Cable pipe gallery

By designing a cable pipeline corridor that separates power, hydraulic and gas pipelines, combined with movable silos and sealing structures, the safety hazards caused by pipeline concentration in the prior art are solved, and the safety of the pipeline and the waterproof performance of the concrete frame are improved.

CN222044270UActive Publication Date: 2024-11-22TIANJIN BINHAI NEW AREA PLANNING & COMPILATION RES CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420511988.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-22
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The power, water supply and gas pipelines in the existing cable pipelines are too concentrated, which can easily cause safety hazards and economic losses.

Method used

A cable pipeline gallery including concrete frame, cable bin, water bin, gas bin and movable bin was designed. By separating the electric, hydraulic and gas pipeline arrangements, the movable components and sealing structures are added to improve the safety of the pipeline. and waterproof performance.

Benefits of technology

It achieves no impact on pipelines when damaged, improves the safety of use, and extends the service life of the concrete frame through a waterproof layer, which facilitates maintenance and reduces moisture erosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044270U_ABST
    Figure CN222044270U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cables, and discloses a cable pipe gallery which comprises a concrete frame, a cable bin, a water conveying bin and a gas conveying bin are sequentially formed in the middle of the concrete frame from top to bottom, a cable is laid in the middle of the cable bin, and a fire fighting pipe and a water supply pipe are sequentially installed in the middle of the water conveying bin from top to bottom. A gas conveying bin is arranged in the middle of the concrete frame, a gas pipe is laid in the middle of the gas conveying bin, a movable bin is formed in the middle of the concrete frame, a movable assembly is installed in the middle of the concrete frame and comprises a movable plate, the movable plate is slidably connected to the middle of the top wall of the concrete frame, and a grip is fixedly connected to the inner wall of the movable bin. And the middle part of the concrete frame is rotationally connected with a rotating door. According to the utility model, under the action of structures such as the cable cabin, the water conveying cabin, the gas conveying cabin and the movable cabin, the pipelines cannot influence each other when being damaged, so that the safety of the pipelines in the use process is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cables, in particular to a cable corridor. Background Art

[0002] Cable galleries are used to accommodate power cables and communication cables. These corridor systems are usually used in cities, industrial areas, airports, subway systems, highways and other places that require a large amount of electricity, communication and data transmission facilities. The corridors not only improve the appearance of the city, but also have great benefits for the inspection and replacement of power cables and communication cables.

[0003] After searching, Chinese patent announcement number: CN209652977U discloses a composite cable corridor, including an integrated cable cabin, a first cabin, a second cabin and a first inspection well, at least one side of the integrated cable cabin is provided with the first cabin, the second cabin and the first inspection well, the first inspection well is located on the top of the first cabin and is connected with the first cabin, the second cabin is located above the first cabin, and at the first inspection well, the second cabin is offset in the direction away from the integrated cable cabin to bypass the first inspection well.

[0004] The above technology realizes the intensive arrangement of water supply, rainwater, sewage, electricity, communication and other pipelines under the road by adding the first compartment and the second compartment, reduces road excavation, and can be used even under narrow roads. However, in actual use, pipelines such as electricity, water supply and gas are concentrated in one space, which can easily cause major safety hazards after pipeline damage, thereby causing huge economic losses. Therefore, a cable corridor is proposed to solve the above problems. Utility Model Content

[0005] In order to make up for the above deficiencies, the utility model provides a cable duct corridor, which aims to improve the problem in the prior art that power, water supply, gas and other pipelines are relatively concentrated and easily cause safety hazards.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A cable corridor comprises a concrete frame, wherein a cable compartment, a water delivery compartment and a gas delivery compartment are sequentially provided in the middle of the concrete frame from top to bottom, a cable is laid in the middle of the cable compartment, a fire-fighting pipe and a water supply pipe are sequentially installed in the middle of the water delivery compartment from top to bottom, a gas pipe is laid in the middle of the gas delivery compartment, a movable compartment is provided in the middle of the concrete frame, and a movable component is installed in the middle of the concrete frame;

[0008] Through the above technical solution, cables, fire-fighting pipes, water pipes and gas pipes are laid in cable bins, water bins and gas bins respectively, thereby separating electricity, water and gas pipelines and improving the safety of pipeline use.

[0009] Further, the movable assembly includes a movable plate, the movable plate is slidably connected to the middle of the top wall of the concrete frame, a handle is fixedly connected to the inner wall of the movable bin, a rotating door is rotatably connected to the middle of the concrete frame, and a concrete step ladder is fixedly connected to the middle of the movable bin;

[0010] Through the above technical solution, the movable panel can be opened to enter the movable compartment, and then the different rotating doors can be rotated to enter the cable compartment, water delivery compartment and gas delivery compartment respectively, so as to facilitate the inspection and maintenance of the pipeline.

[0011] Furthermore, a rubber layer is fixedly connected to the outer side of the concrete frame, a mud layer is fixedly connected to the outer side of the rubber layer, an asphalt layer is fixedly connected to the outer side of the mud layer, and a water diversion groove is provided on the top of the concrete frame and the movable plate;

[0012] Through the above technical solution, under the action of the water diversion ditch, asphalt layer, mud layer and rubber layer, it is difficult for moisture in the soil to corrode the concrete frame, so as to improve the safety of the use of the concrete frame and pipelines.

[0013] Furthermore, drainage grooves are provided in the middle of the cable compartment, water delivery compartment and gas delivery compartment;

[0014] Through the above technical solution, water accumulation in the middle of the cable bin, the water delivery bin and the gas delivery bin can be avoided under the action of the drainage trough.

[0015] Furthermore, a groove is provided on the top of the concrete frame, the groove is located above the movable bin, and the movable plate is slidably connected to the middle of the groove;

[0016] Through the above technical solution, the movable plate can slide out from the top middle of the concrete frame under the action of the groove, so that maintenance personnel can enter the movable compartment easily.

[0017] Furthermore, a sealing ring 1 is fixedly connected to the middle of the movable plate, and the sealing ring 1 is located at the connection between the concrete frame and the movable plate;

[0018] Through the above technical solution, under the action of the sealing ring 1, it is difficult for moisture to penetrate into the movable chamber through the gap.

[0019] Furthermore, a sealing ring 2 is fixedly connected to a side of the rotating door away from the concrete step ladder;

[0020] Through the above technical solution, under the action of the second sealing ring, the sealing performance of the cable bin, the water supply bin and the gas supply bin is improved, thereby improving the safety of pipeline use.

[0021] Furthermore, a protrusion is provided on the top of the concrete frame, and the asphalt layer, the mud layer and the rubber layer are located at the bottom of the protrusion;

[0022] Through the above technical solution, under the action of the protrusion, the water brought out by the water diversion groove will not flow into the gaps between the asphalt layer, the mud layer and the rubber layer.

[0023] The utility model has the following beneficial effects:

[0024] 1. In the utility model, through the action of the cable bin, water delivery bin, gas delivery bin, movable bin and other structures, the pipelines will not affect each other when damaged, thereby improving the safety of the pipelines during use. At the same time, different rotating doors can be opened under the action of the concrete steps in the movable bin to facilitate entering different bins for pipeline maintenance.

[0025] 2. In the utility model, the concrete frame has a good waterproof effect through the action of the asphalt layer, mud layer, rubber layer, water diversion trough and other structures, thereby reducing the erosion of pipelines by water and improving the service life of pipelines and concrete frames. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A three-dimensional schematic diagram of a cable corridor proposed by the utility model;

[0027] Figure 2 This is a structural schematic diagram of a concrete step ladder for a cable corridor proposed by the utility model;

[0028] Figure 3 This is a schematic diagram of the structure of a water supply pipe for a cable corridor proposed by the utility model;

[0029] Figure 4 This is a structural schematic diagram of an asphalt layer of a cable corridor proposed by the utility model;

[0030] Figure 5 for Figure 4 Enlarged view of point A in the middle.

[0031] Legend:

[0032] 1. Concrete frame; 2. Cable compartment; 3. Water compartment; 4. Gas compartment; 5. Movable compartment; 6. Water diversion channel; 7. Asphalt layer; 8. Mud layer; 9. Rubber layer; 10. Drainage channel; 11. Revolving door; 12. Groove; 13. Concrete steps; 14. Cable; 15. Fire hose; 16. Water pipe; 17. Gas pipe; 18. Movable plate; 19. Handle; 20. Sealing ring 1; 21. Sealing ring 2. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] Reference Figure 1-3 The utility model provides an embodiment: a cable corridor, including a concrete frame 1, a cable bin 2, a water bin 3 and a gas bin 4 are sequentially opened in the middle of the concrete frame 1 from top to bottom, a cable 14 is laid in the middle of the cable bin 2, a fire pipe 15 and a water supply pipe 16 are sequentially installed in the middle of the water bin 3 from top to bottom, and a gas pipe 17 is laid in the middle of the gas bin 4. First, the cable 14, the fire pipe 15, the water supply pipe 16 and the gas pipe 17 are respectively laid in the cable bin 2, the water bin 3 and the gas bin 4 in the concrete frame 1, so that different pipelines such as electricity, water and gas can be laid in different spaces, so as to avoid safety hazards caused by pipeline damage that easily affects each other, so as to improve the safety of the cable corridor.

[0035] A movable bin 5 is provided in the middle of the concrete frame 1, and a movable assembly is installed in the middle of the concrete frame 1. The movable assembly includes a movable plate 18, which is slidably connected to the middle of the top wall of the concrete frame 1. A groove 12 is provided on the top of the concrete frame 1, and the groove 12 is located above the movable bin 5. The movable plate 18 is slidably connected to the middle of the groove 12. A handle 19 is fixedly connected to the inner wall of the movable bin 5. A revolving door 11 is rotatably connected to the middle of the concrete frame 1, and a concrete step ladder 13 is fixedly connected to the middle of the movable bin 5. Maintenance personnel can open the movable plate 18, enter the movable bin 5 through the groove 12, and move downward under the action of the handle 19, and open different revolving doors 11 on the platform of the concrete step ladder 13 to enter the cable bin 2, the water delivery bin 3 or the gas delivery bin 4 respectively, so as to inspect different pipelines and ensure the safety of the pipelines during use.

[0036] Reference Figure 1 , 35, a rubber layer 9 is fixedly connected to the outside of the concrete frame 1, a mud layer 8 is fixedly connected to the outside of the rubber layer 9, an asphalt layer 7 is fixedly connected to the outside of the mud layer 8, a water diversion trough 6 is provided on the top of the concrete frame 1 and the movable plate 18, a protrusion is provided on the top of the concrete frame 1, and the asphalt layer 7, the mud layer 8 and the rubber layer 9 are located at the bottom of the protrusion. The rubber layer 9 can reduce the moisture in the soil from penetrating into the concrete frame 1, and the waterproof effect of the concrete frame 1 can be further improved under the action of the mud layer 8 and the rubber layer 9, and the water diversion trough 6 can prevent the top of the concrete frame 1 from accumulating water, and under the action of the protrusion on the top of the concrete frame 1, the accumulated water discharged from the water diversion trough 6 will not enter the top connection of the asphalt layer 7, the mud layer 8 and the rubber layer 9.

[0037] Reference Figure 1-3 The cable bin 2, the water delivery bin 3 and the gas delivery bin 4 are all provided with drainage grooves 10 in the middle, the movable plate 18 is fixedly connected with a sealing ring 1 20 in the middle, the sealing ring 1 20 is located at the connection between the concrete frame 1 and the movable plate 18, and the side of the rotating door 11 away from the concrete step 13 is fixedly connected with a sealing ring 21. Under the action of the drainage grooves 10, water accumulation inside the cable bin 2, the water delivery bin 3 and the gas delivery bin 4 can be avoided, and the sealing ring 1 20 can reduce the water from penetrating into the movable bin 5 from the connection between the movable plate 18 and the concrete frame 1. At the same time, under the action of the sealing ring 21, the sealing performance of the rotating door 11 to the cable bin 2, the water delivery bin 3 and the gas delivery bin 4 can be improved, thereby ensuring the safety of the use of different pipelines.

[0038] Working principle: First, the cable 14, fire pipe 15, water pipe 16 and gas pipe 17 are respectively arranged in the middle of the cable bin 2, water bin 3 and gas bin 4, so that electricity, water power and gas are separated, thereby improving the safety between the pipelines. The maintenance personnel can open the movable plate 18 and enter the movable bin 5 through the handle 19. At the same time, open the revolving doors 11 on different platforms on the concrete step ladder 13, and enter the cable bin 2, water bin 3 and gas bin 4 respectively to facilitate the maintenance of the cable 14, fire pipe 15, water pipe 16 and gas pipe 17, thereby further improving the safety of the pipelines.

[0039] The rubber layer 9 can reduce the penetration of moisture in the soil into the concrete frame 1. At the same time, the waterproofness of the concrete frame 1 can be further improved under the action of the asphalt layer 7 and the mud layer 8. The water accumulation on the top of the concrete frame 1 can be avoided in the water diversion ditch 6 on the top of the concrete frame 1, thereby improving the service life of the concrete frame 1 and reducing the damage of the pipelines inside the concrete frame 1 due to the erosion of moisture.

[0040] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cable corridor, comprising a concrete frame (1), characterized in that: The middle part of the concrete frame (1) is provided with a cable compartment (2), a water delivery compartment (3) and a gas delivery compartment (4) in order from top to bottom; the middle part of the cable compartment (2) is provided with a cable (14); the middle part of the water delivery compartment (3) is provided with a fire pipe (15) and a water supply pipe (16) in order from top to bottom; the middle part of the gas delivery compartment (4) is provided with a gas pipe (17); the middle part of the concrete frame (1) is provided with a movable compartment (5); and the middle part of the concrete frame (1) is provided with a movable component.

2. A cable corridor according to claim 1, characterized in that: The movable assembly comprises a movable plate (18), the movable plate (18) being slidably connected to the middle of the top wall of the concrete frame (1), a handle (19) being fixedly connected to the inner wall of the movable bin (5), a rotating door (11) being rotatably connected to the middle of the concrete frame (1), and a concrete step ladder (13) being fixedly connected to the middle of the movable bin (5).

3. A cable corridor according to claim 2, characterized in that: A rubber layer (9) is fixedly connected to the outside of the concrete frame (1), a mud layer (8) is fixedly connected to the outside of the rubber layer (9), an asphalt layer (7) is fixedly connected to the outside of the mud layer (8), and a water diversion groove (6) is provided on the top of the concrete frame (1) and the movable plate (18).

4. A cable corridor according to claim 1, characterized in that: Drainage grooves (10) are provided in the middle of the cable compartment (2), the water delivery compartment (3) and the gas delivery compartment (4).

5. A cable corridor according to claim 2, characterized in that: A groove (12) is provided on the top of the concrete frame (1), the groove (12) is located above the movable bin (5), and the movable plate (18) is slidably connected to the middle of the groove (12).

6. A cable corridor according to claim 2, characterized in that: A sealing ring 1 (20) is fixedly connected to the middle of the movable plate (18), and the sealing ring 1 (20) is located at the connection between the concrete frame (1) and the movable plate (18).

7. A cable corridor according to claim 2, characterized in that: A second sealing ring (21) is fixedly connected to the side of the rotating door (11) away from the concrete step ladder (13).

8. A cable corridor according to claim 3, characterized in that: A protrusion is provided on the top of the concrete frame (1), and the asphalt layer (7), the mud layer (8) and the rubber layer (9) are located at the bottom of the protrusion.