Flexibly modified thermoelectric decoupling structure of coal power unit

By designing a thermoelectric decoupling structure in a coal-electric unit, and using technologies such as energy storage water tanks and bypass pipelines, the problem of the contradiction between heating and power load during peak shaving operation of a coal-electric unit is solved, and efficient energy utilization and Flexible transformation reduces the transformation cost and is suitable for coal-electric units in different regions and models.

CN222047706UActive Publication Date: 2024-11-22INNER MONGOLIA ELECTRIC POWER GROUP MENGDIAN ECONOMIC & TECHNOLOGICAL RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422526476.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-11-22
Estimated Expiration
2034-10-18

AI Technical Summary

Technical Problem

There is insufficient flexibility in peak-shaving operation of coal-electric power units, resulting in a contradiction between heating and power load. The transformation of existing technologies is difficult, costly, not very applicable, and lack of standardization support, which affects the operating reliability and energy utilization of the units. efficiency.

Method used

A flexible thermoelectric decoupling structure of coal-electric power unit is designed, including boilers, steam turbines, power supply units and heat supply units. By setting up energy storage water tanks, bypass pipelines and control valves, heat energy storage and rapid adjustment are achieved. , use the generator set's own power generation capacity to heat the heating network water supply pipeline, improve heating flexibility and efficiency, and reduce energy waste and operating costs.

Benefits of technology

Effectively reduce energy waste, improve the overall efficiency and peak shaving capacity of coal-electric units, enhance heating flexibility and reliability, and reduce transformation costs. It is suitable for coal-electric units in different regions and models, and is convenient for standardized promotion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047706U_ABST
    Figure CN222047706U_ABST
Patent Text Reader

Abstract

The utility model provides a thermoelectricity decoupling structure of a flexibly modified coal power unit, which comprises a boiler, a steam turbine, an electric power supply unit and a heat power supply unit, an energy storage water tank is connected with a heat supply network water supply pipeline, and exhaust steam waste heat of an intermediate pressure cylinder is used for heating the heat supply network water supply pipeline and storing heat supply network water supply through the energy storage water tank; a first control valve is arranged between the exhaust steam of the intermediate-pressure cylinder and the steam inlet of the low-pressure cylinder, and an exhaust steam backpressure pipeline is connected between the exhaust steam of the intermediate-pressure cylinder and the steam inlet of the heat supply network heater and is used for assisting the exhaust steam waste heat of the intermediate-pressure cylinder to heat the heat supply network water supply pipeline; the superheater and the reheater are communicated through a bypass pipeline provided with a first pressure reducing valve, and exhaust steam waste heat of the reheater is assisted in heating a heat supply network water supply pipeline. The electric boiler is used for heating the heat supply network water supply pipeline. The generator set is used for supplying power to the electric boiler. Energy waste and operation cost can be reduced, the overall efficiency of the coal power unit is improved, heat supply is reliable, and the peak load regulation capacity of the unit is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of parts or accessories of furnaces commonly used in the bio-industry, and specifically to a flexible transformation of a thermal-electric decoupling structure of a coal-fired power unit, which is used for the coordinated peak regulation of power generation and heat supply of the coal-fired power unit. Background Art

[0002] With the continuous increase in the total amount and proportion of new energy installed capacity, the power system's demand for flexible adjustment capabilities has become increasingly prominent. Coal-fired power units have gradually transformed from the main power source that provides electricity and power to a basic power source that provides reliable electricity and has peak-shaving and frequency-regulating capabilities. The three indicators for measuring the operational flexibility of coal-fired power units are rapid start and stop, rapid load change, and deep peak-shaving capabilities. When coal-fired power units participate in peak-shaving operation, the operating conditions of the units change frequently, which will have a certain impact on the reliability of the unit's operation. Flexibility transformation of coal-fired power units and improving the adjustment capabilities of coal-fired power units, including improving the peak-shaving capabilities of the units, climbing speed, start and stop time, etc., are crucial to ensuring the absorption of new energy and the safe and stable operation of the system.

[0003] Increasing the peak-shaving capacity, that is, reducing the minimum output, is currently the most widespread and main transformation goal, and has become an effective measure to solve the current problem of renewable energy consumption. At present, the peak-shaving capacity of my country's pure condensing units in actual operation is generally about 50% of the rated capacity, but the peak-shaving capacity of the extraction condensing units during the heating period is only 20% of the rated capacity. Therefore, the most important thing in the near future is to decouple thermal power during flexibility transformation. Taking the "Three Norths" region as an example, during the heating season, since more than 70% of coal-fired power is thermal power units, even under the minimum output state to ensure heating, the wind power acceptance space in many provinces has been greatly limited, and it is even more difficult to balance electricity during low-load periods. The purpose of thermal-electric decoupling is to solve the contradiction between electrical load and thermal load during the heating period when the unit is in the "heat-based electricity" operation mode.

[0004] The flexibility transformation of coal-fired power units requires comprehensive consideration of factors such as unit safety, unit economy, equipment life, technical reliability, construction cost, dispatching and operation, and policy subsidies. At present, the flexibility transformation of coal-fired power units mainly faces the following problems:

[0005] First, there are many technical routes for demonstration projects, but few follow-up promotion projects for some technical routes.

[0006] Second, some technologies are not cost-effective and need further development, such as battery energy storage peak and frequency regulation projects;

[0007] Third, although some technologies have been widely recognized, they are difficult to transform and difficult to standardize, so they are difficult to promote due to the lack of standard support.

[0008] Fourth, the current development of new energy is not enough to support the strong electricity demand caused by the current strong economy in my country. Power plants are constrained by the high coal prices and suffer large losses. The cost of unit transformation and operation and maintenance is high and there is a lack of financial guarantee.

[0009] Fifth, my country’s current flexibility mechanism was introduced and absorbed from mature electricity markets abroad, and power generation companies find it difficult to adapt.

[0010] Sixth, there are many technical routes for the flexibility transformation projects of coal-fired power units at present, and there are certain differences in applicability in different regions, different power grids, and different models. Some technologies are not cost-effective and have weak applicability. Utility Model Content

[0011] In response to the problems existing in the prior art, the utility model provides a thermal-electric decoupling structure for a coal-fired power unit that can effectively reduce energy waste and operating costs, achieve efficient energy utilization, improve the overall efficiency of the coal-fired power unit, improve the flexibility and reliability of heating, and enhance the flexibility of the peak-shaving capacity of the unit.

[0012] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is as follows: a flexible transformation of the thermal-electric decoupling structure of a coal-fired power unit, including a boiler, a steam turbine, a power supply unit and a heat supply unit, the boiler includes a superheater and a reheater, the steam turbine includes a high-pressure cylinder, a medium-pressure cylinder and a low-pressure cylinder, the power supply unit includes a generator set, and the heat supply unit includes a heat network heater, an energy storage water tank, a steam-water heat exchanger, a heat network water supply pipeline and an electric boiler; the medium-pressure cylinder includes a first medium-pressure output pipeline, a second medium-pressure output pipeline, a third medium-pressure output pipeline and an exhaust back-pressure pipeline;

[0013] The first medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the steam-water heat exchanger. The steam-water heat exchanger is used to heat the water supply pipeline of the heating network. The energy storage water tank is connected to the water supply pipeline of the heating network. The exhaust waste heat of the medium-pressure cylinder heats the water supply pipeline of the heating network through the steam-water heat exchanger. At the same time, the water supply of the heating network is stored and taken through the energy storage water tank.

[0014] The second medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the heat network heater; the third medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the low-pressure cylinder, and a first control valve is arranged on the third medium-pressure output pipeline, and the first control valve is arranged between the exhaust port of the medium-pressure cylinder and the steam inlet of the low-pressure cylinder, so as to assist the exhaust steam waste heat of the medium-pressure cylinder in heating the heat network water supply pipeline;

[0015] A bypass pipeline is provided between the steam inlet of the superheater and the reheater, a first pressure reducing valve is provided on the bypass pipeline, the exhaust port of the reheater is connected to the steam inlet of the heating network heater through a branch pipeline, the steam inlet of the superheater and the reheater is communicated through the bypass pipeline provided with the first pressure reducing valve, so as to assist the exhaust steam waste heat of the reheater to heat the water supply pipeline of the heating network;

[0016] The electric boiler is used to heat the water supply pipeline of the heating network, and the generator set is used to supply power to the electric boiler, and the power generated by the generator set itself is used to directly heat the water supply pipeline of the heating network through the electric boiler;

[0017] An exhaust back pressure pipeline is arranged between the exhaust port of the intermediate pressure cylinder and the steam inlet of the heat network heater, so as to enhance the exhaust waste heat of the intermediate pressure cylinder to heat the heat network water supply pipeline.

[0018] Furthermore, the heat supply unit also includes a condenser;

[0019] The exhaust port of the steam-water heat exchanger is connected to the steam inlet of the condenser, and the condenser can be used to extract steam from the exhaust port of the intermediate pressure cylinder when the steam turbine is running at high load.

[0020] Furthermore, the exhaust port of the low-pressure cylinder is connected to the steam inlet of the condenser. The exhaust steam of the low-pressure cylinder enters the condenser, is cooled by circulating water and condensed into water, and then is pumped out by a condensate pump, heated by various stages of heaters, and sent to the boiler as feed water.

[0021] Furthermore, the exhaust port of the reheater is connected to the steam inlet of the condenser via a second reheat exhaust pipeline.

[0022] Furthermore, the heating network water supply pipeline includes a first heating network water supply pipeline and a second heating network water supply pipeline:

[0023] The first heating network water supply pipeline is heated by the heating network heater and is the main pipeline of the heating network water supply pipeline;

[0024] The second heating network water supply pipeline is heated by the heating network heater and the electric boiler in sequence. When the heating capacity of the heating network heater is insufficient, the electric boiler is used for supplementary heating.

[0025] Furthermore, the heating network water supply pipeline includes a third heating network water supply pipeline and a fourth heating network water supply pipeline:

[0026] The third heat network water supply pipeline supplies heat to the condenser, which can effectively utilize the heat of the condenser and improve thermal efficiency;

[0027] The fourth heating network water supply pipeline is heated by the condenser and the heating network heater in sequence. When the energy after the heating by the condenser is insufficient, it can be supplemented by the heating network heater to ensure the stability of heating.

[0028] Furthermore, the heat supply unit further comprises a heat network return water pipeline; the heat network return water pipeline comprises a first heat network return water pipeline and a second heat network return water pipeline;

[0029] The first heating network return water pipeline is connected to the water inlet of the heating network heater;

[0030] The second heat network return water pipeline is connected to the water inlet of the condenser.

[0031] Furthermore, the intermediate-pressure cylinder further includes a fourth intermediate-pressure output pipeline, and the fourth intermediate-pressure output pipeline is connected between the exhaust port of the intermediate-pressure cylinder and the steam inlet of the condenser.

[0032] Further, the reheater includes a first reheat exhaust steam pipeline;

[0033] The first reheat exhaust steam pipeline is connected between the exhaust port of the reheater and the steam inlet of the intermediate pressure cylinder.

[0034] Furthermore, the reheater also includes a second reheat exhaust steam pipeline, one end of which is connected to the exhaust port of the reheater, one end of the branch pipeline is connected to the second reheat exhaust steam pipeline, and the other end of the branch pipeline is connected to the steam inlet of the heat network heater, and a second pressure reducing valve is arranged on the second reheat exhaust steam pipeline, and the second pressure reducing valve is located between the branch pipeline and the exhaust port of the reheater.

[0035] Compared with the prior art, the utility model has the following beneficial effects:

[0036] The utility model is provided with an energy storage water tank, which can store heat when there is sufficient waste heat from power generation, and quickly replenish heat energy when the heating demand increases or the power generation load decreases, effectively reducing energy waste and operating costs;

[0037] The first control valve is set to cut off the third medium-pressure output pipeline so that the exhaust steam of the medium-pressure cylinder is used to heat the water supply pipeline of the heat network, so that the low-pressure cylinder can operate in a "zero output" state, and the restriction of the minimum steam flow of the low-pressure cylinder is removed. It not only improves the heating flexibility of the coal-fired power unit, but also can quickly adjust the heating amount when the power demand fluctuates, realizes efficient use of energy, and can reduce the complexity and cost of rotor replacement while maintaining high peak-shaving capacity;

[0038] By setting a bypass pipeline between the steam inlet of the superheater and the reheater and setting a branch pipeline between the exhaust port of the reheater and the steam inlet of the heat network heater, the thermal-electric decoupling of the coal-fired power unit can be achieved, the heating efficiency and the thermal-electric ratio can be improved, the throttling loss can be minimized, and the overall efficiency of the coal-fired power unit can be improved;

[0039] The utility model utilizes the power generation of the generator set itself to directly heat the water supply pipeline of the heat network, realizes the rapid storage and release of thermal energy, can provide stable heating when the coal-fired power unit is running at low load, and absorbs excess wind power to reduce energy waste, which not only improves the flexibility and reliability of heating, but also provides a new way for the consumption of renewable energy;

[0040] The utility model can reduce the loss of cold source by increasing the exhaust back pressure of the steam turbine and directly heating the water supply pipeline of the heat network by using the exhaust steam. It is suitable for large-area heating needs, and the modification of the steam turbine body is relatively small and the cost is low. It can improve the peak-shaving capacity of the unit while maintaining low cost and high maturity to adapt to the ever-changing heating demand.

[0041] The technical route of the utility model is simple and requires little modification. It is suitable for my country's national conditions and existing coal-fired power units in different regions, different power grids, and different models. It is convenient to achieve standardization, normalization, and scientificization in engineering applications. By improving the technical standard system, it can promote the standardized and efficient development of flexibility transformation, ensure the safe, environmentally friendly, and economical operation of the units in service, and facilitate subsequent promotion and transformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 This is a schematic diagram of the structure of the first flexibility transformation module in the embodiment of the utility model;

[0043] Figure 2 This is a schematic diagram of the structure of the second flexibility transformation module in the embodiment of the utility model;

[0044] Figure 3 This is a schematic diagram of the structure of the third flexibility transformation module in the embodiment of the utility model;

[0045] Figure 4 This is a schematic diagram of the structure of the fourth flexibility transformation module in the embodiment of the utility model;

[0046] Figure 5 It is a structural schematic diagram of the fifth flexibility transformation module in the embodiment of the utility model.

[0047] Among them, the accompanying drawings are marked as follows: 1, boiler; 11, superheater; 111, bypass pipeline; 1111, first pressure reducing valve; 12, reheater; 121, first reheat exhaust pipeline; 122, second reheat exhaust pipeline; 1221, second pressure reducing valve; 123, branch pipeline; 21, high-pressure cylinder; 211, high-pressure output pipeline; 22, medium-pressure cylinder; 221, first medium-pressure output pipeline; 222, second medium-pressure output pipeline; 2221, second control valve; 223, third medium-pressure output pipeline; 2231, first control valve; 224, exhaust back pressure pipeline; 225, fourth medium-pressure output pipeline; 23, low-pressure cylinder; 31. Generator set; 41. Heating network heater; 42. Energy storage water tank; 43. Steam-water heat exchanger; 44. Electric boiler; 451. First heating network water supply pipeline; 4512. Third control valve; 452. Second heating network water supply pipeline; 4521. Fourth control valve; 453. Third heating network water supply pipeline; 4531. Fifth control valve; 454. Fourth heating network water supply pipeline; 4541. Sixth control valve; 455. Fifth heating network water supply pipeline; 461. First heating network return water pipeline; 462. Second heating network return water pipeline; 47. Condenser; 5. Power demand unit; 6. Heat demand unit; 7. Multi-stage regenerative heater. DETAILED DESCRIPTION

[0048] It is worth noting that the methods used in the present invention are all conventional methods unless otherwise specified; the raw materials and devices used are all conventional commercially available products, and their sources are not specifically limited unless otherwise specified.

[0049] See also Figure 1-Figure 5 A flexible transformation of a thermal-electric decoupling structure of a coal-fired power unit includes a boiler 1, a steam turbine, a power supply unit and a heat supply unit. The boiler 1 includes a superheater 11 and a reheater 12. The exhaust port of the superheater 11 is connected to the steam inlet of a high-pressure cylinder 21. The exhaust port of the reheater 12 is connected to the steam inlet of an intermediate-pressure cylinder 22. The steam turbine includes a high-pressure cylinder 21, an intermediate-pressure cylinder 22 and a low-pressure cylinder 23. The high-pressure cylinder 21 includes a high-pressure output pipeline 211. The high-pressure output pipeline 211 is connected between the exhaust port of the high-pressure cylinder 21 and the steam inlet of the reheater 12. The reheater 12 includes a first reheat exhaust pipeline 121 The exhaust port of the reheater 12 is connected to the steam inlet of the intermediate pressure cylinder 22 through the first reheat exhaust steam pipeline 121, which is the main steam inlet of the intermediate pressure cylinder 22. The power supply unit includes a generator set 31, and the power supply unit is used to supply power to the power demand unit 5. The heat supply unit includes a heat network heater 41, an energy storage water tank 42, a steam-water heat exchanger 43, a heat network water supply pipeline and an electric boiler 44, and the heat supply unit is used to supply heat to the heat demand unit 6; the intermediate pressure cylinder 22 includes a first intermediate pressure output pipeline 221, a second intermediate pressure output pipeline 222, a third intermediate pressure output pipeline 223 and an exhaust back pressure pipeline 224;

[0050] See also Figure 1 The first medium-pressure output pipeline 221 is connected between the exhaust port of the medium-pressure cylinder 22 and the steam inlet of the steam-water heat exchanger 43. The steam-water heat exchanger 43 is used to heat the water supply pipeline of the heat network. The energy storage tank 42 is connected to the water supply pipeline of the heat network. This is the first flexibility transformation module. The exhaust waste heat of the medium-pressure cylinder 22 heats the water supply pipeline of the heat network through the steam-water heat exchanger 43. At the same time, the water supply of the heat network is stored and taken through the energy storage tank 42. The hot water supply pipeline includes the fifth heat network water supply pipeline 455. When the steam turbine is running at high load, the steam at the exhaust port of the medium-pressure cylinder 22 is extracted. Steam is used to heat the fifth heat network water supply pipeline 455, and part of the heated water in the fifth heat network water supply pipeline 455 is stored in the energy storage tank 42, so as to achieve efficient use of heat energy and rapid response. When the heat demand increases or the power generation load decreases, the hot water stored in the energy storage tank 42 flows back to the fifth heat network water supply pipeline 455 to achieve rapid replenishment of heat energy. Therefore, it has significant advantages in heat energy management, and can store heat when there is sufficient waste heat from power generation, and quickly replenish heat energy when the heat demand increases or the power generation load decreases, thereby effectively reducing energy waste and operating costs.

[0051] Preferably, the heat supply unit further comprises a condenser 47;

[0052] The steam exhaust port of the steam-water heat exchanger 43 is connected to the steam inlet of the condenser 47 .

[0053] The condenser 47 can be used to extract steam from the exhaust port of the intermediate pressure cylinder 22 when the steam turbine is running at high load;

[0054] See also Figure 2The second medium-pressure output pipeline 222 is connected between the exhaust port of the medium-pressure cylinder 22 and the steam inlet of the heat network heater 41, and the third medium-pressure output pipeline 223 is connected between the exhaust port of the medium-pressure cylinder 22 and the steam inlet of the low-pressure cylinder 23. A first control valve 2231 is arranged on the third medium-pressure output pipeline 223; this is the second flexibility transformation module. A first control valve 2231 is arranged between the exhaust port of the medium-pressure cylinder 22 and the steam inlet of the low-pressure cylinder 23, which is used to assist the exhaust steam waste heat of the medium-pressure cylinder 22 to heat the heat network water supply pipeline. By cutting off the third medium-pressure output pipeline 223 through the first control valve 2231, the main steam inlet of the low-pressure cylinder 23 can be cut off, and the necessary cooling steam is retained in the low-pressure cylinder 23. The exhaust steam of the medium-pressure cylinder 22 is used to supply the heat network heater 41 to heat the heat network water supply pipeline. Since the high-pressure cylinder 21, the medium-pressure cylinder 22 and the low-pressure cylinder 23 are coaxial, The mechanical energy converted by steam in the high-pressure cylinder 21 and the mechanical energy converted by steam in the medium-pressure cylinder 22 are both transmitted to the low-pressure cylinder 23 through the shaft, so that the low-pressure cylinder 23 can run at 3000r / min at "zero force", and the low-pressure cylinder 23 can run at "zero output", which removes the restriction of the minimum steam flow of the low-pressure cylinder 23. It not only improves the heating flexibility of the coal-fired power unit, but also can quickly adjust the heating amount when the power demand fluctuates, so as to achieve efficient utilization of energy, and can reduce the complexity and cost of rotor replacement while maintaining high peak-shaving capacity, with low transformation cost and easy transformation; preferably, a second control valve 2221 is provided on the second medium-pressure output pipeline 222, and independent control of the cut-off and recovery of the first control valve 2231 and the second control valve 2221 can be achieved by adding monitoring and control devices, which is a prior art and will not be described in detail here;

[0055] See also Figure 3A bypass pipeline 111 is arranged between the steam inlet of the superheater 11 and the reheater 12, and a first pressure reducing valve 1111 is arranged on the bypass pipeline 111. The exhaust port of the reheater 12 is connected to the steam inlet of the heat network heater 41 through a branch pipeline 123; this is a third flexibility transformation module, the steam inlet of the superheater 11 and the reheater 12 are connected through the bypass pipeline 111 provided with the first pressure reducing valve 1111, the exhaust steam waste heat of the auxiliary reheater 12 is used to heat the heat network water supply pipeline, and part of the steam of the superheater 11 is led to the steam inlet of the reheater 12 through the bypass pipeline 111 and the first pressure reducing valve 1111. The reheater 12 also includes a second reheater The exhaust steam pipeline 122, the second reheat exhaust steam pipeline 122 is provided with a second pressure reducing valve 1221, the steam discharged through the exhaust port of the reheater 12, which should enter the intermediate pressure cylinder 22, is transmitted to the heat network heater 41 by the branch pipeline 123 after passing through the second pressure reducing valve 1221 to heat the heat network water supply pipeline, and the thermal-electric decoupling of the coal-fired power unit can be realized by providing a bypass pipeline 111 between the steam inlet of the superheater 11 and the reheater 12, and providing a branch pipeline 123 between the exhaust port of the reheater 12 and the steam inlet of the heat network heater 41, thereby improving the heating efficiency and the thermal-electric ratio, minimizing the throttling loss to the greatest extent, and improving the overall efficiency of the coal-fired power unit;

[0056] The exhaust port of the reheater 12 is connected to the steam inlet of the condenser 47 via a second reheat exhaust pipeline 122 for condensing the steam that has not entered the branch pipeline 123 .

[0057] See also Figure 4 , the electric boiler 44 is used to heat the water supply pipeline of the heating network, and the generator set 31 is used to supply power to the electric boiler 44; this is the fourth flexibility transformation module, which uses the power generated by the generator set 31 itself to directly heat the water supply pipeline of the heating network through the electric boiler 44, thereby realizing the rapid storage and release of thermal energy. The fourth flexibility transformation module has significant advantages in peak load regulation and emergency response, and can provide stable heating when the coal-fired power unit is running at low load, while absorbing excess wind power and reducing energy waste. It not only improves the flexibility and reliability of heating, but also provides a new way for the consumption of renewable energy.

[0058] See also Figure 5 An exhaust back pressure pipeline 224 is arranged between the exhaust port of the intermediate pressure cylinder 22 and the steam inlet of the heat network heater 41. This is the fifth flexibility transformation module, which is used to enhance the exhaust waste heat of the intermediate pressure cylinder 22 to heat the heat network water supply pipeline. It can achieve the goal of increasing the exhaust back pressure of the steam turbine and directly heating the heat network water supply pipeline with the exhaust steam, thereby reducing the loss of cold source. It is suitable for large-area heating needs, and the changes to the steam turbine body are relatively small and the cost is low. While maintaining low cost and high maturity, the peak-shaving capacity of the unit can be improved to adapt to the ever-changing heating needs.

[0059] The above-mentioned flexible transformation of coal-fired power units with thermal-electric decoupling structure is based on the needs of deep peak regulation and flexibility transformation of coal-fired power units. It systematically summarizes the technical path of thermal-electric decoupling. It has low transformation cost and is easy to transform. It is suitable for the transformation of existing coal-fired power units in different regions, different power grids and different models. It provides a reference and reference for the implementation of flexibility transformation of coal-fired power units, and is easy to achieve standardization, normalization and scientificization in engineering applications. By improving the technical standard system, it can promote the standardized and efficient implementation of flexibility transformation, and ensure the safe, environmentally friendly and economical operation of the units in service.

[0060] In addition, in engineering applications, the structure can be combined with different peak-shaving depth requirements and adopt a flexible combination method according to the energy consumption principle, that is, the first flexibility transformation module, the second flexibility transformation module, the third flexibility transformation module, the fourth flexibility transformation module and the fifth flexibility transformation module are flexibly combined to realize engineering application, and waste heat heating, namely the first flexibility transformation module and heating steam extraction peak-shaving, namely the fifth flexibility transformation module, are given priority, and then the main reheat steam peak-shaving, namely the third flexibility transformation module, is adopted, and finally the electric boiler peak-shaving, namely the fourth flexibility transformation module, is adopted.

[0061] The exhaust port of the low-pressure cylinder 23 is connected to the steam inlet of the condenser 47. The exhaust steam of the low-pressure cylinder 23 enters the condenser 47, is cooled by the circulating water and condensed into water, and then is pumped out by the condensate pump, and is heated by various stages of heaters before being sent to the boiler 1 as feed water.

[0062] In some preferred embodiments, the heating network water supply pipeline includes a first heating network water supply pipeline 451 and a second heating network water supply pipeline 452:

[0063] See also Figure 4 The first heating network water supply pipeline 451 is heated by the heating network heater 41 and is the main pipeline of the heating network water supply pipeline. When the fourth control valve 4521 is closed and the third control valve 4512 is opened, the first heating network water supply pipeline 451 and the first heating network return water pipeline 461 form a heating network water supply loop, and the heating network water supply loop is heated by the heating network heater 41;

[0064] Still see Figure 4 The second heating network water supply pipeline 452 is heated by the heating network heater 41 and the electric boiler 44 in turn. When the heating capacity of the heating network heater 41 is insufficient, the electric boiler 44 provides supplementary heating. When the third control valve 4512 is closed and the fourth control valve 4521 is opened, the second heating network water supply pipeline 452 and the first heating network return pipeline 461 form a heating network water supply loop, which is heated by the heating network heater 41 and the electric boiler 44.

[0065] In some preferred embodiments, the heating network water supply pipeline includes a third heating network water supply pipeline 453 and a fourth heating network water supply pipeline 454:

[0066] See also Figure 5 , the third heat network water supply pipeline 453 is heated by the condenser 47, which can effectively utilize the heat of the condenser 47 and improve thermal efficiency; when the fifth control valve 4531 is opened and the sixth control valve 4541 is closed, the third heat network water supply pipeline 453 and the second heat network return water pipeline 462 form a heat network water supply loop, and the heat network water supply loop is heated by the condenser 47;

[0067] Still see Figure 5 The fourth heating network water supply pipeline 454 is heated by the condenser 47 and the heating network heater 41 in turn. When the energy after the heating by the condenser 47 is insufficient, it can be supplemented by the heating network heater 41 to ensure the stability of heating. When the sixth control valve 4541 is opened and the fifth control valve 4531 is closed, the fourth heating network water supply pipeline 454 and the second heating network return pipeline 462 form a heating network water supply loop, which is heated by the condenser 47 and the heating network heater 41.

[0068] The heat supply unit further includes a heat network return water pipeline; the heat network return water pipeline includes a first heat network return water pipeline 461 and a second heat network return water pipeline 462;

[0069] The first heat network return water pipeline 461 is connected to the water inlet of the heat network heater 41;

[0070] The second heat network return water pipeline 462 is connected to the water inlet of the condenser 47 to ensure effective use of heat.

[0071] In some preferred embodiments, the medium-pressure cylinder 22 also includes a fourth medium-pressure output pipeline 225, which is connected between the exhaust port of the medium-pressure cylinder 22 and the steam inlet of the condenser 47. Similar to the low-pressure cylinder 23, the exhaust steam of the medium-pressure cylinder 22 enters the condenser 47, is cooled by circulating water and condensed into water, and then is pumped out by a condensate pump, and is heated by various stages of heaters before being sent to the boiler 1 as feed water.

[0072] In some preferred embodiments, the flexible transformation of the thermal-electric decoupling structure of the coal-fired power unit also includes a multi-stage heat recovery heater 7; the exhaust port of the high-pressure cylinder 21 and the exhaust port of the medium-pressure cylinder 22 are respectively connected to the multi-stage heat recovery heater 7, which is the prior art and will not be repeated here.

[0073] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.

Claims

1. A flexible transformation of the thermal-electric decoupling structure of a coal-fired power unit, characterized by: It includes a boiler, a steam turbine, a power supply unit and a heat supply unit, wherein the boiler includes a superheater and a reheater, the steam turbine includes a high-pressure cylinder, a medium-pressure cylinder and a low-pressure cylinder, the power supply unit includes a generator set, and the heat supply unit includes a heat network heater, an energy storage water tank, a steam-water heat exchanger, a heat network water supply pipeline and an electric boiler; the medium-pressure cylinder includes a first medium-pressure output pipeline, a second medium-pressure output pipeline, a third medium-pressure output pipeline and an exhaust steam back-pressure pipeline; The first medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the steam-water heat exchanger, the steam-water heat exchanger is used to heat the water supply pipeline of the heating network, and the energy storage water tank is connected to the water supply pipeline of the heating network; The second medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the heat network heater; the third medium-pressure output pipeline is connected between the exhaust port of the medium-pressure cylinder and the steam inlet of the low-pressure cylinder, and a first control valve is arranged on the third medium-pressure output pipeline; A bypass pipeline is arranged between the steam inlet of the superheater and the reheater, a first pressure reducing valve is arranged on the bypass pipeline, and the exhaust port of the reheater is connected to the steam inlet of the heating network heater through a branch pipeline; The electric boiler is used to heat the water supply pipeline of the heating network, and the generator set is used to supply power to the electric boiler; An exhaust steam back pressure pipeline is arranged between the exhaust steam port of the intermediate pressure cylinder and the steam inlet of the heat network heater.

2. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 1 is characterized by: The heat supply unit also includes a condenser; The steam exhaust port of the steam-water heat exchanger is connected to the steam inlet of the condenser.

3. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 2 is characterized by: The steam exhaust port of the low-pressure cylinder is connected to the steam inlet of the condenser.

4. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 2 is characterized by: The exhaust port of the reheater is connected to the steam inlet of the condenser through a second reheat exhaust pipeline.

5. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 2 is characterized by: The heating network water supply pipeline comprises a first heating network water supply pipeline and a second heating network water supply pipeline: The first heating network water supply pipeline is heated by the heating network heater; The second heating network water supply pipeline is heated by the heating network heater and the electric boiler in sequence.

6. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 5 is characterized by: The heating network water supply pipeline includes a third heating network water supply pipeline and a fourth heating network water supply pipeline: The third heat network water supply pipeline supplies heat to the condenser; The fourth heating network water supply pipeline is heated by the condenser and the heating network heater in sequence.

7. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 6 is characterized by: The heat supply unit further includes a heat network return water pipeline; the heat network return water pipeline includes a first heat network return water pipeline and a second heat network return water pipeline; The first heating network return water pipeline is connected to the water inlet of the heating network heater; The second heat network return water pipeline is connected to the water inlet of the condenser.

8. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 2 is characterized by: The intermediate pressure cylinder further includes a fourth intermediate pressure output pipeline, and the fourth intermediate pressure output pipeline is connected between the steam exhaust port of the intermediate pressure cylinder and the steam inlet port of the condenser.

9. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 1 is characterized by: The reheater includes a first reheat exhaust steam pipeline; The first reheat exhaust steam pipeline is connected between the exhaust port of the reheater and the steam inlet of the intermediate pressure cylinder.

10. The thermal-electric decoupling structure of the flexible coal-fired power unit according to claim 9 is characterized by: The reheater also includes a second reheat exhaust steam pipeline, one end of which is connected to the exhaust port of the reheater, one end of the branch pipeline is connected to the second reheat exhaust steam pipeline, and the other end of the branch pipeline is connected to the steam inlet of the heat network heater. A second pressure reducing valve is arranged on the second reheat exhaust steam pipeline, and the second pressure reducing valve is located between the branch pipeline and the exhaust port of the reheater.