Reinforcing structure for preventing key part of building floor from cracking

By setting up primary reinforcement steel bars and secondary reinforcement structures near the side walls of the frame columns, the cracks caused by frame column deformation are solved, the ground support strength and construction quality are improved, and the cracks are prevented.

CN222101584UActive Publication Date: 2024-12-03SHAANXI CONSTR ENG NO 2 CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420695641.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-12-03
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

During construction, the crack problems caused by uneven deformation of structural frame columns and deformation joints on the floor affect the overall appearance and use effect of the floor.

Method used

A primary reinforcement steel bar is installed near the side wall of the frame column, and a secondary reinforcement structure is set up, including straight sections and cantilever sections connected to the frame column, forming a diamond-shaped integrated structure to increase the strength of the ground support and overcome the impact of Crack problems caused by uneven force.

Benefits of technology

By increasing the ground support strength, cracks in key parts of the building floor are effectively prevented, and the construction quality and overall structure stability are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101584U_ABST
    Figure CN222101584U_ABST
Patent Text Reader

Abstract

The utility model discloses a reinforcing structure for preventing a key part of a building floor from cracking, the key part of the building floor is a frame column, and embedded steel bars are bound on the peripheral side of the frame column. The reinforcing structure is a primary reinforcing steel bar arranged at the position, close to the side wall of the frame column, of the embedded steel bar, and a secondary reinforcing structure connected with the frame column is further arranged on the primary reinforcing steel bar. The reinforcing structure is a primary reinforcing steel bar arranged at the position, close to the side wall of the frame column, of the embedded steel bar, and the ground supporting strength of the connecting position of the secondary construction ground and the frame column is improved by arranging the primary reinforcing steel bar, so that the problem that cracks are easily caused due to uneven and insufficient stress of the ground at the position of the frame column is solved. And the secondary reinforcing structure is arranged, and the frame column body is used for supporting the secondary construction ground and the position close to the frame column, so that the problem that the joint of the secondary construction ground and the frame column is prone to cracking due to external force is further solved, and the construction quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of cracks in key parts of floors during construction, and in particular to a reinforcement structure for preventing cracks in key parts of floors. Background Art

[0002] Wear-resistant concrete floors are currently widely used, and the existing construction technology has been basically perfected. There is a certain quality control over the flatness, thickness, color, etc. of the floors. However, in large-area floor construction, with the passage of time, changes in the settlement of the main structure and the influence of environmental factors, the floors gradually reveal cracks of different levels, especially around the structural frame columns and expansion joints, where the cracks are most serious, affecting the overall appearance and use of the floors.

[0003] According to the staged inspection of the completed floor sub-projects, the main locations of floor cracks are around the structural frame columns and deformation joints. The reasons for the cracks in the two locations prone to quality problems are as follows:

[0004] 1. Structural frame column position

[0005] During the floor concrete construction, the steel mesh is tied according to the design requirements before the floor concrete is poured. For the structural frame column, its force characteristics and structural transformation laws are analyzed. The positive corner of the frame column bears different forces from the surrounding lower part, which is prone to deformation, resulting in cracks after the floor construction. The cracks extend from the positive corner of the frame column to the outside.

[0006] 2. Construction joint location

[0007] According to the design specifications, construction joints are required for cast-in-place frame structures with a length exceeding 55m, and post-cast strips are set at intervals of 30-40m. The width of the post-cast strips is generally 0.8-1m. After the main structure construction is completed, the post-cast strip concrete is poured. During the decoration and renovation floor construction stage, the floor at the construction joint (post-cast strip) often causes cracks in the upper floor due to inconsistent structural deformation on both sides of the post-cast strip. Summary of the invention

[0008] In response to the above-mentioned problems, the present application aims to provide a reinforcement structure for preventing cracks in key parts of the floor, which is a primary reinforcement steel bar arranged at the position of the embedded steel bar near the side wall of the frame column. By setting the primary reinforcement steel bar, the ground support strength at the junction of the secondary construction ground and the frame column is increased, thereby overcoming the problem of uneven and insufficient ground force at the frame column, which easily leads to cracks.

[0009] In order to achieve the above-mentioned purpose, the technical solution adopted in this application is as follows: a reinforcement structure for preventing cracks in key parts of the floor, wherein the key parts of the floor are frame columns, and embedded steel bars are tied around the frame columns. It is characterized in that: the reinforcement structure is a primary reinforcement steel bar arranged at a position where the embedded steel bars are close to the side walls of the frame columns, and a secondary reinforcement structure connected to the frame columns is also arranged on the primary reinforcement steel bar.

[0010] Preferably, the primary reinforcing steel bars are arranged on the embedded steel bars in parallel at an outward spacing from the corners of the frame columns, and the primary reinforcing steel bars form a diamond-shaped integrated structure as a whole.

[0011] Preferably, the secondary reinforcement structure is a secondary reinforcement steel bar that connects the primary reinforcement steel bar to the frame column along the circumferential direction and from the bottom side thereof.

[0012] Preferably, the secondary reinforcing steel bar includes a straight section connected to the primary reinforcing steel bar, and a cantilevered section that is concave downward and connected to the frame column.

[0013] The beneficial effect of the present application is that the reinforcement structure is a primary reinforcement steel bar arranged at a position of the embedded steel bar near the side wall of the frame column. By arranging the primary reinforcement steel bar, the ground support strength at the junction of the secondary construction ground and the frame column is increased, thereby overcoming the problem of uneven and insufficient ground force at the frame column that easily leads to cracks.

[0014] By setting up a secondary reinforcement structure, the frame column body is used to support the secondary construction ground near the frame column, thereby further overcoming the problem of cracks that are easily caused by external forces at the junction of the secondary construction ground and the frame column, thereby improving the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a top-down structural diagram of the current frame columns and embedded steel bars.

[0016] Figure 2 Illustration of the primary reinforcement setting and frame column position for this application.

[0017] Figure 3 This is a diagram of the primary reinforcement and embedded steel bar structure for this application.

[0018] Figure 4 This is a diagram showing the overall structural setting of the primary and secondary reinforcement bars for this application.

[0019] Figure 5 This is a side view structural diagram of the connection between the secondary reinforcement steel bars and the frame columns for this application. DETAILED DESCRIPTION

[0020] In order to enable ordinary technicians in the field to better understand the technical solution of the present application, the technical solution of the present application is further described below in conjunction with the accompanying drawings and embodiments.

[0021] Refer to the attached Figures 1 to 5 A reinforcement structure for preventing cracks in key parts of a floor is shown, wherein the key part of the floor is a frame column 1 (the present embodiment is illustrated using the frame column 1, and it can also be applied to the construction joint position in actual construction). Pre-embedded steel bars 2 are tied around the frame column 1. Usually, before pouring, the frame column 1 is also a frame-type steel bar structure, which is tied and formed as a whole with the pre-embedded steel bars 2 on the ground, and the ground and the frame column 1 are uniformly formed during pouring.

[0022] At present, when the ground is reconstructed in the future, in order to avoid the ground exceeding the design height due to operations such as setting up wear-resistant concrete floors or ground decoration and beautification, the pre-cast ground is usually lower than the design ground height, and subsequent operations such as wear-resistant concrete floors are carried out to reach the design ground height.

[0023] In order to solve the problem that the frame column 1 is easily deformed after the second floor construction (the entire floor construction is completed), which leads to cracks after the floor construction, the present application sets a reinforcement structure during the second floor construction to solve the crack problem. Figure 2-3 As shown, the reinforcement structure is a primary reinforcement steel bar 3 arranged at the position of the embedded steel bar 2 near the side wall of the frame column 1. By setting the primary reinforcement steel bar 3 (preferably with a specification of φ8mm), the ground support strength at the junction of the secondary construction ground and the frame column 1 is increased, thereby overcoming the problem of uneven and insufficient ground force at the frame column 1, which is easy to cause cracks.

[0024] In order to further improve the anti-crack effect, a secondary reinforcement structure connected to the frame column 1 is also arranged on the primary reinforcement steel bar 3. It uses the frame column 1 body to support the secondary construction ground and close to the frame column 1, thereby further overcoming the crack problem that is prone to occur at the junction of the secondary construction ground and the frame column 1 due to external force, thereby improving the construction quality.

[0025] Specifically, Figure 2-3As shown, the primary reinforcing steel bar 3 is arranged on the embedded steel bar 2 in parallel with the outward spacing from the corner of the frame column 1, and the primary reinforcing steel bar 3 forms a diamond-shaped integrated structure as a whole. Usually, when the secondary ground is constructed, the primary ground has been formed, and the embedded steel bar 2 has been embedded, so the embedded steel bar 2 is arranged on the top side of the primary ground and forms an angle with the embedded steel bar 2, so as to complement the strength support structure of the ground near the frame column 1 as a whole (that is, staggered along the circumferential direction), improve the body strength of the entire ground after the secondary ground construction is completed (the primary ground is usually processed into a rough surface during the secondary ground construction to improve the integration of the secondary ground and the primary ground casting), and the reinforcing steel bar 3 of the diamond-shaped integrated structure is used to resist the strength of the ground due to external force torsion, so as to resist and solve the problem of easy cracks at the frame column 1.

[0026] Preferably, the distance between the inner primary reinforcing steel bar 3 and the positive angle of the frame column 1 is controlled at 100 mm, the spacing between the three φ8 reinforcing steel bars is controlled at 50 mm, and the primary reinforcing steel bar 3 and the steel mesh laid by the secondary construction on the ground are tied and connected by wire.

[0027] Specifically, Figure 4 As shown, the secondary reinforcement structure is a secondary reinforcement steel bar 4 that connects the primary reinforcement steel bar 3 to the frame column 1 along the circumferential direction and from its bottom side. The secondary reinforcement steel bar 4 is preferably tied in the reinforcement frame of the frame column 1 and pre-embedded when the primary ground and the frame column 1 are integrally constructed, and extends out of the frame column 1. When the secondary ground is poured later, the primary reinforcement steel bar 3 is connected to the secondary reinforcement steel bar 4 at intervals (such as Figure 4 As shown), the secondary ground is then cast and formed. After forming, the secondary cast ground and the frame column 1 are connected as a whole through the secondary reinforcing steel bars 4. The secondary cast ground is supported again with the help of the frame column 1, thereby further resisting the problem of cracks that are easy to exist between the secondary cast ground and the frame column 1.

[0028] In order to further improve the supporting strength of frame column 1 to the secondary pouring ground, Figure 5 As shown, preferably, the secondary reinforcing steel bar 4 includes a straight section 41 connected to the primary reinforcing steel bar 3, and a cantilever section 42 that is concave downward and connected to the frame column 1. By providing the cantilever section 42 with an arc structure, after the secondary pouring ground is subjected to force, the bending resistance of the secondary reinforcing steel bar 4 can be effectively improved compared with the reinforcing steel bar with a straight structure, thereby further improving the supporting effect and crack prevention ability of the secondary pouring ground achieved through the frame column 1.

[0029] The principle of this application is: when carrying out secondary ground construction, the primary reinforcing steel bars 3 are connected to the secondary reinforcing steel bars 4 that have been embedded and extended from the frame column 1 with a diamond-shaped integrated structure spacing, and then the secondary ground is cast and formed. After forming, the secondary cast ground and the frame column 1 are connected as a whole through the secondary reinforcing steel bars 4, and the secondary cast ground is supported again with the help of the frame column 1, so as to further resist the problem of cracks that are easy to exist between the secondary cast ground and the frame column 1.

[0030] The above shows and describes the basic principles, main features and advantages of the present application. Without departing from the spirit and scope of the present application, the present application may have various changes and improvements, which fall within the scope of the present application to be protected.

Claims

1. A reinforcement structure for preventing cracks in key parts of a floor, wherein the key parts of the floor are frame columns (1), and embedded steel bars (2) are tied around the frame columns (1), characterized in that: The reinforcement structure is a primary reinforcement steel bar (3) arranged at a position of the embedded steel bar (2) close to the side wall of the frame column (1), and a secondary reinforcement structure connected to the frame column (1) is also arranged on the primary reinforcement steel bar (3).

2. The reinforcement structure according to claim 1, characterized in that: The primary reinforcing steel bars (3) are arranged in parallel on the embedded steel bars (2) at an outward spacing from the corners of the frame column (1), and the primary reinforcing steel bars (3) form a diamond-shaped integrated structure as a whole.

3. The reinforcement structure according to claim 2, characterized in that: The secondary reinforcement structure is a secondary reinforcement steel bar (4) that connects the primary reinforcement steel bar (3) to the frame column (1) along the circumferential direction and from the bottom side thereof.

4. The reinforcement structure according to claim 3, characterized in that: The secondary reinforcing steel bar (4) comprises a straight section (41) connected to the primary reinforcing steel bar (3), and a cantilevered section (42) which is concave downward and connected to the frame column (1).