Protective device for construction of gantry crane of pipe-jacking foundation pit
By designing a protective device for the construction of the top pipe foundation pit gantry crane, the design of automatic adjustment of rain cloth has been solved, and the problem of difficult to quickly erect protective measures in bad weather has been improved, construction efficiency and safety have been improved, and manpower and space have been saved.
Patent Information
- Application Number
- CN202420671913.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-03
AI Technical Summary
In water conservancy and hydropower construction, when rainwater and high temperatures are encountered during the construction of the pipe top foundation pit, protective measures are difficult to quickly be set up, and personnel operations are complicated, manpower is wasted, and construction safety and efficiency cannot be effectively guaranteed.
A protective device for the construction of a top pipe foundation pit gantry crane is designed, including components such as cross rods, vertical rods, oblique support chutes, motor boxes, transmission rods, rain cloths and hollow slide rails that are arranged at intervals. The rain cloths are automatically driven by the motor. Adjusting the width and angle simplifies the installation and storage process of the protective device.
The device improves protection efficiency in bad weather, reduces reaction time, reduces construction costs, saves space, and allows single-person operation, greatly improving construction efficiency and safety.
Smart Images

Figure CN222101566U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of protective devices for water conservancy and hydropower construction, in particular to a protective device for gantry crane construction of a jacking pipe foundation pit. Background Art
[0002] At present, in water conservancy and hydropower construction, outdoor jacking pit construction has problems such as large openings, deep pits, and complicated and heavy construction equipment above the pits that is difficult to move. When encountering severe weather such as rain and high temperature during the construction process, construction workers need to prepare protective equipment in advance. The temporary assembled protective equipment is difficult to set up and has slow response and high degree of danger in erection, which increases the construction safety cost and wastes manpower and material resources.
[0003] The main problems of the prior art are: 1) When the pipe jacking pit encounters rainy weather, especially sudden rain weather, the waterproof measures cannot be quickly set up and completed; 2) When encountering high temperature and high sunshine weather, the working surface inside and outside the pipe jacking pit and the construction personnel cannot get the proper sun protection; 3) When arranging the protection equipment of the pipe jacking pit, the coverage range and height difference of the rain cloth are large, and the arrangement of the equipment below the coverage range is complicated, which cannot guarantee the safe operating environment of the protection equipment; 4) When the construction workers manually arrange the rainproof equipment, multiple people are needed to operate, which takes up manpower and wastes manpower. Therefore, how to make a protective device for the gantry crane construction of the pipe jacking pit that can solve the problems of the prior art becomes a technical problem to be solved. Utility Model Content
[0004] The utility model is based on the above technical problems and proposes a protective device for gantry crane construction of pipe jacking pit to solve the problem that the pipe jacking pit cannot be conveniently protected during extreme weather such as precipitation and high temperature.
[0005] In view of this, the utility model proposes a protective device for the construction of a gantry crane for a jacking pipe foundation pit, which comprises: two groups of cross bars arranged at intervals, vertical poles arranged on the cross bars, slide grooves with oblique braces are respectively arranged between the cross bars and the two sides of the vertical poles, a storage box is arranged between the tops of the two groups of vertical poles, a motor box is arranged in the storage box, transmission rods are respectively meshed on both sides of the output end of the motor box, a tarpaulin is arranged on the transmission rod, a hollow slide rail is hingedly arranged on the upper part of the vertical pole, a support rod is slidably arranged between the slide groove and the hollow slide rail, a skeleton rod is slidably arranged between the corresponding two groups of hollow slide rails, and the other end of the tarpaulin is arranged on the skeleton rod.
[0006] Furthermore, the slide groove and the hollow slide rail are respectively provided with a clamping groove.
[0007] Furthermore, the slide groove and the hollow slide rail are respectively provided with scales.
[0008] Furthermore, pulleys are respectively provided at both ends of the skeleton rod, and the skeleton rod slides in the hollow slide rail via the pulleys.
[0009] Furthermore, the cross bar, the vertical bar, the slide groove and the storage box form a triangular support structure of the gantry crane.
[0010] Furthermore, wheels are respectively arranged at both ends of the crossbar.
[0011] Furthermore, the hollow slide rail, the skeleton rod, the support rod, the slide groove and the transmission rod are made of light steel.
[0012] The utility model proposes a protective device for gantry crane construction of jacking foundation pit. Compared with the prior art, the utility model has the following advantages:
[0013] 1. This device is combined with a gantry crane and an additional rainproof cloth attached to an adjustable rod driven by a motor to realize automatic storage of the device, and the appropriate opening width and angle of the rainproof cloth can be adjusted according to the size of the jacking pit;
[0014] 2. The use of this device reduces rain damage and high temperature exposure during the construction of the jacking foundation pit, reduces the response time of the response measures, and improves the efficiency of emergency protection in severe weather;
[0015] 3. The low efficiency and poor safety of manual extreme weather protection in complex pipe jacking pit construction work surfaces have been effectively improved;
[0016] 4. The use of this device effectively saves construction space and has the advantages of low modification cost, convenient and fast operation, and reusability;
[0017] 5. Construction workers can perform single-person operation, which greatly improves the reaction speed and protection strength, and increases the effective working time for pipe jacking pit construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 Shows a three-dimensional view of the utility model in an expanded state;
[0019] Figure 2 Shows a three-dimensional view of the closed state of the utility model;
[0020] Figure 3 A top view of the closed state of the utility model is shown;
[0021] Figure 4 The schematic diagram of the structure of the rain cloth of the utility model is shown;
[0022] Figure 5 A schematic diagram of the hollow slide rail structure of the utility model is shown;
[0023] In the figure: 1 motor box, 2 rain cloth, 3 storage box, 4 hollow slide rail, 5 skeleton rod, 6 support rod, 7 slide groove, 8 wheel, 9 transmission rod, 10 pulley. DETAILED DESCRIPTION
[0024] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0025] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the contents disclosed below.
[0026] The following combination Figures 1 to 5 The technical solution of the utility model is further explained.
[0027] The first embodiment, as Figures 1 to 5 As shown: a protective device for the construction of a gantry crane for a jacking pipe foundation pit, comprising: two groups of cross bars arranged at intervals, vertical poles arranged on the cross bars, diagonal slide grooves 7 are respectively arranged between the cross bars and the two sides of the vertical poles, a storage box 3 is arranged between the tops of the two groups of vertical poles, a motor box 1 is arranged in the storage box 3, transmission rods 9 are respectively meshed on both sides of the output end of the motor box 1, a tarpaulin 2 is arranged on the transmission rod 9, a hollow slide rail 4 is hingedly arranged on the upper part of the vertical pole, a support rod 6 is slidably arranged between the slide groove 7 and the hollow slide rail 4, a skeleton rod 5 is slidably arranged between the corresponding two groups of hollow slide rails 4, and the other end of the tarpaulin 2 is arranged on the skeleton rod 5.
[0028] The slide groove 7 and the hollow slide rail 4 are respectively provided with a clamping groove for limiting. The slide groove 7 and the hollow slide rail 4 are respectively provided with a scale for reading. Pulleys 10 are respectively provided at both ends of the skeleton rod 5, and the skeleton rod 5 slides in the hollow slide rail 4 through the pulleys 10.
[0029] The crossbar, the vertical bar, the slide 7 and the storage box 3 form a triangular support structure of the gantry crane. Wheels 8 for movement are respectively provided at both ends of the crossbar. The hollow slide rail 4, the skeleton rod 5, the support rod 6, the slide 7 and the transmission rod 9 are made of light steel.
[0030] During use: the construction personnel first lift the hollow slide rail 4, which is unfolded outward by the gantry crane triangular support structure, and slide the support rod 6 to the end of the hollow slide rail 4, so that a stable supporting state is established between the support rod 6, the hollow slide rail 4 and the slot of the gantry crane triangular support structure; according to this step, open the other three support rods 6 one by one, and make the opening angles of the four hollow slide rails 4 consistent; turn on the tarpaulin 2 to store the motor, and the tarpaulin 2 will be opened after the skeleton rod 5 is released and slides to the end of the hollow slide rail 4, and the length and opening angle of the tarpaulin 2 can be adjusted according to the needs of use; the reverse operation can be performed when storing.
[0031] The utility model is suitable for ensuring the arrangement of protective measures for the jacking working pit in response to precipitation and high temperature weather. When precipitation and high temperature weather are encountered during the daily construction of the outdoor jacking working pit, since there are usually large and complex gantry hoists and some other equipment supporting the construction in the pit above the jacking foundation pit during construction, it becomes an obstacle to the protection of the working pit during sudden rainfall and high temperature construction in summer. The use of the utility model not only reduces the damage caused by rain and high temperature exposure during the construction of the jacking foundation pit, but also reduces the reaction time of the response measures, improves the efficiency of emergency protection in severe weather, and the equipment effectively saves construction space, and increases the effective working time for the jacking foundation pit construction.
[0032] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A protective device for gantry crane construction of pipe jacking foundation pit, characterized in that: It comprises two groups of cross bars arranged at intervals, vertical bars arranged on the cross bars, obliquely supported slide grooves are respectively arranged between the cross bars and the two sides of the vertical bars, a storage box is arranged between the tops of the two groups of vertical bars, a motor box is arranged in the storage box, transmission rods are respectively meshed on both sides of the output end of the motor box, a tarpaulin is arranged on the transmission rod, a hollow slide rail is hingedly arranged on the upper part of the vertical bar, a support rod is slidably arranged between the slide groove and the hollow slide rail, a skeleton rod is slidably arranged between the two corresponding groups of hollow slide rails, and the other end of the tarpaulin is arranged on the skeleton rod.
2. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 1 is characterized in that: The slide groove and the hollow slide rail are respectively provided with clamping grooves.
3. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 2 is characterized in that: The slide groove and the hollow slide rail are respectively provided with scales.
4. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 3 is characterized in that: Pulleys are respectively arranged at both ends of the skeleton rod, and the skeleton rod slides in the hollow slide rail via the pulleys.
5. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 4 is characterized in that: The cross bar, the vertical bar, the slide groove and the storage box form a triangular support structure of the gantry crane.
6. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 5, characterized in that: Wheels are respectively arranged at both ends of the crossbar.
7. The protective device for gantry crane construction of pipe jacking foundation pit according to claim 6, characterized in that: The hollow slide rail, the skeleton rod, the support rod, the slide groove and the transmission rod are made of light steel.