Buffering device for anchor cable disengaging under mine
By designing a buffer device for deaning anchor cables under mines, the buffer components and buffer bolts provide buffering effect, the impact damage problem of anchor cables when they collapse during blasting construction is solved, and the safety and support effect of tunnel construction are improved.
Patent Information
- Application Number
- CN202420829746.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The anchor cables of existing coal mine tunnels are prone to collapse or breaking due to gangue impact during blasting construction, resulting in a reduction in support effect, endangering the safety of construction workers, and lacking an effective buffering mechanism to prevent the wire from breaking.
Design a buffer device for deaning anchor under mine anchor cables, including the anchor cable body, casing, buffer assembly and buffer bolts. The buffer assembly is composed of a circular tube, a telescopic tube and a hydraulic rod, and the buffer effect is provided by the cooperation of spring and hydraulic rod. Cushioning bolts provide additional support through rock formation installation.
It effectively avoids impact damage when the anchor cable collapses, protects construction personnel's safety, improves the tunnel support effect, prevents the anchor cable from breaking and falling, and enhances safety.
Smart Images

Figure CN222066816U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coal mine tunnel protection, in particular to a buffer device for unanchoring an anchor cable under a mine. Background Art
[0002] At present, my country's coal mine rock tunnel excavation mainly adopts blasting construction method, and anchor cables need to be installed to support the roof after blasting. However, due to the outward impact of the gangue produced by blasting, there is a possibility that the installed anchor cables will bend, damage, or even break and fall, which will reduce the tunnel support effect and cause great safety hazards to tunnel construction personnel.
[0003] China Utility Model Patent Publication No.: CN 214145540 U, discloses: an anti-loosening anchor cable breakage safety protection device, the anti-loosening anchor cable breakage safety protection device has a simple structure, low manufacturing cost, and easy use. It can not only protect personnel and equipment from being injured when the anchor cable is normally stressed; it can also prevent the broken anchor cable body from falling and injuring people when the anchor cable breaks, thereby ensuring the safety of personnel and equipment. However, although the anti-loosening anchor cable breakage safety protection device can play a protective role, it has no buffer mechanism, so when it is subjected to the impact force when the anchor cable collapses, it is easy to cause the steel wire to break, affecting the protective effect. Summary of the invention
[0004] The utility model aims to provide a buffer device for releasing anchor cables in mines, which can solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a buffer device for unanchoring an anchor cable in a mine, comprising a rigging, an anchor cable body is arranged at the center of the rigging, a sleeve is fixedly connected to the outside of the anchor cable body, a round seat is fixedly connected to the upper end of the sleeve, a buffer assembly is arranged below the round seat, a spring is fixedly connected to the lower end of the round seat, a mounting frame is arranged on the outside of the rigging, a buffer bolt is fixedly installed at the lower end of the mounting frame, and the mounting frame is fixedly installed at the lower end of the rock formation.
[0006] Preferably, the buffer assembly comprises a circular tube, telescopic tube 1, telescopic tube 2 and a hydraulic rod, the outer side of the circular tube is rotatably connected to telescopic tube 1, the end of telescopic tube 1 away from the circular tube is provided with telescopic tube 2, and the upper end of telescopic tube 2 is fixedly connected to the hydraulic rod.
[0007] Preferably, the telescopic tube 1, the telescopic tube 2 and the hydraulic rod are provided in four identical groups, and the four groups of telescopic tube 1, the telescopic tube 2 and the hydraulic rod are evenly arranged on the outside of the circular tube.
[0008] Preferably, the telescopic tube 1 is slidably connected to the telescopic tube 2, and the output end of the hydraulic rod is fixedly connected to the telescopic tube 1.
[0009] Preferably, the buffer bolt comprises an anchor bolt, a limit seat and a second spring; the lower end of the anchor bolt is fixedly connected to the limit seat, and the outer side of the anchor bolt is sleeved with the second spring.
[0010] Preferably, eight buffer bolts are provided, and the eight buffer bolts are fixedly mounted on four sides of the mounting frame.
[0011] Preferably, the upper end of the telescopic tube 2 is rotatably connected to the mounting frame, and the round tube is slidably connected to the sleeve.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The utility model provides a telescopic tube 1 and a telescopic tube 2, and the telescopic tube 1 and the telescopic tube 2 cooperate with a hydraulic rod, so that the round tube has a vertical telescopic amount, and cooperates with a spring 1 to have a buffering effect. Through the provided hydraulic rod, when the anchor cable body is unanchored, the anchor cable body moves downward, and the spring 1 cooperates with the hydraulic rod to buffer the anchor cable body, thereby avoiding injuries to construction personnel.
[0014] The utility model has a buffer bolt, and during installation, a hole is drilled on the surface of the rock formation, a medicine is put into the hole, and the anchor bolt is passed through the mounting frame and then screwed into the hole in the rock formation. The second spring is located between the mounting frame and the limit seat, the mounting frame can move along the anchor bolt, and the second spring provides buffering. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic diagram of the three-dimensional structure of the utility model;
[0016] Figure 2 This is an enlarged structural diagram of the buffer device and mounting frame of the utility model;
[0017] Figure 3 This is a schematic diagram of the disassembled structure of the mounting frame and buffer bolts of the utility model;
[0018] Figure 4 The utility model shows the disassembly structure of the buffer device and the mounting frame. Figure 1 ;
[0019] Figure 5 The utility model shows the disassembly structure of the buffer device and the mounting frame. Figure 2 ;
[0020] Among them: 1. rigging; 2. anchor cable body; 3. casing; 4. round seat; 5. buffer assembly; 501. round tube; 502. telescopic tube one; 503. telescopic tube two; 504. hydraulic rod; 6. spring one; 7. mounting frame; 8. buffer bolt; 801. anchor bolt; 802. limit seat; 803. spring two; 9. rock layer. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example 1
[0022] See also Figure 1-4 The figure shows a buffer device for anchoring under a mine, comprising a rigging 1, an anchor body 2 is arranged at the center of the rigging 1, a sleeve 3 is fixedly connected to the outer side of the anchor body 2, a round seat 4 is fixedly connected to the upper end of the sleeve 3, a buffer assembly 5 is arranged below the round seat 4, a spring 6 is fixedly connected to the lower end of the round seat 4, a mounting frame 7 is arranged on the outer side of the rigging 1, a buffer bolt 8 is fixedly installed at the lower end of the mounting frame 7, and the mounting frame 7 is fixedly installed at the lower end of the rock formation 9.
[0023] See also Figure 1-5 In the figure, the buffer assembly 5 includes a circular tube 501, a telescopic tube 1 502, a telescopic tube 2 503 and a hydraulic rod 504. The outer side of the circular tube 501 is rotatably connected to the telescopic tube 1 502. The end of the telescopic tube 1 502 away from the circular tube 501 is provided with a telescopic tube 2 503. The upper end of the telescopic tube 2 503 is fixedly connected to the hydraulic rod 504.
[0024] In this embodiment: the buffer component 5 is provided to provide buffering for the anchor cable body 2.
[0025] Working principle: during installation, a hole is drilled on the surface of the rock layer 9, the agent is put into the hole, the anchor bolt 801 is passed through the mounting frame 7 and then screwed into the hole in the rock layer 9, the spring 2 803 is located between the mounting frame 7 and the limit seat 802, the telescopic tube 1 502 and the telescopic tube 2 503 cooperate with the hydraulic rod 504 to make the round tube 501 have a vertical telescopic amount, when the anchor cable body 2 is unanchored, the anchor cable body 2 moves downward, the spring 1 6, the spring 2 803 and the hydraulic rod 504 cooperate to buffer the round tube 501 and the anchor cable body 2 to avoid injuries to the construction personnel. Example 2
[0026] See also Figure 1-5 This embodiment further illustrates Example 1. In the figure, four identical groups of telescopic tube 1 502 , telescopic tube 2 503 and hydraulic rod 504 are arranged. The four groups of telescopic tube 1 502 , telescopic tube 2 503 and hydraulic rod 504 are evenly arranged on the outside of the circular tube 501 .
[0027] In this embodiment, by setting telescopic tube 1 502 and telescopic tube 2 503, telescopic tube 1 502 and telescopic tube 2 503 cooperate with hydraulic rod 504, so that the round tube 501 has a vertical telescopic amount, which cooperates with spring 1 6 to have a buffering effect.
[0028] See also Figure 3-5 In the figure, telescopic tube 1 502 is slidably connected to telescopic tube 2 503 , and the output end of the hydraulic rod 504 is fixedly connected to telescopic tube 1 502 .
[0029] In this embodiment, by providing a hydraulic rod 504, when the anchor cable body 2 is unanchored, the anchor cable body 2 moves downward, and the spring 1 6 cooperates with the hydraulic rod 504 to buffer the anchor cable body 2, thereby avoiding injuries to construction personnel.
[0030] See also Figure 3-5 In the figure, the buffer bolt 8 includes an anchor bolt 801, a limit seat 802 and a second spring 803. The lower end of the anchor bolt 801 is fixedly connected to the limit seat 802, and the outer side of the anchor bolt 801 is sleeved with the second spring 803.
[0031] In this embodiment: the buffer bolt 8 is provided to provide buffering for the buffer assembly 5 .
[0032] See also Figure 3-5 As shown in the figure, eight buffer bolts 8 are provided, and the eight buffer bolts 8 are fixedly installed on the four sides of the mounting frame 7.
[0033] In this embodiment: during installation, a hole is drilled on the surface of the rock layer 9, the agent is placed in the hole, the anchor bolt 801 is passed through the mounting frame 7 and screwed into the hole in the rock layer 9, the second spring 803 is located between the mounting frame 7 and the limit seat 802, the mounting frame 7 can move along the anchor bolt 801, and the second spring 803 provides a buffer.
[0034] See also Figure 3-5 In the figure, the upper end of the telescopic tube 503 is rotatably connected to the mounting frame 7, and the round tube 501 is slidably connected to the sleeve 3.
[0035] In this embodiment, the circular tube 501 is provided, and the circular tube 501 is slidably connected with the round seat 4 to limit the anchor cable body 2.
[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include"-"comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process-method-article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process-method-article or device.
[0037] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A buffer device for releasing an anchor cable in a mine, comprising a rigging (1), Features: An anchor cable body (2) is arranged at the center of the rigging (1), a sleeve (3) is fixedly connected to the outer side of the anchor cable body (2), a round seat (4) is fixedly connected to the upper end of the sleeve (3), a buffer assembly (5) is arranged below the round seat (4), a spring (6) is fixedly connected to the lower end of the round seat (4), a mounting frame (7) is arranged on the outer side of the rigging (1), a buffer bolt (8) is fixedly installed at the lower end of the mounting frame (7), and the mounting frame (7) is fixedly installed at the lower end of the rock layer (9).
2. A buffer device for releasing anchor cables from a mine according to claim 1, Features: The buffer assembly (5) comprises a circular tube (501), a telescopic tube 1 (502), a telescopic tube 2 (503) and a hydraulic rod (504); the outer side of the circular tube (501) is rotatably connected to the telescopic tube 1 (502); the end of the telescopic tube 1 (502) away from the circular tube (501) is provided with the telescopic tube 2 (503); the upper end of the telescopic tube 2 (503) is fixedly connected to the hydraulic rod (504).
3. A buffer device for releasing anchor cables from a mine according to claim 2, Features: The telescopic tube 1 (502), the telescopic tube 2 (503) and the hydraulic rod (504) are arranged in four identical groups, and the four groups of telescopic tube 1 (502), the telescopic tube 2 (503) and the hydraulic rod (504) are evenly arranged on the outside of the circular tube (501).
4. A buffer device for releasing anchor cables under a mine according to claim 3, Features: The telescopic tube 1 (502) is slidably connected to the telescopic tube 2 (503), and the output end of the hydraulic rod (504) is fixedly connected to the telescopic tube 1 (502).
5. A buffer device for releasing anchor cables under a mine according to claim 4, Features: The buffer bolt (8) comprises an anchor bolt (801), a limiting seat (802) and a second spring (803); the lower end of the anchor bolt (801) is fixedly connected to the limiting seat (802), and the outer side of the anchor bolt (801) is sleeved with the second spring (803).
6. A buffer device for releasing anchor cables under a mine according to claim 5, Features: Eight buffer bolts (8) are provided, and the eight buffer bolts (8) are fixedly mounted on four sides of the mounting frame (7).
7. A buffer device for releasing anchor cables under a mine according to claim 6, Features: The upper end of the second telescopic tube (503) is rotatably connected to the mounting frame (7), and the circular tube (501) is slidably connected to the sleeve (3).