Energy-saving heat-preservation type embedded and penetrable prefabricated hanging brick for kiln head cover

By designing and embedded prefabricated hanging bricks on the kiln head cover, the connecting grooves, connecting blocks and air pressure structures are used to solve the problem of straight joints of hanging bricks, improving the connection reliability and assembly convenience, and extending the service life.

CN222069287UActive Publication Date: 2024-11-26YIXING LONGCHANG REFRACTORIES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323405657.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-11-26
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing kiln hoods have straight joints when splicing, causing the flame to pass through and burn the top of the kiln hood, and the connection is not compact and the assembly is inconvenient.

Method used

An energy-saving and thermal insulation type for kiln hoods can be embedded with prefabricated hanging bricks. By setting connection grooves and connecting blocks on the main body of the hanging bricks, the mounting rod assembly and air pressure structure are used to achieve the tightness of the adjacent hanging bricks. Connect and strengthen firmness by filling the castable.

Benefits of technology

Effectively preventing flames from passing through the brick-hanging layer, improving the reliability and assembly convenience between the brick-hanging brick and the kiln hood, and extending the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222069287U_ABST
    Figure CN222069287U_ABST
Patent Text Reader

Abstract

The utility model discloses an energy-saving heat-preservation type embedded and penetrable prefabricated hanging brick for a kiln head cover, and belongs to the technical field of kiln head covers. Comprising hanging brick bodies and hanging rod assemblies arranged between every two adjacent hanging brick bodies, and each hanging rod assembly comprises a hanging vertical rod and hanging transverse rods arranged at the upper end and the lower end of the hanging vertical rod; two adjacent hanging brick bodies are subjected to primary connection through the hanging rod assemblies, two adjacent hanging brick bodies are subjected to secondary connection through the connecting grooves and the connecting blocks, and meanwhile, the space between the hanging brick bodies and the kiln head cover and the space between the hanging rod assemblies and the hanging brick bodies are filled with refractory castable, so that straight seams between the brick bodies are avoided; flames are prevented from penetrating through the prefabricated hanging brick layer, and by means of the hanging brick connecting structure capable of being embedded and penetrated, the assembling convenience between the prefabricated hanging bricks is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of kiln head covers, in particular to an energy-saving and heat-insulating prefabricated hanging brick that can be embedded and penetrated for the kiln head cover. Background Art

[0002] The kiln head hood is a non-standard equipment in the new dry process cement production line firing system. It is connected to the rotary kiln, grate cooler and preheater. Its main function is to collect and treat the kiln head exhaust gas and prevent the hot air flow from leaking out to maintain the temperature stability of the kiln head.

[0003] In order to prevent the fire in the kiln from burning the kiln hood, a layer of refractory hanging bricks is usually hung at the lower end of the kiln hood to isolate the flames from the kiln hood; because straight seams are left when the hanging bricks are spliced, the flames will pass through the straight seams and burn the kiln hood.

[0004] When the existing hanging bricks for the kiln head cover are in use, the connection between two adjacent hanging bricks is simple, not compact, and inconvenient to assemble. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the deficiencies of the above-mentioned prior art and provide an energy-saving and heat-insulating prefabricated hanging brick for a kiln head cover.

[0006] The technical solution of the utility model is: an energy-saving and heat-insulating prefabricated hanging brick for a kiln head cover, comprising a hanging brick body and a hanging rod assembly arranged between two adjacent hanging brick bodies;

[0007] The brick hanging body comprises a lower brick body and an upper brick body arranged at the upper end of the lower brick body, and the left and right sides of the upper brick body are respectively provided with hanging horizontal grooves, and the upper end of each hanging horizontal groove is provided with a hanging vertical groove penetrating to the outside;

[0008] The hanging rod assembly includes a hanging vertical rod and a hanging cross rod arranged at the upper and lower ends of the hanging vertical rod. The hanging cross rod located at the lower end includes a cross rod frame with an open structure at the upper end, a movable cross plate slidably connected to the side wall of the cross rod frame and connected to the bottom end of the hanging vertical rod. The side wall of the cross rod frame is provided with a first filling port, a plastic film is attached to the first filling port, the inside of the cross rod frame is in a negative pressure state, and second filling ports are provided on the left and right sides of the upper brick body and corresponding to the hanging cross groove position.

[0009] Furthermore, left and right sides of the lower brick body are respectively provided with connection grooves and connection blocks matching the size of the connection grooves.

[0010] Description: By setting connecting grooves and connecting blocks on the left and right sides of the lower brick body, it is convenient to embed and connect the two adjacent lower brick bodies. The connecting blocks on the adjacent lower brick bodies are limited by the connecting grooves to avoid a small misalignment between the two adjacent hanging brick bodies and affect the connection reliability of the hanging brick bodies.

[0011] Furthermore, there are a plurality of connecting grooves, which are located on the same horizontal line, and there are a plurality of connecting blocks, which are arranged on the lower brick body and are located at the same height as the connecting grooves.

[0012] Description: By limiting the number of connecting grooves and connecting blocks, the compactness and stability of the connection between two adjacent lower brick bodies are further improved.

[0013] Furthermore, a plurality of pouring recesses are provided at the upper end of the upper brick body, and the hanging transverse groove and the transverse bar frame are both wavy structures.

[0014] Note: By setting the pouring recess at the upper end of the upper brick body, the contact area with the castable is increased, thereby improving the connection reliability between the hanging brick body and the kiln head cover.

[0015] Furthermore, each side wall of the cross bar frame is provided with a sliding limit groove, and the upper end of the movable cross plate is provided with a sliding block slidably connected to the sliding limit groove.

[0016] Description: Since the cross bar frame is in a negative pressure state, when connecting two adjacent upper brick bodies, the hanging cross bar located at the lower end position is placed between the two relatively distributed hanging cross grooves, and the hanging vertical bar is placed between the two relatively distributed hanging vertical grooves. The hanging between the two adjacent upper brick bodies is completed through the limit card connection between the hanging cross bar and the hanging cross groove. Then, it is hung with the kiln head cover through the hanging cross bar located at the upper end position. When the hanging cross bar is in use, the staff reaches in through the second pouring port to poke the plastic film at the first pouring port to increase the air pressure in the cross bar frame. At this time, under the push of the air pressure, the movable cross plate slides upward in the cross bar frame, so that the gap between it and the upper end of the hanging cross groove becomes smaller and smaller, thereby improving the compactness of the connection between the two. At the same time, castables are poured into the cross bar frame through the second pouring port and the first pouring port. After the castables solidify, they support the bottom end of the movable cross plate, further improving the compactness of the connection between the two, making the entire structure more solid and effectively improving the service life.

[0017] The working principle of the utility model is:

[0018] When connecting two adjacent upper brick bodies, the hanging cross bar at the lower end position is placed between two relatively distributed hanging cross grooves, and the hanging vertical bar is placed between two relatively distributed hanging vertical grooves, and is connected through the limit clamping between the hanging cross bar and the hanging cross groove, and then, it is hung with the kiln head cover through the hanging cross bar at the upper end position. When the hanging cross bar is in use, the staff reaches in through the second pouring port to poke the plastic film at the first pouring port to increase the air pressure in the cross bar frame. At this time, under the push of the air pressure, the movable cross plate slides upward in the cross bar frame, so that the gap between it and the upper end of the hanging cross groove becomes smaller and smaller. At the same time, castables are poured into the cross bar frame through the second pouring port and the first pouring port. After the castables solidify, they support the bottom end of the movable cross plate, thereby further improving the compactness of the connection between the two.

[0019] Compared with the prior art, the beneficial effects of the utility model are:

[0020] When the embeddable prefabricated hanging bricks of the present invention are in use, they are connected once with two adjacent hanging brick bodies through the hanging rod assembly, and are connected for a second time with the connecting groove and the connecting block. At the same time, refractory castables are filled between the hanging brick body and the kiln head cover, and between the hanging rod assembly and the hanging brick body, so that straight seams between the brick bodies are avoided and flames are blocked from passing through the prefabricated hanging brick layer. In addition, the above-mentioned embeddable hanging brick connection structure increases the assembly convenience between the prefabricated hanging bricks. When the hanging cross bar is in use, the staff reaches in through the second pouring port to pierce the plastic film sheet at the first pouring port, so that the air pressure in the cross bar frame increases. At this time, under the driving effect of the air pressure, the movable cross plate slides upward in the cross bar frame, so that the gap between it and the upper end of the hanging cross groove becomes smaller and smaller, thereby improving the compactness of the connection between the two. At the same time, castables are poured into the cross bar frame through the second pouring port and the first pouring port. After the castables solidify, they support the bottom end of the movable cross plate, further improving the compactness of the connection between the two, making the entire structure more solid and effectively improving the service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a cross-sectional view of the utility model;

[0022] Figure 2 It is a schematic diagram of the external structure of the utility model;

[0023] Figure 3 For the utility model Figure 1 A in the enlarged view;

[0024] Figure 4 It is a top view of the lower brick body of the utility model.

[0025] Among them, 1-hanging brick body, 10-lower brick body, 100-connecting groove, 101-connecting block, 11-upper brick body, 110-hanging horizontal groove, 111-hanging vertical groove, 112-second pouring port, 113-pouring recess, 2-hanging rod assembly, 20-hanging vertical rod, 21-hanging horizontal rod, 210-horizontal rod frame, 211-movable horizontal plate, 212-first pouring port, 213-plastic film sheet, 214-sliding limit groove, 215-sliding block. DETAILED DESCRIPTION

[0026] Example 1

[0027] like Figure 1 , 2 As shown in 3, an energy-saving and heat-insulating prefabricated hanging brick for a kiln head cover can be embedded, comprising a hanging brick body 1 and a hanging rod assembly 2 arranged between two adjacent hanging brick bodies 1;

[0028] The brick hanging body 1 comprises a lower brick body 10 and an upper brick body 11 arranged at the upper end of the lower brick body 10. The upper brick body 11 is provided with hanging transverse grooves 110 on the left and right sides respectively. The upper end of each hanging transverse groove 110 is provided with a hanging vertical groove 111 penetrating to the outside.

[0029] The hanging rod assembly 2 includes a hanging vertical rod 20, a hanging cross rod 21 arranged at the upper and lower ends of the hanging vertical rod 20, and the hanging cross rod 21 located at the lower end includes a cross rod frame 210 with an open structure at the upper end, and a movable cross plate 211 slidably connected to the side wall of the cross rod frame 210 and connected to the bottom end of the hanging vertical rod 20. The side wall of the cross rod frame 210 is provided with a first pouring port 212, and a plastic film sheet 213 is attached to the first pouring port 212. The inside of the cross rod frame 210 is in a negative pressure state, and second pouring ports 112 are provided on the left and right sides of the upper brick body 11 and at the position corresponding to the hanging cross groove 110;

[0030] When connecting two adjacent upper brick bodies 11, the hanging cross bar 21 located at the lower end position is placed between the two relatively distributed hanging cross grooves 110, and the hanging vertical bar 20 is placed between the two relatively distributed hanging vertical grooves 111, and is connected through the limit clamping between the hanging cross bar 21 and the hanging cross groove 110. Then, it is hung with the kiln head cover through the hanging cross bar 21 located at the upper end position. When the hanging cross bar 21 is in use, the staff reaches in through the second pouring port 112 to pierce the plastic film sheet 213 at the first pouring port 212, so that the air pressure in the cross bar frame 210 increases. At this time, under the push of the air pressure, the movable cross plate 211 slides upward in the cross bar frame 210, so that the gap between it and the upper end of the hanging cross groove 110 becomes smaller and smaller. At the same time, castables are poured into the cross bar frame 210 through the second pouring port 112 and the first pouring port 212. After the castables solidify, they support the bottom end of the movable cross plate 211.

[0031] Example 2

[0032] The difference between this embodiment and embodiment 1 is that:

[0033] like Figure 3 , 4 As shown, the left and right sides of the lower brick body 10 are respectively provided with a connecting groove 100 and a connecting block 101 matching the size of the connecting groove 100;

[0034] There are three connecting grooves 100, which are located on the same horizontal line; there are three connecting blocks 101, which are arranged on the lower brick body 10 and are located at the same height as the connecting grooves 100;

[0035] The upper end of the upper brick body 11 is provided with 20 pouring notches 113, and the hanging transverse groove 110 and the crossbar frame 210 are both wavy structures;

[0036] Each side wall of the crossbar frame 210 is provided with a sliding limit groove 214, and the upper end of the movable cross plate 211 is provided with a sliding block 215 slidably connected to the sliding limit groove 214;

[0037] By providing the connection grooves 100 and the connection blocks 101 on the left and right sides of the lower brick body 10, it is convenient to embed and connect two adjacent lower brick bodies 10. The connection blocks 101 on the adjacent lower brick bodies 10 are limited by the connection grooves 100 to avoid a small misalignment between the two adjacent hanging brick bodies 1 and affect the connection reliability of the hanging brick bodies 1.

[0038] By limiting the number of connecting grooves 100 and connecting blocks 101, the compactness and stability of the connection between two adjacent lower brick bodies 10 are further improved;

[0039] By setting the pouring recess 113 at the upper end of the upper brick body 11, the contact area with the castable is increased, thereby improving the connection reliability between the hanging brick body 1 and the kiln head cover;

[0040] When the movable cross plate 211 slides upward in the cross bar frame 210, and the sliding block 215 slides upward in the corresponding sliding limit groove 214, the sliding limit groove 214 limits the sliding block 215, thereby preventing the movable cross plate 211 and the cross bar frame 210 from being separated, so that the entire structure is connected to each other, thereby improving the connection reliability of the entire structure.

Claims

1. An energy-saving and heat-insulating prefabricated hanging brick for kiln head cover, characterized in that: It comprises a brick hanging body (1) and a hanging rod assembly (2) arranged between two adjacent brick hanging bodies (1); The brick hanging body (1) comprises a lower brick body (10) and an upper brick body (11) arranged at the upper end of the lower brick body (10); the upper and lower sides of the upper brick body (11) are respectively provided with hanging transverse grooves (110); and the upper end of each hanging transverse groove (110) is provided with a hanging vertical groove (111) penetrating to the outside; The hanging rod assembly (2) comprises a hanging vertical rod (20), a hanging horizontal rod (21) arranged at the upper and lower ends of the hanging vertical rod (20), the hanging horizontal rod (21) located at the lower end position comprises a horizontal rod frame (210) with an open structure at the upper end, a movable horizontal plate (211) slidably connected to the side wall of the horizontal rod frame (210) and connected to the bottom end of the hanging vertical rod (20), a first pouring port (212) is provided on the side wall of the horizontal rod frame (210), a plastic film sheet (213) is attached to the first pouring port (212), the interior of the horizontal rod frame (210) is in a negative pressure state, and second pouring ports (112) are provided on the left and right sides of the upper brick body (11) and at positions corresponding to the hanging horizontal grooves (110).

2. The energy-saving and heat-insulating prefabricated hanging brick for kiln head cover according to claim 1, characterized in that: The left and right sides of the lower brick body (10) are respectively provided with connection grooves (100) and connection blocks (101) having sizes matching the connection grooves (100).

3. The energy-saving and heat-insulating prefabricated hanging brick for a kiln head cover as claimed in claim 2, characterized in that: There are a plurality of connection grooves (100), and the plurality of connection grooves (100) are located on the same horizontal line. There are a plurality of connection blocks (101), and the plurality of connection blocks (101) are arranged on the lower brick body (10) and are located at the same height as the connection grooves (100).

4. The energy-saving and heat-insulating prefabricated hanging brick for a kiln head cover as claimed in claim 1, characterized in that: The upper end of the upper brick body (11) is provided with a plurality of pouring recesses (113), and the hanging transverse groove (110) and the transverse bar frame (210) are both wavy structures.

5. The energy-saving and heat-insulating prefabricated hanging brick for kiln head cover according to claim 1, characterized in that: Each side wall of the cross bar frame (210) is provided with a sliding limit groove (214), and the upper end of the movable cross plate (211) is provided with a sliding block (215) slidably connected to the sliding limit groove (214).