Formaldehyde synthesis device

By separating and recovering hydrogen from the tail gas in the formaldehyde synthesis unit, the problem of hydrogen resource waste in the silver catalytic oxidation method is solved, the tail gas is recycled, the company's operating costs are reduced, and the concentration of formaldehyde products is increased.

CN222034695UActive Publication Date: 2024-11-22HENAN SHENGHONGFENG CHEM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420626979.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-11-22
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

In existing technologies, the tail gas in the formaldehyde production process using silver catalytic oxidation contains a large amount of hydrogen, which is directly sent to a steam boiler for combustion, resulting in resource waste, increased operating costs for enterprises, and low formaldehyde product concentration.

Method used

Design a formaldehyde synthesis device. Through a first formaldehyde absorption tower and a second formaldehyde absorption tower, use a membrane separator to separate hydrogen from the exhaust gas and sell it as a by-product. At the same time, use the separated exhaust gas as an inert gas to form a quaternary gas mixture with a ternary gas mixture, which is used to produce formaldehyde by silver catalytic oxidation, thus realizing the recycling of exhaust gas.

Benefits of technology

The separation and recovery of hydrogen gas reduced the company's operating costs, increased the concentration of formaldehyde products, and boosted the company's revenue.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222034695U_ABST
    Figure CN222034695U_ABST
Patent Text Reader

Abstract

The utility model relates to a formaldehyde synthesis device which comprises a first formaldehyde absorption tower and a second formaldehyde absorption tower, the first formaldehyde absorption tower is communicated with a synthesis gas conveying pipe, and the synthesis gas conveying pipe is provided with an oxidation reactor, a flame-retardant filter, a first mixer tank body, a second mixer tank body, an air supercharger and an air filter. A steam conveying pipe and a formaldehyde steam conveying pipe are arranged on the first mixer tank body, a tail gas conveying branch pipe is arranged on the second mixer tank body, a separated gas conveying pipe is arranged on the second formaldehyde absorption tower, a membrane separator is arranged on the separated gas conveying pipe, and a hydrogen conveying pipe and a combustion gas conveying pipe are arranged on the membrane separator; a steam boiler is arranged on the combustion gas conveying pipe and provided with a tail gas conveying main pipe, the tail gas conveying branch pipe is communicated with the tail gas conveying main pipe, and the water vapor conveying pipe is installed on the steam boiler. And hydrogen in hydrogen-containing tail gas discharged by a formaldehyde absorption tower can be separated. The utility model has the advantages of convenient use and wide market prospect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of formaldehyde synthesis equipment, in particular to a formaldehyde synthesis device. Background Art

[0002] Under the action of catalyst, methanol is oxidized or dehydrogenated to produce formaldehyde, including main reaction 1 and main reaction 2: Main reaction 1: ; Main reaction 2: ; The first main reaction is oxidation reaction, and the second main reaction is dehydrogenation reaction. Both oxidation reaction and dehydrogenation reaction can produce formaldehyde. Since the temperatures required for oxidation reaction and dehydrogenation reaction are different, oxidation reaction is mainly occurring at 300°C to 450°C, while dehydrogenation reaction is mainly occurring at 600°C to 700°C. Two methods are also produced: iron-molybdenum oxide catalytic oxidation method, namely excess air oxidation method, referred to as iron-molybdenum method; silver catalytic oxidation method, namely excess methanol oxidation method, referred to as silver method. The difference between them lies in the different stoichiometric ratio of feed air / methanol and reaction temperature.

[0003] The iron-molybdenum production process was industrialized in the 1930s and is widely used abroad. The iron-molybdenum process is characterized by low reaction temperature. The temperature of the oxidation reaction is 320℃ to 380℃, which is much lower than the 600℃ to 650℃ of the excess methanol oxidation method using silver catalysts. Therefore, the service life of the catalyst is extended and there are fewer by-products of the oxidation reaction. The iron-molybdenum method uses Fe203 and Mo03 catalysts, and chromium and cobalt oxides are often added as co-catalysts. Methanol is mixed with excess air, and after purification and preheating, it enters the oxidation tower to react and generate formaldehyde. The iron-molybdenum process is represented by the technology of Sweden's Perstorp Company. Its advantages are large-scale equipment, methanol conversion rate can reach 95% to 99%, low methanol consumption, long catalyst life, and can produce formaldehyde with a concentration of 55% to 58%. The formaldehyde product produced by the iron-molybdenum process has high purity and low alcohol content, and can be directly used for downstream product production. The disadvantages are large investment and high power consumption. At present, about 30% of the world's formaldehyde production capacity uses the iron-molybdenum process.

[0004] The silver catalytic oxidation method of formaldehyde production was industrialized early, represented by the technology of BASF in Germany. The silver method uses silver wire mesh or silver particles laid in a thin layer as a catalyst. The excess methanol causes the reaction materials to exceed the upper explosion limit, and the reaction temperature is 600℃ to 650℃. Its advantages are mature technology, short process, low investment, and low power consumption. However, the methanol conversion rate is low, the unit consumption is high, the catalyst life is short, and the methanol purity requirements are high. There is more residual methanol in the product formaldehyde solution. Due to the addition of water vapor as a heat transfer method, it condenses into water after absorption, and can only produce low-concentration formaldehyde.

[0005] Since the silver process is mainly based on dehydrogenation reaction during the reaction process, the tail gas contains a large amount of hydrogen. In the prior art, there is a method of using tail gas as an inert gas and mixing it with a ternary mixed gas of air, water vapor and methanol vapor to form a reaction gas and send it to the methanol oxidizer for dehydrogenation and oxidation. The role of tail gas in this process is to act as an inert gas to take away part of the reaction heat, changing the practice of removing the reaction heat with the batching steam in the traditional process, thereby reducing the amount of steam added and the output of condensed water, and producing high-concentration formaldehyde. However, there are also corresponding disadvantages. The tail gas discharged from the formaldehyde absorption tower contains a large amount of hydrogen. After being directly sent to the steam boiler for combustion, although it can meet the requirements of the silver process for tail gas, due to the difficulty in producing hydrogen, it is a high-value-added industrial product, and there is a waste of materials in the use of materials, which is not conducive to enterprises reducing operating costs. Therefore, there is room for improvement, thereby improving the promotion of the process. Summary of the invention

[0006] In view of the deficiencies in the prior art, the utility model provides a formaldehyde synthesis device capable of separating hydrogen from hydrogen-containing tail gas discharged from a formaldehyde absorption tower, so as to overcome the defects in the prior art.

[0007] The technical solution adopted by the utility model is as follows: a formaldehyde synthesis device comprises a first formaldehyde absorption tower, the first formaldehyde absorption tower is connected to a second formaldehyde absorption tower, the first formaldehyde absorption tower is connected to a synthesis gas delivery pipe, the synthesis gas delivery pipe is sequentially provided with an oxidation reactor, a flame retardant filter, a first mixer tank body, a second mixer tank body, an air supercharger and an air filter in a direction from close to the first formaldehyde absorption tower to far away from the first formaldehyde absorption tower, the first mixer tank body is provided with an outlet end of a water vapor delivery pipe and an outlet end of a formaldehyde steam delivery pipe, the second mixer tank body is provided with an exhaust gas delivery pipe, and the exhaust gas delivery pipe is provided with an exhaust gas delivery pipe. A gas mixing device is respectively arranged between the delivery branch pipe, the water vapor delivery pipe and the first mixer tank body, between the first mixer tank body and the formaldehyde steam delivery pipe, and between the second mixer tank body and the tail gas delivery branch pipe. The second formaldehyde absorption tower is provided with an inlet end of a separation gas delivery pipe, a membrane separator is arranged on the outlet end of the separation gas delivery pipe, a hydrogen delivery pipe and a combustion gas delivery pipe are arranged on the membrane separator, a steam boiler is arranged on the combustion gas delivery pipe, the steam boiler is provided with a tail gas delivery main pipe, the tail gas delivery branch pipe is connected to the tail gas delivery main pipe, and the inlet end of the water vapor delivery pipe is installed on the steam boiler.

[0008] Preferably, the gas mixing device comprises a gas delivery elbow, a gas mixing cone and spiral blades which are sequentially arranged on the inner cavity of the first mixer tank body or the inner cavity of the second mixer tank body along a direction away from the flame retardant filter to close to the flame retardant filter.

[0009] Preferably, the outlet end of the formaldehyde vapor delivery pipe is installed on the corresponding gas mixing device, a methanol vaporizer is provided on the inlet end of the formaldehyde vapor delivery pipe, a liquid methanol delivery pipe is provided on the methanol vaporizer, and the liquid methanol delivery pipe is provided with a first boosting pump, a first regulating valve and a liquid formaldehyde storage tank in sequence along the direction from close to the methanol vaporizer to far away from the methanol vaporizer, and a liquid level sensor is provided on the liquid formaldehyde storage tank.

[0010] Preferably, the synthesis gas delivery pipe, formaldehyde steam delivery pipe and exhaust gas delivery branch pipe between the second mixer tank body and the air booster are respectively provided with a one-way valve, a first gas flow sensor and a second regulating valve in sequence along the direction close to the flame retardant filter to away from the flame retardant filter, the synthesis gas delivery pipe between the first mixer tank body and the second mixer tank body is provided with a second gas flow sensor, and the exhaust gas delivery main pipe on the side of the exhaust gas delivery branch pipe away from the steam boiler is provided with a third regulating valve.

[0011] Preferably, a first online chromatograph is provided on the synthesis gas delivery pipe between the first mixer tank body and the second mixer tank body, and a second online chromatograph is provided on the tail gas delivery branch pipe.

[0012] Preferably, the first formaldehyde absorption tower comprises a first tower body and a first packing layer arranged in the first tower body, the second formaldehyde absorption tower comprises a second tower body and a second packing layer arranged in the first tower body, a desalted water delivery pipe is arranged on the second tower body above the second packing layer, the second tower body below the second packing layer and the top of the first tower body are connected through a gas phase delivery pipe, the bottom end of the second tower body and the first tower body above the first packing layer are connected through an absorption liquid delivery pipe, the first tower body below the first packing layer is connected to a synthesis gas delivery pipe, the bottom end of the first tower body and the first tower body above the first packing layer are connected through a formaldehyde reflux delivery pipe, and the formaldehyde reflux delivery pipe and the absorption liquid delivery pipe are respectively and sequentially provided with a temperature sensor, a refrigerator, a fifth regulating valve and a third booster pump along the direction from close to the top of the first tower body to away from the top of the first tower body.

[0013] Preferably, a liquid formaldehyde delivery pipe is provided on the formaldehyde reflux delivery pipe between the fifth regulating valve and the third boosting pump, and a fourth regulating valve is provided on the liquid formaldehyde delivery pipe.

[0014] The beneficial effects of the utility model are as follows: firstly, the utility model realizes separation of hydrogen as a by-product from the hydrogen-containing tail gas discharged from the second formaldehyde absorption tower, and the tail gas after hydrogen separation is sent to the steam boiler as a part of the combustion product, and a part of it in the steam boiler is mixed with the ternary synthesis gas as an inert gas to form a quaternary mixed gas, thereby realizing the process flow of preparing formaldehyde by the silver catalytic oxidation method of the tail gas circulation method, and the separated hydrogen can be sold as a by-product, which increases the business income of the enterprise, thereby indirectly reducing the operation cost of the enterprise, and is convenient for the popularization and application of the technology.

[0015] Secondly, a liquid level sensor is arranged on the liquid formaldehyde storage tank of the utility model, and installation of the liquid level sensor is convenient for feeding back liquid level parameters.

[0016] Finally, a first online chromatograph is arranged on the synthesis gas delivery pipe between the first mixer tank and the second mixer tank described in the utility model, and a second online chromatograph is arranged on the tail gas delivery branch pipe; installing the first online chromatograph and the second online chromatograph facilitates the feedback of component parameters.

[0017] The utility model has the advantages of simple structure, convenient operation, ingenious design, greatly improved working efficiency, good social and economic benefits, and is a product that is easy to promote and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the utility model.

[0019] Figure 2 for Figure 1 A partial enlarged schematic diagram of detail A.

[0020] Figure 3 for Figure 1 A partial enlarged schematic diagram of detail B.

[0021] Figure 4 It is a structural schematic diagram of the components of the utility model. DETAILED DESCRIPTION

[0022] like Figures 1 to 4As shown, a formaldehyde synthesis device comprises a first formaldehyde absorption tower 1, the first formaldehyde absorption tower 1 is connected to a second formaldehyde absorption tower 2, the first formaldehyde absorption tower 1 is connected to a synthesis gas delivery pipe 3, the synthesis gas delivery pipe 3 is sequentially provided with an oxidation reactor 4, a flame retardant filter 5, a first mixer tank 6, a second mixer tank 7, an air supercharger 8 and an air filter 9 in a direction from close to the first formaldehyde absorption tower 1 to far away from the first formaldehyde absorption tower 1, the first mixer tank 6 is provided with an outlet end of a water vapor delivery pipe 10 and an outlet end of a formaldehyde vapor delivery pipe 11, the second mixer tank 7 is provided with an exhaust gas delivery branch pipe 12, the water vapor delivery pipe 10 and the first mixer tank 7 are connected to each other, and the exhaust gas delivery branch pipe 12 is connected to the exhaust gas delivery branch pipe 13. A gas mixing device is respectively arranged between the mixer tank bodies 6, between the first mixer tank body 6 and the formaldehyde vapor delivery pipe 11, and between the second mixer tank body 7 and the exhaust gas delivery branch pipe 12. The gas mixing device includes a gas delivery elbow 19, a mixing cone 20 and a spiral blade 21 which are arranged in sequence on the inner cavity of the first mixer tank body 6 or the inner cavity of the second mixer tank body 7 along the direction away from the flame retardant filter 5 to close to the flame retardant filter 5. The central axis of the gas delivery elbow 19 and the central axis of the mixing cone 20 are located on the same axis. The number of spiral blades 21 is several, and the several spiral blades 21 are evenly distributed in a star shape on the outside of the central axis of the mixing cone 20. The second formaldehyde absorption tower 2 is provided with an inlet end of a separation gas delivery pipe 13, a membrane separator 14 is provided on the outlet end of the separation gas delivery pipe 13, a tail gas compressor 46 is provided on the separation gas delivery pipe 13, a hydrogen delivery pipe 15 and a combustion gas delivery pipe 16 are provided on the membrane separator 14, a steam boiler 17 is provided on the combustion gas delivery pipe 16, the steam boiler 17 is provided with a tail gas delivery main pipe 18, the tail gas delivery branch pipe 12 is connected to the tail gas delivery main pipe 18, and the inlet end of the water vapor delivery pipe 10 is installed on the steam boiler 17.

[0023] The outlet end of the formaldehyde vapor delivery pipe 11 is installed on the corresponding gas mixing device, and a methanol vaporizer 22 is arranged on the inlet end of the formaldehyde vapor delivery pipe 11. The methanol vaporizer 22 is provided with a liquid methanol delivery pipe 23. The liquid methanol delivery pipe 23 is provided with a first boosting pump 24, a first regulating valve 25 and a liquid formaldehyde storage tank 26 in sequence along the direction from close to the methanol vaporizer 22 to away from the methanol vaporizer 22. A liquid level sensor 27 is provided on the liquid formaldehyde storage tank 26.

[0024] The synthesis gas delivery pipe 3 between the second mixer tank 7 and the air booster 8, the formaldehyde steam delivery pipe 11 and the tail gas delivery branch pipe 12 are respectively provided with a one-way valve 28, a first gas flow sensor 29 and a second regulating valve 30 in sequence along the direction from close to the flame retardant filter 5 to far away from the flame retardant filter 5, the synthesis gas delivery pipe 3 between the first mixer tank 6 and the second mixer tank 7 is provided with a second gas flow sensor 31, and the tail gas delivery main pipe 18 on the side of the tail gas delivery branch pipe 12 away from the steam boiler 17 is provided with a third regulating valve 32. The synthesis gas delivery pipe 3 between the first mixer tank 6 and the second mixer tank 7 is provided with a first online chromatograph 33, and the tail gas delivery branch pipe 12 is provided with a second online chromatograph 34.

[0025] The first formaldehyde absorption tower 1 includes a first tower body and a first packing layer arranged in the first tower body, the second formaldehyde absorption tower 2 includes a second tower body and a second packing layer arranged in the first tower body, a desalted water delivery pipe 35 is arranged on the second tower body above the second packing layer, the second tower body below the second packing layer and the top of the first tower body are connected through a gas phase delivery pipe 36, the bottom end of the second tower body and the first tower body above the first packing layer are connected through an absorption liquid delivery pipe 37, the first tower body below the first packing layer is connected to the synthesis gas delivery pipe 3, the bottom end of the first tower body and the first tower body above the first packing layer are connected through a formaldehyde reflux delivery pipe 38, and the formaldehyde reflux delivery pipe 38 and the absorption liquid delivery pipe 37 are respectively and sequentially provided with a temperature sensor 39, a refrigerator 40, a fifth regulating valve 41 and a third booster pump 42 along the direction from close to the top of the first tower body to away from the top of the first tower body. A liquid formaldehyde delivery pipe 43 is provided on the formaldehyde reflux delivery pipe 38 between the fifth regulating valve 41 and the third boosting pump 42 , a fourth regulating valve 44 is provided on the liquid formaldehyde delivery pipe 43 , and a third online chromatograph 45 is provided on the formaldehyde reflux delivery pipe 38 between the liquid formaldehyde delivery pipe 43 and the third boosting pump 42 .

[0026] The usage of this product is as follows: Figures 1 to 4 As shown, the following steps are included:

[0027] S1, turn on the air booster 8, the first booster pump 24 and the steam boiler 17, the outside air is filtered by the air filter 9 and then pressurized by the air booster 8 to form the boosted air, which enters the synthesis gas delivery pipe 3 and is then delivered to the inlet end of the second mixer tank 7. At the same time, the first booster pump 24 is kept in the started state, the liquid methanol stored in the liquid formaldehyde storage tank 26 is delivered to the methanol vaporizer 22 through the liquid methanol delivery pipe 23 to form formaldehyde vapor, and the methanol vapor is delivered to the corresponding gas mixing device through the formaldehyde vapor delivery pipe 11. Under the action of the gas mixing device, the boosted air and the formaldehyde vapor form a binary reaction gas and then continue to move along the inner cavity of the second mixer tank 7; at the same time, the steam boiler 17 produces The water vapor is transported to the inner cavity of the second mixer tank body 7 through the water vapor transport pipe 10 and the corresponding gas mixing device. Under the action of the gas mixing device, the binary reaction gas forms a ternary reaction gas with the water vapor, and then is transported to the first mixer tank body 6 after the flow parameter is fed back by the second gas flow sensor 31 and the component parameter is fed back by the first online chromatograph 33; a part of the exhaust gas discharged to the outside by the steam boiler 17 is transported to the corresponding gas mixing device through the exhaust gas transport branch pipe 12, the ternary reaction gas and the exhaust gas transported through the exhaust gas transport branch pipe 12 are mixed to form a quaternary reaction gas, and the quaternary reaction gas is transported to the oxidation reactor 4 for deoxidation and hydrogenation reaction to form formaldehyde synthesis gas and is sent to the first formaldehyde absorption tower 1.

[0028] S2, desalted water is transported to the desalted water delivery pipe 35, the desalted water is transported to the top of the second tower body to form a first absorption liquid and then continues to descend along the inner cavity of the second tower body and is enriched at the bottom of the second tower body, the first absorption liquid enriched at the bottom of the second tower body is transported to the top of the first tower body as the second absorption liquid through the absorption liquid delivery pipe 37 and after being cooled in the corresponding refrigerator 40, the second absorption liquid continues to descend along the inner cavity of the first tower body and is enriched at the bottom of the first tower body, the second absorption liquid is transported to the top of the first tower body through the formaldehyde reflux delivery pipe 38 and after being cooled in the corresponding refrigerator 40 Part of it is used as the reflux absorption liquid. After entering the inner cavity of the first tower body, the formaldehyde synthesis gas continues to ascend and is countercurrently contacted with the reflux absorption liquid and the second absorption liquid which continue to descend along the inner cavity of the first tower body. The formaldehyde component in the formaldehyde synthesis gas is absorbed in large quantities to form a secondary synthesis gas. The secondary synthesis gas is transported to the second tower body through the gas phase transport pipe 36. Then the secondary synthesis gas continues to ascend along the inner cavity of the first tower body and is countercurrently contacted with the first absorption liquid which continues to descend along the second tower body. The residual formaldehyde gas in the secondary synthesis gas is absorbed by the first absorption liquid and forms hydrogen-containing tail gas at the top of the second tower body.

[0029] S3, the hydrogen-containing tail gas is transported to the membrane separator 14 through the separation gas delivery pipe 13, the hydrogen component in the hydrogen-containing tail gas is transported outward through the hydrogen delivery pipe 15 and collected, the remaining tail gas is transported to the steam boiler 17 through the combustion gas delivery pipe 16 as a part of the combustion material, the burned tail gas is transported to the tail gas delivery main pipe 18, and part of the burned tail gas in the tail gas delivery main pipe 18 is transported to the tail gas delivery branch pipe 12 to form a circulation.

[0030] S4. When the parameters fed back by the third online chromatograph 45 reach the preset range, the second absorption liquid transported through the formaldehyde reflux delivery pipe 38 is divided into two parts. The first part is transported outward as a finished product through the liquid formaldehyde delivery pipe 43, and the second part is still transported along the formaldehyde reflux delivery pipe 38 to the top of the first tower body as a reflux absorption liquid.

[0031] It should also be noted that the exhaust gas transported through the exhaust gas transport branch pipe 12 has its component parameters fed back by the second online chromatograph 34. The staff should appropriately adjust the amount of water vapor and the exhaust gas transported through the exhaust gas transport branch pipe 12 based on the component parameters of the ternary reaction gas fed back by the first online chromatograph 33, so that the water vapor, compressed air, water vapor and exhaust gas as an inert gas in the quaternary reaction gas reach an appropriate ratio.

[0032] Through this embodiment, hydrogen is separated from the hydrogen-containing tail gas discharged from the second formaldehyde absorption tower 2 as a by-product, and the tail gas after hydrogen separation is sent to the steam boiler 17 as a part of the combustion product. A part of it in the steam boiler 17 is mixed with the ternary synthesis gas as an inert gas to form a quaternary mixed gas, thereby realizing the process of preparing formaldehyde by the silver catalytic oxidation method of the tail gas circulation method. The separated hydrogen can be sold as a by-product, which increases the company's operating income, thereby indirectly reducing the company's operating costs and facilitating the promotion and application of this technology.

[0033] The embodiments described above are only preferred embodiments of the present invention and are not intended to limit the scope of implementation of the present invention. Therefore, any equivalent changes or modifications made based on the structures, features and principles described in the patent scope of the present invention should be included in the patent application scope of the present invention.

Claims

1. A formaldehyde synthesis device, comprising a first formaldehyde absorption tower (1), wherein the first formaldehyde absorption tower (1) is connected to a second formaldehyde absorption tower (2), Features: The first formaldehyde absorption tower (1) is connected to a synthesis gas delivery pipe (3), and the synthesis gas delivery pipe (3) is provided with an oxidation reactor (4), a flame retardant filter (5), a first mixer tank (6), a second mixer tank (7), an air compressor (8) and an air filter (9) in sequence along the direction from close to the first formaldehyde absorption tower (1) to far away from the first formaldehyde absorption tower (1). The first mixer tank (6) is provided with an outlet end of a water vapor delivery pipe (10) and an outlet end of a formaldehyde vapor delivery pipe (11), and the second mixer tank (7) is provided with an exhaust gas delivery branch pipe (12). There are two outlets between the water vapor delivery pipe (10) and the first mixer tank (6), and between the first mixer tank (6) and the formaldehyde vapor delivery pipe (11). Gas mixing devices are respectively provided between the aldehyde steam delivery pipes (11) and between the second mixer tank (7) and the tail gas delivery branch pipe (12). The second formaldehyde absorption tower (2) is provided with an inlet end of a separation gas delivery pipe (13). A membrane separator (14) is provided at the outlet end of the separation gas delivery pipe (13). A hydrogen delivery pipe (15) and a combustion gas delivery pipe (16) are provided on the membrane separator (14). A steam boiler (17) is provided on the combustion gas delivery pipe (16). The steam boiler (17) is provided with a tail gas delivery main pipe (18). The tail gas delivery branch pipe (12) and the tail gas delivery main pipe (18) are connected. The inlet end of the water vapor delivery pipe (10) is installed on the steam boiler (17).

2. The formaldehyde synthesis device according to claim 1, Features: The gas mixing device comprises a gas delivery elbow (19), a gas mixing cone (20) and a spiral blade (21) which are arranged in sequence on the inner cavity of the first mixer tank (6) or the inner cavity of the second mixer tank (7) along a direction away from the flame retardant filter (5) to close to the flame retardant filter (5).

3. The formaldehyde synthesis device according to claim 1, Features: The outlet end of the formaldehyde vapor delivery pipe (11) is mounted on a corresponding gas mixing device, a methanol vaporizer (22) is arranged on the inlet end of the formaldehyde vapor delivery pipe (11), a liquid methanol delivery pipe (23) is arranged on the methanol vaporizer (22), a first booster pump (24), a first regulating valve (25) and a liquid formaldehyde storage tank (26) are arranged in sequence on the liquid methanol delivery pipe (23) in a direction from close to the methanol vaporizer (22) to far away from the methanol vaporizer (22), and a liquid level sensor (27) is arranged on the liquid formaldehyde storage tank (26).

4. The formaldehyde synthesis device according to claim 1, Features: A one-way valve (28), a first gas flow sensor (29) and a second regulating valve (30) are respectively arranged in sequence on the synthesis gas delivery pipe (3), the formaldehyde steam delivery pipe (11) and the tail gas delivery branch pipe (12) between the second mixer tank body (7) and the air booster (8) in a direction from close to the flame retardant filter (5) to far away from the flame retardant filter (5); a second gas flow sensor (31) is arranged on the synthesis gas delivery pipe (3) between the first mixer tank body (6) and the second mixer tank body (7); and a third regulating valve (32) is arranged on the tail gas delivery main pipe (18) on the side of the tail gas delivery branch pipe (12) far away from the steam boiler (17).

5. The formaldehyde synthesis device according to claim 1, Features: A first online chromatograph (33) is provided on the synthesis gas delivery pipe (3) between the first mixer tank body (6) and the second mixer tank body (7), and a second online chromatograph (34) is provided on the tail gas delivery branch pipe (12).

6. The formaldehyde synthesis device according to claim 1, Features: The first formaldehyde absorption tower (1) comprises a first tower body and a first packing layer arranged in the first tower body, and the second formaldehyde absorption tower (2) comprises a second tower body and a second packing layer arranged in the first tower body, a desalted water delivery pipe (35) is arranged on the second tower body above the second packing layer, the second tower body below the second packing layer and the top of the first tower body are connected through a gas phase delivery pipe (36), the bottom end of the second tower body and the first tower body above the first packing layer are connected through an absorption liquid delivery pipe (37), the first tower body below the first packing layer is connected to a synthesis gas delivery pipe (3), the bottom end of the first tower body and the first tower body above the first packing layer are connected through a formaldehyde reflux delivery pipe (38), and the formaldehyde reflux delivery pipe (38) and the absorption liquid delivery pipe (37) are respectively provided with a temperature sensor (39), a refrigerator (40), a fifth regulating valve (41) and a third booster pump (42) in sequence along a direction from close to the top of the first tower body to away from the top of the first tower body.

7. The formaldehyde synthesis device according to claim 6, Features: A liquid formaldehyde delivery pipe (43) is provided on the formaldehyde reflux delivery pipe (38) between the fifth regulating valve (41) and the third booster pump (42), and a fourth regulating valve (44) is provided on the liquid formaldehyde delivery pipe (43).