Assembly type bridge pier column mounting and positioning device
By using a positioning cavity and indicator ring in bridge construction combined with laser and circumferential positioning light emitter, the complexity and positioning difficulty in the installation of pier columns are solved, and the precise alignment of pier columns and the construction efficiency is improved. .
Patent Information
- Application Number
- CN202420394423.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-01
AI Technical Summary
The installation process of pier columns in existing bridge construction is complex and difficult to position, resulting in a long construction period and it is difficult for traditional methods to achieve accurate vertical and circumferential alignment, which poses safety risks.
Design a prefabricated bridge pier column installation positioning device, including installing a positioning cavity on the support platform and installing a translucent indicator ring on the pier column, and using a laser emitter and a circumferential positioning light emitter to realize the perpendicularity of the pier column and the support platform. Align with the circumference, combine the concave and convex mating structure to prevent rotation, simplify operation and improve accuracy.
The intuitive and precise vertical and circumferential alignment of the pier columns is achieved, the construction process is simplified, the operation difficulty and safety risks are reduced, and the construction efficiency is improved.
Smart Images

Figure CN222043915U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction, and more specifically, to an assembly-type bridge pier installation and positioning device. Background Art
[0002] At present, the construction method of reinforced concrete bridges mainly adopts cast-in-place construction. The cast-in-place construction of piers, which is an important part of the bridge, leads to a long construction period for the entire bridge, which is one of the important reasons hindering the development of the whole bridge assembly. The use of assembly construction can greatly shorten the bridge construction period and reduce on-site construction. Prefabricated components are produced in factories to meet the requirements of standardization, mechanization, specialization, and informatization, and are in line with the direction of industrial development. As an important component for transmitting vertical loads and resisting horizontal loads, the construction quality of the bridge piers directly affects the overall structural performance and seismic performance of the bridge. The assembly bridge piers have high requirements for installation accuracy. In the existing construction process, it is necessary to embed upright steel bars on the pedestal where the piers are installed, embed steel pipes at the lower end of the piers, and set grouting holes connected to the outer surface of the piers at the upper and lower ends of the steel pipes. When hoisting the piers, the steel pipes at the lower end of the piers need to be aligned with the steel bars on the pedestal and lowered vertically. After adjusting the verticality, slurry is injected through the grouting holes connected to the steel pipes to fill the gap between the steel bars and the steel pipes. Although there are many lifting tools such as tower cranes, gantry cranes, and cranes, it is still difficult to accurately align the steel pipe at the lower end of the pier column with the steel bars on the cap. On the one hand, the position of the steel pipe and the steel bar is low, and the sight of the tower crane operator is blocked by the pier column. The operator cannot see the situation at the lower end of the pier column. The pier column can only be suspended within a rough range according to the command of the commander, and then the auxiliary personnel on the ground use manpower to push the suspended pier column to align the steel pipe with the steel bar, and then instruct the tower crane operator to lower the pier column; on the other hand, for the auxiliary personnel on the ground, the position of the steel pipe and the steel bar is also very low when they are aligned, and they need to bend over and lie on the ground to observe the steel pipe mouth at the lower end of the pier column. At this time, the auxiliary personnel lying on the ground must not only observe the steel pipe mouth at the lower end of the pier column, but also push the pier column hard to align the steel pipe mouth with the steel bar, which is difficult; if the force pushing the pier column is large, the tilt range of the pier column exceeds the standard, and the pier column is also in danger of overturning. Chinese Patent 2023215947935 discloses "A multi-segment prefabricated pier connection structure", in which cavities are set in the middle and on both sides of the pier body, a connecting beam is provided on the upper middle side of the pier body, and a left load-bearing column and a right load-bearing column are provided on both sides of the connecting beam, and multiple load-bearing steel bars are provided on the left and right load-bearing columns; multiple middle steel bars are provided on both sides of the middle of the connecting beam; side steel bars are provided at both ends of the connecting beam; and a stop connecting beam is provided in the middle of the pier body cavity. The pier connection structure plays the role of staggered fixed connection through the internal steel bars, which enhances the stability of the structure to a certain extent. However, this structure still does not solve the problems of complex operation and difficult positioning during the on-site installation and construction of the pier, and the modified pier connection structure changes the structure of the traditional pier, which is not conducive to the connection and inheritance of existing construction technology. Utility Model Content
[0003] The utility model aims to provide an assembled bridge pier installation and positioning device which has a simple structure, is easy to use and can be accurately positioned.
[0004] The utility model discloses an installation and positioning device for assembled bridge piers, comprising a positioning cavity installed on a pedestal and an indicator ring installed on the pier, wherein the positioning cavity has an inner cavity matching the cross-sectional shape of the pier, and a plurality of laser emitters for vertically emitting laser beams are evenly distributed around the inner cavity at the upper end of the positioning cavity, and the indicator ring is an annular structure made of a translucent material; the inner wall of the positioning cavity is provided with a concave-convex matching structure matching the outer wall of the pier; the upper end of the positioning cavity is provided with a circular positioning light emitter for vertically emitting light, and two of the circular positioning light emitters are symmetrically arranged on both sides of the upper end face of the positioning cavity; both sides of the indicator ring are provided with symmetrically arranged marks for circumferential positioning, and the marks are the protruding parts or the concave parts of the outer ring edge of the indicator ring.
[0005] Through this solution, both the tower crane operator and the ground assistant can judge whether the pier and the base are vertically aligned according to the laser spot on the indicator ring. They will not be blocked by the pier and do not have to climb down to observe the bottom of the pier. It has a simple structure, is easy to use and has accurate positioning.
[0006] Preferably, a connecting sleeve is provided at the lower end of the pier, the lower end of the connecting sleeve is open and flush with the lower end surface of the pier, and an upper grouting hole and a lower grouting hole connected to the connecting sleeve are provided on the side wall of the pier, and the concave-convex matching structure is a groove longitudinally arranged on the inner wall of the positioning cavity and a guide rod matching the two ends of the groove and respectively installed in the upper grouting hole and the lower grouting hole.
[0007] Through this solution, the pier column can be positioned in the circumferential direction during the lowering process, thereby preventing the pier column from rotating during the lowering process.
[0008] Preferably, the concave-convex matching structure is a convex rib longitudinally arranged on the inner wall of the positioning cavity and a pipe groove longitudinally arranged on the side wall of the pier column to match the convex rib.
[0009] Through this solution, the pier column can be positioned in the circumferential direction during the lowering process, thereby preventing the pier column from rotating during the lowering process.
[0010] Preferably, the circular positioning light emitter is a laser line projector installed at the upper end of the positioning cavity.
[0011] Through this solution, the laser line projector can be used in conjunction with the indicator ring to achieve the circumferential positioning of the pier.
[0012] Preferably, the circular positioning light emitter is a spotlight installed at the upper end of the positioning cavity and emitting a visible light beam vertically upward.
[0013] Through this solution, the circumferential positioning of the pier column can be achieved by using spotlights in conjunction with indicator rings.
[0014] Due to the adoption of the above technical scheme, the assembly-type bridge pier installation and positioning device described in the utility model helps on-site construction personnel to intuitively judge and align the connecting sleeve at the lower end of the beam pier with the connecting steel bar on the pedestal and put them together. It has a simple structure, is easy to use and has accurate positioning. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.
[0016] Figure 1 It is a half-section structural schematic diagram of an assembled bridge pier installation and positioning device according to one embodiment of the utility model.
[0017] Figure 2 yes Figure 1 A top view of the positioning cavity in an embodiment.
[0018] Figure 3 It is a three-dimensional perspective structural schematic diagram of the connection sleeve and the connection steel bar being aligned.
[0019] Figure 4 is a top view of a positioning cavity in another embodiment. DETAILED DESCRIPTION
[0020] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangements of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention.
[0021] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0022] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.
[0023] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0024] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0025] like Figure 1As shown, a prefabricated bridge pier installation and positioning device includes a positioning cavity 2 installed on a cap 1 and an indicator ring 3 installed on a pier 9. The structures of the cap 1 and the pier 9 are prior arts. When the cap 1 is constructed, connecting steel bars 11 are pre-buried in the cap 1. A plurality of the connecting steel bars 11 are arranged around the central axis of the cap 1 and the upper ends of the connecting steel bars 11 are exposed from the upper surface of the cap 1. When the pier 9 is produced and constructed in a factory, a connecting sleeve 91 is pre-buried at the lower end of the pier 9. The lower end of the connecting sleeve 91 is open and flush with the lower end surface of the pier 9. An upper grouting hole and a lower grouting hole connected to the connecting sleeve 91 are arranged on the side wall of the pier 9. A plurality of the connecting sleeves 91 are arranged around the central axis of the pier 9 and the number and position of the connecting sleeves 91 correspond one-to-one to the connecting steel bars 11. The task of installing the pier column is to align the pier column 9 vertically with the base 1, so that the connecting sleeve 91 at the lower end of the pier column 9 is accurately inserted into the connecting steel bar 11 on the base 1, and then grout is injected into the connecting sleeve 91 through the grouting hole to connect the connecting steel bar 11 and the connecting sleeve 91 together, thereby improving the stability of the pier column 9.
[0026] In order to facilitate the positioning and installation of the pier column 9, the utility model adopts a positioning cavity 2 in conjunction with an indicator ring 3 to intuitively indicate the relative position of the pier column 9 and the base 1 to the on-site construction personnel, without having to observe the position status of the connecting sleeve 91 and the connecting steel bar 11 on the bottom surface of the pier column 9; in this way, on the one hand, it solves the problem that the tower crane operator's line of sight is blocked by the pier column 9 and cannot see the bottom surface of the pier column 9, and on the other hand, it enables ground auxiliary personnel to understand whether the connecting sleeve 91 and the connecting steel bar 11 are aligned without having to lie down.
[0027] The positioning cavity 2 has an inner cavity that matches the cross-sectional shape of the pier column. The cross-sectional shape of the conventional pier column 9 is circular or elliptical, and the inner cavity of the positioning cavity 2 that matches it is also circular or elliptical. For easy disassembly and assembly, two symmetrical arc structures can be docked and connected together by a lock. Figure 2 As shown, the lock buckle includes lock hooks fixedly connected to both sides of the arc structure and lock pins 22 installed on the lock hooks 21. The lower ends of the lock hooks 21 are connected to the side walls of the arc structure, and the upper ends are away from the side walls of the arc structure for a certain distance. Both ends of the lock pin 22 have hook heads bent downward. When the two arc structures are relatively butt-jointed together, the lock hooks 21 are fitted together in pairs. At this time, just insert the lock pin 22 into the gap between the lock hook 21 and the side wall of the arc structure so that the hook heads at both ends of the lock pin 22 hook the two lock hooks 21 respectively. In this way, the two arc structures can be fixed together to form a complete positioning cavity 2 with a circular or elliptical inner cavity.
[0028] A plurality of laser emitters 4 emitting laser beams 41 vertically upward are evenly distributed around the inner cavity at the upper end of the positioning cavity 2. The indicator ring 3 is an annular structure made of a translucent material, and the inner diameter of the indicator ring 3 matches the outer diameter of the pier 9. There are many ways to fix the indicator ring 3 on the pier 9. For example, a radially arranged screw rod can be connected to the indicator ring 3 by threading, and the inner end of the screw rod points to the center of the indicator ring 3. A handle is provided at the outer end of the screw rod. After the indicator ring 3 is put on the pier 9, the inner short end of the screw rod can be pushed against the outer wall of the pier 9 by rotating the screw rod by the handle. In addition, after the indicator ring 3 is put on the pier 9, materials such as cork, rubber pad, and foaming agent can be filled between the inner annular surface of the indicator ring 3 and the outer wall of the pier 9 to fix the indicator ring 3 on the outer wall of the pier 9.
[0029] When the laser beam 41 emitted by the laser transmitter 4 hits the indicator ring 3, a light spot will be formed on the indicator ring 3. The laser beam 41 emitted vertically upward will only produce a light spot directly above the positioning cavity 2. The tower crane operator and ground assistant personnel only need to observe whether a light spot is formed on the indicator ring 3 and the position and number of the light spots to determine whether the indicator ring 3 is directly above the positioning cavity 2. When the indicator ring 3 is installed on the pier 9, it can be determined whether the pier 9 is directly above the positioning cavity 2.
[0030] In addition, in order to maintain stability when lowering the pier 9, the inner wall of the positioning cavity 2 is provided with a concave-convex matching structure matching the outer wall of the pier.
[0031] As a further improvement of the utility model, Figure 1 , Figure 2 As shown, a laser line projector 5 is symmetrically arranged at the upper end of the positioning cavity 2. There are two laser line projectors 5, which are arranged on both sides of the positioning cavity 2. When installing the pier 9, the laser line projector 5 can project a longitudinal laser line on the side wall of the pier 9. The laser line projected on the side wall of the pier 9 can verify the verticality of the pier 9 on the one hand, and on the other hand, by observing the position of the upper end of the laser line projected on the indicator ring 3, it can be judged whether the connecting sleeve 91 at the lower end of the pier 9 is aligned with the connecting steel bar 11 on the base 1 in the circumferential direction. Figure 2 , Figure 3As shown, if the laser line projector 5 is installed on the extension line R of the line connecting a certain connecting steel bar 11 and the center point of the positioning cavity 2, and at the same time, protruding parts or concave parts are symmetrically set on both sides of the indicator ring 3 as marks 31, when the indicator ring 3 is installed on the pier 9, the marks 31 on both sides of the indicator ring 3 are located on the extension line R1 of the line connecting a certain connecting sleeve 91 and the center point of the pier 9. When hoisting the pier 9, the direction of the longitudinal laser line projected by the laser line projector 5 is adjusted so that the longitudinal laser line passes through the connecting steel bar 11 and the center point of the positioning cavity 2. At this time, the angle of the pier 9 is adjusted. If the upper end of the laser line passes through the mark on the indicator ring 3, it means that the connecting sleeve 91 at the lower end of the pier 9 is aligned with the connecting steel bar 11 on the base 1 in the circumferential direction. The pier 9 can be vertically lowered to accurately fit the connecting sleeve 91 on the connecting steel bar 11. Of course, the laser line projector 5 may not be on the extension line R of the line connecting the connecting steel bar 11 and the center point of the positioning cavity 2, that is to say, the laser line projector 5 has a certain deflection angle between the extension line R in the circumferential direction. In this case, as long as the mark 31 on the indicator ring 3 is deflected by the same angle relative to the line connecting the connecting sleeve 91 and the center point of the pier 9 when installing the indicator ring 3, the connecting sleeve 91 can still be aligned with the connecting steel bar 11 in the circumferential direction by aligning the upper end of the laser line with the mark 31.
[0032] like Figure 1 , Figure 2 As shown, the lower end of the pier 9 is provided with a connecting sleeve 91, the lower end of the connecting sleeve 91 is open and flush with the lower end surface of the pier 9, and the side wall of the pier 9 is provided with an upper grouting hole and a lower grouting hole connected to the connecting sleeve 91. The concave-convex matching structure is a groove 6 longitudinally arranged on the inner wall of the positioning cavity 2 and a guide rod 61 matching the groove 6 and installed in the upper grouting hole and the lower grouting hole respectively at both ends. The number of the grooves 6 can be two, three or four, and they are evenly distributed around the circumference of the inner wall of the positioning cavity 2. The guide rod 61 extends longitudinally close to the side wall of the pier 9, and has direct bending sections at its upper and lower ends, and the direct bending sections at both ends are respectively inserted in the upper grouting hole and the lower grouting hole. The inner cavity of the positioning cavity 2 is a trumpet shape with an inner diameter of the upper end larger than that of the lower end. When the pier 9 is placed vertically downward, the guide rod 61 is correspondingly inserted into the groove 6, which can prevent the pier 9 from rotating, so that it will not deflect in the circumferential direction and be placed vertically. The inner cavity of the horn-shaped positioning cavity 2 can smoothly put the pier 9 with a slight deviation in the vertical direction into the inner cavity of the positioning cavity 2 and correct its deviation in the vertical direction. Of course, the angle of the horn should not be too large, preferably no more than 10 degrees.
[0033] As another embodiment of the present invention, Figure 4As shown, the concave-convex matching structure is a convex rib 7 longitudinally arranged on the inner wall of the positioning cavity 2 and a pipe groove longitudinally arranged on the side wall of the pier 9 to match the convex rib 7. In order to facilitate the installation of drainage pipes, the existing assembled bridge piers will be provided with concave pipe grooves on both sides. At this time, as long as the convex rib 7 matching it is provided on the inner wall of the positioning cavity 2, during the lowering process of the pier 9, the convex rib 7 is aligned with the pipe groove, which can also play a role in positioning the pier 9 in the circumferential direction and preventing deflection. Of course, since there are only two pipe grooves on the pier 9, only two corresponding convex ribs 7 are required.
[0034] The utility model discloses a method for installing and positioning a prefabricated bridge pier, comprising the following steps:
[0035] Step 1, construct the cap 1 and the pier 9 respectively. When constructing the cap 1, pre-embed the connecting steel bars 11 in the cap 1. Multiple connecting steel bars 11 are arranged around the central axis of the cap 1 and the upper end of the connecting steel bars 11 is exposed on the upper surface of the cap 1. When constructing the pier 9, pre-embed the connecting sleeve 91 at the lower end of the pier 9. The lower end of the connecting sleeve 91 is open and flush with the lower end surface of the pier 9. The connecting sleeve 91 is longitudinally arranged in the pier 9 and parallel to the axis of the pier 9. The side wall of the pier 9 is provided with an upper grouting hole and a lower grouting hole connected to the connecting sleeve 91. Multiple connecting sleeves 91 are arranged around the central axis of the pier 9 and the number and position of the connecting sleeves 91 correspond one-to-one to the connecting steel bars 11.
[0036] Step 2: The annular positioning cavity 2 is fixedly mounted on the upper surface of the pedestal 1, and the plurality of connecting steel bars 11 are located at the center of the inner cavity of the positioning cavity 2 matching the cross-sectional shape of the pier column, that is, the inner cavity of the positioning cavity 2 is concentric with the mounting position of the pier column 9 to be installed on the pedestal 1; a plurality of laser emitters 4 for vertically emitting laser beams 41 upward are arranged at the upper end of the positioning cavity 2, and an indicator ring 3 of an annular structure made of a translucent material for displaying the laser beam emitted by the laser emitter 4 is mounted on the pier column 9;
[0037] Step three, lift the pier 9 vertically and move it to the top of the platform 1, turn on the laser emitter 4 and adjust the verticality of the emitted laser beam 41, observe the light spot of the laser beam 41 hitting the indicator ring 3, if the light spot position is not correct, it means that the pier 9 is not vertically aligned with the platform 1, that is, if the laser beam 41 fails to form a light spot on the indicator ring 3 or there is a small amount of light spot but the position of the light spot is biased to one side, it means that the pier 9 is not vertically aligned with the installation position on the platform 1, at this time, it is necessary to move the pier 9 forward, backward, left and right until the laser beam hits the indicator ring 3 The light spot is evenly distributed along the circumference of the indicator ring 3, which indicates that the pier column 9 and the cap 1 are vertically aligned. Then the pier column 9 is vertically lowered, so that the lower end of the pier column 9 is vertically inserted into the positioning cavity 2. The positioning cavity 2 is used to constrain and limit the pier column 9, so that the connecting sleeve 91 at the lower end of the pier column 9 is correspondingly inserted into the connecting steel bar 11 of the cap 1; of course, in order to facilitate and smoothly lower the pier column 9 into the positioning cavity 2, a trumpet with a larger upper part and a smaller lower part can be set at the upper end of the positioning cavity 2. When lowering the pier column 9, the guiding effect of the trumpet is used to locate the center of the pier column 9. Finally, the pier column 9 is accurately placed on the installation position of the cap 1.
[0038] Step 4: remove the positioning cavity 2 and the indicator ring 3, and inject grout into the connecting sleeve 91 through the upper grouting hole and the lower grouting hole set on the side wall of the pier 9.
[0039] During the process of hoisting the pier column 9, the above-mentioned embodiment can ensure that the pier column 9 is aligned with the installation position of the platform 1 in the vertical direction, and it can be accurately lowered onto the platform 1. However, during the process of lowering the pier column 9, ground auxiliary personnel are still required to rotate the pier column 9 and adjust the angle of the pier column 9 in the circumferential direction so that the connecting sleeve 91 under the pier column 9 is aligned with the connecting steel bar 11 on the platform 1.
[0040] As a further improvement of the present utility model, in step 2, a circular positioning light emitter for emitting light vertically upward is provided at the upper end of the positioning cavity 2, and two of the circular positioning light emitters are symmetrically arranged on both sides of the upper end surface of the positioning cavity 2, and the circular positioning light emitter emits visible light, and cooperates with the indicator ring 3 to perform circumferential positioning on the pier 9, that is, after the pier 9 is aligned with the center point of the positioning cavity 2, the pier 9 is rotated so that the pier 9 rotates a certain angle around its own central axis, and the connecting sleeve 91 at the lower end of the pier 9 is aligned with the connecting steel bar 11 on the cap 1; in step 3, after the pier 9 is vertically aligned with the cap 1, before the lower end of the pier 9 is vertically inserted into the positioning cavity 2, the circular positioning light emitter is turned on, and the circumferential positioning light spot emitted by the circular positioning light emitter is observed to hit the circumferential positioning light spot on the indicator ring 3, and the position of the circumferential positioning light spot is used to determine whether the pier 9 is circumferentially aligned with the cap 1, and if not, the pier 9 is horizontally rotated until the circumferential positioning light spot shows that the pier 9 is circumferentially aligned with the cap 1.
[0041] As a further improvement of the utility model, Figure 3 As shown, the above-mentioned circumferential positioning light emitter can be a laser line projector 5 installed at the upper end of the positioning cavity 2. In step 2, the two sides of the indicator ring 3 are provided with symmetrically arranged marks 31 for circumferential positioning. The marks 31 are the protruding parts or concave parts of the outer ring edge of the indicator ring 3, and the marks 31 are used in conjunction with the laser line projector 5. When the indicator ring 3 is installed on the pier 9, the marks 31 on both sides of the indicator ring 3 are located on the extension line of the line connecting a certain connecting sleeve 91 and the center point of the pier 9. In step 3, after the pier 9 and the base 1 have been vertically aligned, before the lower end of the pier 9 is vertically inserted into the positioning cavity 2, the laser line projector 5 is turned on, and the direction of the longitudinal laser line projected by the laser line projector 5 is adjusted so that the longitudinal laser line passes through the connecting steel bar 11 and also passes through the center point of the positioning cavity 2. Then, the pier 9 is rotated and the angle of the pier 9 is adjusted so that the upper end of the longitudinal laser line passes through the mark 31 on the indicator ring 3, and then the pier 9 is vertically lowered so that the lower end of the pier 9 is vertically inserted into the positioning cavity 2.
[0042] The laser line projector, also known as a laser marking instrument or a laser level, is a common measuring tool that is widely used in various fields such as construction, inspection, and installation. During use, the laser line projector emits a laser beam, which passes through a prism light guide system to form a laser surface to project horizontal and plumb laser lines, ultimately achieving the purpose of measurement. In this embodiment, the laser line projector 5 is used to project a plumb laser line on the side wall of the pier 9 to correct the verticality of the pier 9; on the other hand, the laser line projector 5 cooperates with the mark 31 on the indicator ring 3 to position the pier 9 in a circular manner.
[0043] In addition, the circumferential positioning light emitter can also be a spotlight installed at the upper end of the positioning cavity 2 and emitting a visible light beam vertically upward. In step 2, the two sides of the indicator ring 3 are provided with symmetrically arranged marks 31 for circumferential positioning, and the marks 31 are the protruding parts or concave parts of the outer ring edge of the indicator ring 3; the installation position of the spotlight is on the same straight line as the connecting steel bar 11 and the center point of the positioning cavity 2; when the indicator ring 3 is installed on the pier 9, the marks 31 on both sides of the indicator ring 3 are located at the middle of the connecting sleeve 91 and the pier 9. On the extension line of the line connecting the center points; in step three, after the pier 9 and the base 1 have been vertically aligned, before the lower end of the pier 9 is vertically inserted into the positioning cavity 2, turn on the spotlight, adjust the verticality of the visible light beam emitted by the spotlight, and then rotate the pier 9 and adjust the angle of the pier 9 so that the visible light beam emitted by the spotlight hits the mark 31 of the indicator ring 3. The light beam hits the mark 31 of the indicator ring 3, indicating that the pier 9 has achieved circular positioning, the connecting sleeve 91 and the connecting steel bar 11 have been aligned, and then the pier 9 is vertically lowered so that the lower end of the pier 9 is vertically inserted into the positioning cavity 2.
[0044] Although some specific embodiments of the present invention have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.
Claims
1. A prefabricated bridge pier installation and positioning device, comprising a positioning cavity (2) installed on a cap (1), an indicator ring (3) installed on a pier (9), Features: The positioning cavity (2) has an inner cavity matching the cross-sectional shape of the pier column, and a plurality of laser emitters (4) for vertically emitting laser beams (41) are evenly distributed around the inner cavity at the upper end of the positioning cavity (2), and the indicator ring (3) is an annular structure made of a translucent material; the inner wall of the positioning cavity (2) is provided with a concave-convex matching structure matching the outer wall of the pier column; the upper end of the positioning cavity (2) is provided with a circular positioning light emitter for vertically emitting light, and the two circular positioning light emitters are symmetrically arranged on both sides of the upper end face of the positioning cavity (2); the two sides of the indicator ring (3) are provided with symmetrically arranged marks (31) for circular positioning, and the marks (31) are the protruding parts or the concave parts of the outer ring edge of the indicator ring (3).
2. According to claim 1, a prefabricated bridge pier installation and positioning device, It is characterized in that The lower end of the pier column (9) is provided with a connecting sleeve (91), the lower end of the connecting sleeve (91) is open and flush with the lower end surface of the pier column (9), and the side wall of the pier column (9) is provided with an upper grouting hole and a lower grouting hole connected to the connecting sleeve (91), and the concave-convex matching structure is a groove (6) longitudinally arranged on the inner wall of the positioning cavity (2) and a guide rod (61) matching the groove (6) and installed in the upper grouting hole and the lower grouting hole respectively at both ends.
3. According to claim 1, a prefabricated bridge pier installation and positioning device, It is characterized in that The concave-convex matching structure is a convex rib (7) longitudinally arranged on the inner wall of the positioning cavity (2) and a pipe groove longitudinally arranged on the side wall of the pier (9) to match the convex rib (7).
4. A prefabricated bridge pier installation and positioning device according to any one of claims 1 to 3, It is characterized in that The circumferential positioning light emitter is a laser line projector (5) installed at the upper end of the positioning cavity (2).
5. A prefabricated bridge pier installation and positioning device according to any one of claims 1 to 3, It is characterized in that The circumferential positioning light emitter is a spotlight installed at the upper end of the positioning cavity (2) and emitting a visible light beam vertically upward.