Air pre-heater center cylinder sealing structure

By setting up a multi-layer sealing ring on the central cylinder housing and shaft of the rotary air preheater and filling the sealing fluid, the problem of lax sealing is solved, efficient sealing and convenient disassembly and assembly are achieved, and working efficiency is improved.

CN222103663UActive Publication Date: 2024-12-03GUODIAN LIAOCHENG POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420677738.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-03
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

The central cylinder sealing structure of the rotary air preheater has a problem of air leakage and dust leakage. The existing technology is complex and inconvenient to disassemble and assemble, which affects working efficiency.

Method used

A sealing structure including a central cylinder housing and an air preloader shaft is designed. By providing a multi-layer upper sealing ring on the central cylinder housing and a multi-layer lower sealing ring on the air preloader shaft and filling the sealing fluid, it ensures that the The sealing ring is always effective during rotation and is plugged and installed to facilitate disassembly and assembly and maintenance.

Benefits of technology

Effective dust and wind sealing is achieved, avoiding the impact of ash leakage on the environment and the hidden danger of hot air burning the thermal control signal line. At the same time, the disassembly and assembly process is simplified and the working efficiency is greatly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222103663U_ABST
    Figure CN222103663U_ABST
Patent Text Reader

Abstract

The utility model discloses a central cylinder sealing structure of an air preheater, belongs to the technical field of rotary air preheaters, and solves the problems of air leakage and ash leakage of the conventional central cylinder sealing structure. The central cylinder comprises a central cylinder shell and an air pre-heater rotating shaft, the central cylinder shell is arranged on the periphery of the air pre-heater rotating shaft in a sleeving mode, an upper supporting plate is arranged on the lower portion of the central cylinder shell, and at least one upper annular plate is arranged at the bottom of the upper supporting plate; a lower supporting plate is arranged on the air pre-heater rotating shaft below the center cylinder shell, at least two lower annular plates are arranged at the top of the lower supporting plate, and the lower annular plates are parallel to the air pre-heater rotating shaft; the space between every two adjacent lower ring plates is filled with sealing fluid, each upper ring plate is connected between every two adjacent lower ring plates in an inserted mode, and each upper ring plate is soaked in the corresponding sealing fluid. According to the sealing structure, the problem that the packing cannot be completely sealed can be solved, meanwhile, disassembly, assembly and maintenance are very convenient, and the working efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of rotary air preheaters, and more specifically, to a central tube sealing structure of an air preheater. Background Art

[0002] There are two types of air preheaters widely used in power station boilers: tubular and rotary. The heat transfer method of tubular air preheaters is: heat is continuously transferred from flue gas to air through the tube wall, which is an indirect heat transfer method. The rotary air preheater transfers heat in a regenerative manner, and flue gas and air flow alternately through the heating surface. When the flue gas flows through, heat is transferred from the flue gas to the heating surface, the temperature of the heating surface rises, and heat is accumulated; when the air flows through again, the heating surface releases the accumulated heat to the air. Among them, the rotary air preheater has a compact structure and a small footprint due to its high heat transfer surface density. Its volume is about 1 / 10 of that of a tubular air preheater of the same capacity, and it is widely used in boilers in thermal power plants.

[0003] However, the rotary air preheater also has its disadvantages, that is, the air leakage is large, so the sealing technology of the rotary air preheater is very important. The central tube seal of the rotary air preheater is generally a circle of packing seal, and the packing is fastened by the packing gland. After long-term operation, the packing is easily squeezed and deformed. The uneven deformation around the four sides causes the gap to become larger, resulting in air leakage and ash leakage.

[0004] After searching, it was found that the prior art with patent number: CN212746555U discloses a sealing structure for the hot and cold ends of the central tube of an air preheater. The sealing structure includes a central tube, the surface of which is sleeved with a mounting plate, the upper surface of which is plugged with a support tube, the surface of which is fixedly mounted with a fixed disk, the inner wall of which is respectively fixedly mounted with a limit disk and a plurality of springs, the inner walls of the first opening and the second opening are both fixedly connected with a soft packing layer, the ends of the plurality of springs away from the inner wall of the support tube are fixedly connected with a fixed tube, and the inner wall of the fixed tube is fixedly connected with a graphite packing. The sealing structure for the hot and cold ends of the central tube of the air preheater is provided with a support tube, a limit disk, a spring, a soft packing layer, a fixed tube and a graphite packing. In the process of the rotation of the central tube of the air preheater, the graphite packing is always in contact with the central tube due to the action of the spring, and no gap is generated, thereby avoiding the leakage of flue gas and achieving a good sealing effect.

[0005] The air preheater central tube sealing structure in the prior art has solved the air and dust leakage problems, eliminated the impact of dust leakage on the environment, and eliminated the hidden danger of leaked hot air scalding nearby thermal control signal lines. However, its structure is relatively complex, and the packing needs to be cut off during maintenance, which is troublesome to disassemble and assemble, seriously affecting work efficiency.

[0006] Therefore, it is necessary to design a new type of air preheater center tube sealing structure to solve the above-mentioned technical problems. Utility Model Content

[0007] The technical problem to be solved by the utility model is to provide an air preheater central tube sealing structure in view of the above-mentioned deficiencies in the prior art, which can solve the problem that the packing cannot be completely sealed, and at the same time is very convenient for disassembly, assembly and maintenance, thereby greatly improving work efficiency.

[0008] In order to achieve the above-mentioned purpose, the present disclosure provides an air preheater center tube sealing structure, including a center tube shell and an air preheater shaft, the center tube shell is sleeved on the periphery of the air preheater shaft, an upper support plate is provided at the lower part of the center tube shell, and at least one upper ring plate is provided at the bottom of the upper support plate, the upper ring plate is parallel to the center tube shell, and the upper ring plate is sleeved on the periphery of the center tube shell; a lower support plate is provided on the air preheater shaft below the center tube shell, and at least two lower ring plates are provided on the top of the lower support plate, the lower ring plates are parallel to the air preheater shaft, and the lower ring plates are sleeved on the periphery of the air preheater shaft; sealing fluid is filled between two adjacent lower ring plates, each of the upper ring plates is respectively inserted between two adjacent lower ring plates, and each of the upper ring plates is immersed in the sealing fluid.

[0009] Optionally, the heights of the two lower ring plates on both sides of the lower support plate are greater than the height of the lower ring plate on the inner side of the lower support plate.

[0010] Optionally, a filling port is provided on the upper support plate.

[0011] Optionally, the sealing fluid is high-temperature grease.

[0012] Optionally, the upper support plate and the center tube shell, and the lower support plate and the air preheater shaft are fixed by welding.

[0013] Optionally, one side of the central tube shell is connected to an exhaust pipe, and the exhaust pipe is connected to the flue gas side of the air preheater through an air supply pipe.

[0014] Optionally, the gas pipeline is provided with a gas valve.

[0015] Optionally, a cooling ring pipe is provided in the sealing fluid between two adjacent lower ring plates, the cooling ring pipe is connected to the upper ring plate, and the cooling ring pipe is respectively connected to a water inlet pipe and a water outlet pipe.

[0016] Optionally, the water inlet pipe is connected to a water pump via a hose, and the water outlet pipe is connected to a water pool via a hose.

[0017] Through the above technical scheme, that is, a sealing structure of the central tube of an air preheater provided by the present invention, an upper support plate and an upper ring plate are arranged on the central tube shell to form a multi-layer upper sealing ring, and a lower support plate and a lower ring plate are arranged on the air preheater shaft to form a multi-layer lower sealing ring, the upper sealing ring is inserted into the lower sealing ring and filled with sealing fluid, so that a multi-stage seal is formed between the central tube shell and the air preheater shaft, when the air preheater shaft rotates, the lower sealing ring rotates with it, and the upper and lower sealing rings are always in a sealed state, dust or wind cannot leak from between the central tube shell and the air preheater shaft, and the sealing fluid will not be squeezed, deformed and shrunk, which can solve the problem that the packing cannot be completely sealed, and realize the control of the dust leakage and air leakage problems of the central tube of the air preheater, thereby achieving the control of the influence of the dust leakage on the environment, eliminating the hidden danger of the leaked hot air scalding the nearby thermal control signal line, and at the same time, the upper sealing ring and the lower sealing ring are plug-in installed, when the central tube shell or the air preheater shaft is disassembled, the sealing structure can be disassembled, and the disassembly and maintenance are very convenient, which greatly improves the work efficiency.

[0018] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:

[0020] Figure 1 It is a structural schematic diagram of the utility model;

[0021] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;

[0022] Figure 3 for Figure 2 Schematic diagram of the enlarged structure at position A in the middle.

[0023] Description of Reference Numerals

[0024] 1-Center tube shell; 2-Air preheater shaft; 3-Upper support plate; 4-Upper ring plate; 5-Lower support plate; 6-Lower ring plate; 7-Sealing fluid; 8-Filling port; 9-Exhaust pipe; 10-Air pipe; 11-Air valve; 12-Cooling ring pipe; 13-Water inlet pipe; 14-Water outlet pipe; 15-Hose; 16-Cover plate. DETAILED DESCRIPTION

[0025] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0026] In the description of the present disclosure, it should be understood that the terms "upper", "lower" and the like indicate positions or location relationships based on Figure 1 The directions of the drawings shown are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, a specific orientation structure and operation, and therefore cannot be understood as limiting the present disclosure. In addition, the terms "inside" and "outside" refer to the inside and outside of the corresponding structural contours. In addition, the terms "first", "second", etc. are only used to distinguish one element from another element and do not have order and importance.

[0027] In the description of the present disclosure, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connect", "connected", and "installed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.

[0028] See also Figure 1-3The utility model provides an air preheater center tube sealing structure, comprising a center tube shell 1 and an air preheater shaft 2, wherein the center tube shell 1 is sleeved on the periphery of the air preheater shaft 2, which is a structure in the prior art and will not be described in detail here. An upper support plate 3 is provided at the lower part of the center tube shell 1, and the upper support plate 3 is perpendicular to the center tube shell 1. At least one upper ring plate 4 is provided at the bottom of the upper support plate 3. Preferably, there are two upper ring plates 4 in this embodiment, and the upper ring plates 4 are parallel to the center tube shell 1, that is, the upper ring plates 4 are perpendicular to the upper support plate 3, and the upper ring plates 4 are sleeved on the periphery of the center tube shell 1; a lower support plate 5 is provided on the air preheater shaft 2 below the center tube shell 1, and the lower support plate 5 is perpendicular to the air preheater shaft 2. There is a gap between the lower support plate 5 and the bottom surface of the center tube shell 1 to prevent the two from contacting and causing abnormal noise when the air preheater shaft 2 rotates. At least two lower ring plates 6 are provided on the top of the lower support plate 5. Preferably, there are three lower ring plates 6 in this embodiment. It should be noted that the number of lower ring plates 6 should be one more than the number of upper ring plates 4 to ensure that all upper ring plates 4 can be inserted between two adjacent lower ring plates 6. The lower ring plate 6 is parallel to the air preheater shaft 2, that is, the lower ring plate 6 is perpendicular to the lower support plate 5, and the lower ring plate 6 is sleeved on the periphery of the air preheater shaft 2 to ensure that when the air preheater shaft 2 rotates, there is no interference between the upper ring plate 4 and the lower ring plate 6; the two adjacent lower ring plates 6 are filled with sealing fluid 7, and the fluid seal method prevents dust and wind from passing through the fluid, achieving the purpose of efficient sealing. Each upper ring plate 4 is respectively inserted between two adjacent lower ring plates 6, and there is a gap between each upper ring plate 4 and each lower ring plate 6 to prevent the upper ring plate 4 and the lower ring plate 6 from interfering when the air preheater shaft 2 rotates, and each upper ring plate 4 is immersed in the sealing fluid 7 to ensure that the fluid can seal the joint between the upper ring plate 4 and the lower ring plate 6.

[0029] The sealing structure of the utility model is characterized in that an upper support plate 3 and an upper ring plate 4 are arranged on the central tube shell 1 to form a multi-layer upper sealing ring, and a lower support plate 5 and a lower ring plate 6 are arranged on the air preheater shaft 2 to form a multi-layer lower sealing ring. The upper sealing ring is plugged into the lower sealing ring and filled with a sealing fluid 7, so that a multi-stage seal is formed between the central tube shell 1 and the air preheater shaft 2. When the air preheater shaft 2 rotates, the lower sealing ring rotates with it, and the upper and lower sealing rings are always in a sealed state. Dust or wind cannot leak from between the central tube shell 1 and the air preheater shaft 2, and the sealing fluid 7 will not be squeezed, deformed or shrunk. The problem that the packing cannot be completely sealed can be solved, and the dust and air leakage problems of the central tube of the air preheater can be controlled, thereby achieving the control of the influence of the dust leakage on the environment and eliminating the hidden danger of the leaked hot air scalding the nearby thermal control signal line. At the same time, the upper sealing ring and the lower sealing ring are installed in a plug-in manner. When the central tube shell 1 or the air preheater shaft 2 is disassembled, the sealing structure can be disassembled, and the disassembly and assembly maintenance are very convenient, which greatly improves the work efficiency.

[0030] Preferably, the height of the two lower ring plates 6 on both sides of the lower support plate 5 is greater than the height of the lower ring plate 6 on the inner side of the lower support plate 5, and the outer lower ring plate 6 is higher. When the sealing fluid 7 rotates with the air preheater shaft 2, the sealing fluid 7 can be effectively prevented from flying out.

[0031] Preferably, a cover plate 16 is further provided on the top of the lower ring plate 6 outside the lower support plate 5, and the cover plate 16 extends above the upper support plate 3, and can block the gap between the upper support plate 3 and the lower ring plate 6 outside to prevent impurities from falling directly into the sealing fluid 7 through the gap. Specifically, the cover plate 16 is vertically welded to the top of the lower ring plate 6, which is easy to manufacture and has higher stability.

[0032] Preferably, a filling port 8 is provided on the upper support plate 3 to facilitate adding the sealing fluid 7 .

[0033] Preferably, the sealing fluid 7 is high-temperature grease, which has the characteristics of high temperature resistance and strong pressure resistance. It is applied to the air preheater to effectively extend its service life and also play a role in lubricating the upper ring plate 4 and the lower ring plate 6. In other embodiments, the sealing fluid 7 can also be water, and it is obvious that high-temperature grease has a better effect.

[0034] Preferably, the upper support plate 3 and the central tube shell 1, and the lower support plate 5 and the air preheater shaft 2 are fixed by welding, which can effectively improve the installation stability of the upper support plate 3 and the lower support plate 5, and ensure the sealing performance. Correspondingly, the upper ring plate 4 and the upper support plate 3, and the lower ring plate 6 and the lower support plate 5 are also fixed by welding, which is convenient to manufacture.

[0035] Preferably, an air extraction pipe 9 is connected to one side of the central tube housing 1, and the air extraction pipe 9 is connected to an external air extractor through an air delivery pipe 10. Furthermore, the air delivery pipe 10 can be a high temperature resistant hose, which is convenient for the arrangement of the pipeline and can also prevent the air delivery pipe 10 from being damaged and extend its service life.

[0036] The sealing structure of this embodiment is achieved by arranging an exhaust pipe 9 on one side of the central tube shell 1, and the exhaust pipe 9 is connected to the flue gas side of the air preheater through the air supply pipe 10. When the air preheater is operating normally, the flue gas side is under negative pressure, so that the flue gas in the central tube flows into the flue gas side preferentially, thereby sucking away the dust accumulated on the lower support plate 5, achieving the purpose of quickly cleaning the dust, and being more convenient to use.

[0037] Preferably, an air valve 11 is provided on the air delivery pipe 10 to facilitate the control of air path connectivity.

[0038] Preferably, a cooling ring pipe 12 is provided in the sealing fluid 7 between two adjacent lower ring plates 6. The cooling ring pipe 12 is a copper pipe with better heat exchange performance. The cooling ring pipe 12 is connected to the upper ring plate 4, and the cooling ring pipe 12 is connected with a water inlet pipe 13 and a water outlet pipe 14 respectively. The water inlet pipe 13 and the water outlet pipe 14 are fixed on the upper ring plate 4, and one end of the water inlet pipe 13 and the water outlet pipe 14 both penetrate the upper support plate 3 so as to connect the hose 15. The water inlet pipe 13 and the water outlet pipe 14 are fixed and sealed to the upper support plate 3 by welding. The design of the water inlet pipe 13 and the water outlet pipe 14 facilitates the provision of circulating cold water to the cooling ring pipe 12. Furthermore, the water inlet pipe 13 is connected to the water pump through the hose 15, and the water outlet pipe 14 is connected to the water tank through the hose 15. The hose 15 is a high temperature resistant hose to prevent damage and extend its service life. The way the hose 15 conveys water is convenient for the arrangement of pipelines.

[0039] The sealing structure of this embodiment, by setting a cooling loop 12 in the sealing fluid 7, can cool the sealing fluid 7 by circulating cooling water through the cooling loop 12 during actual application, thereby preventing the sealing fluid 7 from drying out or reducing due to high-temperature evaporation, thereby further extending the service life of the sealing structure.

[0040] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0041] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0042] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. An air preheater central tube sealing structure, comprising a central tube shell and an air preheater shaft, wherein the central tube shell is sleeved on the outer periphery of the air preheater shaft, and characterized in that: An upper support plate is provided at the lower part of the center tube shell, and at least one upper ring plate is provided at the bottom of the upper support plate, the upper ring plate is parallel to the center tube shell, and the upper ring plate is sleeved on the periphery of the center tube shell; a lower support plate is provided on the air preheater shaft below the center tube shell, and at least two lower ring plates are provided on the top of the lower support plate, the lower ring plates are parallel to the air preheater shaft, and the lower ring plates are sleeved on the periphery of the air preheater shaft; sealing fluid is filled between two adjacent lower ring plates, each upper ring plate is respectively inserted between two adjacent lower ring plates, and each upper ring plate is immersed in the sealing fluid.

2. The air preheater central tube sealing structure according to claim 1 is characterized in that: The heights of the two lower ring plates on both sides of the lower support plate are greater than the height of the lower ring plate on the inner side of the lower support plate.

3. The air preheater central tube sealing structure according to claim 1 is characterized in that: A cover plate is also provided on the top of the lower ring plate outside the lower support plate, and the cover plate extends to the top of the upper support plate.

4. The air preheater central tube sealing structure according to claim 1 is characterized in that: The upper supporting plate is provided with a filling port.

5. The air preheater central tube sealing structure according to claim 1 is characterized in that: The sealing fluid is high-temperature grease.

6. The air preheater central tube sealing structure according to claim 1 is characterized in that: The upper support plate and the central tube shell, as well as the lower support plate and the air preheater shaft are fixed by welding.

7. The air preheater central tube sealing structure according to claim 1 is characterized in that: One side of the central tube shell is connected with an exhaust pipe, and the exhaust pipe is connected with the flue gas side of the air preheater through an air supply pipe.

8. The air preheater central tube sealing structure according to claim 7 is characterized in that: The gas delivery pipe is provided with a gas valve.

9. An air preheater central tube sealing structure according to any one of claims 1 to 8, characterized in that: A cooling ring pipe is provided in the sealing fluid between two adjacent lower ring plates, the cooling ring pipe is connected to the upper ring plate, and the cooling ring pipe is respectively connected to a water inlet pipe and a water outlet pipe.

10. The air preheater central tube sealing structure according to claim 9, characterized in that: The water inlet pipe is connected to the water pump through a hose, and the water outlet pipe is connected to the pool through a hose.