-11-19青海辉达水泥制品有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322851286.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-24
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing self-embedded retaining wall tiles have poor seismic resistance and insufficient inter-blocking measures, which cannot meet the needs of ecological protection and river channel stability.

Method used

A self-embedded ecological retaining brick is designed. The retaining bricks are provided with bumps and V-shaped openings on both sides, and the center is equipped with inlay holes and circular water leakage holes. The bumps are provided with triangular water leakage holes, which are filled with soil and Reinforcement is reinforced to achieve horizontal and vertical insertion, and has water leakage function.

Benefits of technology

Through soil filling and steel reinforcement, the design improves the seismic resistance and embeddedness of the retaining wall, has water leakage and permeability, protects the river ecology, and reduces the water pressure behind the wall, and has high practical value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024973U_ABST
    Figure CN222024973U_ABST
Patent Text Reader

Abstract

The utility model discloses a self-embedded ecological soil retaining brick which comprises a soil retaining brick body, protruding blocks are arranged in the middles of the two sides of the soil retaining brick body respectively, lateral V-shaped openings are formed in the rear portions of the protruding blocks, a built-in hole is formed in the middle of the soil retaining brick body, a plurality of round water leakage holes are formed in the two sides of the built-in hole, and triangular water leakage holes are formed in the protruding blocks. Compared with the prior art, the building-in hole and the V-shaped opening can be filled with soil and play a role in horizontal and vertical building-in, the water leakage hole can be used for water leakage, and the round water leakage hole can be overlapped up and down and can also be used as a steel bar mortise. The self-embedded ecological soil retaining brick can be filled with soil to be horizontally and vertically embedded and fixed, can be reinforced through reinforcing steel bars, has water leakage and water permeability, is beneficial to river channel ecology protection, can reduce residual water pressure behind a wall, and has very high practical value and popularization value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of self-embedded ecological retaining bricks, in particular to a self-embedded ecological retaining brick. Background Art

[0002] Traditional vertical rigid retaining walls in river channels, such as stone retaining walls, reinforced concrete retaining walls and retaining pile retaining walls, are structurally stable and have high retaining capacity, but they cannot meet ecological requirements. Self-embedded retaining walls are a new type of gravity retaining wall with a flexible structure. They mainly rely on the self-weight of the composite body composed of self-embedded blocks and fill connected by reinforced belts to resist loads and achieve stability. They are characterized by fast construction, durability, applicability, environmental protection and economy. At the same time, existing self-embedded blocks also have shortcomings. There are too few embedding measures between bricks, and they only rely on rubber rods to resist all horizontal relative displacements, and their seismic resistance is poor. Utility Model Content

[0003] The technical problem to be solved by the utility model is to overcome the defects of the above-mentioned technology and provide a self-embedded ecological retaining brick.

[0004] In order to solve the above technical problems, the technical solution provided by the utility model is a self-embedded ecological retaining brick: comprising a retaining brick, wherein a protrusion is respectively provided in the middle of both sides of the retaining brick, a lateral V-shaped opening is provided at the rear of the protrusion, an embedding hole is provided in the middle of the retaining brick, a plurality of circular leakage holes are provided on both sides of the embedding hole, and the protrusion is provided with a triangular leakage hole.

[0005] Compared with the prior art, the utility model has the advantages that the embedding holes and the V-shaped openings can be filled with soil to achieve horizontal and vertical embedding, the water leakage holes can be used for water leakage, and the circular water leakage holes that overlap up and down can also be used as steel bar mortise holes.

[0006] This self-embedded ecological retaining brick can be filled with soil to be embedded horizontally and vertically, and can also be reinforced with steel bars. It has the characteristics of water leakage and water permeability, which is beneficial to protecting the river ecology. At the same time, it can reduce the residual water pressure behind the wall and has high practical value and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 The utility model is a structural schematic diagram of a self-embedded ecological retaining brick.

[0008] Figure 2 The utility model discloses an assembly structure diagram of a self-embedded ecological retaining brick.

[0009] Figure 3 The utility model is a top view of the assembly of a self-embedded ecological retaining brick.

[0010] As shown in the figure: 1. Retaining brick, 2. Bump, 3. V-shaped opening, 4. Embedding hole, 5. Circular leakage hole, 6. Triangular leakage hole. DETAILED DESCRIPTION

[0011] The following is a further detailed description of the self-embedded ecological retaining brick of the utility model in conjunction with the accompanying drawings.

[0012] Combined with Figures 1 to 3 A self-embedded ecological retaining brick comprises a retaining brick 1, wherein the middle parts of both sides of the retaining brick 1 are respectively provided with protrusions 2, the rear parts of the protrusions 2 are provided with lateral V-shaped openings 3, the middle part of the retaining brick 1 is provided with an embedding hole 4, a plurality of circular leakage holes 5 are provided on both sides of the embedding hole 4, and the protrusions 2 are provided with triangular leakage holes 6.

[0013] When the utility model is implemented, Figure 2 , 3 The embedded holes 4 and the V-shaped openings 3 can be filled with soil to achieve horizontal and vertical embedding. The water leakage holes can be used for water leakage, and the circular water leakage holes 5 that overlap up and down can also be used as steel bar mortise holes.

[0014] The above describes the utility model and its implementation methods, which is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creative design without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A self-embedded ecological retaining brick, characterized in that: The invention comprises a retaining brick (1), wherein the middle parts of both sides of the retaining brick (1) are respectively provided with protrusions (2), the rear parts of the protrusions (2) are provided with lateral V-shaped openings (3), the middle part of the retaining brick (1) is provided with an embedding hole (4), a plurality of circular water leakage holes (5) are provided on both sides of the embedding hole (4), and the protrusions (2) are provided with triangular water leakage holes (6).