Pot-type excavation reserved back pressure soil upper all-round scaffold erecting device

By using a combination of concrete cushion and fixtures in basin excavation construction, the problem of high difficulty and instability of scaffolding caused by backpressure soil slopes is solved, and a stable and accurate scaffolding foundation is provided to ensure that Safety and efficiency of construction.

CN222101383UActive Publication Date: 2024-12-03BEIJING URBAN CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420379145.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-12-03
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

In basin excavation construction, the existence of counter-pressure soil slopes has increased the difficulty of setting up a full-house scaffolding and unstable installation, and the existing technology is difficult to effectively solve this problem.

Method used

Using a combination of concrete cushion and fixing parts, the concrete cushion layer is poured on the outer surface of the backpressure soil slope, and the fixing parts and uprights are fixed and installed. The uprights are arranged vertically on the fixing parts to provide a stable foundation of the scaffolding, and The verticality of the vertical rod is ensured through the adjustment mechanism to ensure the stable installation of the scaffolding.

Benefits of technology

Through the combination of concrete cushion layer and vertical poles, the stable fixation and precise erection of scaffolding are provided, which reduces the difficulty of erection, improves the stability and safety of erection, and solves the problem of unstable erection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101383U_ABST
    Figure CN222101383U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of scaffold erecting devices, in particular to a basin type excavation reserved back pressure soil upper all-round scaffold erecting device which comprises a cushion layer, a fixing piece and a vertical rod, the cushion layer is a concrete layer and is used for being arranged on the outer surface of a back pressure soil slope, the fixing piece is fixedly arranged on the slope surface of the cushion layer, and the vertical rod is arranged on the slope surface of the cushion layer. The vertical rod is arranged on the side, away from the cushion layer, of the fixing piece in the vertical direction and used for being inserted into a steel pipe of the scaffold. The scaffold has the effect that the problems that the scaffold erecting difficulty is high, and erecting is not stable are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of scaffold erection devices, and in particular to a full-scale scaffold erection device for the upper part of a basin-type excavation reserved for counter-pressure soil. Background Art

[0002] Basin excavation is a deep foundation pit excavation method. During construction, the earth in the middle part of the foundation pit is excavated first, and then the excavated earth is reserved on the four sides around the foundation pit to form a back pressure soil slope. The back pressure of the back pressure soil is used to offset part of the earth pressure. Basin excavation can reduce the deformation of the retaining structure, reduce the impact on the surrounding environment, and improve the stability of the foundation pit structure.

[0003] Construction sites often use a method of erecting a full-height scaffolding on the counter-pressure soil as a retaining structure. However, the existence of the counter-pressure soil slope will form an inclined surface, which makes the scaffolding erection more difficult and unstable. Utility Model Content

[0004] In order to improve the problem of high difficulty and unstable erection of scaffolding, the present application provides a full-floor scaffolding erection device on the upper part of a basin-type excavation reserved for counter-pressure soil.

[0005] The present application provides a device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil, which adopts the following technical solution:

[0006] A device for erecting a full-floor scaffold on the upper part of a basin-type excavation reserved for counter-pressure soil comprises a cushion layer, fixings and uprights, wherein the cushion layer is a concrete layer, the cushion layer is used to be arranged on the outer surface of the counter-pressure soil slope, the fixings are fixed on the slope surface of the cushion layer, the uprights are vertically arranged on the side of the fixings away from the cushion layer, and the uprights are used to insert steel pipes of the scaffold.

[0007] By adopting the above technical scheme, during construction, a cushion layer is cast on the outer surface of the counter-pressure soil slope by concrete. According to the shape of the counter-pressure soil slope, the cushion layer will present a certain slope. The cushion layer made of concrete material has high strength as a base layer and can provide stable support. Then, the fixing parts are fixedly installed on the slope surface of the cushion layer, and finally, the vertical poles are fixedly installed vertically on the side of the fixing parts away from the cushion layer. The vertical poles serve as the basis for erecting scaffolds. During the erection of the scaffolds, it is only necessary to insert the vertical steel pipes of the scaffolds on the vertical poles to form a stable fixing effect on the bottom of the scaffolds, thereby improving the problems of high difficulty and unstable erection when erecting scaffolds on the counter-pressure soil slope.

[0008] Optionally, the fixing member includes a first side plate and a second side plate parallel to each other and a connecting plate vertically connected to the middle of the first side plate and the second side plate, the first side plate abuts against the slope surface of the cushion layer, an anchor rod is fixed on the first side plate, the anchor rod is used to anchor into the cushion layer and the back pressure soil at the same time, and the vertical pole is arranged on the second side plate.

[0009] By adopting the above technical solution, before casting and forming the cushion layer, the anchor rods fixed on the first side plate are pre-through the cushion layer and anchored into the counter-pressure soil. When the cushion layer is cast and formed, the counter-pressure soil, the cushion layer and the fixing parts will form a relatively stable whole under the joint action of concrete and the anchor rods. The structure is simple and the connection of the fixing parts is stable and reliable.

[0010] Optionally, the upright pole is fixed to the second side plate by welding.

[0011] By adopting the above technical solution, the vertical pole and the second side plate are welded and fixed, so that the vertical pole can form a permanent and firm connection with the fixing part, so that the vertical pole can provide a stable foundation for the scaffolding; and the welding production speed is fast and cost-effective.

[0012] Optionally, the vertical pole is rotatably connected to the second side plate via a rotating rod, the rotating rod is arranged in the transverse direction, the rotating rod is parallel to the second side plate, and the fixing member is provided with an adjusting mechanism for driving the rotating rod to rotate.

[0013] By adopting the above technical solution, the vertical angle of the upright pole can be adjusted by driving the rotating rod to rotate through the adjusting mechanism, so that the verticality of the upright pole can be more accurate, thereby making the erection of the scaffolding more stable and standard.

[0014] Optionally, the adjustment mechanism includes a gear, a slider, a rack and a drive assembly, the gear is coaxially connected to the rotating rod, the slider is slidably connected to the fixing member along the length direction of the second side plate, the rack is provided on the slider and extends along the length direction of the second side plate, the rack is meshed with the gear, and the drive assembly is used to drive the slider to move.

[0015] By adopting the above technical solution, the driving component drives the slider to move, drives the rack to move, drives the gear to rotate, and thus synchronously drives the rotating rod to rotate; the coordinated arrangement of the gear, the rack and the driving component makes it possible to synchronously drive multiple vertical poles to rotate around the rotating rod by driving the slider to move, which has a simple structure and is easy to use.

[0016] Optionally, the driving assembly includes a screw and a power component, the screw is rotatably connected to the fixing member, the screw passes through the slider along the length direction of the second side plate and is threadedly connected to the slider, and the power component is used to drive the screw to rotate.

[0017] By adopting the above technical solution, the power component drives the screw rod to rotate, so that the slider has a tendency to rotate with the screw rod. Since the slider can only be slidably connected to the fixing member along the length direction of the second side plate, the slider can be driven to slide along the length direction of the second side plate by rotating the screw rod, thereby meeting the functional requirements of the driving component to drive the slider to move. Moreover, since the screw rod is threadedly connected to the slider, the movement of the slider is smoother and more stable.

[0018] Optionally, the power component includes a worm wheel and a worm, the worm wheel is coaxially connected to the lead screw, the worm is rotatably connected to a fixed member, and the worm is meshed with the worm wheel.

[0019] By adopting the above technical solution, rotating the worm can drive the worm wheel to rotate, thereby driving the lead screw to rotate, with a simple structure and easy use. Due to the transmission characteristics of the worm wheel and the worm, only the worm can drive the worm wheel, and the worm wheel cannot drive the worm, so that the worm wheel and the worm have self-locking properties, and the power component also has a locking function, so that the angle adjustment of the vertical pole is more accurate and stable.

[0020] Optionally, a level bubble meter is provided on the vertical pole.

[0021] By adopting the above technical solution, the setting of the horizontal bubble meter can more intuitively observe the vertical state of the pole, further ensure the verticality of the pole, and has a simple structure and is easy to use.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. The cushion layer is cast with concrete, which can provide a high-strength foundation for erection. The fixings are fixed on the cushion layer to provide an installation foundation for the vertical poles, which are arranged vertically on the fixings. When erecting the scaffold, the vertical steel pipes of the scaffold can be directly sleeved on the vertical poles. The vertical poles can provide accurate positioning and fixation for the scaffold steel pipes, which improves the problem of high difficulty and instability in erecting the scaffold on the back pressure soil slope.

[0024] 2. The coordinated setting of the rotating rod and the adjusting mechanism enables the angle of the vertical pole to be adjusted, so that the verticality of the vertical pole can be more accurate, ensuring that the erection of the scaffolding is more stable and reliable;

[0025] 3. The arrangement of the worm wheel and the worm screw allows the worm wheel to rotate by driving the worm screw to rotate, thereby driving the lead screw to rotate. The structure is simple, practical and convenient. Moreover, due to the self-locking property of the worm wheel and the worm screw, the lead screw can be locked when the worm screw is not rotated, thereby ensuring the stability of the vertical pole. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 It is a schematic diagram of the overall structure of Example 1 of the present application;

[0028] Figure 2 is a schematic cross-sectional structural diagram of Example 1 of the present application;

[0029] Figure 3 It is a schematic diagram of the overall structure of Example 2 of the present application.

[0030] Figure numerals: 1. cushion layer; 11. slope; 2. fixing part; 21. first side plate; 22. second side plate; 221. support block; 23. connecting plate; 231. mounting block; 3. vertical pole; 31. rotating rod; 32. level bubble meter; 4. back pressure soil; 5. anchor rod; 6. adjustment mechanism; 61. slider; 62. rack; 63. gear; 64. screw; 65. worm gear; 66. worm; 67. handwheel. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-3 This application is described in further detail.

[0032] Embodiment 1:

[0033] The present application embodiment discloses a device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil. Figure 1 The apparatus for erecting a full-floor scaffold on the upper part of the reserved counter-pressure soil in a basin-type excavation includes a cushion layer 1, a fixing part 2 and a vertical pole 3. The cushion layer 1 is arranged on the outer surface of the counter-pressure soil 4, and the cushion layer 1 is cast by concrete. The cushion layer 1 also presents a slope surface 11 due to the slope of the counter-pressure soil 4. The cushion layer 1 cast by concrete is used as a base layer, which has higher strength and is used to provide stable support for the upper structure.

[0034] The fixing member 2 is made of I-beam, which includes a first side plate 21 and a second side plate 22 which are parallel to each other, and a connecting plate 23 which is vertically welded and fixed to the middle of the first side plate 21 and the second side plate 22. The side of the first side plate 21 which is away from the second side plate 22 is tightly attached to the slope 11 of the cushion layer 1. The fixing member 2 extends along the inclined direction of the slope 11. A plurality of fixing members 2 are arranged at intervals along the lateral direction. The spacing of the fixing members 2 is determined according to the lateral spacing specifications of the steel pipes for the scaffolding to be erected.

[0035] Reference Figure 2, the side of the first side plate 21 away from the second side plate 22 is welded and fixed with anchor rods 5 at intervals along the length direction of the fixing member 2, and the anchor rods 5 are perpendicular to the first side plate 21. Before casting the cushion layer 1, the end of the anchor rod 5 away from the fixing member 2 is passed through the cushion layer 1 and anchored into the counterpressure soil 4, and then the concrete cushion layer 1 is cast through the formwork. After the cushion layer 1 is formed, the fixing member 2 is stably connected to the cushion layer 1 through the connection of the anchor rods 5. The vertical pole 3 is welded and fixed to the side of the second side plate 22 away from the first side plate 21, and multiple vertical poles 3 are arranged at intervals along the length direction of the fixing member 2.

[0036] The implementation principle of the full-floor scaffolding erection device for the upper part of the reserved counter-pressure soil in the basin excavation of the embodiment of the present application is as follows: during construction, the anchor rod 5 on the fixing part 2 is first pre-anchored into the counter-pressure soil 4, and then the concrete cushion layer 1 is cast through the formwork. After the cushion layer 1 reaches the required strength, the fixing part 2 can be stably connected to the cushion layer 1, and the counter-pressure soil 4, the cushion layer 1 and the fixing part 2 are connected through the concrete cushion layer 1 to form a whole with high strength, and then the vertical pole 3 is welded and fixed to the fixing part 2 along the vertical direction. When erecting the scaffold on the slope 11, it is only necessary to insert the vertical steel pipe of the scaffold on the vertical pole 3 to form a stable fixing effect on the bottom of the scaffold, which improves the problem of high erection difficulty and unstable erection when erecting the scaffold on the slope 11 of the counter-pressure soil 4.

[0037] Embodiment 2:

[0038] The embodiment of the present application discloses a device for erecting a full-floor scaffolding on the upper part of a pot-type excavation reserved for counter-pressure soil. The difference between the embodiment 2 of the present application and the embodiment 1 of the present application is that the connection method between the vertical pole 3 and the second side plate 22 is different. Figure 3 A rotating rod 31 is vertically welded and fixed at one end of the vertical pole 3. The rotating rod 31 is parallel to the plane where the second side plate 22 is located, and the rotating rod 31 is horizontally arranged. The rotating rod 31 is rotatably connected to the side of the second side plate 22 away from the first side plate 21 through two support blocks 221. The fixing member 2 is provided with an adjustment mechanism 6 for driving the rotating rod 31 to rotate. By driving the rotating rod 31 to rotate through the adjustment mechanism 6, the angle of the vertical pole 3 can be adjusted, thereby ensuring that the vertical pole 3 can maintain a relatively accurate verticality, thereby making the erection of the scaffold more stable and reliable. In addition, in order to more intuitively ensure the verticality of the vertical pole 3, a miniature horizontal bubble meter 32 is embedded on the vertical pole 3.

[0039] The adjustment mechanism 6 includes a slider 61, a rack 62, a gear 63 and a driving assembly. Two cavities separated by the connecting plate 23 are formed between the first side plate 21, the second side plate 22 and the connecting plate 23. The slider 61 is slidably clamped in one of the cavities, and the slider 61 slides along the length direction of the fixing member 2. The rack 62 is integrally formed on the side of the slider 61 away from the first side plate 21, and the rack 62 extends along the length direction of the fixing member 2. The gear 63 is coaxially fixedly connected to the rotating rod 31, and the gear 63 is meshed with the rack 62. The driving assembly is arranged on the fixing member 2, and is used to drive the slider 61 to slide. When in use, the rack 62 is driven to slide by the driving assembly, which can drive the gear 63 to rotate, thereby swinging and adjusting the angle of the upright pole 3, and finally ensuring that the upright pole 3 can be more accurately vertical, thereby improving the stability and accuracy of the scaffolding erection.

[0040] The driving assembly includes a screw rod 64 and a power component. Both ends of the connecting plate 23 in the length direction are welded and fixed with mounting blocks 231. The screw rod 64 is rotatably connected to the two mounting blocks 231. The screw rod 64 passes through the slider 61 along the length direction of the connecting plate 23 and is threadedly connected to the slider 61. The power component is installed on the fixing member 2 to drive the screw rod 64 to rotate. When in use, the screw rod 64 is driven to rotate by the power component, so that the slider 61 has a tendency to rotate with the screw rod 64. However, since the slider 61 is stuck in the chamber formed by the first side plate 21, the second side plate 22 and the connecting plate 23 and cannot rotate, the rotation of the screw rod 64 can drive the slider 61 to slide along the length direction of the connecting plate 23. The threaded connection between the screw rod 64 and the slider 61 also makes the slider 61 move more smoothly, improving the stability and safety of the overall structure.

[0041] The power component includes a worm wheel 65, a worm 66 and a hand wheel 67. The worm wheel 65 is coaxially welded and fixed on the screw 64. The worm 66 is rotatably connected to the connecting plate 23. The worm 66 meshes with the worm wheel 65. The hand wheel 67 is coaxially welded and fixed on the worm 66. By manually rotating the hand wheel 67, the worm 66 can be driven to rotate, and the worm wheel 65 can be driven to rotate, thereby driving the screw 64 to rotate, meeting the functional requirements of the power component to drive the screw 64 to rotate; and through the self-locking characteristics of the worm wheel 65 and the worm 66, when the hand wheel 67 is no longer rotated, the worm wheel 65 cannot drive the worm 66 to rotate, and the screw 64 can be locked, thereby locking the angle of the vertical pole 3. The power component also has a locking function, killing two birds with one stone, with a simple structure and convenient use.

[0042] The implementation principle of the full-floor scaffolding erection device for the upper part of the reserved counter-pressure soil for basin-type excavation in the embodiment of the present application is: when in use, the worm 66 is driven to rotate by rotating the hand wheel 67, which drives the worm wheel 65 to rotate, drives the screw 64 to rotate, thereby driving the slider 61 to move, drives the rack 62 to move, drives the gear 63 to rotate, and then adjusts the swing angle of the vertical pole 3 to ensure that the vertical pole 3 can maintain a vertical state more accurately, thereby achieving better positioning and supporting effects on the erection of the scaffolding, and having strong practicality.

[0043] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A device for erecting a full-floor scaffold on the upper part of a basin-type excavation reserved for counter-pressure soil, characterized in that: The invention comprises a cushion layer (1), a fixing member (2) and a vertical pole (3), wherein the cushion layer (1) is a concrete layer, the cushion layer (1) is used to be arranged on the outer surface of a slope of a counter-pressure soil (4), the fixing member (2) is fixed on the slope surface (11) of the cushion layer (1), the vertical pole (3) is arranged on a side of the fixing member (2) away from the cushion layer (1) in the vertical direction, and the vertical pole (3) is used to insert a steel pipe of a scaffold; The fixing member (2) comprises a first side plate (21) and a second side plate (22) which are parallel to each other, and a connecting plate (23) which is vertically connected to the middle of the first side plate (21) and the second side plate (22); the first side plate (21) abuts against the slope surface (11) of the cushion layer (1); an anchor rod (5) is fixedly provided on the first side plate (21); the anchor rod (5) is used to be anchored into the cushion layer (1) and the counterpressure soil (4) at the same time; and the vertical rod (3) is arranged on the second side plate (22).

2. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 1 is characterized in that: The upright pole (3) is fixed to the second side plate (22) by welding.

3. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 1 is characterized in that: The vertical rod (3) is rotatably connected to the second side plate (22) via a rotating rod (31); the rotating rod (31) is arranged in a transverse direction and is parallel to the second side plate (22); and the fixing member (2) is provided with an adjusting mechanism (6) for driving the rotating rod (31) to rotate.

4. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 3 is characterized in that: The adjusting mechanism (6) comprises a gear (63), a slider (61), a rack (62) and a driving assembly, wherein the gear (63) is coaxially connected to the rotating rod (31), the slider (61) is slidably connected to the fixing member (2) along the length direction of the second side plate (22), the rack (62) is arranged on the slider (61) and extends along the length direction of the second side plate (22), the rack (62) is meshed with the gear (63), and the driving assembly is used to drive the slider (61) to move.

5. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 4 is characterized in that: The drive assembly comprises a screw rod (64) and a power component, wherein the screw rod (64) is rotatably connected to the fixing member (2), the screw rod (64) passes through the slider (61) along the length direction of the second side plate (22) and is threadedly connected to the slider (61), and the power component is used to drive the screw rod (64) to rotate.

6. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 5, characterized in that: The power component comprises a worm wheel (65) and a worm (66); the worm wheel (65) is coaxially connected to the screw (64); the worm (66) is rotatably connected to the fixing member (2); and the worm (66) is meshed with the worm wheel (65).

7. The device for erecting a full-floor scaffolding on the upper part of a basin-type excavation reserved for counter-pressure soil according to claim 1 is characterized in that: The vertical pole (3) is provided with a horizontal bubble meter (32).