Performance detection device for electric energy meter
By automatically transmitting the power meter with an elliptical guide rail and sliding plate in the power meter detection device, and using the air pressure telescopic rod to drive the detection meter for inspection, the problems of low detection efficiency and high cost in the existing technology are solved, and rapid and large-scale Batch inspection and safety improvement.
Patent Information
- Application Number
- CN202323382528.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The existing power meter detection devices have low detection efficiency, high cost, and have safety hazards, so they cannot quickly and in large quantities to conduct power meter performance testing.
An electric energy meter performance detection device is designed to realize the automatic transmission of the electric energy meter using an elliptical guide rail and a sliding plate. The electric performance detection meter is carried out in combination with the air pressure telescopic rod driving detection meter, which improves the detection efficiency and reduces labor costs.
It realizes rapid and large-scale inspection of electricity meters, reduces time and labor costs, avoids safety hazards of manual inspection, and improves detection efficiency and safety.
Smart Images

Figure CN222050427U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of detection devices, in particular to an electric energy meter performance detection device. Background Art
[0002] When the existing electric energy meter detection device detects the electrical performance of the electric energy meter, the electric energy meter is generally plugged into the detection meter, and then the electric energy meter is pressed by hand to prevent it from loosening and affecting the detection, thereby detecting the electrical performance of the electric energy meter. However, this detection efficiency is very low, and it is not possible to quickly and massively detect the performance of the electric energy meter. At the same time, manual detection of the electric energy meter is also dangerous and has high labor costs. Therefore, the current detection method of the device for the electric energy meter is unreasonable and needs to be improved. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] In view of the deficiencies in the prior art, the utility model provides an electric energy meter performance detection device, which provides an elliptical guide rail on a workbench, slides a sliding plate on the guide rail, and carries an electric energy meter on the sliding plate. When the electric energy meter moves to one side of the detection meter, the pneumatic telescopic rod drives the detection meter to move, thereby realizing the detection of the electric energy meter, effectively improving work efficiency, reducing time and labor costs, and solving the problems of low efficiency and high cost of the current device.
[0005] (II) Technical solution
[0006] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:
[0007] A performance detection device for an electric energy meter comprises a workbench, on which two rotating wheels are rotatably connected, a conveyor belt is arranged between the two rotating wheels, the workbench is located on the outer side of the conveyor belt and is fixedly connected to an elliptical guide rail, a plurality of sliding plates are slidably connected to the guide rail, a connecting piece is fixed between one side of the sliding plate and the conveyor belt, and an electric energy meter body is arranged on the sliding plate, a detection component is installed on one side of the workbench, the detection component comprises a support frame and a mounting plate fixedly connected to the workbench, a detection meter is slidably connected to a limit frame fixed on the top of the support frame, a terminal is arranged on one side of the detection meter, and a pneumatic telescopic rod is installed on the mounting plate, and the end of the pneumatic telescopic rod is fixedly connected to the detection meter.
[0008] Furthermore, a display is installed on one side of the workbench located at the detection component, and the display is electrically connected to the detection meter.
[0009] Furthermore, the sliding plate is provided with a positioning groove for accommodating the electric energy meter body.
[0010] Furthermore, a driving shaft is fixedly connected to one of the rotating wheels, the lower end of the driving shaft extends to the bottom of the workbench and is fixed with a worm gear, a motor is installed on the lower surface of the workbench, and a worm meshing with the worm gear is fixedly connected to the output shaft of the motor.
[0011] (III) Beneficial effects
[0012] Compared with the prior art, the utility model provides an electric energy meter performance detection device having the following
[0013] Beneficial effects:
[0014] The utility model fixes an elliptical guide rail on a workbench, slides a plurality of sliding plates on the guide rail, and the sliding plates are all equipped with an electric energy meter body. When the conveyor belt on the rotating wheel rotates, the sliding plate can be driven to move. When the electric energy meter body moves to one side of the detection component, the conveyor belt stops rotating, and the pneumatic telescopic rod in the detection component works to drive the detection meter to slide on the inner side of the limit frame, so that the terminal on one side of the detection meter contacts with the electric energy meter body, and the detection processing of the corresponding electric energy meter body is performed, so as to realize fast and large-scale electric energy detection of the electric energy meter. This method can effectively improve work efficiency, meet the detection requirements of large quantities of electric energy meters, reduce time and labor costs, and avoid the safety hazards caused by manual detection. It has a good practical use effect and is suitable for popularization and use. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a front perspective view of the utility model;
[0016] Figure 2 It is a structural schematic diagram of the detection component in the utility model;
[0017] Figure 3 It is a bottom-up stereogram of the present invention.
[0018] In the figure: 1. workbench; 2. rotating wheel; 3. conveyor belt; 4. connecting part; 5. guide rail; 6. sliding plate; 7. detection component; 701. support frame; 702. limit frame; 703. terminal; 704. detection meter; 705. mounting plate; 706. pneumatic telescopic rod; 8. display; 9. electric energy meter body; 10. driving shaft; 11. worm gear; 12. motor; 13. worm. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Example
[0021] like Figure 1 and Figure 2 As shown, an electric energy meter performance detection device proposed in an embodiment of the utility model includes a workbench 1, on which two rotating wheels 2 are rotatably connected, a transmission belt 3 is arranged between the two rotating wheels 2, and the rotating wheels 2 can drive the transmission belt 3 to operate, and the workbench 1 is located on the outer side of the transmission belt 3 and is fixedly connected with an elliptical guide rail 5, on which a plurality of sliding plates 6 are slidably connected, and between one side of the sliding plate 6 and the transmission belt 3, a connecting piece 4 is fixed, when the transmission belt 3 operates, the sliding plate 6 can be driven to slide on the guide rail 5 through the relationship of the connecting piece 4, and an electric energy meter body 9 is arranged on the sliding plate 6, which then drives the electric energy meter body 9 to move, so as to realize the automatic transmission and movement of the electric energy meter body 9, and a detection component 7 is installed on one side of the workbench 1, and the electrical performance of the electric energy meter body 9 is detected by the detection component 7, and the detection component 7 comprises a support frame 701 and a mounting plate 705 fixedly connected to the workbench 1, a detection meter 704 is slidably connected to a limit frame 702 fixed on the top of the support frame 701, the setting of the limit frame 702 can realize the limit function of the detection meter 704, so that the detection meter 704 can move linearly, a terminal 703 is arranged on one side of the detection meter 704, the terminal 703 is in contact with the electric energy meter body 9, and the electric performance test of the electric energy meter body 9 is realized, and a pneumatic telescopic rod 706 is installed on the mounting plate 705, the end of the pneumatic telescopic rod 706 is fixedly connected to the detection meter 704, the pneumatic telescopic rod 706 can drive the detection meter 704 to slide on the limit frame 702, and realize the automatic detection of the electric energy meter body 9. This method can quickly perform the electric performance detection of the electric energy meter body 9, and the assembly line operation is high in efficiency.
[0022] like Figure 1 and Figure 2 As shown, in some embodiments, a display 8 is installed on one side of the workbench 1 located at the detection component 7, and the display 8 is electrically connected to the detection meter 704, and the detection status of the electric energy meter body 9 can be displayed through the display 8.
[0023] like Figure 1As shown, in some embodiments, a positioning groove for accommodating the electric energy meter body 9 is opened on the sliding plate 6 to achieve the positioning and storage of the electric energy meter body 9, thereby avoiding shaking when the detection meter 704 and the electric energy meter body 9 are in contact, thereby affecting the detection accuracy of the electric energy meter body 9.
[0024] like Figure 1 and Figure 3 As shown, in some embodiments, a driving shaft 10 is fixedly connected to one of the rotating wheels 2, and the driving shaft 10 can drive the rotating wheel 2 to rotate, thereby causing the conveyor belt 3 to operate, and driving the sliding plate 6 to move on the guide rail 5. The lower end of the driving shaft 10 extends to the bottom of the workbench 1 and is fixed with a worm gear 11. A motor 12 is installed on the lower surface of the workbench 1, and a worm 13 meshing with the worm gear 11 is fixedly connected to the output shaft of the motor 12. When the motor 12 is working, it can drive the driving shaft 10 to rotate through the meshing relationship between the worm gear 11 and the worm gear 13, thereby realizing the rotational drive of the rotating wheel 2, and this driving method is stable.
[0025] The working principle and use steps of the utility model are as follows: when in use, the electric energy meter body 9 to be detected is placed on the positioning groove of the sliding plate 6, and the driving motor 12 is started. The motor 12 drives the worm 13 to rotate, and the driving shaft 10 is driven to rotate through the meshing relationship between the worm 13 and the worm wheel 11, so as to realize the rotation drive of the rotating wheel 2. When the rotating wheel 2 rotates, it can drive the transmission belt 3 to operate, and drive the sliding plate 6 to slide on the guide rail 5 through the relationship of the connecting piece 4, thereby realizing the movement of the electric energy meter body 9. When the electric energy meter body 9 moves to one side of the detection component 7, the motor 12 stops working and the transmission belt 3 stops rotating. At this time, the pneumatic telescopic rod 706 drives the detection meter 704 to slide linearly on the limit frame 702, so that the detection meter 704 moves closer to the electric energy meter body 9, and the terminal 703 contacts the electric energy meter body 9. At this time, the detection status of the electric energy meter body 9 can be observed through the display 8. After the detection, the pneumatic telescopic rod 706 drives the detection meter 704 to reset, so as to realize the detection of the electric energy meter body 9.
[0026] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An electric energy meter performance detection device, comprising a workbench (1), Features: The workbench (1) is rotatably connected to two rotating wheels (2), a conveyor belt (3) is arranged between the two rotating wheels (2), the workbench (1) is located outside the conveyor belt (3) and is fixedly connected to an elliptical guide rail (5), a plurality of sliding plates (6) are slidably connected to the guide rail (5), a connecting piece (4) is fixed between one side of the sliding plate (6) and the conveyor belt (3), and an electric energy meter body (9) is arranged on the sliding plate (6), and a detection device (9) is installed on one side of the workbench (1). The detection component (7) comprises a support frame (701) and a mounting plate (705) fixedly connected to a workbench (1); a detection meter (704) is slidably connected to a limit frame (702) fixed on the top of the support frame (701); a terminal (703) is provided on one side of the detection meter (704); and a pneumatic telescopic rod (706) is installed on the mounting plate (705); and the end of the pneumatic telescopic rod (706) is fixedly connected to the detection meter (704).
2. An electric energy meter performance detection device according to claim 1, Features: A display (8) is installed on one side of the workbench (1) located on the detection component (7), and the display (8) is electrically connected to the detection meter (704).
3. The electric energy meter performance detection device according to claim 1, Features: The sliding plate (6) is provided with a positioning groove for accommodating the electric energy meter body (9).
4. The electric energy meter performance detection device according to claim 1, Features: A driving shaft (10) is fixedly connected to one of the rotating wheels (2), the lower end of the driving shaft (10) extends to the bottom of the workbench (1) and is fixed with a worm gear (11), a motor (12) is mounted on the lower surface of the workbench (1), and a worm (13) meshing with the worm gear (11) is fixedly connected to the output shaft of the motor (12).