Concrete pouring structure

Through the design of the support frame and flip plate, combined with the liftable funnel structure, the stability of the conduit connection and disassembly of the concrete pouring structure in places with deep casting depth is solved, and the stable suspended positioning of the conduit and convenient assembly and disassembly of the conduit is achieved. Pouring concrete at high depth.

CN222065477UActive Publication Date: 2024-11-26ZHEJIANG DINGSHUN TRANSPORTATION CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420738000.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-11-26
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The existing concrete pouring structures are difficult to stably connect and disassemble the conduits in places with deep cast concrete depths, and it is easy to cause the problems of hanging steel cages and falling off the conduits.

Method used

Using a support frame, flap, barrier ring, first and second connecting rings and liftable funnel structure, the suspended positioning and stable connection of the conduit are achieved through the coordination of the flap and barrier ring, and the operation of the conduit is facilitated by the crane. Assembly and disassembly.

Benefits of technology

It improves the stability of the conduit and the convenience of assembly and disassembly, making the concrete pouring structure suitable for places with deep cast concrete depths, avoiding the problems of conduit breaking and falling off.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065477U_ABST
    Figure CN222065477U_ABST
Patent Text Reader

Abstract

The utility model provides a concrete pouring structure, and belongs to the technical field of construction buildings. The problem that in an existing place where concrete is poured deep, a guide pipe is inconvenient to assemble and disassemble is solved. The concrete pouring structure comprises a plurality of guide pipes, a plurality of first connecting rings, a supporting frame, a second connecting ring and a funnel capable of being lifted, every two adjacent guide pipes are detachably connected through the corresponding first connecting ring, the funnel is detachably connected with the guide pipes through the corresponding second connecting ring, and the upper portion of each guide pipe is fixedly connected with an annular baffle ring. A passageway allowing a guide pipe to penetrate through is arranged in the supporting frame, two turning plates are hinged to the supporting frame and located on the two sides of the passageway, and when the two turning plates are turned inwards towards the passageway and abut against the supporting frame, the baffle ring can abut against the two turning plates to enable the guide pipe to be positioned in a suspended mode. The concrete pouring structure has the advantages that the concrete pouring structure is suitable for places where the concrete pouring depth is large, and the guide pipe is convenient to assemble and disassemble.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction and building, and relates to a concrete pouring structure. Background Art

[0002] When pouring concrete into bored piles, since the pile body is relatively long, multiple conduits of limited length are generally required for connection and use. The existing connection methods are mostly flange or clamp connections. Due to the pressure of upper concrete pouring and the gravity of the long conduit itself, it is difficult to control the stability in the vertical pouring direction during concrete pouring. When lifting the conduit, problems such as breaking the steel cage and falling off of the conduit often occur.

[0003] In response to the above problems, people have made various improvements, and some have even applied for patents. For example, Chinese patent literature discloses an adjustable connection device for cast-in-place pile concrete conduit [patent number: 202121348833.9; application publication number: CN215721434U], which includes two steel conduits connected upper and lower parts, and the ends of the steel conduits are provided with external threads at the joints, and steel plate rings are provided at the joints of the steel conduits. The steel plate rings are provided with internal threads, and the internal threads and external threads are matched. The steel plate rings are rotated with a steel wrench to reinforce the steel conduits.

[0004] The steel conduit of this structure is connected by a steel plate ring, and concrete is poured into the bored pile through the steel conduit. When a certain amount of concrete is poured into the bored pile, the steel conduit needs to be pulled up and down to tamp the concrete. After tamping, the steel conduit needs to be stretched upward and separated from the bored pile. The steel plate ring is then rotated to remove a section of the steel conduit. However, this method of removing the steel conduit is only suitable for places where the height of the bored pile is relatively low and the depth of concrete pouring is shallow. It cannot be used in places where the height of the bored pile is relatively high and the depth of concrete pouring is deep. Summary of the invention

[0005] The utility model aims at the above problems existing in the prior art and proposes a concrete pouring structure, the technical problem to be solved is how to make the pouring structure suitable for places with a deeper concrete pouring depth and make the conduit easy to assemble and disassemble.

[0006] The purpose of the utility model can be achieved through the following technical solutions: a concrete pouring structure, comprising a plurality of conduits and a plurality of first connecting rings, two adjacent conduits being detachably connected via the first connecting rings, characterized in that the pouring structure also comprises a support frame, a second connecting ring and a funnel that can be lifted, the funnel being detachably connected to the conduits via the second connecting ring, an annular retaining ring being fixedly connected to the upper portion of each conduit, the support frame having a passage for the conduits to pass through, two flaps being hingedly connected to the support frame, the two flaps being located on both sides of the passage, and when the two flaps are flipped inward toward the passage and abutted against the support frame, the retaining ring can abut against the two flaps to position the conduits suspended in the air.

[0007] During pouring, first drive the bored pile, place the support frame on the top of the bored pile, connect the conduit through the first connecting ring, and put the connected conduit into the bored pile through the aisle. When more conduits need to be connected, the two flaps can be flipped inward toward the aisle and abutted against the support frame, so that the retaining ring abuts against the two flaps to make the conduit in the bored pile suspended in position, and then continue to connect the conduits through the first connecting ring, and finally connect the conduit at the top to the funnel through the second connecting ring, so that the conduit assembly is convenient, the funnel is hoisted by a crane, concrete is poured into the funnel and concrete is poured into the bored pile through the conduit, so that the cast-in-place structure is suitable for places with a deeper depth of concrete pouring. When the concrete is poured to a certain height, the funnel and the conduit are lifted up by a crane to the height of one section of the conduit, and the retaining ring is placed against the two flaps, the first connecting ring and the second connecting ring are loosened, the conduit at the top is removed, and then the funnel is connected to the conduit at the top through the second connecting ring, and then concrete is poured, and so on, the conduit is removed section by section, which makes it easy to disassemble the conduit and makes the pouring structure suitable for places with a deeper concrete pouring depth.

[0008] In the above concrete pouring structure, the other side of the flap relative to the hinged side has an arc-shaped avoidance groove, and when the two flaps are turned inward toward the aisle and abut against the support frame, the conduit can pass through the space surrounded by the two avoidance grooves, and the retaining ring abuts against the edge of the avoidance groove. This structure enables the flap to better position and support the conduit, improves the stability of the conduit, and facilitates the assembly and disassembly of the conduit.

[0009] In the above concrete pouring structure, when the two flaps are turned inward toward the passage and abut against the support frame, there is a certain distance between the two flaps. This structure prevents the two flaps from getting stuck, ensures that the flaps can support the retaining ring, and facilitates the assembly and disassembly of the conduit.

[0010] In the above-mentioned concrete pouring structure, the support frame includes two long support arms located on both sides and two support blocks fixedly connected between the two support arms, the two support arms and the two support blocks enclose the passage, the two flaps are respectively hinged on the two support blocks, and the flaps can be against the support arms after being flipped inwards toward the passage. This structure makes the support frame simple in structure, and the flaps have sufficient support strength after being flipped inwards, so that the conduit can be suspended and positioned, and the conduit is easy to assemble and disassemble.

[0011] In the above concrete pouring structure, each of the support arms is fixedly connected with two upwardly protruding stop bars, and the flap can be abutted against the stop bars after being turned outward, so that the flap is tilted relative to the other side of the hinged side. The setting of the stop bars allows the flap to tilt after being turned outward, making it convenient for the operator to lift the flap and turn it inward.

[0012] In the above concrete pouring structure, the support frame further comprises a plurality of support rods, the support rods are fixedly connected between the two support arms at intervals, and the two ends of the support rods are respectively fixedly connected to the two support arms. The support rods enable the operator to stand, which is convenient for the operator to assemble and disassemble the catheter.

[0013] In the above concrete pouring structure, a plurality of lugs for the cables to pass through are fixedly connected at intervals at the circumferential edge of the top of the funnel. The cables pass through the lugs, so that the funnel can be lifted by a crane.

[0014] In the above concrete pouring structure, the funnel includes an extension tube located at the bottom, and the extension tube can be detachably connected to the conduit through the second connecting ring. The provision of the extension tube facilitates the connection between the funnel and the conduit.

[0015] Compared with the prior art, the concrete pouring structure provided by the utility model has the following advantages:

[0016] 1. The concrete pouring structure supports the retaining ring through the flap on the support frame, so that the conduit can be suspended and positioned, making the conduit assembly and disassembly convenient, and making the pouring structure suitable for places with a deeper concrete pouring depth.

[0017] 2. The support frame of the concrete pouring structure is simple in structure, and the flap is turned inward and rests on the support arm, so that the flap has sufficient strength to support the conduit. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a state diagram of the concrete pouring structure when pouring concrete.

[0019] Figure 2 This is a state diagram of the concrete pouring structure when the conduit is removed.

[0020] Figure 3 It is a schematic diagram of the overall structure of the concrete pouring structure support frame.

[0021] Figure 4 This is an exploded diagram of the connection between the two conduits of this concrete pouring structure.

[0022] In the figure, 1. conduit; 2. first connecting ring; 3. support frame; 31. aisle; 32. support arm; 33. support block; 34. stop bar; 35. support rod; 4. second connecting ring; 5. funnel; 51. hanging ear; 52. extension tube; 6. retaining ring; 7. flap; 71. avoidance groove; 8. cast-in-place pile. DETAILED DESCRIPTION

[0023] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

[0024] like Figure 1 , Figure 2 As shown, the concrete pouring structure includes a conduit 1, a first connecting ring 2, a support frame 3, a second connecting ring 4, a funnel 5, a retaining ring 6 and a flap 7.

[0025] like Figure 3 As shown, the support frame 3 includes two support arms 32, two support blocks 33, four baffles 34 and support rods 35. In this embodiment, the number of support rods 35 is twenty-six. In actual production, the number of support rods 35 can be eighteen or thirty-six.

[0026] The support arms 32 are in the shape of long strips, and the two support arms 32 are located on both sides. The two support blocks 33 are fixedly connected between the two support arms 32, and the two support blocks 33 are located in the middle of the two support arms 32. The two support arms 32 and the two support blocks 33 form an aisle 31 for the catheter 1 to pass through. Each support arm 32 is fixedly connected to two upwardly protruding stop bars 34, and the two flaps 7 are hinged on the two support blocks 33 respectively. The two flaps 7 are located on both sides of the aisle 31. The other side of the flap 7 relative to the hinged edge has an arc-shaped avoidance groove 71. After the flap 7 is flipped inward toward the aisle 31, it can rest on the support arm 32. At this time, there is a certain distance between the two flaps 7, and the catheter 1 can pass through the space surrounded by the two avoidance grooves 71. After the flap 7 is flipped outward, it can rest on the stop bar 34 so that the other side of the flap 7 relative to the hinged edge is tilted. The support rod 35 is fixedly connected between the two support arms 32 at intervals, and both ends of the support rod 35 are fixedly connected to the two support arms 32 respectively.

[0027] like Figure 4As shown, the top and bottom of the conduit 1 are both threaded, and two adjacent conduits 1 can be detachably connected through the first connecting ring 2. An annular retaining ring 6 is fixedly connected to the upper part of each conduit 1, and the retaining ring 6 can abut against the edge of the avoidance groove 71 to position the conduit 1 in suspension.

[0028] Four ears 51 for the cable to pass through are fixedly connected at intervals at the circumferential edge of the top of the funnel 5 , and an extension tube 52 is provided at the bottom. The extension tube 52 can be detachably connected to the catheter 1 through the second connecting ring 4 .

[0029] When pouring, first drive the bored pile 8, place the support frame 3 on the top of the bored pile 8, connect the conduit 1 through the first connecting ring 2, and put the connected conduit 1 into the bored pile 8 through the aisle 31, finally connect the funnel 5 with the conduit 1 at the top through the second connecting ring 4, pour concrete into the funnel 5 and pour concrete into the bored pile 8 through the conduit 1. When the concrete is poured to a certain height, the funnel 5 and the conduit 1 are lifted to the height of a section of the conduit 1 by a crane, the flap 7 is turned inward and abutted against the support frame 3, the conduit 1 is moved down a certain distance so that the retaining ring 6 abuts against the flap 7, the first connecting ring 2 and the second connecting ring 4 are loosened, the conduit 1 at the top is removed, and then the funnel 5 is connected to the conduit 1 at the top at this time through the second connecting ring 4, and then concrete is poured into the bored pile 8 through the funnel 5 and the conduit 1, and the cycle is repeated to complete the pouring of the entire bored pile 8.

[0030] The specific embodiments described herein are merely examples of the spirit of the present invention. A person skilled in the art of the present invention may make various modifications or additions to the specific embodiments described or replace them in a similar manner, but this will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

[0031] Although the present invention uses more terms such as conduit 1, first connection ring 2, support frame 3, passage 31, support arm 32, support block 33, stop bar 34, support rod 35, second connection ring 4, funnel 5, hanging ear 51, extension tube 52, stop ring 6, flap 7, avoidance groove 71, cast-in-place pile 8, etc., it does not exclude the possibility of using other terms. These terms are used only to more conveniently describe and explain the essence of the utility model; interpreting them as any additional restrictions is contrary to the spirit of the utility model.

Claims

1. A concrete pouring structure, comprising a plurality of conduits (1) and a plurality of first connecting rings (2), wherein two adjacent conduits (1) are detachably connected via the first connecting rings (2), characterized in that: The perfusion structure further comprises a support frame (3), a second connecting ring (4) and a funnel (5) that can be lifted, wherein the funnel (5) is detachably connected to the conduit (1) via the second connecting ring (4), an annular retaining ring (6) is fixedly connected to the upper part of each conduit (1), the support frame (3) comprises a passage (31) for the conduit (1) to pass through, two flaps (7) are hingedly connected to the support frame (3), the two flaps (7) are located on both sides of the passage (31), and when the two flaps (7) are turned inwardly toward the passage (31) and abut against the support frame (3), the retaining ring (6) can abut against the two flaps (7) to position the conduit (1) in suspension.

2. A concrete pouring structure according to claim 1, characterized in that: The other side of the flap (7) opposite to the hinged side has an arc-shaped avoidance groove (71); when the two flaps (7) are turned inward toward the passage (31) and abut against the support frame (3), the conduit (1) can pass through the space surrounded by the two avoidance grooves (71), and the retaining ring (6) abuts against the edge of the avoidance groove (71).

3. A concrete pouring structure according to claim 1, characterized in that: When the two flaps (7) are turned inwardly toward the passage (31) and abut against the support frame (3), a certain distance is provided between the two flaps (7).

4. A concrete pouring structure according to claim 1, 2 or 3, characterized in that: The support frame (3) comprises two long strip-shaped support arms (32) located at two sides and two support blocks (33) fixedly connected between the two support arms (32); the two support arms (32) and the two support blocks (33) enclose the passage (31); the two flaps (7) are respectively hinged on the two support blocks (33); and the flaps (7) can be abutted against the support arms (32) after being flipped inwardly toward the passage (31).

5. A concrete pouring structure according to claim 4, characterized in that: Each of the support arms (32) is fixedly connected to two upwardly protruding stop bars (34), and after the flap (7) is turned outward, it can abut against the stop bars (34) so ​​that the flap (7) is tilted relative to the other side of the hinged side.

6. A concrete pouring structure according to claim 4, characterized in that: The support frame (3) further comprises a plurality of support rods (35), wherein the support rods (35) are fixedly connected between the two support arms (32) at intervals, and the two ends of the support rods (35) are respectively fixedly connected to the two support arms (32).

7. A concrete pouring structure according to claim 1, 2 or 3, characterized in that: A plurality of hanging ears (51) for the cables to pass through are fixedly connected at intervals on the circumferential edge of the top of the funnel (5).

8. A concrete pouring structure according to claim 1, 2 or 3, characterized in that: The funnel (5) comprises an extension tube (52) located at the bottom, and the extension tube (52) can be detachably connected to the catheter (1) via the second connecting ring (4).