Roof separation instrument device for mine

Through the combination of design measurement mechanism and telescopic rod, accurate recording of top plate desolation meter data and multi-spec adaptability are achieved, the problem of low observation efficiency of top plate desolation meter in the existing technology is solved, and the safety production conditions of coal mines are improved .

CN222027592UActive Publication Date: 2024-11-19YUWU COAL CO LTD OF SHANXI LUAN GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420279608.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-11-19
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

The existing roof desolation instrument has a tunnel height of 3.8 meters, and the artificial observation of the naked eye is unclear, resulting in the weak roof desolation that cannot be identified, and the efficiency of climbing operations is low. The ladder needs to be frequently moved, affecting production safety.

Method used

A top plate desolator device for mines was designed. By setting up a measuring mechanism and telescopic rod, using a pull rope and sliding sleeve mechanism, the main data of the desolator is converted to an observable position, and combining a scale meter and a reset mechanism to realize the data. Accurate recording and multi-spec adaptability.

Benefits of technology

It solves the problem that the roof desolator is difficult to accurately observe, improves observation efficiency, reduces the frequency of manual climbing operations, and enhances the practicality and safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222027592U_ABST
    Figure CN222027592U_ABST
Patent Text Reader

Abstract

The utility model discloses a roof separation instrument device for a mine, and relates to the technical field of mine tunnel monitoring equipment. Comprising a rectangular sleeve, a telescopic rod is fixedly installed on the lower surface of the rectangular sleeve, a measuring mechanism is arranged at the position, close to the lower side, of the telescopic rod, a transverse plate is installed in the rectangular sleeve through a first locking bolt, and first sliding sleeves are installed at the positions, located on the left and right side faces of the rectangular sleeve, of the transverse plate; reset mechanisms are arranged between the front and rear side faces of the first sliding sleeves and the front and rear side faces of the rectangular sleeve, U-shaped clamping blocks are fixedly installed on the upper surfaces of the first sliding sleeves, and second sliding sleeves are installed on the transverse plate close to the left and right positions. According to the device for measuring the data of the bed separation instrument main body, the data of the bed separation instrument main body is accurately recorded by observing the corresponding dial gauge on the telescopic rod, the problem that the bed separation instrument is difficult to accurately observe is solved, the data of the bed separation instrument main body is converted to an observable position, and the device for measuring the data of the bed separation instrument main body can be matched with bed separation instrument main bodies of various specifications for installation and use. The practicability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mine tunnel monitoring equipment, in particular to a roof separation instrument device for mines. Background Art

[0002] Tunnel roof disaster is one of the five major disasters in my country's coal mines. Although with the continuous advancement of tunnel support technology, tunnel roof disasters have been effectively curbed, due to the complex underground geological conditions in coal mines and the properties of coal-bearing sedimentary rocks, tunnel deformation, especially tunnel roof deformation, is inevitable due to the influence of mining activities and the stress redistribution generated. The basic characteristic of tunnel roof deformation is that the bending deformation of shallow coal and rock strata is greater than that of deep coal and rock strata, which leads to the incoordination of the deformation of shallow and deep surrounding rocks of the tunnel roof, resulting in delamination of shallow and deep rock strata. The amount of delamination reflects the degree of bending deformation of the tunnel. When the coal and rock strata are bent and deformed, they are in a tensile state. Since the tensile strength of the coal and rock strata is very low, they are easily broken, resulting in roof collapse disasters.

[0003] In order to monitor the changes in the delamination of the tunnel roof in real time, in the actual production process of coal mines, holes are often drilled in the tunnel roof to install roof delamination meters for real-time monitoring. The roof delamination meter is a special monitoring instrument for monitoring the movement of the roof rock layer. The roof delamination meter is also called a roof delamination indicator, which can effectively ensure the safe production of coal mines. In addition, digital display roof delamination meters and online monitoring roof delamination meters have also been developed.

[0004] In the prior art, the height of the fully-mechanized mining face tunnel is 3.8 meters, and the "roof separation meter" is installed on the tunnel roof to observe the roof separation. Since the instrument is a mechanical structure instrument, the scale is accurate to mm, and the data needs to be observed manually with the naked eye. Since the tunnel height is 3.8 meters, the naked eye cannot see clearly, resulting in the inability to identify the slight roof separation through the visual separation meter. If the roof separation meter data is viewed by climbing, 2-3 people are required to lift the iron ladder and wear safety belts to climb up for close viewing. Due to the long length of the underground tunnel, the iron ladder needs to be carried over a long distance and the climbing operation needs to be frequent, resulting in low observation efficiency. Utility Model Content

[0005] The utility model provides a roof separation instrument device for a mine, so as to solve the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a roof separation meter device for a mine, comprising a rectangular sleeve, a telescopic rod is fixedly installed on the lower surface of the rectangular sleeve, a measuring mechanism is arranged on the telescopic rod near the lower side, a cross plate is installed in the rectangular sleeve through a first locking bolt, a first sliding sleeve is installed on the cross plate at the left and right side positions of the rectangular sleeve, a reset mechanism is arranged between the front and rear side faces of the first sliding sleeve and the front and rear side faces of the rectangular sleeve, a U-shaped clamping block is fixedly installed on the upper surface of the first sliding sleeve, a second sliding sleeve is installed on the cross plate near the left and right positions, and the second sliding sleeve is locked and fixed to the cross plate through a second locking bolt, a fixing plate is fixedly installed on the upper surface of the second sliding sleeve, and a separation meter body is arranged between the left and right fixing plates, a pull rope is arranged on the surface facing the first sliding sleeve, and a guide wheel group is arranged on the second sliding sleeve corresponding to the pull rope, and the pull rope passes through the guide wheel group and is fixedly connected to the measuring mechanism.

[0007] Furthermore, the telescopic rod includes a first sleeve, a first fastener, a second sleeve, a second fastener and a third sleeve, the second sleeve is inserted into the upper surface of the first sleeve through the first fastener, the third sleeve is installed on the upper surface of the second sleeve through the second fastener, and the upper surface of the third sleeve is fixedly connected to the lower surface of the rectangular sleeve.

[0008] Furthermore, the measuring mechanism includes a scale, a limit ring, a movable sleeve, a through hole and a third locking bolt. The scale is fixedly mounted on the first sleeve. A limit ring is installed on the upper side of the scale. A movable sleeve is provided on the upper movable sleeve of the scale on the lower side of the limit ring. A through hole is opened on the movable sleeve at a position corresponding to the pull rope, and the pull rope is inserted into the through hole. The movable sleeve is locked and fixed to the pull rope by the third locking bolt.

[0009] Furthermore, the resetting mechanism includes a fixing block and an elastic rubber band, the fixing blocks are respectively mounted on the rectangular sleeve and the first sliding sleeve, and the left and right fixing blocks are connected by an elastic rubber band.

[0010] Furthermore, the U-shaped clamp block is movably mounted on the delamination instrument body.

[0011] Furthermore, a non-slip rubber sleeve is fixedly installed on the telescopic rod near the lower side.

[0012] Compared with the prior art, the utility model provides a roof separation instrument device for mines, which has the following beneficial effects:

[0013] 1. The roof separation meter device for the mine drives the pull rope to move by setting a measuring mechanism, and the pull rope drives the U-shaped block on the first sliding sleeve to move. The U-shaped block and the white spring sleeve on the separation meter body slide to the corresponding scale. The data of the separation meter body is accurately recorded by observing the corresponding scale on the telescopic rod, which solves the problem that the roof separation meter is difficult to observe accurately and converts the data of the separation meter body to an observable position.

[0014] 2. The mine roof separation meter device is configured to move left and right in a rectangular sleeve by arranging a horizontal plate, and the first sliding sleeve and the second sliding sleeve move left and right on the horizontal plate, and then cooperate with the pull rope to adjust in the measuring mechanism, so that the equipment for measuring the main data of the separation meter can be installed and used in conjunction with the main body of the separation meter of various specifications, and has strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a cross-sectional view of a rectangular sleeve of the utility model;

[0017] Figure 3 It is a cross-sectional view of the measuring mechanism of the utility model.

[0018] In the figure: 1. rectangular sleeve; 2. telescopic rod; 201. first sleeve; 202. first fastener; 203. second sleeve; 204. second fastener; 205. third sleeve; 3. measuring mechanism; 301. scale; 302. limit ring; 303. movable sleeve; 304. through hole; 305. third locking bolt; 4. first locking bolt; 5. cross plate; 6. first sliding sleeve; 7. reset mechanism; 701. fixed block; 702. elastic rubber band; 8. U-shaped block; 9. second sliding sleeve; 10. second locking bolt; 11. fixed plate; 12. delamination instrument body; 13. pull rope; 14. guide wheel group; 15. anti-slip rubber sleeve. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-Figure 3The utility model discloses a roof separation instrument device for a mine, comprising a rectangular sleeve 1, a telescopic rod 2 is fixedly installed on the lower surface of the rectangular sleeve 1, a measuring mechanism 3 is arranged on the telescopic rod 2 near the lower side, a transverse plate 5 is installed in the rectangular sleeve 1 through a first locking bolt 4, first sliding sleeves 6 are installed on the transverse plate 5 at the left and right side positions of the rectangular sleeve 1, a reset mechanism 7 is arranged between the front and rear side surfaces of the first sliding sleeve 6 and the front and rear side surfaces of the rectangular sleeve 1, and a U-shaped measuring device 7 is fixedly installed on the upper surface of the first sliding sleeve 6. The cross plate 5 is provided with a second sleeve 9 near the left and right positions, and the second sleeve 9 is locked and fixed to the cross plate 5 by a second locking bolt 10, a fixing plate 11 is fixedly installed on the upper surface of the second sleeve 9, and a delamination meter body 12 is arranged between the left and right fixing plates 11, a pull rope 13 is arranged on the facing surface of the first sleeve 6 and the second sleeve 9, and a guide wheel group 14 is arranged on the second sleeve 9 corresponding to the pull rope 13, and the pull rope 13 passes through the guide wheel group 14 and is fixedly connected to the measuring mechanism 3.

[0021] Specifically, the telescopic rod 2 includes a first sleeve 201, a first fastener 202, a second sleeve 203, a second fastener 204 and a third sleeve 205. The second sleeve 203 is inserted into the upper surface of the first sleeve 201 through the first fastener 202, and the third sleeve 205 is installed on the upper surface of the second sleeve 203 through the second fastener 204. The upper surface of the third sleeve 205 is fixedly connected to the lower surface of the rectangular sleeve 1.

[0022] In this embodiment, the first fastener 202 is loosened or tightened to allow the second sleeve 203 to move up and down in the first sleeve 201, and the second fastener 204 is loosened or tightened to allow the third sleeve 205 to move up and down in the second sleeve 203, thereby achieving the effect of adjusting the height of the rectangular sleeve 1.

[0023] Specifically, the measuring mechanism 3 includes a scale 301, a limit ring 302, a movable sleeve 303, a through hole 304 and a third locking bolt 305. The scale 301 is fixedly installed on the first sleeve 201. The limit ring 302 is installed on the upper side of the scale 301. The movable sleeve 303 is provided on the upper side of the scale 301 under the limit ring 302. A through hole 304 is opened on the movable sleeve 303 at a position corresponding to the pull rope 13, and the pull rope 13 is inserted into the through hole 304. The movable sleeve 303 is locked and fixed to the pull rope 13 by the third locking bolt 305.

[0024] In this embodiment, the movable sleeve 303 moves up and down along the scale 301 to achieve the measurement effect. The limit ring 302 limits the initial position of the movable sleeve 303. The third locking bolt 305 is loosened or tightened to allow the pull rope 13 to pass through the through hole 304, and the pull rope 13 is locked and fixed to the movable sleeve 303.

[0025] Specifically, the resetting mechanism 7 includes a fixing block 701 and an elastic rubber band 702 . The fixing block 701 is respectively mounted on the rectangular sleeve 1 and the first sliding sleeve 6 , and the left and right fixing blocks 701 are connected by the elastic rubber band 702 .

[0026] In this embodiment, the elastic rubber band 702 pulls the first sliding sleeve 6 to move, so that the first sliding sleeve 6 is reset.

[0027] Specifically, the U-shaped block 8 is movably mounted on the delamination instrument body 12 .

[0028] In this embodiment, the U-shaped block 8 moves stably left and right along the delamination instrument body 12 .

[0029] Specifically, a non-slip rubber sleeve 15 is fixedly installed on the telescopic rod 2 near the lower side.

[0030] In this embodiment, the anti-skid rubber sleeve 15 makes the telescopic rod 2 more comfortable to hold and less likely to slip out of the hand.

[0031] When in use, according to the specifications of the delamination instrument body 12, the first locking bolt 4 is loosened or tightened, and the rectangular sleeve 1 moves left and right on the horizontal plate 5. At the same time, the second locking bolt 10 is loosened or tightened, so that the left and right fixing plates 11 move left and right on the horizontal plate 5. Then, the first fastener 202 on the telescopic rod 2 is loosened or tightened to make the second sleeve 203 move up and down in the first sleeve 201. The second fastener 204 is loosened or tightened to make the third sleeve 205 move up and down in the second sleeve 203, so as to achieve the effect of adjusting the height of the rectangular sleeve 1. , by holding the telescopic rod 2, the lower surface of the rectangular sleeve 1 is fitted with the lower surface of the delamination instrument body 12, the left and right fixed plates 11 clamp the left and right sides of the delamination instrument body 12, and the U-shaped clamping block 8 is movably arranged on the delamination instrument body 12. At the same time, the movable sleeve 303 in the measuring mechanism 3 moves to the lower surface position of the limit ring 302, and the movable sleeve 303 is locked and fixed with the pull rope 13 by the third locking bolt 305. The initial position of the U-shaped clamping block 8 is the maximum position of the deep and shallow base points (the shallow base point is 120mm , deep base point 180mm), when the deep and shallow base points change, the white spring sleeves at both ends of the separation instrument body 12 slide to the corresponding scales, and the movable sleeve 303 is manually pulled downward to make the movable sleeve 303 drive the pull rope 13 to move downward, and the pull rope 13 drives the first sliding sleeve 6 to move along the cross plate 5, and the first sliding sleeve 6 drives the U-shaped block 8 to move along the separation instrument body 12. When the U-shaped block 8 fits with the white spring sleeves at both ends of the separation instrument, the sliding distance of the white spring sleeves at both ends of the separation instrument body 12 can be obtained by observing the distance that the movable sleeve 303 moves downward on the scale 301. After the measurement is completed, the movable sleeve 303 is released, and the elastic rubber band 702 in the reset mechanism 7 pulls the U-shaped block 8 back to the initial position through the first sliding sleeve 6 for the next measurement, thereby solving the problem that the roof separation instrument body 12 is difficult to observe accurately, and converting the data of the separation instrument body 12 to an observable position. The separation instrument body 12 can be installed and used in conjunction with separation instrument bodies 12 of various specifications, and has strong practicality.

[0032] To sum up, the roof delamination meter device for mines can accurately record the data of the delamination meter body 12 by observing the corresponding scale 301 on the telescopic rod 2, solve the problem that the roof delamination meter is difficult to observe accurately, and convert the data of the delamination meter body 12 to an observable position. In addition, the equipment for measuring the data of the delamination meter body 12 can be installed and used with delamination meter bodies 12 of various specifications, and has strong practicality.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A roof separation instrument device for use in a mine, comprising a rectangular sleeve (1), characterized in that: A telescopic rod (2) is fixedly mounted on the lower surface of the rectangular sleeve (1), a measuring mechanism (3) is arranged on the telescopic rod (2) near the lower side, a transverse plate (5) is installed in the rectangular sleeve (1) via a first locking bolt (4), first sliding sleeves (6) are installed on the transverse plate (5) at left and right side positions of the rectangular sleeve (1), a reset mechanism (7) is arranged between the front and rear side positions of the first sliding sleeve (6) and the front and rear side positions of the rectangular sleeve (1), a U-shaped clamping block (8) is fixedly mounted on the upper surface of the first sliding sleeve (6), and a first locking bolt (4) is arranged on the left and right side positions of the transverse plate (5). A second sliding sleeve (9) is installed at each position, and the second sliding sleeve (9) is locked and fixed to the transverse plate (5) by a second locking bolt (10); a fixing plate (11) is fixedly installed on the upper surface of the second sliding sleeve (9), and a delamination instrument body (12) is arranged between the left and right fixing plates (11); a pull rope (13) is arranged on the surface of the first sliding sleeve (6) facing the second sliding sleeve (9), and a guide wheel group (14) is arranged on the second sliding sleeve (9) corresponding to the pull rope (13); the pull rope (13) passes through the guide wheel group (14) and is fixedly connected to the measuring mechanism (3).

2. A mine roof separation instrument device according to claim 1, characterized in that: The telescopic rod (2) comprises a first sleeve (201), a first fastener (202), a second sleeve (203), a second fastener (204) and a third sleeve (205); the second sleeve (203) is inserted into the upper surface of the first sleeve (201) via the first fastener (202); the third sleeve (205) is installed on the upper surface of the second sleeve (203) via the second fastener (204); and the upper surface of the third sleeve (205) is fixedly connected to the lower surface of the rectangular sleeve (1).

3. A mine roof separation instrument device according to claim 1, characterized in that: The measuring mechanism (3) comprises a scale (301), a limiting ring (302), a movable sleeve (303), a through hole (304) and a third locking bolt (305); the scale (301) is fixedly mounted on the first sleeve (201); a limiting ring (302) is mounted on the upper side of the scale (301); a movable sleeve (303) is provided on the upper side of the scale (301) below the limiting ring (302); a through hole (304) is provided on the movable sleeve (303) at a position corresponding to the pull rope (13); the pull rope (13) is inserted into the through hole (304); and the movable sleeve (303) is locked and fixed to the pull rope (13) by the third locking bolt (305).

4. A mine roof separation instrument device according to claim 1, characterized in that: The resetting mechanism (7) comprises a fixing block (701) and an elastic rubber band (702); the fixing block (701) is respectively mounted on the rectangular sleeve (1) and the first sliding sleeve (6); and the left and right fixing blocks (701) are connected via the elastic rubber band (702).

5. A mine roof separation instrument device according to claim 1, characterized in that: The U-shaped clamping block (8) is movably mounted on the delamination instrument body (12).

6. A mine roof separation instrument device according to claim 1, characterized in that: An anti-slip rubber sleeve (15) is fixedly mounted on the telescopic rod (2) near the lower side.