Quick and accurate positioning tool for water purification tank installation

By designing the water purification tank to install quickly and accurately position the tooling, and using components such as positioning beams, support rods and beam support, the problem of inaccurate positioning of the water purification tank in rail vehicle assembly is solved, and an efficient and safe installation process is achieved to adapt to different Specifications and models of water tanks improve installation quality and efficiency.

CN222058919UActive Publication Date: 2024-11-26CRRC CHANGCHUN RAILWAY VEHICLES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420650240.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-26
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

During the assembly process of rail vehicle, the installation of the water purification tank is large in size, small space, irregular structure and large weight, resulting in inaccurate positioning and inconvenient operation, making existing tools difficult to use, resulting in low installation efficiency and great safety hazards. Pure hand-drilling methods cannot meet production needs.

Method used

A water purification tank installation quick and accurate positioning tool is designed, including the first positioning beam, the second positioning beam, the side beam, the support rod, the positioning plate and the beam support. The positioning circular hole is combined with the screw sleeve of the wall and combined with the angle iron. and bolt assembly to achieve rapid and accurate positioning of the material parts and adapt to the installation of water tanks of different specifications and models.

Benefits of technology

It realizes rapid and accurate water tank positioning, reduces installation workload, improves efficiency and quality, avoids the risk of scratches on the partition wall and dismantling of surrounding components, and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222058919U_ABST
    Figure CN222058919U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick and accurate positioning tool for installing a water purifying tank, and belongs to the technical field of auxiliary tools for rail transit vehicle production. The device is provided with a first positioning beam, a second positioning beam and an edge beam, the second positioning beam and the first positioning beam are arranged at an interval, the edge beam is used for fixedly connecting the first positioning beam and the second positioning beam, and the upper part of the edge beam is fixedly connected with a supporting rod which vertically extends; the positioning plate is provided with a water tank positioning reference hole; the two sides of the positioning plate are fixedly connected with the first positioning beam and the second positioning beam through connecting blocks; a cross beam support is installed at the top of the supporting rod, a positioning round hole is formed in the cross beam support and used for being matched with a thread sleeve of a dividing wall, and the water purifying box positioning device has the advantages of being light in weight, convenient to carry, capable of reducing working intensity, capable of accurately positioning a water purifying box and improving working efficiency, high in construction quality, high in practicability and the like. And meanwhile, potential safety hazards in the water tank carrying and unloading process are eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of auxiliary tooling for rail transit vehicle production, and in particular to a tooling for fast and accurate positioning of a clean water tank installation. Background Art

[0002] At present, when assembling existing rail vehicles, there is no precise positioning method for the installation of the clean water tank at the position of the driver's cab through the platform, and there are the following difficulties during installation: large size, small installation space, irregular structure, heavy weight, inconvenient operation, etc. In actual production, due to the limited space of the partition wall, it is impossible to use tools such as ink gauges and tape measures. It often takes a long time to repeatedly move and unload the water tank for adjustment. Not only is the positioning inaccurate, but it is also time-consuming and labor-intensive, inefficient, and easily causes safety hazards. If the positioning is deviated, it will also cause rework, scratching of the partition wall, and dismantling of surrounding components. Moreover, with the increasing demand for rail vehicles at home and abroad, the previous method of drilling holes and setting up the bottom of the clean water tank by pure manual labor can no longer meet the production needs of vehicles;

[0003] Therefore, based on the above problems, how to meet production needs, improve overall installation efficiency, and improve the rapid and accurate positioning of materials has become an important technical problem that technical personnel in this field urgently need to solve. Utility Model Content

[0004] The purpose of the utility model is to overcome the defects of the prior art and provide a water clean tank installation fast and accurate positioning tool, which can replace manual positioning to achieve fast and accurate positioning of the water tank in the driver's cab, reduce the workload of water clean tank installation, improve work efficiency and installation quality, and avoid the risk of scratching partition walls and dismantling surrounding components.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] The utility model discloses a water purification tank installation fast and accurate positioning tool, comprising:

[0007] a first positioning beam;

[0008] a second positioning beam, which is spaced apart from the first positioning beam; and

[0009] A side beam, used for fixedly connecting the first positioning beam and the second positioning beam, wherein a vertically extending support rod is fixedly connected to the upper portion of the side beam; and

[0010] A positioning plate provided with a water tank positioning reference hole;

[0011] Both sides of the positioning plate are fixedly connected to the first positioning beam and the second positioning beam through connecting blocks;

[0012] A crossbeam support is installed on the top of the support rod, and a positioning circular hole is opened on the crossbeam support for matching with the threaded sleeve provided with the partition wall.

[0013] Furthermore, the first positioning beam, the second positioning beam, the side beam and the support rod are all profiles, and the side walls of the profiles are provided with sliding grooves along their length directions.

[0014] Furthermore, it also includes an L-shaped angle iron, the horizontal section and the vertical section of the angle iron are both installed with bolt assemblies, wherein the first positioning beam, the second positioning beam and the end of the support rod are connected to the side beam, and the side is fixedly connected to the side beam through the bolt assembly of the angle iron.

[0015] Furthermore, the crossbeam support is constructed as a bent plate with a concave structure.

[0016] Furthermore, a mounting hole capable of installing a bolt assembly is provided on one side wall of the beam support, the positioning circular hole is provided on the other side, and an avoidance groove is provided on the bottom wall of the beam support corresponding to the end position of the support rod.

[0017] Furthermore, the connection block is detachably fixedly connected to the positioning plate via a connection piece.

[0018] Further, preferably, felt is bonded to the contact positions of the side beams, the support rods and the cross beam supports with the partition walls.

[0019] In the above technical scheme, the utility model provides a fast and accurate positioning tool for installing a clean water tank. The research and development of the tool focuses on solving the needs of fast and accurate positioning of clean water tanks of different specifications with large material volume, small operating space, and difficult to determine drilling positions, and has the following beneficial effects:

[0020] 1) Quickly and accurately complete the positioning of the water tank in the driver's cab;

[0021] 2) Reduce the workload of water purification tank installation and improve work efficiency;

[0022] 3) The installation quality of the water purification tank is improved, and the risk of scratching the partition wall and dismantling the surrounding components is effectively avoided. On the basis of using the tooling to improve efficiency, the construction quality can also be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0024] Figure 1It is an axonometric diagram of the fast and accurate positioning tooling for installing a clean water tank disclosed in the utility model;

[0025] Figure 2 This is a front view of the fast and accurate positioning tool for installing a clean water tank disclosed in the utility model;

[0026] Figure 3 It is a left view of the fast and accurate positioning tool for installing a clean water tank disclosed in the utility model;

[0027] Figure 4 It is a top view of the fast and accurate positioning tooling for installing a clean water tank disclosed in the utility model;

[0028] Figure 5 This is the axonometric diagram of the crossbeam support of the water purification tank installation fast and accurate positioning tool disclosed in the utility model;

[0029] Figure 6 It is an axonometric diagram of a positioning plate of a fast and accurate positioning tool for installing a clean water tank disclosed in the utility model.

[0030] Description of reference numerals:

[0031] 1. First positioning beam; 2. Second positioning beam; 3. Side beam; 4. Positioning plate; 41. Water tank positioning reference hole; 5. Connecting block; 6. Connecting block; 7. Support rod; 8. Crossbeam support; 81. Positioning circular hole; 82. Avoidance groove; 83. Mounting hole; 9. Angle iron. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0033] See also Figure 1-4 As shown;

[0034] The utility model water purification tank installation fast and accurate positioning tool comprises: a first positioning beam 1, a second positioning beam 2, and a side beam 3;

[0035] The first positioning beam 1 and the second positioning beam 2 are arranged at intervals, the side beam 3 is fixedly connected to the first positioning beam 1 and the second positioning beam 2, the upper part of the side beam 3 is fixedly connected to a vertically extending support rod 7, the tooling also includes a positioning plate 4, the positioning plate 4 is provided with a water tank positioning reference hole 41, and the two sides of the positioning plate 4 are fixedly connected to the first positioning beam 1 and the second positioning beam 2 through a connecting block 5 and a connecting block 6;

[0036] A crossbeam support 8 is installed on the top of the support rod 7, and a positioning circular hole 81 is opened in the crossbeam support 8. When in use, the positioning circular hole 81 cooperates with the threaded sleeve of the partition wall to fix the position of the tooling, so that the tooling can determine the positions of the two installation points on the floor through the two installation points of the partition wall, thereby realizing fast and accurate positioning of the water tank in the driver's cab, reducing the workload of the clean water tank installation, and improving work efficiency and installation quality.

[0037] Preferably, the first positioning beam 1, the second positioning beam 2, the side beam 3 and the support rod 7 are all profiles, which may be aluminum profiles in the prior art, and the side walls of the profiles are provided with slide grooves along their length direction.

[0038] Preferably, the tooling also includes an angle iron 9, which is an L-shaped angle iron. The horizontal section and the vertical section of the angle iron 9 are both installed with bolt assemblies. When in use, the bolt assemblies cooperate with the first positioning beam 1, the second positioning beam 2, the side beam 3 and the slide groove of the support rod 7, wherein the first positioning beam 1, the second positioning beam 2 and the support rod 7 are butted against the side beam 3 at their ends, and the sides are fixedly connected to the side beam 3 through the bolt assemblies of the angle iron 9. After the assembly is completed, the base of the tooling is directly placed on the surface of the floor cloth. The bolt assemblies can be bolts and nuts slidably connected to the slide grooves in the prior art. The side beams 3 of the tooling are connected to the first positioning beam 1, the second positioning beam 2 and the support rod 7 through the angle iron 9, so that the positions of the first positioning beam 1, the second positioning beam 2 and the support rod 7 on the side beam 3 are adjustable, which is convenient to use.

[0039] See also Figure 5 As shown, preferably, the structure of the beam support 8 is a bent plate with a concave structure, which is formed by a bending process or casting. A mounting hole 83 for installing a bolt assembly is opened on one side wall of the beam support 8, and a positioning circular hole 81 is opened on the other side. An avoidance groove 82 is opened on the bottom wall of the beam support 8 corresponding to the end position of the support rod 7, and the end of the support rod 7 is avoided by the avoidance groove 82. The beam support 8 cooperates with the bolt assembly through the mounting hole 83, so that the beam support 8 can be adjusted in the height direction of the support rod 7 to adapt to the installation of water tanks of different specifications and models.

[0040] See also Figure 6 As shown, preferably, the connecting block 5 and the connecting block 6 are fixedly connected to the positioning plate 4 through a connecting piece that can be detachably assembled and assembled. The connecting piece is a bolt, and the bolt is threadedly connected to the bolt hole on the connecting block, so that the positioning plate 4 can be replaced at any time to adapt to the positioning of water tanks of different specifications and models.

[0041] Preferably, felt is bonded to the contact positions of the side beams 3, the support rods 7 and the cross beam supports 8 with the partition walls. Since the clean water tank is installed at the lower part of the partition wall with a narrow space, in order to avoid scratching the partition wall when moving the tooling, felt is pasted on the contact position of the outside of the tooling with the partition wall to ensure soft contact between the tooling and the partition wall when positioning, avoiding bumps and scratches on the partition wall. In addition, while using this tooling to improve efficiency, the construction quality can also be improved at the same time.

[0042] In the above technical solution, the utility model provides a fast and accurate positioning tool for installing a clean water tank, and the method of use is:

[0043] After the various parts of the tooling are assembled and fixed, the first positioning beam 1, the second positioning beam 2 and the side beam 3 are in contact with the surface of the floor cloth, and the crossbeam support 8 cooperates with the threaded sleeve of the partition wall through the positioning circular hole 81 to fix the position of the tooling. After the position of the tooling is determined, holes are drilled according to the water tank positioning reference hole 41 on the positioning plate 4 to achieve water tank positioning;

[0044] Beneficial effect: the tooling is made of aluminum alloy, is light in weight, easy to carry, reduces work intensity, can achieve precise positioning, improves work efficiency, has high construction quality, and also eliminates safety hazards in the process of moving and unloading water tanks.

[0045] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. The fast and accurate positioning tooling for installing the clean water tank is characterized by: include: A first positioning beam (1); a second positioning beam (2), which is spaced apart from the first positioning beam (1); as well as A side beam (3) is used to fixedly connect the first positioning beam (1) and the second positioning beam (2), and a vertically extending support rod (7) is fixedly connected to the upper part of the side beam (3); and further includes A positioning plate (4) provided with a water tank positioning reference hole (41); The two sides of the positioning plate (4) are fixedly connected to the first positioning beam (1) and the second positioning beam (2) via connecting blocks (5, 6); A crossbeam support (8) is installed on the top of the support rod (7), and the crossbeam support (8) is provided with a positioning circular hole (81) for cooperating with the threaded sleeve of the partition wall.

2. According to the water tank installation fast and accurate positioning tooling of claim 1, It is characterized by: The first positioning beam (1), the second positioning beam (2), the side beam (3) and the support rod (7) are all profiles, and the side walls of the profiles are provided with sliding grooves along their length directions.

3. The water purification tank installation rapid and accurate positioning tool according to claim 2 is characterized in that ; It also includes an L-shaped angle iron (9), the horizontal section and the vertical section of the angle iron (9) are both installed with bolt assemblies, wherein the ends of the first positioning beam (1), the second positioning beam (2) and the support rod (7) are connected to the side beam (3), and the side portions are fixedly connected to the side beam (3) through the bolt assemblies of the angle iron (9).

4. The water purification tank installation rapid and accurate positioning tool according to claim 2 is characterized in that ; The crossbeam support (8) is constructed as a bent plate with a concave structure.

5. The water purification tank installation rapid and accurate positioning tool according to claim 4, characterized in that; A mounting hole (83) capable of mounting a bolt assembly is provided on one side wall of the crossbeam support (8), a positioning circular hole (81) is provided on the other side, and an avoidance groove (82) is provided on the bottom wall of the crossbeam support (8) at a position corresponding to the end of the support rod (7).

6. The water purification tank installation rapid and accurate positioning tool according to claim 1 or 2, characterized in that; The connection blocks (5, 6) are fixedly connected to the positioning plate (4) via a connection piece so as to be detachable.

7. The water purification tank installation rapid and accurate positioning tool according to claim 1, characterized in that; Felt is bonded to the contact positions of the side beam (3), the support rod (7) and the cross beam support (8) with the partition wall.