Dirt crushing and temporary storage device

By designing a dirt crushing and storage device, combining the dirt crushing and storage functions, the problems of long and low dirt treatment cycles and low efficiency in the prior art are solved, and the rapid and efficient treatment of dirt is achieved and secondary pollution is reduced.

CN222057617UActive Publication Date: 2024-11-26ZHEJIANG JUNTAI ECOLOGICAL ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323660324.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

Due to the different requirements for treating dirt in different states, existing dirt treatment equipment leads to long treatment cycles and low efficiency, and secondary pollution occurs during the transit process.

Method used

Design a dirt crushing and temporary storage device, combining the crushing and temporary storage functions, including a material pooling trough, temporary storage box and water tank, and realize dirt through a crusher, liquid level automatic switch, sewage pump, high-pressure water pump and control electric box Quick handling and cleaning.

Benefits of technology

It realizes rapid and efficient treatment of dirt, reduces secondary pollution during the transfer process, and improves treatment efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222057617U_ABST
    Figure CN222057617U_ABST
Patent Text Reader

Abstract

The utility model provides a sewage crushing and temporary storage device, and belongs to the technical field of household garbage treatment. Comprising a material gathering groove and a temporary storage box which are sequentially arranged, a feeding port is formed in the top of the material gathering groove, the material gathering groove and the temporary storage box are separated through a material bin plate, material bin holes are formed in the material bin plate, a pulverizer and a sewage pump are arranged in the temporary storage box, and the pulverizer is located on the side close to the material gathering groove and corresponds to a washing spray head. The sewage pump is hoisted in the temporary storage box, it is ensured that a pump shell of the sewage pump leaves the box bottom of the temporary storage box, and the sewage pump is connected with a sludge discharge pipe. According to the device, rapid and efficient treatment of dirt is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a waste crushing and temporary storage device, belonging to the technical field of domestic waste treatment. Background Art

[0002] In life, the types of waste are relatively complex. After the relevant garbage is collected and collected, it is generally transported to the waste treatment plant by tank trucks for centralized treatment. However, since waste is not only liquid, but also solid and even gel, the treatment requirements of waste in different states are different, so the waste treatment equipment is usually completed by multiple separate treatment equipment. Not only is the treatment cycle long and the treatment efficiency low, but it also requires multiple transfers, which will cause secondary pollution during the transfer process. Utility Model Content

[0003] In view of this, the present application provides a waste crushing and temporary storage device, which integrates the crushing and caching of waste to achieve fast and efficient waste processing.

[0004] Specifically, the present application is implemented through the following scheme:

[0005] A waste crushing and temporary storage device comprises a material collecting trough, a temporary storage box and a water tank which are arranged in sequence.

[0006] A grille is provided on the top of the material collecting trough, and the grille is movably connected to the material collecting trough. When the grille is closed, it is used as an operating walking pedal, and when the grille is opened, it is used as a feeding port.

[0007] The side of the aggregate trough is provided with a cleaning port, and a plurality of cleaning ports can be provided as required, which are respectively used to clean the gravel and solids precipitated in the aggregate trough, or to clean and flush the residual sewage at the bottom of the temporary storage tank.

[0008] A flushing nozzle is arranged on one side of the material collecting trough close to the temporary storage box to flush the sediment accumulated under the crusher and cool the submersible motor. The material collecting trough and the temporary storage box are separated by a material cabin board, and a material cabin hole is arranged on the material cabin board.

[0009] A pulverizer, a liquid level automatic switch and a sewage pump are arranged in the temporary storage box. The pulverizer is located on the side close to the material aggregation tank and is arranged corresponding to the flushing nozzle. The sewage pump is hoisted in the temporary storage box and ensures that the pump casing of the sewage pump leaves the bottom of the temporary storage box. The sewage pump is connected to a mud discharge pipe.

[0010] The water tank may also be equipped with a water level meter for observing the amount of water in the water tank. When cleaning the water tank, the bottom screws may be loosened to drain the water.

[0011] A high-pressure water pump is installed in the water tank, and the high-pressure water pump is equipped with a high-pressure water drum hose reel. Before starting, ensure that there is sufficient water in the water tank. In the above scheme, a matching nozzle and / or an extended gun rod can also be set under the control electrical box. The matching nozzle and / or the extended gun rod are connected to the high-pressure water pump according to different situations.

[0012] A control box is arranged above the water tank, and the control box supplies power to each component to realize central control. According to needs, a flushing valve can be arranged below the control box, and the flushing valve can work alone or in conjunction with the flushing nozzle.

[0013] The working process of the above device is: aggregation → crushing → temporary storage → extraction → high-pressure water cleaning, so as to achieve rapid treatment of waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A schematic diagram of the three-dimensional structure of this application;

[0015] Figure 2 This is a schematic diagram of the front structure of this application;

[0016] Figure 3 This is a schematic diagram of the top structure of this application;

[0017] Figure 4 It is a side structural schematic diagram of this application;

[0018] Figure 5 This is another structural schematic diagram of the front side of this application.

[0019] Numbers in the figure: 1. Aggregate trough; 11. Grille; 12. Cleaning port 1; 13. Cleaning port 2; 14. Flushing nozzle; 15. Material compartment plate; 2. Crusher; 3. Ladder; 4. Crane; 5. Temporary storage box; 6. Water tank; 61. Sewage pump; 62. Mud discharge pipe; 63. Liquid level automatic control switch; 7. High-pressure water pump; 71. High-pressure water drum hose reel; 8. Control electrical box; 9. Outer box. DETAILED DESCRIPTION Example 1

[0020] This embodiment is a waste crushing and temporary storage device, combined with Figures 1 to 4 , including a material aggregation trough 1, a temporary storage box 5 and a water tank 6 which are arranged in sequence. The working process of the device is: material aggregation → crushing → temporary storage → extraction → high-pressure water cleaning.

[0021] A grille 11 is provided on the top of the material collecting tank 1 as an operating walking pedal, and both ends of the grille 1 are movably connected to the material collecting tank 1 and opened as a feeding port.

[0022] A cleaning port is provided on the side of the aggregate tank 1, and multiple cleaning ports can be provided as needed, such as Figure 4The cleaning port 12 and the cleaning port 2 13 are shown. The cleaning port 12 is mainly used to clean the gravel and solids precipitated in the aggregate tank 1. The orifice diameter is 245mm and can be cleaned after opening; the cleaning port 2 13 is mainly used to clean and flush the residual sewage at the bottom of the temporary storage tank 1.

[0023] Combination Figure 5 A flushing nozzle 14 is arranged on one side of the material trough 1 near the temporary storage box 5. The material trough 1 is separated from the temporary storage box 5 by a material cabin plate 15, and a material cabin hole (not shown in the figure, a conventional hole structure is sufficient) is arranged on the material cabin plate 15.

[0024] A pulverizer 2, a liquid level automatic switch 63 and a sewage pump 61 are arranged in the temporary storage box 5. The pulverizer 2 is located on the side close to the aggregation tank 1 and is arranged corresponding to the flushing nozzle 14. The sewage pump 61 is hoisted in the temporary storage box 5, and it is ensured that the pump casing of the sewage pump 61 leaves the bottom of the temporary storage box 5. The sewage pump 61 is connected to a mud discharge pipe 62.

[0025] A water tank water level meter may also be provided in the water tank 6 to observe the amount of water in the water tank 6. When cleaning the water tank 6, the bottom screws may be loosened to drain the water.

[0026] A high-pressure water pump 7 is arranged in the water tank 6, and the high-pressure water pump 7 is equipped with a high-pressure water drum hose reel 71. Before starting, ensure that there is sufficient water in the water tank 6. In the above scheme, a matching nozzle and / or an extended gun rod can also be arranged below the control electrical box 8, and the matching nozzle and / or the extended gun rod are connected to the high-pressure water pump 7 according to different situations.

[0027] The control box 8 is located above the water tank 6 . A flushing valve can be provided below the control box 8 as required. The flushing valve can work alone or in conjunction with the flushing nozzle 14 to clean the motor sludge of the pulverizer 2 .

[0028] When the tank truck delivers sewage to the device, the grille 11 is opened, the tank truck valve or the on-board mud pump is opened, and the sewage is delivered to the aggregate tank 1 by using the tank truck storage tank valve or the delivery pump. The sewage entering the aggregate tank 1 is filtered through the material cabin hole, and the sewage enters the temporary storage box 5.

[0029] When the dirt in the temporary storage box 5 reaches the upper end of the motor of the pulverizer 2 (the discharge volume at this time is about 2 cubic meters), the pulverizer 2 is turned on (automatic gear is turned on) for pulverization. When the dirt in the temporary storage box 5 reaches the upper limit (the capacity of the temporary storage box 5 is about 8 cubic meters), the liquid level automatic control switch 63 works, and the sewage pump 61 is automatically turned on. Through the mud discharge pipe 62 connected thereto, the solid matter in the dirt is crushed into fragments, and the sewage is sent to the next treatment device or directly discharged into the sewage pool through the sewage pump 61 and the mud pump 62. During the pulverization process, the tank truck can also continue to unload the material into the aggregate tank 1.

[0030] If the dirt in the temporary storage box 5 has not reached the set upper limit and needs to be temporarily extracted, the sewage pump 61 can be turned on by a manual button; the time for the sewage pump 61 to be exposed to the liquid surface is controlled (15 minutes). If necessary, the water gun of the high-pressure water pump 7 is started to flush and cool the sewage pump 61.

[0031] After the work is finished, stop feeding, turn off the crusher 2, turn off the sewage pump 61, stop discharging mud, start the high-pressure water pump 7, pull out the water gun of the high-pressure water drum hose reel 71, and rinse the aggregate tank 1, crusher 2, sewage pump 61, etc. After the equipment is rinsed clean, turn off the high-pressure water pump 7 and turn off the main power supply of the control electric box 8.

[0032] Before starting the device on the second working day, the flushing nozzle 14 needs to be opened to flush the sediment from the motor, valve, etc. of the crusher 2 for 10-15 minutes (depending on the bottom silt situation).

[0033] As an alternative, a horizontal bar is also provided on the top of the temporary storage box 5, and the crane 4 (electric) is arranged in the middle of the temporary storage box 5 through the horizontal bar. When the crusher 2 is entangled or fails and needs to be repaired, or the sewage pump 61 is blocked or fails, the crane 4 is started and hoisted to the grille surface for maintenance. The switch of the crane 4 can be operated by panel buttons and remote control according to the actual situation.

Claims

1. A waste crushing and temporary storage device, characterized in that: It includes a material trough and a temporary storage box which are arranged in sequence. A feed inlet is arranged at the top of the aggregate trough. The material collecting trough and the temporary storage box are separated by a material cabin plate, and a material cabin hole is arranged on the material cabin plate. A pulverizer and a sewage pump are arranged in the temporary storage box. The pulverizer is located on a side close to the aggregate tank and is arranged corresponding to the flushing nozzle. The sewage pump is hoisted in the temporary storage box to ensure that the pump casing of the sewage pump leaves the bottom of the temporary storage box. The sewage pump is connected to a mud discharge pipe.

2. A waste crushing and temporary storage device according to claim 1, characterized in that: A grille is arranged on the top of the material collecting trough, and the grille is movably connected to the material collecting trough. The grille is opened to form a feeding port, and is closed to transform into an operating walking pedal.

3. A waste crushing and temporary storage device according to claim 1, characterized in that: At least one cleaning port is arranged on the side of the material collecting trough.

4. The waste crushing and temporary storage device according to claim 1, characterized in that: A flushing nozzle is arranged on one side of the material collecting trough close to the temporary storage box.

5. The waste crushing and temporary storage device according to claim 1, characterized in that: A liquid level automatic control switch is also arranged in the temporary storage box, and the liquid level automatic control switch is connected with the motor signal of the sewage pump.

6. A waste crushing and temporary storage device according to any one of claims 1 to 5, characterized in that: The utility model also comprises a water tank, in which a high-pressure water pump is arranged, and the high-pressure water pump is equipped with a high-pressure water drum hose reel.

7. A waste crushing and temporary storage device according to claim 6, characterized in that: The water tank may also be provided with a water tank water level meter.

8. The waste crushing and temporary storage device according to claim 6, characterized in that: The utility model also comprises a matching nozzle and / or an extended gun rod, and the matching nozzle and / or the extended gun rod are connected with a high-pressure water pump.

9. The waste crushing and temporary storage device according to claim 6, characterized in that: A control electric box is arranged above the water tank.

10. A waste crushing and temporary storage device according to claim 9, characterized in that: The control electrical box is provided with a flushing valve, and the flushing valve is connected with a flushing nozzle.