Combined arrangement structure of reservoir release structure under pumped storage power station
By cross-arranged diversion tunnels, drain pipes and vertical shaft flood discharge holes in reservoir drain buildings under pumped storage power stations, and using the design of piston valves and steel gates, the problems of large volume of reconstruction projects and construction difficulties in water discharge buildings are solved. , realizes flexible flood discharge methods and safe construction processes, reducing project investment and construction period.
Patent Information
- Application Number
- CN202420709559.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-08
AI Technical Summary
The joint arrangement of the reservoir drainage buildings under the pumped storage power station has problems such as large reconstruction project volume after the diversion tunnel is removed, the reconstruction period is tight and construction difficulties, especially due to the large size of the imported structure and the high complexity of the construction site.
The cross-arrangement method is adopted for the diversion tunnel, drain pipe and vertical shaft flood discharge hole. The drain pipe is connected to the vertical shaft flood discharge hole. The diversion tunnel and vertical shaft flood discharge hole share the water retardation tunnel section and the exit section. The angle between the axis of the two holes is not greater than 60. °, and a piston valve and steel gate are installed in the drain pipe. The outlet section of the drain pipe and the vertical shaft section of the vertical shaft section of the vertical shaft are arranged below the free water surface in the shaft.
It realizes the flexibility and safety of flood discharge, water discharge and air discharge functions, while reducing construction complexity and project volume, ensuring construction period and safety, reducing project investment, avoiding adverse flow conditions, and improving system safety and construction efficiency.
Smart Images

Figure CN222065381U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to a combined arrangement structure of discharge buildings of a lower reservoir of a pumped storage power station. Background Art
[0002] Pumped storage power stations achieve their functions of energy storage and grid operation regulation through water exchange between the upper and lower reservoirs. The water levels of the upper and lower reservoirs frequently change between dead water level and normal water level. Compared with conventional hydropower, the layout of the discharge buildings of pumped storage power stations is more complicated, mainly reflected in:
[0003] (1) Under power generation conditions, for the lower reservoir, if a flood occurs, the natural flood and power generation flow will be superimposed. Especially when the reservoir basin has poor regulation capacity and the natural flood volume is large, the superposition effect is more prominent;
[0004] (2) When the pumped storage power station is operating normally, the total water volume of the upper and lower reservoirs cannot exceed the regulating storage capacity of one reservoir. The excess water in the reservoir is mainly discharged through the bottom discharge holes arranged at the lower elevation of the reservoir to discharge the excess water in a timely manner;
[0005] (3) The operation and scheduling of the discharge structures of the lower reservoir of a pumped-storage power station must meet the functional requirements of flood discharge, water release, emptying, and ecological flow guarantee. At the same time, diversion tunnels need to be arranged during the construction period to provide dry land construction conditions for the buildings.
[0006] Therefore, from the perspective of ensuring project safety and saving investment, the lower reservoir discharge structure usually adopts a layout method that combines diversion tunnels, discharge pipes, and vertical shaft discharge tunnels. For example, CN116607482A discloses a method for combining the arrangement of a drop spillway and a discharge pipe inspection gate shaft of a pumped storage power station. A circular shaft is constructed so that its center line is located on the axis of the water withdrawal tunnel. The circular shaft is a drop spillway; a square shaft is constructed so that its center line is located on the axis of the diversion tunnel and the discharge pipe. The discharge pipe is arranged coaxially with the diversion tunnel. The square shaft is a discharge pipe inspection gate shaft; a number of diversion piers are arranged on the top of the inlet weir of the drop spillway so that the tail of the diversion pier is curved. It is in the shape of an arc, and the side of the square shaft close to the drop-flow spillway is also in the shape of an arc, serving as a diversion pier of the drop-flow spillway; the axis of the diversion tunnel is provided with a turn, and a plug is provided in front of the turning section, and the rear section of the turn is coaxial with the water withdrawal tunnel; the turning angle of the axis of the diversion tunnel and the discharge pipe is less than 30°; when the diversion tunnel, discharge pipe, and shaft spillway of the utility model are arranged in combination, there are problems such as the combined inlet structure being too large in size, the reconstruction work volume after the diversion tunnel is closed, the tight reconstruction period, and the difficulty in construction of the joint parts. Summary of the invention
[0007] The technical problem to be solved by the utility model is to provide a combined arrangement structure of the discharge buildings of the lower reservoir of a pumped storage power station, so as to solve the problems of the existing combined arrangement technology of the discharge buildings of the lower reservoir, the excessive size of the inlet structure, the large amount of reconstruction work after the diversion tunnel is closed, the tight reconstruction period, and the difficulty in construction of the joint parts.
[0008] In order to solve the above technical problems, the technical solution adopted by the utility model is: a joint arrangement structure of the discharge structure of the lower reservoir of a pumped storage power station, including a diversion tunnel, a discharge pipe and a vertical shaft spillway tunnel. The axes of the diversion tunnel, the discharge pipe and the vertical shaft spillway tunnel are arranged crosswise on the plane without interfering with each other. The discharge pipe is connected with the vertical shaft spillway tunnel, and the angle between the axis of the discharge pipe and the axis of the vertical shaft spillway tunnel is set according to the terrain conditions. The diversion tunnel is connected with the vertical shaft spillway tunnel to share a water withdrawal tunnel section and an outlet section, and the angle between the axes of the two tunnels is not greater than 60°.
[0009] In the preferred scheme, the drain pipe includes a drain pipe inlet section, a pipe body section and a drain pipe outlet section which are connected in sequence. A steel gate is arranged on the top of the drain pipe inlet section, and an opening and closing machine room and a base are arranged above and below the steel gate respectively. The pipe body section is horizontally arranged at the bottom of the base, and a drain pipe outlet section is arranged thereafter. The other end of the drain pipe outlet section is connected to the vertical shaft flood discharge tunnel.
[0010] In a preferred solution, the drain pipe inlet section of the drain pipe adopts a diagonal door inlet.
[0011] In a preferred solution, the pipe body section is provided with a piston valve, and a working valve well is provided at the installation location of the piston valve.
[0012] In a preferred solution, the vertical shaft spillway tunnel comprises an inlet annular weir and a vertical shaft section which are vertically connected, the vertical shaft section is connected to a free water surface and a water withdrawal tunnel section, and the water withdrawal tunnel section is connected to an outlet section.
[0013] In a preferred solution, the outlet section of the discharge pipe is arranged in combination with and connected to the vertical shaft section of the vertical shaft flood discharge tunnel, and the connecting port is placed below the free water surface of the vertical shaft section.
[0014] In a preferred solution, the diversion tunnel comprises a diversion tunnel inlet section, a tunnel body section, a water withdrawal tunnel section and an outlet section which are connected in sequence. The tunnel body section is connected to the water withdrawal tunnel section of the vertical shaft flood discharge tunnel and shares the outlet section.
[0015] The combined arrangement structure of the lower reservoir discharge building of the pumped storage power station provided by the utility model has the following beneficial effects:
[0016] 1. The combined setting of the diversion tunnel, the discharge pipe and the vertical shaft flood discharge tunnel of the utility model meets the functional requirements of flood discharge, water discharge, emptying and ecological flow guarantee of the lower reservoir, and at the same time provides dry land conditions and guarantees for building construction during the construction period;
[0017] 2. The axes of the diversion tunnel, the discharge pipe and the vertical shaft flood discharge tunnel of the utility model are arranged crosswise on the plane without interfering with each other, which effectively ensures the flexibility of water discharge. The flood discharge method can be flexibly selected according to the flood water volume, which ensures safety and saves costs;
[0018] 3. The diversion tunnel, drain pipe and vertical shaft flood discharge tunnel inlet of the utility model adopt independent channels, which do not interfere with each other and are convenient for construction. This avoids the problem that the inlet size is too large, which leads to large engineering workload, tight construction period and difficult construction at the same time;
[0019] 4. The structural design of the diversion tunnel of the utility model makes the construction of the diversion tunnel simple before the closure. After the diversion tunnel is closed, there is basically no reconstruction work, and the construction period can be effectively guaranteed;
[0020] 5. The diversion tunnel of the utility model shares the drainage tunnel section and the outlet section with the vertical shaft flood discharge tunnel, and the angle between the axes of the two tunnels is no more than 60°, thus avoiding the unfavorable flow state and further improving the safety of the lower reservoir buildings;
[0021] 6. The outlet section of the discharge pipe of the utility model is arranged in combination with the vertical section of the vertical shaft flood discharge tunnel and is placed below the free water surface in the vertical shaft, thereby avoiding the impact of the outflow from the pipe mouth on the vertical shaft, while saving the amount of steel pipe engineering and reducing engineering investment;
[0022] 7. The piston valve on the discharge pipe of the utility model is set to control the flow rate and dissipate hydraulic energy of the discharge pipe, reducing the pressure of the discharge pipe and its impact on the vertical shaft flood discharge tunnel, thereby further improving the safety of the system;
[0023] 8. The utility model sets a working valve well at the piston valve, which not only meets the working environment requirements of the piston valve, but also facilitates the later maintenance and replacement of the piston valve. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The utility model is further described below in conjunction with the accompanying drawings and implementation examples:
[0025] Figure 1 It is a plan view of the overall structure of the utility model;
[0026] Figure 2 A longitudinal section diagram of the arrangement of the discharge pipe and the vertical shaft flood discharge tunnel of the utility model;
[0027] Figure 3 This is a schematic diagram of the construction layout of the utility model;
[0028] In the figure: diversion tunnel inlet section 1, tunnel section 2, drainage tunnel section 3, outlet section 4, discharge pipe inlet section 5, pipe section 6, piston valve 7, discharge pipe outlet section 8, opening and closing machine room 9, steel gate 10, base 11, working valve shaft 12, inlet annular weir 13, shaft section 14, free water surface 15. DETAILED DESCRIPTION
[0029] The technical solution of the present utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0030] Example 1
[0031] like Figures 1 to 3 As shown, the joint arrangement structure of the discharge structure of the lower reservoir of the pumped storage power station includes a diversion tunnel, a discharge pipe and a vertical shaft spillway tunnel. The axes of the diversion tunnel, the discharge pipe and the vertical shaft spillway tunnel are arranged crosswise on the plane without interfering with each other. The discharge pipe is connected with the vertical shaft spillway tunnel, and the angle between the axis of the discharge pipe and the axis of the vertical shaft spillway tunnel is set according to the terrain conditions. The diversion tunnel is connected with the vertical shaft spillway tunnel to share the water withdrawal tunnel section 3 and the outlet section 4, and the angle between the axes of the two tunnels is not greater than 60°.
[0032] In this embodiment, the drain pipe includes a drain pipe inlet section 5, a pipe body section 6 and a drain pipe outlet section 8 which are connected in sequence. A steel gate 10 is arranged on the top of the drain pipe inlet section 1, and a hoisting and closing machine room 9 and a base 11 are arranged above and below the steel gate 10 respectively. The pipe body section 6 is horizontally arranged at the bottom of the base 11, and a drain pipe outlet section 8 is arranged thereafter. The other end of the drain pipe outlet section 8 is connected to the vertical shaft flood discharge tunnel.
[0033] Furthermore, the drain pipe inlet section 5 of the drain pipe adopts a diagonal door inlet.
[0034] Furthermore, the pipe body section 6 is provided with a piston valve 7, and a working valve well 12 is provided at the installation location of the piston valve 7.
[0035] Furthermore, the vertical shaft spillway includes an inlet annular weir 13 and a vertical shaft section 14 which are vertically connected. The vertical shaft section 14 is connected to a free water surface 15 and a water withdrawal tunnel section 3 . The water withdrawal tunnel section 3 is connected to an outlet section 4 .
[0036] Furthermore, the discharge pipe outlet section 8 is arranged in combination with and communicated with the vertical shaft section 14 of the vertical shaft flood discharge tunnel, and the communication port is placed below the free water surface 15 of the vertical shaft section 14 .
[0037] Furthermore, the diversion tunnel comprises a diversion tunnel inlet section 1, a tunnel body section 2, a water withdrawal tunnel section 3 and an outlet section 4 which are connected in sequence; the tunnel body section 2 is connected to the water withdrawal tunnel section 3 of the vertical shaft flood discharge tunnel, and the outlet section 4 is shared.
[0038] During specific construction, the construction steps of the combined arrangement method are as follows:
[0039] Step 1: Excavate the diversion tunnel, including the diversion tunnel inlet section 1, tunnel body section 2, drainage tunnel section 3 and outlet section 4, to meet the diversion requirements during the flood season;
[0040] Step 2: After the diversion tunnel is formed, take protective measures at the diversion tunnel entrance and start the construction of the vertical shaft flood discharge tunnel;
[0041] Step 3: After the diversion tunnel is formed, take protective measures at the entrance of the diversion tunnel and start the construction of the water pipe.
[0042] Furthermore, the construction steps of the vertical shaft flood discharge tunnel are:
[0043] Step 2.1: excavate and blast the inlet annular weir 13;
[0044] Step 2.2: After the inlet annular weir 13 is formed, the vertical shaft section 14 is continued to be dug downwards, and the depth is controlled below the free water surface 15;
[0045] Step 2.3: Excavate the drainage tunnel section 3 and connect it with the drainage tunnel section 3 of the diversion tunnel.
[0046] Furthermore, the construction steps of the drain pipe are:
[0047] Step 3.1: Excavate the drainage pipe inlet section 5;
[0048] Step 3.2: After the discharge pipe inlet section 5 is formed, continue to excavate the pipe body section 6 in the direction of the vertical shaft flood discharge section and bury the pipe body;
[0049] Step 3.3: A piston valve 7 is arranged on the pipe body section 6, and a working valve well 12 is arranged at the installation position of the piston valve 7;
[0050] Step 3.4: A base 11 is provided at the inlet section 5 of the discharge pipe, a steel gate 10 is installed on the base 11, and a hoisting and closing machine room 9 is provided for the steel gate 10;
[0051] Step 3.4: A discharge pipe outlet section 8 is provided at the other end of the pipe body section 6 , and the discharge pipe outlet section 8 is connected with the vertical shaft section 14 of the vertical shaft flood discharge tunnel below the free water surface 15 .
[0052] Example 2
[0053] In another preferred embodiment, based on the above-mentioned embodiment 1, flood water is discharged through the diversion tunnel during the diversion period, and the inlet section 1 of the diversion tunnel is sealed with concrete after the diversion period.
[0054] Example 3
[0055] In another preferred embodiment, based on the above-mentioned embodiment 2, when flood comes to the lower reservoir during operation, the flood is discharged in the order of first opening the drain pipe and then opening the vertical shaft flood discharge tunnel. When the water level of the lower reservoir is between the dead water level and the elevation of the weir top of the vertical shaft flood discharge tunnel, the drain pipe in the tunnel is opened to discharge the flood. When the incoming water is less than the discharge capacity of the drain pipe in the tunnel, the piston valve 7 is adjusted to discharge according to the amount of incoming water.
[0056] Example 4
[0057] In another preferred embodiment, based on the above-mentioned embodiment 3, when flood comes to the lower reservoir during operation, the flood is discharged in the order of opening the drain pipe first and then opening the vertical shaft flood discharge tunnel. When the water level of the lower reservoir is between the dead water level and the elevation of the weir top of the vertical shaft flood discharge tunnel, the drain pipe in the tunnel is opened to discharge the flood. When the incoming water is greater than the drain pipe in the tunnel, the flood is discharged according to the discharge capacity.
[0058] Example 5
[0059] In another preferred embodiment, based on the above-mentioned embodiment 2, when a flood comes to the lower reservoir during operation, the flood is discharged in the order of first opening the water pipe and then opening the vertical shaft flood discharge tunnel. When the water level of the lower reservoir is higher than the elevation of the weir top of the vertical shaft flood discharge tunnel, the flood discharge tunnel and the water pipe in the tunnel are used to discharge the flood together.
[0060] In the preferred scheme, the drain pipe includes a drain pipe inlet section 5, a pipe body section 6 and a drain pipe outlet section 8 which are connected in sequence. A steel gate 10 is arranged on the top of the drain pipe inlet section 1, and a hoisting and closing machine room 9 and a base 11 are arranged above and below the steel gate 10 respectively. The pipe body section 6 is horizontally arranged at the bottom of the base 11, and a drain pipe outlet section 8 is arranged thereafter. The other end of the drain pipe outlet section 8 is connected to the vertical shaft flood discharge tunnel. The above arrangement enables the flood discharge function of the drain pipe to be realized while the flood discharge method can be selected and adjusted according to the size of the flood water, thereby further improving its flood discharge capacity and safety.
[0061] In a preferred solution, the drain pipe inlet section 5 of the drain pipe adopts a diagonal door inlet; this arrangement further improves the flood discharge capacity of the drain pipe inlet, thereby further ensuring the safe discharge of flood water.
[0062] In the preferred solution, the pipe body section 6 is provided with a piston valve 7, and a working valve well 12 is provided at the installation location of the piston valve 7; the above arrangement controls the flow rate and dissipates hydraulic energy of the discharge pipe, and the working valve well 12 is provided to meet the working environment requirements of the piston valve 7 and the needs of the later maintenance and replacement of the piston valve 7. When the flood water is small, the piston valve 7 is adjusted to discharge water according to the amount of water, thereby reducing the pressure of the discharge pipe and the impact on the vertical shaft flood discharge tunnel, thereby further ensuring the safety of the system and improving the flood discharge capacity and flexibility.
[0063] In the preferred solution, the vertical shaft spillway includes an inlet annular weir 13 and a vertical shaft section 14 which are vertically connected. The vertical shaft section 14 is connected to a free water surface 15 and a water withdrawal tunnel section 3, and the water withdrawal tunnel section 3 is connected to an outlet section 4. The above arrangement enables the flood discharge function of the vertical shaft spillway to be realized, while effectively utilizing the water withdrawal tunnel section 3 and the outlet section 4 of the diversion tunnel, thereby reducing engineering investment.
[0064] In the preferred solution, the discharge pipe outlet section 8 is arranged in combination with and connected to the vertical shaft section 14 of the vertical shaft flood discharge tunnel, and the connecting port is placed below the free water surface 15 of the vertical shaft section 14. With the above arrangement, the discharge pipe outlet section 8 is submerged in the vertical shaft, which effectively solves the problem of hydraulic energy dissipation of the discharge pipe outflow, while saving the amount of steel pipe engineering and reducing engineering investment.
[0065] In the preferred scheme, the diversion tunnel includes a diversion tunnel inlet section 1, a tunnel body section 2, a water withdrawal tunnel section 3 and an outlet section 4 which are connected in sequence. The tunnel body section 2 is connected to the water withdrawal tunnel section 3 of the vertical shaft flood discharge tunnel and shares the outlet section 4. The above arrangement enables the diversion function of the diversion tunnel to be realized while providing conditions for the dry land construction of the building.
[0066] In summary, the utility model provides a combined arrangement structure of the discharge structure of the lower reservoir of the pumped storage power station, and the combined arrangement of the diversion tunnel, the discharge pipe and the vertical shaft spillway tunnel, which meets the functional requirements of flood discharge, water discharge, emptying and ecological flow guarantee of the lower reservoir, and at the same time provides dry land conditions and guarantees for the construction of buildings during the construction period; the axes of the diversion tunnel, the discharge pipe and the vertical shaft spillway tunnel are cross-arranged on the plane without interfering with each other, which effectively ensures the flexibility of water discharge, and can flexibly select the flood discharge method according to the flood inflow, while ensuring safety and saving costs and facilitating construction, avoiding the problem of large engineering volume and tight construction period caused by the excessive size of the inlet body, and saving engineering investment by combining the problem of difficult construction at the same time; the structural design of the diversion tunnel makes the construction of the diversion tunnel simple before the interception, and there is basically no reconstruction engineering volume after the diversion tunnel is closed, and the construction period can be effectively guaranteed; the diversion tunnel and the vertical shaft spillway tunnel share the drainage tunnel The hole section and the outlet section, and the angle between the axes of the two holes is no more than 60°, avoids causing adverse flow states, thereby further improving the safety of the lower reservoir buildings; the outlet section of the discharge pipe is combined with the shaft section of the vertical shaft spillway tunnel and is placed below the free water surface in the vertical shaft, avoiding the impact of the pipe outlet flow on the vertical shaft, while saving the amount of steel pipe engineering and reducing the project investment; the setting of the piston valve on the discharge pipe controls the flow rate and hydraulic energy dissipation of the discharge pipe, reduces the pressure of the discharge pipe and its impact on the vertical shaft spillway tunnel, thereby further improving the safety of the system; the piston valve is provided with a working valve well, which meets the working environment requirements of the piston valve and facilitates the later maintenance of the piston valve and replacement of the diversion hole. The utility model has a sophisticated design and flexible layout, can be operated independently in sections, has a small reconstruction workload, simple construction, guaranteed construction period, small project investment, and has high practical application value, good economic and social benefits.
Claims
1. A combined arrangement structure of the discharge structure of the lower reservoir of a pumped storage power station, characterized in that: It comprises a diversion tunnel, a discharge pipe and a vertical shaft spillway tunnel. The axes of the diversion tunnel, the discharge pipe and the vertical shaft spillway tunnel are arranged crosswise on a plane without interfering with each other. The discharge pipe is connected to the vertical shaft spillway tunnel, and the angle between the axis of the discharge pipe and the axis of the vertical shaft spillway tunnel is set according to the terrain conditions. The diversion tunnel is connected to the vertical shaft spillway tunnel to share a drainage tunnel section (3) and an outlet section (4), and the angle between the axes of the two tunnels is not greater than 60°.
2. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 1 is characterized in that: The discharge pipe comprises a discharge pipe inlet section (5), a pipe body section (6) and a discharge pipe outlet section (8) which are connected in sequence. A steel gate (10) is arranged at the top of the discharge pipe inlet section (5). A start-stop machine room (9) and a base (11) are arranged above and below the steel gate (10), respectively. The pipe body section (6) is horizontally arranged at the bottom of the base (11), and a discharge pipe outlet section (8) is arranged behind it. The other end of the discharge pipe outlet section (8) is connected to a vertical shaft flood discharge tunnel.
3. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 2 is characterized in that: The drain pipe inlet section (5) of the drain pipe adopts a diagonal door inlet.
4. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 2 is characterized in that: The pipe body section (6) is provided with a piston valve (7), and a working valve well (12) is provided at the installation location of the piston valve (7).
5. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 2 is characterized in that: The vertical shaft spillway comprises an inlet annular weir (13) and a vertical shaft section (14) which are vertically connected, the vertical shaft section (14) being connected to a free water surface (15) and a water withdrawal tunnel section (3), and the water withdrawal tunnel section (3) being connected to an outlet section (4).
6. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 5 is characterized in that: The discharge pipe outlet section (8) is arranged in combination with and communicated with the vertical shaft section (14) of the vertical shaft flood discharge tunnel, and the communication port is located below the free water surface (15) of the vertical shaft section (14).
7. The combined arrangement structure of the lower reservoir discharge structure of the pumped storage power station according to claim 5 is characterized in that: The diversion tunnel comprises a diversion tunnel inlet section (1), a tunnel body section (2), a water withdrawal tunnel section (3) and an outlet section (4) which are connected in sequence; the tunnel body section (2) is connected to the water withdrawal tunnel section (3) of the vertical shaft flood discharge tunnel, and they share the outlet section (4).