Cement kiln dechlorination system comprising preheating device

By introducing a preheating device into the cement kiln chlorine removal system and introducing flue gas containing chloride ions after heating, the problem of crust on the inner wall of the kiln system caused by chlorine is solved, ensuring the normal operation of the system and the quality of the cement.

CN222027432UActive Publication Date: 2024-11-19ANHUI CONCH DESIGN & RES INST OF BUILDING MATERIALS CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420014798.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-19
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

During the cement kiln production process, the volatility and condensation of chlorine elements lead to the crust and clogging of the inner wall of the rotary kiln system, affecting the normal operation of the system, and the chlorine elements solidify into the clinker, affecting the quality of the cement. The existing technology is difficult to effectively solve this problem.

Method used

A cement kiln chlorine removal system containing preheating device was designed. High-temperature gas is extracted from the kiln system through the preheating device and sent to the chlorine removal system. After heating, flue gas containing chloride ions is introduced to prevent chloride ions from stagnating in the inner wall of the equipment. Skin. The system includes a first high-temperature gate valve and a second high-temperature gate valve. The temperature detection device controls the opening and closing of the gate valve to ensure that the equipment has heated up in the early stage of starting and preventing chloride ions from crystallizing.

Benefits of technology

It effectively slows down the problem of crust and clogging on the inner wall surface of the chlorine removal system equipment, ensures the normal operation of the system, improves the quality of cement clinker, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222027432U_ABST
    Figure CN222027432U_ABST
Patent Text Reader

Abstract

The utility model discloses a cement kiln dechlorination system comprising a preheating device, the cement kiln dechlorination system comprising the preheating device comprises the preheating device and a dechlorination system, one end of the preheating device is connected with a kiln system (10), and the other end of the preheating device is connected to the front end of the dechlorination system; a first high-temperature gate valve (11) is arranged in the preheating device, a second high-temperature gate valve (21) is arranged at the front end of the dechlorination system, and the connecting position of the preheating device and the dechlorination system is located behind the second high-temperature gate valve (21). According to the cement kiln dechlorination system comprising the preheating device, the problem that the inner wall face of dechlorination system equipment is skinned and blocked can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of cement kiln dechlorination, in particular to a cement kiln dechlorination system comprising a preheating device. Background Art

[0002] In the cement production process, when various solid hazardous wastes or combustible wastes are used as alternative fuels, more or less chlorine elements will be brought into the rotary kiln system. After passing through the rotary kiln system, these chlorine elements will undergo high-temperature volatilization and low-temperature condensation reactions, eventually becoming enriched and changing the atmosphere of the kiln system. In severe cases, it will cause crusting and blockage in the rotary kiln system, interfering with the entire thermal system and affecting the normal operation of the cement kiln system. At the same time, a large amount of chlorine and other elements will also be solidified into the clinker, which will also affect the quality of cement clinker. Therefore, the rotary kiln system needs to be dechlorinated.

[0003] The Chinese utility model patent application number 202322613280.0 records a cement kiln dechlorination system, which does not quench the high-temperature flue gas after extracting it, so that as many chloride ions as possible exist in the gas phase, and separates the material and the gas at high temperature through a high-temperature cyclone separator, thereby reducing the chloride ion content in the coarse particles and further reducing the amount of chloride ions returning to the kiln system; after passing through the hot and cold air heat exchanger, the gas temperature is reduced, and the chloride ions will condense in the dust and be collected by a bag dust collector.

[0004] However, at the beginning of the operation of the cement kiln dechlorination system, since the equipment is in a low-temperature state, the flue gas containing chloride ions extracted from the kiln tail will gradually cool down in this low-temperature area and eventually form a crust on the inner wall of the equipment, especially the equipment between the air intake device and the hot and cold air heat exchanger. Utility Model Content

[0005] The utility model aims to provide a cement kiln dechlorination system comprising a preheating device, which can effectively alleviate the problem of crusting and clogging on the inner wall surface of the dechlorination system equipment.

[0006] In order to achieve the above-mentioned purpose, the utility model provides a cement kiln dechlorination system including a preheating device, wherein the cement kiln dechlorination system including a preheating device comprises a preheating device and a dechlorination system, one end of the preheating device is connected to the kiln system, and the other end is connected to the front end of the dechlorination system;

[0007] A first high-temperature gate valve is arranged in the preheating device, a second high-temperature gate valve is arranged at the front end of the dechlorination system, and the connection position between the preheating device and the dechlorination system is located behind the second high-temperature gate valve.

[0008] Preferably, the preheating device further comprises an air intake pipe, one end of which is connected to the kiln system, and the other end of which is connected to the front end of the dechlorination system, and the first high-temperature gate valve is arranged on the air intake pipe.

[0009] Preferably, the air intake pipe is provided with a heat insulation structure.

[0010] Preferably, the opening size of the first high-temperature gate valve is adjustable, and the wind speed in the air intake duct is controlled by adjusting the first high-temperature gate valve, and the wind speed in the air intake duct is 19-22 m / s.

[0011] Preferably, the dechlorination system comprises an air intake device, a high-temperature cyclone, a forced cooling chamber, a bag dust collector and an exhaust fan connected in sequence, the inlet of the air intake device is connected to the kiln system and extracts exhaust gas from the kiln system, the forced cooling chamber comprises a cold air extraction device and a cold and hot air exchange chamber connected to the cold air extraction device, and the exhaust fan is used to discharge the gas filtered by the bag dust collector;

[0012] The second high-temperature gate valve is located at the front end of the air intake device.

[0013] Preferably, a temperature detection device is provided in front of the forced cooling chamber, and the temperature detection device controls the first high-temperature gate valve to close and the second high-temperature gate valve to open.

[0014] Preferably, when the temperature detected by the temperature detection device is not lower than 850° C., the first high-temperature gate valve is closed.

[0015] Preferably, a pipeline between the air intake device and the forced cooling chamber is provided with a heat preservation structure.

[0016] Preferably, the exhaust fan controls the air intake of the preheating device.

[0017] Preferably, the air intake of the preheating device is 1.5-3.0% of the tertiary air.

[0018] According to the above technical scheme, the preheating device of the utility model extracts high-temperature gas from the kiln system and then sends it to the dechlorination system to achieve the temperature increase of the dechlorination system at the beginning of startup. After the preheating device has been working for a period of time, the temperature of the equipment between the air intake device and the cold and hot air heat exchanger in the dechlorination system has increased. At this time, the flue gas containing chloride ions is introduced into the dechlorination system. Since the equipment has been heated, the high-temperature flue gas will no longer lose temperature, that is, the chloride ions will not crystallize on the inner wall surface of the equipment, so the inner wall of the equipment will no longer be crusted.

[0019] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present invention, but do not constitute a limitation to the present invention. In the accompanying drawings:

[0021] Figure 1 It is a schematic diagram of the structure of a cement kiln dechlorination system including a preheating device;

[0022] Figure 2 yes Figure 1 A partial view of the .

[0023] Description of Reference Numerals

[0024] 11 The first high temperature gate valve 21 The second high temperature gate valve

[0025] 12 air intake duct 31 air intake device

[0026] 32 high temperature cyclone 10 kiln system

[0027] 34 Bag dust collector 35 Exhaust fan

[0028] 331 Cold air extraction device 332 Cold and hot air interactive warehouse DETAILED DESCRIPTION

[0029] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0030] In the present utility model, unless otherwise stated, directional words contained in the terms such as "front end, front, back, in sequence, inside" merely represent the orientation of the term in normal use, or are common names understood by those skilled in the art, and should not be regarded as limitations on the term.

[0031] See also Figure 1-2 The cement kiln dechlorination system including a preheating device includes a preheating device and a dechlorination system, one end of the preheating device is connected to the kiln system 10, and the other end is connected to the front end of the dechlorination system;

[0032] A first high-temperature gate valve 11 is provided in the preheating device, a second high-temperature gate valve 21 is provided at the front end of the dechlorination system, and the connection position between the preheating device and the dechlorination system is located after the second high-temperature gate valve 21 .

[0033] Through the implementation of the above technical solution, the preheating device extracts high-temperature gas from the kiln system 10 and then sends it to the dechlorination system to achieve the temperature increase of the dechlorination system before startup. After the preheating device has been working for a period of time, the temperature of the equipment between the air intake device and the cold and hot air heat exchanger in the dechlorination system has increased. At this time, the flue gas containing chloride ions is introduced into the dechlorination system. Since the equipment has been heated, the high-temperature flue gas will no longer lose temperature, and the chloride ions will not crystallize on the inner wall of the equipment, so the inner wall of the equipment will no longer be crusted.

[0034] When the kiln system 10 needs to be dechlorinated, the first high-temperature gate valve 11 can be opened first, and after the preheating device is finished working, the first high-temperature gate valve 11 can be closed to block the air intake system of the preheating device. At this time, the second high-temperature gate valve 21 is opened, and the dechlorination system starts to extract the kiln tail flue gas and send it to the dechlorination system for dechlorination treatment.

[0035] In this embodiment, preferably, the preheating device also includes an air intake pipe 12 , one end of which is connected to the kiln system 10 , and the other end is connected to the front end of the dechlorination system, and the first high-temperature gate valve 11 is arranged on the air intake pipe 12 .

[0036] The cement kiln dechlorination system including a preheating device is provided with a first high-temperature gate valve 11 and a second high-temperature gate valve 21, and by controlling the opening timing of the first high-temperature gate valve 11 and the second high-temperature gate valve 21, the preheating device and the dechlorination system can work separately without affecting each other.

[0037] Since the dechlorination system extracts the flue gas from the kiln tail, which contains chloride ions, when the preheating device is working, the second high-temperature gate valve 21 must be closed to prevent the gas containing chloride ions from entering the dechlorination system and forming a crust on the surface of the low-temperature equipment.

[0038] Since the dechlorination system has not started working when the preheating device is working, the gas extracted by the preheating device needs to contain as few impurities as possible. In addition, in order to complete the heating of the dechlorination system equipment as quickly as possible, the temperature of the gas extracted by the preheating device also needs to be as high as possible.

[0039] Preferably, the preheating device extracts tertiary air, that is, the preheating device is connected to the tertiary air duct of the kiln system 10. The gas temperature in the tertiary air duct is higher and contains fewer impurities. Most importantly, compared with other equipment in the kiln system 10, the tertiary air duct is closest to the dechlorination system and is easier to set up the air intake duct 12. Therefore, the preheating device is set to take air from the tertiary air duct, which can effectively reduce the equipment cost and reduce the length of the air intake duct 12, thereby reducing the residence time of the high-temperature gas in the air intake duct 12, thereby improving the working efficiency of the preheating device.

[0040] Preferably, the air intake position of the preheating device is selected at a position above the cross section of the tertiary air duct. Since there is still some smoke and dust in the tertiary air duct, taking air from a position above the cross section of the tertiary air duct can extract as little smoke and dust as possible.

[0041] In this embodiment, preferably, the air intake pipe 12 is provided with a heat insulation structure.

[0042] A heat preservation structure is provided in the air intake pipe 12 to prevent the high-temperature gas from losing temperature in the air intake pipe 12, which can effectively improve the working efficiency of the preheating device.

[0043] Preferably, in order to prevent high-temperature gas from dissipating heat through the shell surface of the air intake duct 12 and to reduce the weight of the equipment, the lining thickness of the air intake duct 12 is not higher than the thickness of the lining of the tertiary air duct.

[0044] In this embodiment, preferably, the opening size of the first high-temperature gate valve 11 is adjustable, and the wind speed in the air intake duct 12 is controlled by adjusting the first high-temperature gate valve 11, and the wind speed in the air intake duct 12 is 19-22 m / s.

[0045] The preheating device relies on negative pressure to extract the high-temperature gas in the kiln system 10, and the fan equipment is used to generate negative pressure in the preheating device. In order to reduce the cost of the equipment, preferably, the preheating device can share the exhaust fan 35 in the dechlorination system. Therefore, when the preheating device is working, the exhaust fan 35 in the dechlorination system also needs to be turned on to extract the high-temperature gas in the kiln system 10 through the fan.

[0046] More preferably, in order to achieve effective preheating of the dechlorination system, the wind speed in the air intake pipe 12 can be adjusted to 19-22m / s. Controlling the wind speed in the air intake pipe 12 can, on the one hand, avoid heat loss caused by too fast wind speed. Due to too fast wind speed, the heat transfer time between the high-temperature gas and the equipment in the dechlorination system is insufficient, and the temperature of the gas entering the cooling chamber is still very high, which will cause waste of heat energy; on the other hand, controlling the wind speed in the air intake pipe 12 can also avoid the dechlorination system heating up too long due to too slow wind speed. If the wind speed is too slow, the amount of high-temperature gas introduced into the dechlorination system per unit time will be insufficient, which will cause the equipment to heat up too slowly.

[0047] In this implementation process, preferably, the dechlorination system includes an air intake device 31, a high-temperature cyclone 32, a forced cooling chamber, a bag dust collector 34 and an exhaust fan 35 connected in sequence, the inlet of the air intake device 31 is connected to the kiln system 10 and extracts exhaust gas from the kiln system 10, the forced cooling chamber includes a cold air extraction device 331 and a cold and hot air interaction chamber 332 connected to the cold air extraction device 331, and the exhaust fan 35 is used to discharge the gas filtered by the bag dust collector 34;

[0048] The second high-temperature gate valve 21 is located at the front end of the air intake device 31 .

[0049] When the preheating device is working, the cold air extraction device 331 in the dechlorination system also needs to be turned on to prevent the high-temperature gas from remaining at a high temperature after passing through the strong cooling chamber, thereby preventing other equipment after the strong cooling chamber from being damaged.

[0050] When the dechlorination system is working, the high-temperature gas is in a high-temperature state before the cooling chamber, with a temperature of about 1000°C. Therefore, the equipment before the strong cooling chamber in the dechlorination system has been treated with high-temperature resistance. However, after passing through the strong cooling chamber, the gas temperature drops rapidly to about 400°C. Therefore, in order to save equipment costs, the equipment after the cooling chamber has not been treated with high-temperature resistance and does not have the ability to withstand high temperatures.

[0051] When the preheating device is working, it is necessary to extract the high-temperature gas in the tertiary air duct, and the gas temperature is about 1000°C. These high-temperature gases need to raise the temperature of the equipment in front of the strong cooling chamber to a temperature at which chloride ions will not crystallize, about 850°C. Therefore, before the cooling chamber, the problem of these high-temperature gases will be about 850°C. Therefore, these high-temperature gases must be cooled before they can continue to be transmitted backwards, so that they can be discharged after being filtered by the dechlorination system. That is, when the preheating device is working, it is also necessary to open the cold air extraction device 331 so that the high-temperature gas extracted by the preheating device can be cooled in the cooling chamber, thereby avoiding the damage of the high-temperature gas to the subsequent equipment of the dechlorination system.

[0052] In this embodiment, preferably, a temperature detection device is provided in front of the strong cooling chamber, and the temperature detection device controls the first high-temperature gate valve 11 to close and the second high-temperature gate valve 21 to open.

[0053] A temperature detection device is provided in front of the forced cooling chamber to detect the working effect of the preheating device. When the temperature detection device detects that the equipment temperature has met the production requirements, the preheating device will be controlled to stop working, and the second high-temperature gate valve 21 will be opened to start the dechlorination system to dechlorinate the flue gas in the kiln system 10.

[0054] In this embodiment, preferably, when the temperature detected by the temperature detection device is not lower than 850° C., the first high-temperature gate valve 11 is closed.

[0055] The temperature for complete gasification or decomposition of chlorine-containing compounds generally needs to be no less than 950°C, while the temperature for gas-solid coexistence of chloride ions is 850-950°C, and the temperature for complete solidification of chloride ions needs to be no higher than 850°C.

[0056] Therefore, when the equipment temperature of the chlorine removal system rises to 850°C, it is difficult for chloride ions to crystallize and solidify on the inner wall of the equipment of the chlorine removal system. Therefore, when the equipment temperature of the chlorine removal system rises to not less than 850°C, the problem of chloride ion crystallization on the inner wall of the equipment of the chlorine removal system can be effectively alleviated.

[0057] In this embodiment, preferably, a heat preservation structure is provided in the pipeline between the air intake device 31 and the strong cooling chamber.

[0058] In this embodiment, preferably, the exhaust fan 35 controls the air intake volume of the preheating device.

[0059] The preheating device extracts the tertiary air through the exhaust fan 35.

[0060] In this embodiment, preferably, the air intake of the preheating device is 1.5-3.0% of the tertiary air.

[0061] In combination with the tertiary air volume of the cement kiln and the air discharge ratio of the dechlorination system, preferably, when the proportion of high-temperature tertiary air extracted by the preheating device from the tertiary air duct is 1.5-3.0% of the total tertiary air volume, the dechlorination system can be preheated with the highest efficiency without affecting the normal operation of the decomposition furnace.

[0062] According to the air intake volume of the air intake pipe 12 and the wind speed in the air intake pipe 12 of 19-22 m / s, the diameter of the preheating device can be calculated, thereby realizing a reasonable design of the preheating device.

[0063] In one embodiment, the air volume is set to 112500Nm3 / h, the extracted high-temperature air volume accounts for 2.0% of the total tertiary air volume, the wind temperature is 980°C, the wind speed in the air intake duct 12 is 20m / s, and the diameter of the air duct 12 of the preheating device is 428mm.

[0064] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, and these simple modifications all belong to the protection scope of the present invention.

[0065] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present utility model will not further describe various possible combinations.

[0066] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

Claims

1. A cement kiln dechlorination system comprising a preheating device, characterized in that: The cement kiln dechlorination system including a preheating device comprises a preheating device and a dechlorination system, one end of the preheating device is connected to the kiln system (10), and the other end is connected to the front end of the dechlorination system; A first high-temperature gate valve (11) is arranged in the preheating device, a second high-temperature gate valve (21) is arranged at the front end of the dechlorination system, and the connection position between the preheating device and the dechlorination system is located behind the second high-temperature gate valve (21).

2. The cement kiln dechlorination system comprising a preheating device according to claim 1, characterized in that: The preheating device also includes an air intake pipe (12), one end of which is connected to the kiln system (10) and the other end of which is connected to the front end of the dechlorination system, and the first high-temperature gate valve (11) is arranged on the air intake pipe (12).

3. The cement kiln dechlorination system comprising a preheating device according to claim 2, characterized in that: The air intake pipe (12) is provided with a heat insulation structure.

4. The cement kiln dechlorination system comprising a preheating device according to claim 2, characterized in that: The opening size of the first high-temperature gate valve (11) is adjustable, and the wind speed in the air intake pipe (12) is controlled by adjusting the first high-temperature gate valve (11). The wind speed in the air intake pipe (12) is 19-22 m / s.

5. The cement kiln dechlorination system comprising a preheating device according to any one of claims 2 to 4, characterized in that: The dechlorination system comprises an air intake device (31), a high-temperature cyclone (32), a forced cooling chamber, a bag dust collector (34) and an exhaust fan (35) which are connected in sequence, wherein the inlet of the air intake device (31) is connected to the kiln system (10) and extracts waste gas from the kiln system (10), the forced cooling chamber comprises a cold air extraction device (331) and a cold and hot air exchange chamber (332) connected to the cold air extraction device (331), and the exhaust fan (35) is used to discharge the gas filtered by the bag dust collector (34); The second high-temperature gate valve (21) is located at the front end of the air intake device (31).

6. The cement kiln dechlorination system comprising a preheating device according to claim 5, characterized in that: A temperature detection device is arranged in front of the strong cooling chamber, and the temperature detection device controls the first high-temperature gate valve (11) to close and the second high-temperature gate valve (21) to open.

7. The cement kiln dechlorination system comprising a preheating device according to claim 6, characterized in that: When the temperature detected by the temperature detection device is not lower than 850° C., the first high-temperature gate valve (11) is closed.

8. The cement kiln dechlorination system comprising a preheating device according to claim 7, characterized in that: The pipeline between the air intake device (31) and the strong cooling chamber is provided with a heat preservation structure.

9. The cement kiln dechlorination system comprising a preheating device according to claim 5, characterized in that: The exhaust fan (35) controls the air intake volume of the preheating device.

10. The cement kiln dechlorination system comprising a preheating device according to claim 9, characterized in that: The air intake of the preheating device is 1.5-3.0% of the tertiary air.

Citation Information

Cited By

  • Use method of cement kiln dechlorination system comprising preheating device

    CN117781712A