Partition wall conveying system for materials
By setting up channels, conveyor belts, air outlets and electrostatic poles in the partition wall conveying system of lithium ore, a wind wall and an electrostatic field is formed, which solves the safety hazards and dust pollution problems in traditional transmission methods, and achieves efficient and safe ore transmission .
Patent Information
- Application Number
- CN202420011684.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-03
AI Technical Summary
During the crushing and processing of lithium ore, traditional cart transmission methods have safety hazards and dust pollution, and the transmission efficiency is low.
A partition wall conveying system for materials was designed. By setting up channels and conveyor belts on the partition walls, and setting air outlets and static poles in the channel, forming wind walls and static fields, adsorbing dust, avoiding dust pollution, and improving transmission efficiency .
It improves the safety of the transmission process, reduces dust pollution, and improves the transmission efficiency, so that the ore can be efficiently transferred from the crushing bin to the processing bin, preventing dust from entering the processing bin.
Smart Images

Figure CN222041593U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of raw material processing, in particular to a partition wall conveying system for materials. Background Art
[0002] Some lithium ores are re-selected ores. After being transported back to the factory by truck, the ores need to be crushed. During the crushing process, a lot of dust will be generated, and some small particles will fly around. For safe production, a partition wall is added in the ore processing workshop, and the two sides of the partition wall are divided into a crushing bin and a processing bin. The crushing work is only carried out in the crushing bin, and the ore after crushing is sent to the processing bin for subsequent processing.
[0003] The conventional technical solution for conveying ore from the crushing bin to the processing is to transport it by cart. During the loading process, there are certain safety hazards and dust pollution, and the efficiency of conveying is low. Utility Model Content
[0004] In view of the technical problems of certain potential safety hazards, dust pollution and low transmission efficiency in the loading process, the utility model provides a partition wall transmission system for materials, which has the advantages of high safety, reduced dust pollution and high transmission efficiency.
[0005] The technical solution of the utility model is:
[0006] A material partition wall conveying system, one side of the partition wall is a crushing bin, the other side is a processing bin, the partition wall is provided with a passage connecting the crushing bin and the processing bin, the system comprises:
[0007] A conveyor belt passes through the passage, with two ends of the conveyor belt located on two sides of the partition wall respectively;
[0008] The air outlet is a long strip structure, with at least 4 air outlets distributed around the inner wall of the channel, the airflow passing through the air outlet flows toward the conveyor belt, and all the air outlets are close to the crushing bin;
[0009] A duct, one end of which is connected to all of the air outlets, and the other end of which is connected to an output port of a blower;
[0010] A plurality of electrostatic rods are vertically arranged on one side of the passage close to the processing chamber, and all of the electrostatic rods are located above the conveyor belt.
[0011] Optionally, a partition is provided in the middle of the channel, the middle of the partition is a hollow structure, the conveyor belt passes through the partition, and the inner side of the partition is close to the conveyor belt relative to the mouth of the air outlet.
[0012] Optionally, the partition is located on a side of the processing chamber close to the partition wall and is spaced apart from the side of the partition wall, and the electrostatic rod and the air outlet are respectively located on two sides of the partition.
[0013] Optionally, all the air outlets are arranged in an inclined shape toward one side of the crushing bin, and a flow direction of the airflow passing through the air outlet forms an angle less than 90° with a length direction of the conveyor belt.
[0014] Optionally, in the channel, the inclination angle of the air outlet at the bottom thereof is greater than the inclination angle of the air outlet at other positions.
[0015] Optionally, there is a distance between two adjacent electrostatic rods, and the lengths of all the electrostatic rods gradually increase from the middle of the channel to both sides.
[0016] Optionally, all the electrostatic rods form an arc structure at one end close to the conveyor belt.
[0017] Optionally, the channel is a square structure, and the bottom surface of the channel is inclined toward one side of the crushing bin.
[0018] Optionally, the loading surface of the conveyor belt is a V-shaped structure.
[0019] Compared with the prior art, the beneficial effects of the utility model are:
[0020] First, a channel is set on the partition wall, and a conveyor belt is set in the channel, and the two ends of the conveyor belt are respectively located in the crushing bin and the processing bin. The ore crushed in the crushing bin is conveyed to the processing bin by the conveyor belt, which has the advantage of high efficiency. In addition, during the entire crushing process, the staff only needs to participate when filling the crusher, so it has better safety than the existing technology.
[0021] In addition, in order to prevent the dust in the crushing bin from passing through the channel on the partition wall, a number of air outlets are arranged inside the partition wall, and high-speed airflow is blown out through the air outlets to form a wind wall to separate the crushing bin and the processing bin. In addition, the electrostatic rods arranged on the channel are used to absorb a small amount of dust passing through the wind wall, thereby completely preventing the dust from passing into the processing bin and avoiding dust pollution. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a schematic diagram of the three-dimensional structure in which the partition wall is located on one side of the processing chamber;
[0024] Figure 2 It is a schematic diagram of the three-dimensional structure in which the partition wall is located on one side of the crushing bin;
[0025] Figure 3 This is a schematic diagram of the front structure of the partition wall located on one side of the processing chamber. DETAILED DESCRIPTION
[0026] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the products of the present invention are conventionally placed when in use, or are the orientations or positional relationships conventionally understood by those skilled in the art, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0028] The embodiments of the present utility model are described in detail below with reference to the accompanying drawings.
[0029] Example:
[0030] See also Figure 1-Figure 3 A material partition conveying system, wherein the two sides of the partition wall 1 are a crushing bin and a processing bin, respectively, and a channel 2 connecting the crushing bin and the processing bin is provided on the partition wall 1, and the channel 2 is a square structure as a whole. The system includes a conveyor belt 3, an air outlet 4, a pipeline, a blower and an electrostatic rod 5.
[0031] Specifically, the conveyor belt 3 passes through the channel 2 on the partition wall 1, and the two ends of the conveyor belt 3 are respectively located in the crushing bin and the processing bin. The end of the conveyor belt 3 located in the crushing bin is arranged below the discharge port of the crusher, so that after the crusher crushes the ore, it can be directly transferred from the crushing bin to the processing bin through the conveyor belt 3.
[0032] The ore crushed in the crushing bin is conveyed to the processing bin by the conveyor belt 3, which has the advantage of high efficiency. In addition, during the whole crushing process, the staff is only required to participate when filling the crusher, so it has better safety compared with the prior art.
[0033] On the other hand, an air outlet 4 is provided on each of the four sides of the inner wall of the channel 2, and the air outlet 4 is a long strip structure. The two air outlets 4 located at the top and bottom of the inner side of the channel 2 have the same length direction as the length direction of the channel 2, and the air outlets 4 located at both sides of the channel 2 have the same length direction as the height direction of the channel 2.
[0034] The airflows passing through the four air outlets 4 all flow toward the conveyor belt 3 , so that a wind wall is formed in the channel 2 , and the conveyor belt 3 passes through the wind wall.
[0035] The four air outlets 4 are respectively connected to one end of a pipe, and the other ends of the four pipes are connected to the output port of the blower, so that air is supplied to the four air outlets 4 at the same time through the blower.
[0036] All air outlets 4 are arranged on the side of the channel 2 close to the crushing bin, and a plurality of electrostatic rods 5 are arranged on the side of the through slot close to the processing bin. One end of all electrostatic rods 5 is fixedly arranged on the top surface of the inner side of the channel 2, and the other end is arranged vertically downward, and all electrostatic rods 5 are located above the conveyor belt 3.
[0037] In this embodiment, in order to prevent the dust in the crushing bin from passing through the channel 2 on the partition wall 1, a plurality of air outlets 4 are arranged inside the partition wall 1, and high-speed airflow is blown out through the air outlets 4 to form a wind wall to separate the crushing bin and the processing bin. In addition, a small amount of dust passing through the wind wall is adsorbed by the electrostatic rod 5 arranged on the channel 2, thereby completely preventing the dust from passing through the processing bin and causing dust pollution.
[0038] In one specific embodiment:
[0039] A partition 6 is provided in the middle of the channel 2, and the middle of the partition 6 is a hollow structure. The outer dimension of the partition 6 is the same as the inner dimension of the channel 2, so the four sides of the partition 6 can be completely in contact with the inner wall of the channel 2, thereby connecting. The conveyor belt 3 passes through the middle of the partition 6, and the distance between the inner side of the partition 6 and the conveyor belt 3 is smaller than the distance between the mouth of the air outlet 4 and the conveyor belt 3.
[0040] In this embodiment, after the airflow outputted from the air outlet 4 impacts the conveyor belt 3, two airflows are formed, one of which flows into the crushing bin through the channel 2, and the other flows into the processing bin after passing through the channel 2, and both airflows carry dust. By providing the partition 6, the amount of airflow flowing into the processing bin can be reduced, thereby reducing the amount of dust entering the processing bin.
[0041] Preferably, the partition 6 is arranged on a side of the channel 2 close to the processing chamber, and there is a distance between the partition 6 and the side wall of the channel 2, and all the electrostatic rods 5 are arranged within the distance. At the same time, all the air outlets 4 and all the electrostatic rods 5 are arranged on both sides of the partition 6 respectively.
[0042] In another specific embodiment:
[0043] The mouths of all air outlets 4 are inclined toward the crushing bin, and the direction of the air flow through the air outlet 4 is at an angle less than 90° to the length direction of the conveyor belt 3. In the channel 2, the inclination angle of the air outlet 4 at the bottom of the channel 2 is greater than the inclination angle of the air outlet 4 at other positions in the channel 2.
[0044] In this embodiment, the air outlet 4 is tilted toward the crushing bin to prevent dust from passing through the channel 2 and to drive the dust away from the channel 2 at the same time.
[0045] In another specific embodiment:
[0046] There is a distance between two adjacent electrostatic rods 5, and the length of all electrostatic rods 5 gradually increases from the middle of the channel 2 to both sides. Usually, all electrostatic rods 5 form an arc structure near one end of the conveyor belt 3. By making the electrostatic rods 5 in the middle of the channel 2 shorter than the electrostatic rods 5 on both sides of the channel 2, the loading capacity of the conveyor belt 3 is increased, and the electrostatic rods 5 are prevented from contacting the crushed raw materials.
[0047] In another specific embodiment:
[0048] The bottom surface of the channel 2 is inclined toward the crushing chamber, so as to facilitate cleaning of dust deposited in the channel 2.
[0049] In another specific embodiment:
[0050] The loading surface of the conveyor belt 3 is a V-shaped structure to increase the loading capacity of the conveyor belt 3 .
[0051] The above-mentioned embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.
Claims
1. A material partition conveying system, one side of the partition is a crushing bin, and the other side is a processing bin, characterized in that: The partition wall is provided with a passage connecting the crushing chamber and the processing chamber. The system comprises: A conveyor belt passes through the passage, with two ends of the conveyor belt located on two sides of the partition wall respectively; The air outlet is a long strip structure, with at least 4 air outlets distributed around the inner wall of the channel, the airflow passing through the air outlet flows toward the conveyor belt, and all the air outlets are close to the crushing bin; A duct, one end of which is connected to all of the air outlets, and the other end of which is connected to an output port of a blower; A plurality of electrostatic rods are vertically arranged on one side of the passage close to the processing chamber, and all of the electrostatic rods are located above the conveyor belt.
2. The material partition wall conveying system according to claim 1, characterized in that: A partition is provided in the middle of the channel, the middle of the partition is a hollow structure, the conveyor belt passes through the partition, and the inner side of the partition is close to the conveyor belt relative to the mouth of the air outlet.
3. The material partition wall conveying system according to claim 2, characterized in that: The partition is located on a side of the processing chamber close to the partition wall and is spaced apart from the side of the partition wall. The electrostatic rod and the air outlet are respectively located on two sides of the partition.
4. The material partition wall conveying system according to claim 1, characterized in that: All the air outlets are arranged in an inclined shape toward one side of the crushing bin, and the flow direction of the airflow passing through the air outlets and the length direction of the conveyor belt form an angle less than 90°.
5. The partition wall conveying system for materials according to claim 4, characterized in that: In the channel, the inclination angle of the air outlet at the bottom thereof is greater than the inclination angles of the air outlet at other positions.
6. The material partition wall conveying system according to claim 1, characterized in that: There is a distance between two adjacent electrostatic rods, and the lengths of all the electrostatic rods gradually increase from the middle of the channel to both sides.
7. The partition wall conveying system for materials according to claim 6, characterized in that: All the electrostatic rods form an arc structure at one end close to the conveyor belt.
8. The partition wall conveying system for materials according to claim 1, characterized in that: The channel is a square structure, and the bottom surface of the channel is inclined toward one side of the crushing bin.
9. The partition wall conveying system for materials according to claim 1, characterized in that: The loading surface of the conveyor belt is a V-shaped structure.