Positioning device for prestressed concrete pipe pile under soft soil geological condition
By designing a positioning device including base, positioning sleeve and pipe pile positioning parts under soft soil geological conditions, the problem of large positioning error in the prior art is solved, and high-precision positioning of pipe pile installation location is achieved, which improves the Construction quality.
Patent Information
- Application Number
- CN202420666453.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-02
AI Technical Summary
Under soft soil geological conditions, there is a large positioning error in the construction positioning of existing pile foundations, which cannot ensure the central position of the pipe pile head and the ground measurement and layout mark, affecting the construction quality.
A positioning device including a base, a positioning sleeve and a plurality of pipe pile positioning members is designed. The pipe piles are positioned through the positioning sleeve and pipe pile positioning members, and the center positioning spring and guide rod are used to ensure the center position of the pipe pile, combined with The level holds the base plate to improve positioning accuracy.
It effectively reduces the installation deviation of pipe piles, improves the accuracy of the installation position, ensures that the axis of the pipe pile is aligned with the tent punctuation point, and improves the construction quality.
Smart Images

Figure CN222100849U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to, and particularly relates to a positioning device for prestressed concrete pipe piles under soft soil geological conditions. Background Art
[0002] The existing pile foundation construction positioning usually adopts the measurement and setting out method. After marking on site, the equipment moves to the marked position, and the construction positioning is ensured by the side-guided parallel triangle line hammer bracket, or by the building wall laser guide. After the positioning is completed, the pipe pile needs to be moved to the positioning position through external measures. Human factors and equipment vibration during the movement process may cause deviations, which will lead to large positioning errors of the pipe pile. Once the pile head touches the ground, it is impossible to observe whether the original measurement and setting out mark on the ground is located at the center of the pipe pile. There is a blind perspective, which affects the construction quality and does not meet the construction use requirements. Summary of the invention
[0003] In view of the above shortcomings, the technical problem to be solved by the utility model is to provide a positioning device for prestressed concrete pipe piles under soft soil conditions, which is used to provide a positioning device for pipe pile installation.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0005] A positioning device for prestressed concrete pipe piles under soft soil geological conditions comprises a base, a positioning sleeve and a plurality of pipe pile positioning pieces. The positioning sleeve is detachably mounted on the base, and the plurality of pipe pile positioning pieces are evenly arranged on the positioning sleeve. The pipe piles arranged in the positioning sleeve are positioned by the pipe pile positioning pieces.
[0006] As a preferred solution of the utility model, the pipe pile positioning member includes a positioning block, a guide rod and a positioning spring. The positioning block is movably mounted on the positioning sleeve through the guide rod. The positioning spring is respectively connected to the positioning sleeve and the positioning block, and a positioning force is applied to the positioning block through the positioning spring.
[0007] As a preferred solution of the utility model, a cushion block is provided on the inner side of the positioning block, and the positioning block abuts against the pipe pile through the cushion block.
[0008] As a preferred solution of the utility model, the positioning block is provided with a mounting nut, and the guide rod is connected to the mounting nut through threads.
[0009] As a preferred solution of the utility model, a limiting rod is provided at the end of the guide rod, and the limiting rod is located outside the positioning sleeve.
[0010] As a preferred solution of the utility model, a connecting piece is installed on the positioning sleeve, and the positioning sleeve is detachably connected to the base through the connecting piece.
[0011] As a preferred solution of the utility model, the base includes a base plate and a plug-in column, the plug-in column is installed on the base plate, and the base plate is fixed by the plug-in column.
[0012] As a preferred solution of the utility model, a through hole is provided on the base plate, and the positioning sleeve is coaxially arranged with the through hole.
[0013] As a preferred solution of the utility model, an adjusting nut is installed on the base plate, and the plug-in column is installed on the base plate through the adjusting nut.
[0014] As a preferred solution of the utility model, a level is installed on the base.
[0015] The beneficial effect of the utility model is that the pipe pile is fixed at the required installation position by the positioning device, which can be used as a mark for locating the installation position of the pipe pile on the one hand; on the other hand, it can eliminate the pipe pile installation deviation caused by the pipe pile head blocking the layout mark, thereby greatly improving the installation position accuracy of the pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a top view of the positioning device.
[0017] Figure 2 It is a cross-sectional view of the positioning device.
[0018] Figure markings: base 1, base plate 1-1, plug-in column 1-2, through hole 1-3, adjusting nut 1-4, positioning sleeve 2, pipe pile positioning piece 3, positioning block 3-1, guide rod 3-2, positioning spring 3-3, pad 3-4, mounting nut 3-5, limit rod 3-6, connecting piece 4, level 5. DETAILED DESCRIPTION
[0019] The utility model is further described below in conjunction with the accompanying drawings.
[0020] A positioning device for prestressed concrete pipe piles under soft soil geological conditions. The positioning device is fixed at the required installation position of the pipe pile in the form of lofting. The pipe pile is fixed at the required installation position by the positioning device. On the one hand, it can be used as a mark for locating the installation position of the pipe pile; on the other hand, it can eliminate the installation deviation of the pipe pile caused by the pile head blocking the lofting mark, thereby greatly improving the installation position accuracy of the pipe pile.
[0021] The positioning device comprises a base 1, a positioning sleeve 2 and a plurality of pipe pile positioning members 3. The base 1 is fixed on the soil layer, the positioning sleeve 2 is detachably mounted on the base 1, and the plurality of pipe pile positioning members 3 are evenly arranged on the positioning sleeve 2. When installing the pipe pile, the center of the positioning sleeve 2 is aligned with the layout mark by a tape measure, the base 1 is fixed, and then the pipe pile is placed in the positioning sleeve 2. The pipe pile is positioned at the center of the positioning sleeve 2 by the pipe pile positioning members 3, thereby facilitating the alignment of the axis of the pipe pile with the position of the layout mark, improving the convenience of installing the pipe pile, and at the same time improving the installation position accuracy of the pipe pile.
[0022] In this embodiment, three pipe pile positioning members 3 are installed on the positioning sleeve 2 , and the three pipe pile positioning members 3 are evenly arranged on the positioning sleeve 2 , so that the axis of the pipe pile can be aligned with the axis of the positioning sleeve 2 through the three pipe pile positioning members 3 .
[0023] The pipe pile positioning member 3 includes a positioning block 3-1, a guide rod 3-2 and a positioning spring 3-3. The positioning block 3-1 is movably mounted on the positioning sleeve 2 through the guide rod 3-2. The positioning spring 3-3 is sleeved on the outside of the guide rod 3-2, and the two ends of the positioning spring 3-3 are respectively connected to the positioning sleeve 2 and the positioning block 3-1. The positioning spring 3-3 applies a positioning force to the positioning block 3-1, so that the pipe pile moves toward the center position of the positioning sleeve 2.
[0024] The parameters of the positioning springs 3 - 3 of the three pipe pile positioning members 3 are completely consistent, ensuring that when the pipe pile is located at the center of the positioning sleeve 2 , the three pipe pile positioning members 3 are in a force balance state.
[0025] A cushion block 3 - 4 is provided inside the positioning block 3 - 1 , that is, the positioning block 3 - 1 abuts against the pipe pile through the cushion block 3 - 4 to prevent the positioning block 3 - 1 from damaging the surface of the pipe pile.
[0026] The pad 3-4 is made of wood material, and the side of the pad 3-4 facing the pipe pile is arc-shaped to ensure that the pad 3-4 fits on the surface of the pipe pile. The pad 3-4 is fixed to the positioning block 3-1 by glue, which is convenient for replacing the pad 3-4.
[0027] The positioning block 3-1 is L-shaped, and a mounting nut 3-5 is fixed at the corner of the positioning block 3-1. The positioning block 3-1 is provided with a through hole at a position directly opposite to the screw hole of the mounting nut 3-5, so that the guide rod 3-2 can abut against the cushion block 3-4. The guide rod 3-2 and the mounting nut 3-5 are connected by threads, which makes it easy to remove the positioning block 3-1 from the guide rod 3-2, so as to separate the pipe pile positioning member 3 from the positioning sleeve 2, thereby facilitating the storage of the device.
[0028] A limit rod 3-6 is provided at the end of the guide rod 3-2, and the limit rod 3-6 is located on the outside of the positioning sleeve 2. When no pipe pile is placed in the positioning sleeve 2, the positioning block 3-1 is moved toward the center of the positioning sleeve 2 by the action of the positioning spring 3-3. The setting of the limit rod 3-6 prevents the guide rod 3-2 from separating from the positioning sleeve 2.
[0029] A connector 4 is mounted on the positioning sleeve 2, and the positioning sleeve 2 is detachably connected to the base 1 via the connector 4, so that the positioning sleeve 2 is easily separated from the base 1, thereby facilitating the storage of the device after disassembly.
[0030] The connecting member 4 is L-shaped, one side of the connecting member 4 is welded to the side wall of the positioning sleeve 2, and the other side of the connecting member 4 is mounted on the base 1 through a nut.
[0031] The base 1 includes a base plate 1-1 and a plug-in column 1-2, the plug-in column 1-2 is installed on the base plate 1-1, and the base plate 1-1 is fixed to the soil layer through the plug-in column 1-2. A through hole 1-3 is provided on the base plate 1-1, and the positioning sleeve 2 is coaxially arranged with the through hole 1-3. Preferably, the aperture of the through hole 1-3 is consistent with the inner diameter of the positioning sleeve 2.
[0032] In this embodiment, the base plate 1-1 is triangular in shape, and a plug-in column 1-2 is respectively installed on the three corners of the triangular base plate 1-1, so as to facilitate fixing the base plate 1-1 on the soil.
[0033] An adjusting nut 1-4 is installed on the base plate 1-1, and a section of external thread is provided on the top of the plug-in column 1-2, so that the plug-in column 1-2 is installed on the base plate 1-1 through the adjusting nut 1-4. During installation, the plug-in column 1-2 can be rotated to increase the depth of the plug-in column 1-2 inserted into the soil, thereby increasing the stability of the positioning device fixed on the soil.
[0034] A level meter 5 is installed on the base 1, and the level meter 5 is used to ensure that the base plate 1-1 is in a horizontal state, thereby ensuring that the positioning sleeve 2 is arranged in a vertical direction and ensuring that the pipe pile can be fixed on the soil in a vertical state.
[0035] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0036] Although this article uses more terms corresponding to the figure marks in the figures, it does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the utility model; interpreting them as any additional restrictions is contrary to the spirit of the utility model.
Claims
1. A positioning device for prestressed concrete pipe piles under soft soil conditions, characterized in that: The invention comprises a base (1), a positioning sleeve (2) and a plurality of pipe pile positioning members (3); the positioning sleeve (2) is detachably mounted on the base (1); the plurality of pipe pile positioning members (3) are evenly arranged on the positioning sleeve (2); and the pipe piles arranged in the positioning sleeve (2) are positioned by the pipe pile positioning members (3).
2. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 1, characterized in that: The pipe pile positioning member (3) comprises a positioning block (3-1), a guide rod (3-2) and a positioning spring (3-3); the positioning block (3-1) is movably mounted on the positioning sleeve (2) via the guide rod (3-2); the positioning spring (3-3) is respectively connected to the positioning sleeve (2) and the positioning block (3-1); and a positioning force is applied to the positioning block (3-1) via the positioning spring (3-3).
3. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 2, characterized in that: A cushion block (3-4) is provided on the inner side of the positioning block (3-1), and the positioning block (3-1) abuts against the pipe pile via the cushion block (3-4).
4. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 2, characterized in that: The positioning block (3-1) is provided with a mounting nut (3-5), and the guide rod (3-2) is connected to the mounting nut (3-5) via threads.
5. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 2, characterized in that: A limiting rod (3-6) is provided at the end of the guide rod (3-2), and the limiting rod (3-6) is located outside the positioning sleeve (2).
6. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 1, characterized in that: A connecting piece (4) is installed on the positioning sleeve (2), and the positioning sleeve (2) is detachably connected to the base (1) via the connecting piece (4).
7. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 1, characterized in that: The base (1) comprises a base plate (1-1) and a plug-in column (1-2), wherein the plug-in column (1-2) is mounted on the base plate (1-1), and the base plate (1-1) is fixed by the plug-in column (1-2).
8. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 7, characterized in that: The base plate (1-1) is provided with a through hole (1-3), and the positioning sleeve (2) is coaxially arranged with the through hole (1-3).
9. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 7, characterized in that: An adjusting nut (1-4) is installed on the base plate (1-1), and the plug-in column (1-2) is installed on the base plate (1-1) via the adjusting nut (1-4).
10. The positioning device for prestressed concrete pipe piles under soft soil conditions according to claim 1, characterized in that: A level (5) is mounted on the base (1).