Jacking and translation device of large mast crane
By designing the hoisting device and the translation device, the overall hoisting and translation of large mast cranes is achieved using jacks and axle trucks, solving the problems of difficult transfer sites and high-cost installation in the prior art, and improving the efficiency and operation of the equipment Security.
Patent Information
- Application Number
- CN202420587976.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-25
AI Technical Summary
Existing large mast cranes have poor mobility when transferring sites, high installation costs, long construction periods, and high installation costs, making it difficult to conveniently transfer sites.
An integral hoisting translation device including a hoisting device, a bottom beam support pad, a jack support pad and an axis truck was designed. The overall hoisting of a mast crane was realized through a jack and a pump station drive. Raise and translate, avoiding the removal and reinstallation process.
It realizes the convenient transfer of mast cranes, reduces the cost of transfer and dismantling and construction period, improves the efficiency of equipment, and solves the problems of inconvenient installation destination or high cost.
Smart Images

Figure CN222082286U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of translation of large mast cranes, and in particular relates to a jacking and translation device for a large mast crane. Background Art
[0002] Mast cranes are widely used in ports and docks for loading and unloading large and overweight cargoes due to their simple structure, large lifting capacity, low site requirements and low operating costs.
[0003] At present, most of the commonly used mast cranes are installed at fixed installation sites, with poor mobility and cannot be easily moved to other sites. Due to its large size, heavy deadweight, long boom length, the installation foundation is close to the dock, the boom extends into the sea, and the center of gravity of the boom is far from the coastline. It can only be installed by floating crane during installation, which has high installation costs, long construction period, great environmental impact, and high requirements for surrounding sites. After installation, when there is a special need to temporarily avoid or relocate the site, the equipment can only be dismantled, transported in parts, and reinstalled, which takes a long time, occupies a large amount of manpower and mechanical equipment, and is costly. Utility Model Content
[0004] The purpose of the utility model is to overcome the defects of the above-mentioned prior art and provide a large mast crane whole machine lifting and translation device, which is easy to operate, safe and reliable, and convenient for site transfer. It greatly saves the installation and disassembly costs and construction period consumption when transferring sites, improves the use efficiency of the equipment, and effectively solves the problem that the final installation destination is inconvenient for installation or the installation cost is too high.
[0005] The technical solution adopted by the utility model is as follows:
[0006] A large mast crane jacking and translation device comprises a jacking device, a bottom beam support pad, a jack support pad and an axis vehicle;
[0007] The lifting device is used for lifting a mast crane, and comprises a jack arranged at the front of the bottom beam and below the rear of the bottom beam of the mast crane and a pump station for driving the jack;
[0008] The jack support pad is used to set the support jack;
[0009] The bottom beam support pads are arranged at the bottom of the front and rear parts of the bottom beam of the mast crane and are used to support the mast crane when the mast crane is supported to a certain height by a jack;
[0010] The axis vehicles include two, which are moved to the bottom of the mast crane when the mast crane is lifted to a set height by a jack, and are used to move the mast crane; the center lines of the two axis vehicles coincide with the center lines of the longitudinal beams in the middle of the bottom beam of the mast crane; the front lifting beam of the bottom beam, the rear lifting beam of the bottom beam and the middle support seat of the bottom beam are arranged on the top of the axis vehicles.
[0011] The above-mentioned axle vehicle has a strong load-balancing capacity. Through calculation, the position of the support pad is reasonably determined, and multiple points of support are set at appropriate positions to ensure that multiple wheels are evenly stressed. The axle vehicle does not require tracks and traction, has its own drive, can rotate 360 degrees, and has its own lifting device, which can be lifted in a small range.
[0012] As a further technical solution, during jacking, a T-shaped tightening plate is installed in the gap between the upper flanges of the connection between the front and middle parts of the bottom beam to lock the relative position between the front and middle parts of the bottom beam, prevent the additional bending moment from damaging the pin shaft during the jacking process, and ensure the stability of the jacking.
[0013] As a further technical solution, multiple bottom beam support pads are arranged along the height direction, and adjacent bottom beam support pads are guided and positioned by keys to facilitate automatic alignment and overall stability of the installation of multiple bottom beam support pads.
[0014] As a further technical solution, the jack pads are arranged in plurality along the height direction, and adjacent jack pads are guided and positioned by keys, so as to facilitate automatic alignment and overall stability of the installation of multiple jack pads.
[0015] As a further technical solution, the jacks include eight jacks, four of which are arranged at the front of the mast crane's ground beam and four at the rear of the mast crane's ground beam; the bottom beam support pad at the front of the bottom beam is located between the corresponding four jacks; the bottom beam support pad at the rear of the bottom beam is located between the corresponding four jacks.
[0016] As a further technical solution, the eight jacks are driven simultaneously by the same pump station.
[0017] As a further technical solution, the eight jacks are installed in the same direction, the cylinder body of the jack is flange-connected to the bottom beam of the large mast crane, the piston rod side is a ball head flange seat, the contact surface is a spherical surface, and it is self-aligning within a small angle to adjust the force on the cylinder.
[0018] As a further technical solution, four lifting beams are provided at the front of the bottom beam; and four lifting beams are provided at the rear of the bottom beam.
[0019] As a further technical solution, the bottom beam middle support seat includes multiple ones, which are installed in sequence under the longitudinal beam in the middle of the bottom beam.
[0020] As a further technical solution, the middle support seats of the bottom beam under each longitudinal beam are evenly distributed; the middle support seats of the bottom beam under the two longitudinal beams are symmetrically arranged.
[0021] The beneficial effects of the utility model are as follows:
[0022] The utility model can realize the transfer site of the mast crane as a whole through the cooperation between the jacking device, two axle vehicles, bottom beam support pads and jack support pads, without the need to dismantle and install the mast crane again. The operation is convenient, safe and reliable, and the process of dismantling and installing once is avoided, which greatly saves time and cost, improves the use efficiency of the equipment, and effectively solves the problem that the final installation destination is inconvenient for installation or the installation cost is too high. A set of jacking and translation devices can be shared by multiple mast cranes of different specifications.
[0023] During translation, the centers of the two axle vehicles coincide with the center lines of the longitudinal beams in the middle of the bottom beam respectively; the front lifting beam of the bottom beam, the rear lifting beam of the bottom beam and the middle support seat of the bottom beam are arranged on the top of the axle vehicle, and the force of the mast crane is evenly transmitted to the wheels of the two axle vehicles through the front lifting beam of the bottom beam, the rear lifting beam of the bottom beam and the middle support seat of the bottom beam, so that the wheels of the axle vehicles are equally stressed. During jacking, a T-shaped jacking plate is installed at the gap between the upper flanges of the connection between the front and middle parts of the bottom beam; it is used to lock the relative position between the front and middle parts of the bottom beam, prevent the additional bending moment from damaging the pin shaft during the jacking process, and ensure the stability of the jacking. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the initial state of the jacking and translation device of a large mast crane proposed by the utility model before jacking;
[0025] Figure 2 This is a schematic diagram of the first jacking state of the jacking and translation device of a large mast crane proposed by the utility model;
[0026] Figure 3 This is a schematic diagram of the first cylinder closing state of the jacking and translation device of a large mast crane proposed by the utility model;
[0027] Figure 4 This is a schematic diagram of the second jacking state of the jacking and translation device of the large mast crane proposed by the utility model;
[0028] Figure 5 This is a schematic diagram of the second cylinder closing state of the jacking and translation device of a large mast crane proposed by the utility model;
[0029] Figure 6 It is a schematic diagram of the large mast crane lifting and translation device proposed by the utility model being lifted to a required height;
[0030] Figure 7 , Figure 8 This is a schematic diagram of the translation state of the jacking and translation device of a large mast crane proposed by the utility model;
[0031] Fig. 9 It is a schematic diagram of the bottom beam of the mast crane of the present utility model.
[0032] In the figure: 1 mast crane body, 2 jack, 3 bottom beam support, 4 jack support, 5 axle car, 6 bottom beam front, 7 bottom beam middle, 8 bottom beam rear, 9 bottom beam front lifting beam, 10 bottom beam rear lifting beam, 11 bottom beam middle support, 12 T-shaped tightening plate. DETAILED DESCRIPTION
[0033] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0034] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or their combinations;
[0035] like Fig. 9 As shown, the bottom beam of the mast crane that needs to be translated in this embodiment is composed of three parts: the front part 6 of the bottom beam, the middle part 7 of the bottom beam, and the rear part 8 of the bottom beam. Since the overall size of the bottom beam exceeds the transportation limit, in order to facilitate transportation, the bottom beam is a split structure, and each part is connected to form an integral whole through a connecting plate, bolts or pins. The top of the front part 6 of the bottom beam is installed with a crane arm, a herringbone frame, an operating room, and an electrical station; the upper surface of the middle part 7 of the bottom beam is installed with a winch; the top of the rear part 8 of the bottom beam is installed with a rear tie rod, and is fixed to the ground foundation through pre-buried bolts to ensure overall stability.
[0036] In order to solve the translation problem of large mast cranes in the prior art, the large mast crane jacking and translation device disclosed in this embodiment mainly includes a jack 2, a bottom beam support pad 3, a jack support pad 4, an axis car 5, etc., which are mainly divided into a jacking device and a translation device;
[0037] A lifting device, used for lifting a mast crane, comprises a jack 2 arranged at the front of a bottom beam and below the rear of the bottom beam of the mast crane and a pump station for driving the jack;
[0038] Jack support pad 4, used for setting the support jack;
[0039] The bottom beam support pad 3 is arranged at the bottom of the front part of the bottom beam and the rear part of the bottom beam of the mast crane, and is used to support the mast crane when the mast crane is supported to a certain height by the jack;
[0040] The axis car 5 includes two units, which are moved to the bottom of the mast crane when the mast crane is lifted to a set height by a jack, and are used to move the mast crane; the center lines of the two axis cars coincide with the center lines of the longitudinal beams in the middle of the bottom beam of the mast crane respectively; a bottom beam front lifting beam, a bottom beam rear lifting beam and a bottom beam middle supporting seat are arranged on the top of the axis car; the force of the mast crane is evenly transmitted to the wheels of the two axis cars through the bottom beam front lifting beam, the bottom beam rear lifting beam and the bottom beam middle supporting seat, so that the wheels of the axis cars are equally stressed.
[0041] The above-mentioned axle vehicle has a strong load-balancing capacity. Through calculation, the position of the support pad is reasonably determined, and multiple points of support are set at appropriate positions to ensure that multiple wheels are evenly stressed. The axle vehicle does not require tracks and traction, has its own drive, can rotate 360 degrees, and has its own lifting device, which can be lifted in a small range.
[0042] The lifting and translation of the large mast crane is a big machine with a high center of gravity and a large lifting height. In order to ensure that the structure of the mast crane is not damaged and the safety during the lifting and translation process, a multi-point synchronous lifting scheme is adopted. The whole lifting process is realized in small strokes and multiple steps to ensure the stability of the whole machine during the lifting process. The lifting and translation interface of the whole machine is set on the bottom beam of the mast crane.
[0043] Due to the structural characteristics of the mast crane, such as heavy deadweight, high center of gravity, and large size, the whole machine is subjected to force, rigidity, stability, and the spatial position of the axis vehicle. Four lifting support points are set at the front part 6 and the rear part 8 of the bottom beam of the mast crane for lifting operations. The lifting support points are set at the main load-bearing beam, and the corresponding parts of the bottom beam are strengthened. At the pin connection between the front part 6 of the bottom beam and the middle part 7 of the bottom beam, a T-shaped top plate 12 is installed at the gap between the upper flanges of the two during the lifting condition to lock the relative position between the front part 6 of the bottom beam and the middle part 7 of the bottom beam, so as to prevent the additional bending moment from damaging the pin during the lifting process and ensure the stability of the lifting.
[0044] In this embodiment, multiple bottom beam support pads 3 are arranged along the height direction, and adjacent bottom beam support pads are guided and positioned by keys, which facilitates the installation of multiple bottom beam support pads for automatic alignment and overall stability.
[0045] In this embodiment, a plurality of jack pads 4 are arranged along the height direction, and adjacent jack pads are guided and positioned by keys, so as to facilitate automatic alignment and overall stability of the installation of multiple jack pads.
[0046] In this embodiment, the lifting device includes eight jacks 2 and a pump station. The eight jacks 2 are lifted synchronously, and the front and rear arrangement is 2+2+2+2, with four jacks in the front and four jacks in the back, and the synchronization is controlled by a pump station. The eight jacks 2 are installed in the same direction, and the bottom of the jack is connected to the structure by a flange. The piston rod side is a ball head flange seat, the contact surface is a spherical surface, and the small angle internal self-aligning is used to adjust the force of the cylinder.
[0047] The eight jacks can be kept loaded during the process of rising and falling, and the rising and falling are synchronous. The synchronous lifting system consists of a hydraulic system and its PLC control system. Based on the closed-loop control system theory, the displacement and pressure of the load are used as the controlled parameters. Displacement sensors and pressure sensors are installed on each set of jacks and oil circuits. The sensor data signal is fed back to the PLC, and the on and off of the solenoid valve is controlled by the PLC program. The displacement data is processed to achieve the synchronous rising or falling of the eight jacks. The eight jacks can move at the same time or individually. There will be no safety problems in the lifting or lowering of the equipment due to system failure caused by the failure of any jack.
[0048] The jack pipeline is easy to plug in, and is equipped with hoses and quick connectors. The pump station is placed on the ground, with wheels and brakes at the bottom, which is convenient for movement and fixed-point operation. The operating table is located in a suitable position for operation, and the control cabinet is equipped with a rain cover.
[0049] The translation device, when the jack is lifted to the designated position, the jack is lowered to press the entire mast crane onto the bottom beam support platform, and the two axis vehicles are driven to the designated positions at the bottom of the equipment respectively, and the centers of the two axis vehicles are aligned with the centers of the longitudinal and transverse beams in the middle of the bottom beam 7. On the two axis vehicles, four lifting beams are placed under the front part 6 and the rear part 8 of the bottom beam of the mast crane respectively, and a plurality of support bearings 11 are placed under the longitudinal and transverse beams in the middle of the bottom beam of the mast crane to evenly transmit the force to the wheels of the two axis vehicles, so that each wheel of the axis vehicle is equally stressed. The lifting beams and support bearings are arranged symmetrically, aligned along the center of the longitudinal beam in the middle of the bottom beam, and locally reinforced at the bottom beam support of the mast crane.
[0050] After the axle vehicle is in place, the jack is lifted, the bottom beam support pad is removed, the jack is slowly retracted, and the equipment is lowered onto the axle vehicle. The axle vehicle moves the equipment horizontally to the designated location. After arriving at the designated location, ensure that the foundation bearing capacity meets the requirements, and then place the equipment to the designated location in the reverse order of lifting.
[0051] If the final installation destination of the mast crane is inconvenient for installation or the installation cost is too high, it can be installed at a reasonable and convenient location, and then the entire machine can be lifted and moved to the corresponding location.
[0052] When the mast crane has special needs and needs to temporarily avoid or relocate to a new location, the entire machine can be lifted and moved to the corresponding location.
[0053] If the mast crane needs to be moved to another dock as a whole, it can be loaded onto a ship as a whole and moved into position as a whole at the next dock.
[0054] The utility model can realize the transfer site of the mast crane as a whole without dismantling and reinstalling the mast crane, is easy to operate, safe and reliable, avoids the process of dismantling and reinstalling, saves a lot of time and cost, improves the use efficiency of the equipment, and effectively solves the problem that the final installation destination is inconvenient for installation or the installation cost is too high. A set of jacking and translation devices can be shared by multiple mast cranes of different specifications.
[0055] The specific working process is as follows:
[0056] Before lifting, adjust the boom of the mast crane to the specified range, raise the hook to the highest point, and rely on the overturning effect of the counterweight to balance the boom frame so that the center of gravity of the whole machine is inside the bottom beam. Set hydraulic lifting support points at the front and rear of the bottom beam, lock each mechanism, remove the embedded bolts of the foundation, install jack 2 in place, connect the pipeline and pump station, debug the hydraulic system and wait for lifting. The initial state before lifting is as follows: Figure 1 shown.
[0057] Slowly lift the jack 2 until it reaches the first lifting position. At this time, the jack 2 is in a loaded locked state, and the bottom beam support pad 3 is placed at the designated position at the bottom of the front and rear bottom beams of the mast crane. Figure 2 shown.
[0058] After the bottom beam support pad 3 is adjusted in place, operate the jack 2 to retract the cylinder until the whole body falls stably on the bottom beam support pad 3 platform. After confirming that it is reliable, continue to retract the cylinder until the jack 2 retracts to its initial length, and then place the jack support pad 4 directly under the jack 2. Figure 3 shown.
[0059] After the jack pad 4 is securely placed, continue to operate the jack 2 to lift, and then add the second layer of bottom beam pad 3. Figure 4 After the second-layer bottom beam support pad 3 is firmly in place, operate the jack 2 to retract the cylinder until the jack 2 retracts to its initial length, and then place the second-layer jack support pad 4 directly under the jack 2. Figure 5 shown.
[0060] Repeat the above-mentioned lifting process until the jack 2 is lifted to the specified position, and the jack 2 is lowered so that the entire device is pressed onto the platform of the bottom beam support pad 3. The axis vehicle 5 is driven to the specified position at the bottom of the equipment. After the axis vehicle 5 is in place, the jack 2 is lifted, the bottom beam support pad 3 is removed, the jack 2 is slowly retracted, and the equipment is dropped onto the axis vehicle 5. The axis vehicle 5 moves the equipment horizontally to the specified location. After arriving at the specified location, ensure that the foundation bearing capacity meets the requirements, and then place the equipment at the specified location in the reverse order of the lifting.
[0061] The bottom beam support pad 3 and the jack support pad 4, on the basis of fully considering their own stress problems, reserve forklift interfaces at the webs to facilitate on-site mechanized and automated work and reduce the intensity of manual work.
[0062] Due to the structural characteristics of the mast crane, such as heavy weight, high center of gravity, large size, etc., and taking into account the force, rigidity, stability of the whole machine, and the spatial position of the axis car, the jacking and translation interface of the whole machine is set on the bottom beam of the mast crane.
[0063] Four lifting support points are set at the front part 6 and the rear part 8 of the bottom beam of the mast crane for lifting operation. The lifting support points are set at the main load-bearing beam, and the corresponding parts of the bottom beam are strengthened. At the pin connection between the front part 6 and the middle part 7 of the bottom beam, a T-shaped top plate 12 is installed at the gap between the upper flanges of the two during the lifting operation to lock the relative position between the front part 6 and the middle part 7 of the bottom beam, prevent the additional bending moment from damaging the pin during the lifting process, and ensure the stability of the lifting.
[0064] During translation, the centers of the two axis vehicles 5 are aligned with the centers of the longitudinal and transverse beams in the middle of the bottom beam 7. On the two axis vehicles 5, four lifting beams are placed under the front part 6 and the rear part 8 of the bottom beam of the mast crane, and multiple support brackets are placed under the longitudinal and transverse beams in the middle of the bottom beam 7 of the mast crane, as shown in the figure, to evenly transmit the force to the wheels of the two axis vehicles 5 so that each wheel of the axis vehicle 5 is equally stressed. The lifting beams and support brackets are arranged symmetrically, aligned along the centers of the longitudinal and transverse beams in the middle of the bottom beam 7, and locally reinforced at the bottom beam support of the mast crane.
[0065] When the final installation location of the mast crane is close to the coastline, the boom extends into the sea, the center of gravity of the boom is far from the coastline, and it is inconvenient to install using methods such as car cranes, and it can only be installed using floating cranes or other costly methods, it can be installed first in a more suitable and convenient site, and then the equipment can be placed in the designated position through the jacking and translation device after installation, thus solving problems such as inconvenient installation or too high installation cost.
[0066] After installation, if there is a special need to temporarily avoid or relocate the site, the equipment can be moved to the site through the jacking and translation device, avoiding the process of disassembling and installing again, saving a lot of disassembly and installation time and cost, and improving the use efficiency of the equipment. If the mast crane needs to be moved to another dock, it can be loaded onto the ship as a whole and put in place as a whole at the next dock.
[0067] A set of jacking and translation devices in this embodiment can be shared by multiple mast cranes of different specifications.
[0068] Finally, it should be noted that relational terms such as first and second are merely used to distinguish one entity or operation from another entity or operation, but do not necessarily require or imply any actual relationship or order between these entities or operations.
[0069] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A large mast crane lifting and translation device, characterized in that: It includes a jacking device, a bottom beam support pad, a jack support pad and an axle car; The lifting device is used for lifting a mast crane, and comprises a jack arranged at the front of the bottom beam and below the rear of the bottom beam of the mast crane and a pump station for driving the jack; The jack support pad is used to set the support jack; The bottom beam support pads are arranged at the bottom of the front and rear parts of the bottom beam of the mast crane and are used to support the mast crane when the mast crane is supported to a certain height by a jack; The axis vehicles include two, which are moved to the bottom of the mast crane when the mast crane is lifted to a set height by a jack, and are used to move the mast crane; the center lines of the two axis vehicles coincide with the center lines of the longitudinal beams in the middle of the bottom beam of the mast crane; the front lifting beam of the bottom beam, the rear lifting beam of the bottom beam and the middle support seat of the bottom beam are arranged on the top of the axis vehicles.
2. A large mast crane lifting and translation device as claimed in claim 1, characterized in that: During jacking, a T-shaped jacking plate is installed in the gap between the upper flanges at the connection between the front part of the bottom beam and the middle part of the bottom beam.
3. A large mast crane lifting and translation device as claimed in claim 1, characterized in that: The bottom beam support pads are arranged in plurality along the height direction, and adjacent bottom beam support pads are guided and positioned by keys.
4. A large mast crane lifting and translation device as claimed in claim 1, characterized in that: The jack pads are arranged in plurality along the height direction, and adjacent jack pads are guided and positioned by keys.
5. The large mast crane lifting and translation device according to claim 1, characterized in that: As a further technical solution, the jacks include eight jacks, four of which are arranged at the front of the mast crane's ground beam and four at the rear of the mast crane's ground beam; the bottom beam support pad at the front of the bottom beam is located between the corresponding four jacks; the bottom beam support pad at the rear of the bottom beam is located between the corresponding four jacks.
6. A large mast crane lifting and translation device as claimed in claim 3, characterized in that: The eight jacks are driven simultaneously by the same pump station.
7. A large mast crane lifting and translation device as claimed in claim 3, characterized in that: The eight jacks are installed in the same direction. The cylinder body of the jack is connected to the bottom beam of the large mast crane by a flange. The piston rod side is a ball head flange seat, the contact surface is a spherical surface, and the small angle internal self-alignment is used to adjust the force of the cylinder.
8. The large mast crane lifting and translation device according to claim 1, characterized in that: Four lifting beams are arranged at the front of the bottom beam, and four lifting beams are arranged at the rear of the bottom beam.
9. A large mast crane lifting and translation device as claimed in claim 1, characterized in that: The bottom beam middle part support seat comprises a plurality of seats which are sequentially installed under the longitudinal beam in the middle part of the bottom beam.
10. A large mast crane lifting and translation device as claimed in claim 9, characterized in that: The middle support seats of the bottom beam under each longitudinal beam are evenly distributed; the middle support seats of the bottom beam under the two longitudinal beams are symmetrically arranged.