Concrete composite shear wall fabricated component with built-in pre-pull rods
The concrete composite shear wall structure with built-in prestressed rods solves the problem of high complexity in the fabrication of prefabricated shear walls, achieves efficient concrete pouring and improved structural stability, and simplifies the construction process.
Patent Information
- Application Number
- CN202420139026.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-19
AI Technical Summary
The existing prefabricated shear wall has a complex manufacturing process and low production efficiency. It also requires two concrete pours and a flipping treatment of the external frame, which increases the complexity of construction.
The concrete composite shear wall structure with built-in prestressed rods is connected to the steel frame by steel tie rods, which replace steel plates to bear horizontal loads. Studs and steel mesh plates are set in the pouring cavity to improve the bonding ability and crack resistance of the concrete layer. The steel tie rods are tightened by tie rod turnbuckles to prevent buckling.
It enables the effective bearing of horizontal and vertical loads of the shear wall, simplifies the manufacturing process, improves manufacturing efficiency, and allows the concrete layer to be cast in one go, thereby enhancing the stability and load-bearing capacity of the structure.
Smart Images

Figure CN222025290U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a concrete shear wall, in particular to a concrete combined shear wall assembly component with built-in pre-tensioned rods. Background Art
[0002] Shear walls are walls in houses or structures used to withstand horizontal and vertical loads caused by wind loads or earthquakes, thereby preventing shear damage to the wall structure. They are generally made of reinforced concrete. The traditional shear wall structure is a cast-in-place reinforced concrete wall, that is, the steel skeleton is tied on site, and then concrete is poured on the outside of the steel skeleton to form a fixed shear wall. However, this production method requires on-site construction, which makes it difficult to guarantee its construction quality and construction time, thereby reducing the manufacturer's on-site construction efficiency and construction quality.
[0003] In view of the above defects, prefabricated shear wall structures have gradually replaced cast-in-place shear walls and are widely used. The prefabricated shear wall is mainly composed of profiles and concrete. During production, an external frame is first formed by splicing profiles, and a casting cavity is formed on the inner side of the external frame. The casting cavity is welded to the surrounding external frames through steel plates, so that the steel plates bear the external horizontal loads; concrete is poured into the casting cavities on both sides of the steel plates, and the concrete bears the vertical loads, thereby ensuring the horizontal and vertical load bearing capacity of the shear wall. However, the defect of this structure is that the steel plates in the casting cavity need to be completely welded to the external frames around the casting cavity to achieve the horizontal bearing capacity, resulting in the steel plates dividing the casting cavity into two parts after welding, so that the manufacturer needs to pour the concrete twice in the subsequent pouring and turn the external frame over during the processing, thereby increasing the complexity of the shear wall production and reducing its production efficiency.
[0004] Therefore, the existing assembled shear walls have the problems of complex process and low manufacturing efficiency. Utility Model Content
[0005] The purpose of the utility model is to provide a concrete composite shear wall assembly component with built-in pre-tensioned rods, which can improve the production efficiency of the assembled shear wall.
[0006] The technical solution of the utility model is: a concrete composite shear wall assembly component with built-in pre-tensioned rods, including a steel frame, a casting cavity formed in the middle of the steel frame, a plurality of steel tension rods arranged crosswise with each other are arranged in the casting cavity, the two ends of the steel tension rods are connected to the steel frame and tightened, a plurality of bolts are distributed in a ring shape on the steel frame around the casting cavity, a first concrete layer is cast on the outside of the steel tension rods and the bolts, and the first concrete layer completely fills the casting cavity after casting.
[0007] In the aforementioned concrete composite shear wall prefabricated component with built-in pre-tensioned rods, ear plates are provided at the four corners of the casting cavity, and the ends of the steel tension rods are connected to the ear plates via tension rod baskets.
[0008] In the aforementioned concrete composite shear wall prefabricated component with built-in pre-tensioned rods, the steel tension rods and the studs are both located in the middle of the casting cavity, and the steel tension rods and the studs are mutually staggered along the circumferential direction.
[0009] In the aforementioned concrete composite shear wall prefabricated component with built-in pre-tensioned rods, steel mesh plates located in the casting cavity are provided on both sides of the steel tension rods and bolts, and the steel mesh plates are connected to the steel frame on all sides. After casting, the first concrete layer completely wraps the steel mesh plates.
[0010] In the aforementioned concrete composite shear wall prefabricated component with built-in pre-tensioned rods, grooves are formed on both sides of the H-shaped steel column, and a second concrete layer formed by pouring concrete is provided in the groove. An opening for pouring concrete is provided on the H-shaped steel column between the second concrete layers on both sides, and the first concrete layer and the second concrete layer are separated from each other.
[0011] Compared with the prior art, the utility model uses the structural coordination of the steel tie rod and the steel frame, so that the steel tie rod can replace the steel plate to connect the steel frame around the casting cavity after connection, and is used to bear the external horizontal load, thereby ensuring the horizontal bearing capacity of the utility model; compared with the steel plate, the steel tie rod can make the casting cavities on the front and rear sides interconnected after installation, so that the first concrete layer can be cast and formed at one time during casting, thereby effectively improving the production efficiency of the shear wall; on this basis, by optimizing the connection structure of the steel tie rod, the steel tie rod can be tightened through the tie rod basket after installation, thereby ensuring the horizontal bearing effect of the tie rod and preventing the tie rod from buckling after being subjected to force;
[0012] (2) After pouring, the first concrete layer is used to bear the vertical load of the shear wall on the one hand, and can also fix the steel tie rods on the other hand, that is, further prevent the buckling of the steel tie rods, thereby improving the stability and bearing effect of the steel tie rods;
[0013] (3) By providing the bolts around the casting cavity, the bonding capacity between the first concrete layer and the steel frame can be improved, thereby reducing the possibility of the first concrete layer and the steel frame peeling off from each other after being subjected to horizontal loads; by providing the steel mesh plates on both sides of the casting cavity, the crack resistance of the first concrete layer can be improved, thereby avoiding local peeling of the first concrete layer after being subjected to horizontal loads; and under the above cooperation, the first concrete layer can realize a stable horizontal limiting function for the steel tie rod, thereby preventing the steel tie rod from partially transferring the horizontal load to the first concrete layer, causing stress damage to the first concrete layer;
[0014] Therefore, the utility model can improve the production efficiency of assembled shear walls. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the utility model.
[0016] The markings in the attached drawings are: 1-steel frame, 2-steel tie rod, 3-bolt, 4-first concrete layer, 5-ear plate, 6-tie rod basket, 7-steel mesh plate, 8-second concrete layer, 9-opening. DETAILED DESCRIPTION
[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0018] Embodiment. A concrete composite shear wall assembly component with built-in pre-tensioned rods, comprising: Figure 1 As shown, it includes a steel frame 1, a casting cavity is formed in the middle of the steel frame 1, a plurality of steel tie rods 2 are arranged crosswise with each other in the casting cavity, both ends of the steel tie rods 2 are connected to the steel frame 1 and tightened, a plurality of bolts 3 are distributed in a ring shape on the steel frame 1 around the casting cavity, a first concrete layer 4 is cast outside the steel tie rods 2 and the bolts 3, and the first concrete layer 4 completely fills the casting cavity after casting.
[0019] Ear plates 5 are provided at the corners of the casting cavity. The ends of the steel tie rods 2 are connected to the ear plates 5 via tie rod baskets 6. The tie rod baskets 6 can adjust their own length through a screw structure, thereby tightening the steel tie rods 2.
[0020] The steel tie rod 2 and the bolt 3 are both located in the middle of the casting cavity, and the steel tie rod 2 and the bolt 3 are staggered with each other along the circumferential direction.
[0021] The steel tie rods 2 and the bolts 3 are provided with steel mesh plates 7 in the casting cavity on both sides. The steel mesh plates 7 are connected to the steel frame 1 on all sides. The first concrete layer 4 completely wraps the steel mesh plates 7 after casting.
[0022] The steel frame 1 is formed by splicing a plurality of H-shaped steel columns, each of which forms a frame structure after splicing. A plurality of casting cavities arranged side by side are formed inside the frame structure, and adjacent casting cavities are separated from each other by the H-shaped steel columns.
[0023] Grooves are formed on both sides of the H-shaped steel column, and a second concrete layer 8 formed by pouring concrete is provided in the grooves. An opening 9 for pouring concrete is provided on the H-shaped steel column between the second concrete layers 8 on both sides. There are multiple openings 9 and they are distributed at intervals on the H-shaped steel column. The first concrete layer 4 and the second concrete layer 8 are separated from each other. Since the horizontal and vertical loads on the shear wall are mainly borne by the steel tie rods 2 and the first concrete layer 4, the openings 9 will not significantly affect the overall bearing capacity of the shear wall after being opened.
[0024] Working principle of the utility model: The utility model uses steel tie rods 2 instead of steel plates to connect the steel frames 1 around the casting cavity, so that the steel tie rods 2 can bear the tension under the horizontal load after being tightened. The provision of the steel tie rods 2 enables the first concrete layer 4 in the casting cavity to be cast and formed at one time, thereby simplifying the process complexity of the shear wall and improving the production efficiency of the manufacturer. On this basis, the utility model can also increase the bonding strength and crack resistance of the first concrete layer 4 through the provision of bolts 3 and steel mesh plates 7, so that the first concrete layer 4 can play a stable limiting effect on the inner steel tie rods 2 after casting, avoiding the buckling of the steel tie rods 2 after being subjected to force.
Claims
1. A concrete composite shear wall assembly with built-in pre-tensioned rods, characterized in that: The invention comprises a steel frame (1), wherein a casting cavity is formed in the middle of the steel frame (1), wherein a plurality of steel tie rods (2) are arranged crosswise with each other in the casting cavity, wherein both ends of the steel tie rods (2) are connected to the steel frame (1) and tightened, wherein a plurality of bolts (3) are distributed in a ring shape on the steel frame (1) around the casting cavity, and a first concrete layer (4) is cast outside the steel tie rods (2) and the bolts (3), and the first concrete layer (4) completely fills the casting cavity after casting.
2. The concrete composite shear wall assembly component with built-in pre-tensioned rods according to claim 1, characterized in that: Ear plates (5) are provided at the corners of the four sides of the casting cavity, and the ends of the steel tie rods (2) are connected to the ear plates (5) via tie rod baskets (6).
3. The concrete composite shear wall assembly component with built-in pre-tensioned rods according to claim 1, characterized in that: The steel tie rod (2) and the bolt (3) are both located in the middle of the casting cavity, and the steel tie rod (2) and the bolt (3) are mutually staggered in the circumferential direction.
4. The concrete composite shear wall assembly component with built-in pre-tensioned rods according to claim 3, characterized in that: A steel mesh plate (7) located in the casting cavity is provided on both sides of the steel tie rod (2) and the bolt (3); the steel mesh plate (7) is connected to the steel frame (1) on all sides; and the first concrete layer (4) completely wraps the steel mesh plate (7) after casting.
5. The concrete composite shear wall assembly component with built-in pre-tensioned rods according to claim 1, characterized in that: The steel frame (1) is formed by splicing a plurality of H-shaped steel columns, each of which forms a frame structure after being spliced, and a plurality of casting cavities arranged side by side are formed inside the frame structure, and adjacent casting cavities are separated from each other by the H-shaped steel columns.
6. The concrete composite shear wall assembly component with built-in pre-tensioned rods according to claim 5, characterized in that: Grooves are formed on both sides of the H-shaped steel column, and a second concrete layer (8) cast by concrete is provided in the groove. An opening (9) for pouring concrete is provided on the H-shaped steel column between the second concrete layers (8) on both sides, and the first concrete layer (4) and the second concrete layer (8) are separated from each other.